HomeMy WebLinkAboutAgenda Packet 2026-04-01 Board of Directors General Manager
Jeff Bender TRUCKEE DONNERBrian C. Wright
Christa Finn Public Utility District Executive Leadership
Tony Laliotis Chad J. Reed
Courtney Murrell Mike Swanson
Steve Randall REGULAR BOARD MEETING Michael Salmon
11570 DONNER PASS ROAD, TRUCKEE, Steven Poncelet
CA 96161 Scott Crow
6:00 PM, Wednesday, April 1, 2026 Jillian Steward
AGENDA Martina Rochefort
1. Call to Order
2. Roll Call
3. Pledge of Allegiance
4. Changes to the agenda
5. Public Comment — This is time set aside for the public to address the Board on any
matter not on the agenda. Testimony related to any agendized matter should be
addressed at the time that that item is considered.
(The public may comment on any subject that is not on the agenda. Each
speaker will be limited to three minutes, but speaker time may be reduced at
the discretion of the Board President if there are a large number of speakers
on any given subject.)
DIRECTOR UPDATE
6. This item provides time for Directors to comment on any item within the purview of
the District.
DEPARTMENT UPDATES
7. This item provides time for each Department to update the Board of Directors.
PUBLIC HEARING
8. Public Hearing Related to Adoption of the Annual Electric and Water Standby
Charges
A. Conduct a public hearing at the regularly scheduled District Board Meeting
on April 1, 2026, at 6:OOPM, or as soon thereafter, to receive input on the
adoption of annual Electric and Water Standby Charges; and
a
.®. RMUL A SPECIAL I .i.....
LEADERSHHIPP FaU FORNNIION
P R_ nmd.u.........
... ..... ....
11570 Donner Pass Road,Truckee,CA 96161 Phone-530-587-3896-www.tdl)ud.org
Page 1 of 161
B. Adopt the following resolutions:
1. Resolution 2026-06 Continuing and Fixing Electric Standby Charges for
the Fiscal Year 2026-2027;
2. Resolution 2026-07 Continuing and Fixing Water Standby Charges for
the Fiscal Year 2026-2027;
3. Resolution 2026-08 Requesting Collection of Electric and Water
Standby Charges on County of Nevada Tax Roll; and
4. Resolution 2026-09 Fixing and Placing Electric and Water Standby
Charges on Placer County Tax Roll for Collection.
CONSENT CALENDAR
These items are generally interpreted as routine in nature or the subject matter has
been previously presented to the Board for discussion. They are intended to be acted
upon by the Board without additional discussion. Any Board Member may request an
item to be removed from the Consent Calendar for discussion prior to voting on the
Consent Calendar.
9. Consideration of Memorandum of Understanding with the Town of Truckee for
Aerial Mapping
Authorize the General Manager to execute a Memorandum of Understanding
with eight public agencies in the Tahoe Truckee area for Aerial Mapping
services in the amount of $16,392.47, plus a 10% change order allowance, for
a total not to exceed amount of$18,032.
10. Board Meeting Minutes
Consider approval of the March 4, 2026 Regular Board Meeting minutes
11. Treasurer's Report, April 2026
Consider Approval of the Treasurer's Report for April 2026 including:
a. Fund Balances for the Month of January 2026
b. Disbursements for the Month of February 2026
12. Resolution 2026-03 to Request Election Services
Consider adoption of Resolution 2026-03 declaring an election be held in the
District's jurisdiction; requesting the Board of Supervisors of Nevada and
Placer Counties, respectively, to consolidate this election with any other
election conducted on November 3, 2026; and requesting election services by
the respective County Clerks
Page 2 of 161
13. Resolution 2026-04 to Nominate Director John Pang of Tahoe City Public Utility
District to ACWA-JPIA Captive Insurance Company
Adopt Resolution 2026-04, Nominating Tahoe City Public Utility District Board
Director John Pang to the Association of California Water Agencies Joint
Powers Insurance Authority Captive Insurance Company Fund Board
14. Consideration of an Updated Firm Electric Service Allocation Assignment
Agreement with the City of Fallon
Authorize the Board President to execute an updated Firm Electric Service
Allocation Agreement with the City of Fallon
ACTION ITEMS
15. Consideration of a professional services contract with Probolsky Research for the
2026 District Customer Survey.
Authorize the General Manager to execute a professional services contract
with Probolsky Research for the 2026 TDPUD Customer Survey in the amount
of$29,750, plus a 10% change order authorization of $2,975, for a total not to
exceed contract amount of $32,725.
16. Consideration of award of contract with West Coast Paving for the District Asphalt
Replacement 2026 project
Authorize the General Manager to execute a construction services contract
and associated documents with West Coast Paving for the District Asphalt
Replacement 2026 project for the bid amount of $122,942, plus a change
order authorization of 10%, or $12,294, for a total contract authorization not to
exceed $135,236.
17. Consideration of Rejecting All Bids Received for Martis Valley Substation Civil
Construction - 2026
Reject all bids received for the Martis Valley Substation Civil Construction -
2026, and direct staff to rebid the project.
18. Consideration of Adopting Resolution 2026-05 Approving the Amended and
Restated Pooling Agreement with Utah Associated Municipal Power Systems
A. Adopt Resolution 2026-05 Authorizing and Approving the Amended and
Restated Power Pooling Agreement with the Utah Associated Municipal
Power Systems for the Pool Project; Authorizing Execution and
Delivery thereof; and related matters; and
Page 3 of 161
B. Authorize Board President to execute the Pooling Agreement
Certificate on behalf of the District
19. Consideration of Award of a Contract for the SCADA Reliability Improvement
Project Phase 6
Authorize the General Manager to execute a contract with Ruppert Inc. for the
SCADA Reliability Improvement Project Phase 6, in an amount of $1,387,753,
plus a ten percent change order allowance of $138,775, for a total
authorization not to exceed $1,526,528.
20. Approval of the Amended Development Agreements For the Soaring Ranch Phase
2 Utility Infrastructure Project and Soaring Ranch Offsite Infrastructure
Improvement Project with J-Marr II, LLC
A. Authorize the General Manager to execute the revised Development
Agreement and associated documents between J-Marr II LLC and the
District for the Soaring Ranch Phase 2 project, in substantially the
same form as presented; and
B. Authorize the General Manager to execute the revised Development
Agreement and associated documents between J-Marr II, LLC and the
District for the Soaring Ranch Offsite Infrastructure Improvement
project, in substantially the same form as presented
CLOSED SESSION
21. Closed Session Pursuant to Government Code Section 54956.9(d)(1), Conference
with Legal Counsel, Existing Litigation, Regina Cooley v. TDPUD et al, Superior
Court of the State of California, County of Nevada Case No. C00002116
22. Closed Session Pursuant to Government Code Section 54956.9(d)(1), Conference
with Legal Counsel, Existing Litigation - TDPUD and IBEW Local 1245 (Sheets),
Grievance #01-2025, C.S.M.C.S Case # ARB-24-0305
ADJOURNMENT
The agenda is available for review at the TDPUD Administrative Office and the District's
internet website. Posted on Friday, March 27, 2026.
Martina Rochefort, District Clerk
A copy of the agenda packet is available for public review, during normal business hours, at the District
Administrative Office located at 11570 Donner Pass Road. Public participation is encouraged. The
meeting location is accessible to people with disabilities. Every reasonable effort will be made to
accommodate participation of the disabled in all of the Districts public meetings. If particular
Page 4 of 161
accommodations for the disabled are needed (i.e. disability-related aids, or other services), please
contact the District Clerk at (530) 582-3923 or martinar@tdpud.org, at least 24 hours in advance of the
meeting.
Any person with a disability may submit a request for reasonable modification or accommodation to the
above-described means for accessing and offering comment at the meeting to Martina Rochefort, District
Clerk, or email at martinar@tdpud.org, who will swiftly resolve such a request.
Page 5 of 161
AGENDA ITEM #7
Public Utility District
MEETING DATE: April 1, 2026
TO: Board of Directors
FROM:
SUBJECT: This item provides time for each Department to update the Board of
D i recto rs.
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
BACKGROUND:
Department updates are attached for review.
ANALYSIS AND BODY:
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
2. Provide a healthy and safe work environment for all District employees.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
5. Manage the District in an environmentally sound manner.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
2. Environmental Stewardship: Create a sustainable resilient environment for all our
communities.
3. Engage with our customers and communities in a welcoming and transparent way to
identify opportunities.
4. Modernize the utility and add value to our communities through collaboration and
innovation.
5. Developing an inclusive culture drives organizational integration and success.
Page 1 of 2
Page 6 of 161
FISCAL IMPACT:
There is no fiscal impact associated with this item.
ATTACHMENTS:
1. Electric Engineering Operations - Department Update
2. Water - Department Update
3. Human Resources & Risk Management - Department Update
4. PIO & Strategic Affairs - Department Update
Page 2 of 2
Page 7 of 161
TRUCKEE DONNER
Public Utility District
MEETING DATE: April 1, 2026
FROM: Mike Swanson, Director of Electric Operations & Engineering
SUBJECT: Electric Engineering & Operations Department Update
EE&O Summary
The Electric Engineering & Operations (EE&O) Department experienced favorable
weather conditions during this reporting period, which allowed crews to make strong
progress on smaller reliability projects and proactively prepare for the upcoming
construction season. These efforts position the District to efficiently execute planned
system hardening and capital improvement work in 2026.
Reliability and Metrics
The District continues to monitor reliability performance using IEEE 1366 metrics,
including SAIFI, SAIDI, and CAIDI. Staff tracks outage causes and trends to identify
areas for improvement.
February System Metrics (TDPUD System Only)
2026 YTD TDPUD S stem Only Excludes Power Provider
YTD 26 YTD 25 Change % Change
SAIFI 0.016 0.611 -0.595 -97%
SAIDI 2.684 50.460 -47.776 -95%
CAIDI 167.750 82.586 250.336 103%
February 2026 TDPUD System Only (Excludes Power Provider)
Feb-26 Feb-25 Change % Change
SAIFI 0.008 0.358 -0.350 -98%
SAIDI 1.425 34.160 -32.735 -96%
CAIDI 178.125 95.438 82.687 87%
Power Provider
Feb-26
SAIFI 0.035
SAIDI 1.639
CAIDI 47.483
System totals shown above include only outages on the TDPUD system and exclude
power provider events.
Page 1 of 3
Page 8 of 161
• SAIFI and SAIDI improved significantly compared to February 2025, while CAIDI
increased due to a small number of longer-duration outages affecting relatively
few customers.
Grid Modernization And Technology Deployment
From March 17 through March 19, the District completed Phase 1 installation of
Gridware devices, deploying:
• 376 Gridware units
• 3 Weather Stations
Installations were completed on the following circuits:
• Truckee 5 — Prosser Lake View
• Donner Lake 2 — South Shore and West End of Donner Lake
• Martis Valley 1 — West Sierra Meadows
This deployment represents a significant milestone in enhancing situational awareness,
wildfire risk mitigation, and outage response capabilities. Data from these devices will
support both real-time operations and long-term system planning.
Vegetation Management
Vegetation crews continued hazard tree mitigation efforts, focusing on high-risk circuits
and areas impacted by storms. Work was prioritized to address trees with potential
impact to primary lines, reduce outage risk, address trimming needs for system
hardening projects in advance of line construction work, and leverage LiDAR data to
address identified risk areas. Crews have also started the District's annual vegetation
trimming cycle.
System Hardening Program
Northwoods Project
• Construction activities have resumed on the Northwoods System Hardening
Project
• The District will leverage the Board-approved Dock Crew to support construction
efforts and improve project delivery efficiency
Additional System Hardening
• Four additional system hardening projects are currently in the final phase of
engineering
• These projects support wildfire mitigation and system resiliency priorities as
outlined in the approved FY 2026 budget.
Page 2 of 3
Page 9 of 161
Capital Projects And Procurement
Martis Valley Substation
• Bids will be discussed as an Action Item during this Board meeting
SRIP 6 — System Hardening Project
• The Line Construction portion of SRIP 6 has been issued for bid as a lump sum
contract.
• Bid results and award recommendations are anticipated for the May Board
Meeting.
Key Focus Areas
The Electric Department remains focused on the following strategic priorities:
• Electric System Master Plan Development and Implementation
Continued advancement of the 2026 Electric System Master Plan, which
identifies system constraints, prioritizes capital investments, and aligns long-
term planning with reliability, wildfire mitigation, and projected growth.
• System Hardening and Wildfire Mitigation
Execution of system hardening projects, including Northwoods and upcoming
projects in final engineering, to reduce wildfire risk and improve system
resiliency.
• Grid Modernization and Technology Integration
Utilizing Gridware devices and weather stations to monitor system conditions
and implement protocols to address identified issues.
• Reliability Performance Improvement
Ongoing focus on improving SAIFI, SAIDI, and CAIDI through targeted
investments, operational efficiencies, and proactive maintenance programs.
• Capital Project Execution and Delivery
Advancing key capital projects, including the Martis Valley Substation and
SRIP 6, ensuring projects are delivered efficiently, safely, and aligned with
budget and schedule expectations.
Page 3 of 3
Page 10 of 161
TRUCKEE DONNER
Public Utility District
MEETING DATE: April 1, 2026
FROM: Chad J. Reed, Water Utility Director
SUBJECT: Water Department Update
Water Supply
Water production for the early winter months continues to follow expected seasonal
patterns. As shown in Figure 1, January and February 2026 production declined compared
to the same period in 2025. Total pumping decreased by 7% in January and 8% in February,
driven by mild winter conditions and continued customer conservation.
The milder weather also resulted in fewer frozen pipe service calls, contributing to lower
operational demand. When compared to the average production of the past three Januarys
and Februarys, total pumping in 2026 was 10% and 13% lower, respectively, reinforcing the
trend of reduced early season demand.
Calendar year 2025 (January—December) pumping totals also remained lower overall. Total
production for 2025 was 4% below 2024, and 8% below the running three-year average,
reflecting sustained water use efficiency among customers.
Water Production(Gallons)
x,nonam
MEN
zoo,000poo
P
I SOA00.000 a� ,�
3ao.am,aoo �b71p �� +i r�
by
tiN,L00p00 ,Pf
O O O
In eaN n_.i. 401 I—, Norembe, Ott11 1.
■202G P,o.dia •2025 N.dtl tl 2 3 Yesr A—p
Figure 12026 Water Demand for Truckee Donner PUD
Page 11 of 161
System Updates
On February 11, a southbound vehicle lost control near Prosser Heights Well, left the
roadway, crossed the K-Rail, and impacted the District building. The wall that was struck
housed the SCADA cabinet, which is no longer able to be secured. Staff has coordinated
with the District's insurance provider, initiated a structural engineering evaluation, and met
with Water Department Motor Control and SCADA personnel to assess repair needs. Staff
anticipates returning to the Board to request authorization to hire a contractor to complete
the necessary building and equipment repairs.
Field crews continue to respond efficiently to system leaks to reduce water loss and
maintain system reliability. Most recently, the Distribution Crew repaired a mainline leak
along Northwoods Blvd in the Tahoe Donner community.
�v
is
sA�,
s:
3
Figure 2Photos of recent leak response along Northwoods Blvd in the Tahoe Donner Community.Crews continue to repair
leaks quickly to reduce water losses and maintain service reliability.
Page 12 of 161
2026 Construction Season Preparation
The Water Department is actively preparing for the 2026 construction season and
advancing several capital projects for the upcoming season, some will need board review,
bidding, and award.
Hirschdale Pipeline Construction Project
The Hirschdale Pipeline Project, awarded at the November 2025 Board Meeting, remains
on schedule to begin construction in May 2026.
Martis Woods Pump Station Project
At the January 21 Board Meeting, staff requested authorization to update the engineering
design for the Martis Woods Pump Station. This design work is essential to maintain the
project's readiness for the 2026 construction season and to support long-term system
reliability.
Pipeline Rehabilitation Project
Staff presented this project to the Board in February.The rehabilitation effort includes slip-
lining several pipeline segments where open-cut construction is not feasible. Two of the
identified segments involve creek crossings, and another crosses beneath Highway 89.
2026 Pipeline Replacement Project
This project was also brought forward in February. The scope includes replacement of the
remaining pipeline segments serving the Ski Bowl Condominiums. Previous phases were
completed in coordination with the Ski Lodge facility improvements, and this project will
finalize the remaining system upgrades.
Page 13 of 161
TRUCKEE DONNER
Public Utility District
MEETING DATE: April 1, 2026
FROM: Jillian Steward, HR & Risk Director
SUBJECT: Human Resources and Risk Department Update
Staffing
• Vehicle Maintenance Foreman — Interviewing
• Seasonal Water Helper Positions — Application accepted until 4/01
Culture
• 4/01 — April Birthday and Anniversary Celebration
• 4/22 — Earth Day Celebration
Core Value Recognition
• Mark Costa, Forrest Heston, Matt Wellise — Accountability
Staff Development
• 4/23 — De-escalation Skills Training
Charging Futures Forward
• 4/23 — Sierra High Speaking Event
Charging Communities Forward
In March, TDPUD donated a total of $430 to support the Sierra Community
House Hunger Relief Program/Empty Bowls Event through employee donations
to our Charging Communities Forward Fund. This donation equals about 180
meals for our community.
Safety and Risk
• 4/15 — Bloodborne Pathogens Training
• 4/30 — Safety Committee Meeting
Page 1 of 1
Page 14 of 161
TRUCKEE n F
Public
MEETING DATE: April 1, 2026
FROM: Steven Poncelet, Public Information & Strategic Affairs
Director
SUBJECT: PIO and Strategic Affairs Department Update
Communications and Outreach
District staff continue to finalize and implement the 2026 Public Information and
Communication Plan which includes District communications themes and annual
campaigns. Communications for the first quarter of the year have included press releases
covering Board meeting recaps, a joint release with Truckee Fire on Adopt-a-Hydrant, and
announcing the District's award of a Certificate of Achievement for Excellence in Financial
Reporting from the Government Finance Officers Association for the fifth year in a row.
Overall communications have covered promoting District customer engagement tools,
supporting our partner agency Nevada County with their wildfire mitigation outreach,
educating on staff's behind-the-scenes work at events like Capitol Day, promoting
scholarship applications, and "Living the Mountain Lifestyle" topics, like winter storm prep
(when there was snow). Internally, staff's major focus is on the new website, which is
moving along nicely and is planned to be released in April. Fortunately, there was very little
outage communications so far this winter due to excellent electric system reliability
performance.
Strategic Affairs
District staff continue to engage with ourjoint-action groups (CMUA, NCPA, ACWA, CSDA,
UAMPS, and APPA)and sister utilities as the 2026 legislative session remains in full swing.
Following up on the NCPA Strategic Issues Conference and CMUA/NCPA Capitol Day
events in January in Sacramento, Staff have been working on a variety of issues including
the SWRCB Wildfire General Order, the CARB Advanced Clean Fleets Rule, wildfire
liability, electric market regionalization, Making Conservation a California Way of Life
regulation, and potential future water quality regulations for PFAS/PFOA and arsenic. Staff
did attend CMUA's annual meeting in March where leaders from California's electric and
water utilities/industry meet to discuss key issues, industry trends, and to share ideas for
future action.
Internally, led by the Utilities Resource Strategy Manager, staff are working to capture in
one place the District's major electric and water regulatory reporting requirements along
with the responsible agency, deadlines, District staff, data sources, and business process
needed to comply. The goal for 2026 is to meet all regulatory reporting requirements while
documenting/streamlining the process for future compliance.
Staff have been asked by UAMPS to present at their meeting in St. George, Utah on April
22nd for the Municipal Toolkit Workshop. The title of the Session is Resilience in Action:
Strengthening Wildfire Preparedness. Staff have also been asked by the Wildfire Safety
Page 1 of 2
Page 15 of 161
Advisory Board (WSAB) to present on a panel in May in Sacramento on wildfire mitigation
and risk reduction. Staff will be attending the NCPA/NWPPA Federal Policy Conference in
Washington, D.C. on April 26-30th.
Page 2 of 2
Page 16 of 161
AGENDA ITEM #8
Public Utility District
MEETING DATE: April 1, 2026
TO: Board of Directors
FROM: Melanie Rives, Finance & Accounting Manager
Michael Salmon, Chief Financial Officer
SUBJECT: Public Hearing Related to Adoption of the Annual Electric and Water
Standby Charges
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
A. Conduct a public hearing at the regularly scheduled District Board Meeting on April
1, 2026, at 6:OOPM, or as soon thereafter, to receive input on the adoption of annual
Electric and Water Standby Charges; and
B. Adopt the following resolutions:
1. Resolution 2026-06 Continuing and Fixing Electric Standby Charges for the
Fiscal Year 2026-2027;
2. Resolution 2026-07 Continuing and Fixing Water Standby Charges for the Fiscal
Year 2026-2027;
3. Resolution 2026-08 Requesting Collection of Electric and Water Standby
Charges on County of Nevada Tax Roll; and
4. Resolution 2026-09 Fixing and Placing Electric and Water Standby Charges on
Placer County Tax Roll for Collection.
BACKGROUND:
It is the Board's purview to conduct public hearings. At the March 4, 2026 meeting, the
Board set a public hearing to be held on April 1, 2026, to receive written and oral
comments from the public regarding the adoption of certain resolutions
establishing/continuing and collecting electric and water standby charges for the 2026-
2027 property tax year. The Public Hearing was advertised in the Sierra Sun
Newspaper on March 20 and 27, 2026. Board action is required to adopt electric and
water standby charges for the 2026-2027 property tax year.
Each year, the Board is required to adopt resolutions establishing and setting electric
and water standby charges, and to request Nevada and Placer Counties collect the
charges as part of the annual property tax bills.
Page 1 of 3
Page 17 of 161
Standby charges have been assessed on vacant parcels in the District since 1975.
These annual charges recoup the District's operating and maintenance costs of the
electric and water distribution facilities from parcel owners, who benefit from their
vacant lot being in proximity to the distribution facilities.
ANALYSIS AND BODY:
The current Electric Standby Charge applies to vacant parcels with a District electric
distribution line installed along an easement or along a public road or right of way,
within 200 feet of the nearest exterior boundary line of any such parcel. The Electric
Standby Charge is $20.00 per year for each parcel 1 acre or larger, or $10.00 per year
for each parcel less than 1 acre.
The current Water Standby Charge applies to vacant parcels with a District water
distribution line not less than two inches in diameter installed within 100 feet of the
nearest exterior boundary line of any such parcel. The current Water Standby Charge is
$80.00 per parcel per year.
Standby rates have not been modified in many years. No changes to Standby Charge
rates is recommended for 2026/2027. The qualifying parcel lists are currently in
preliminary draft form. Final lists will be on record with Placer and Nevada Counties
and the District Clerk's Office.
Staff recommends renewing the existing Electric and Water Standby Charges on
vacant parcels in the District for 2026/2027.
GOALS AND OBJECTIVES:
District Code 1.05.020 Objectives:
1. Responsibly serve the public.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1.05.030 Goals:
1. Manage for Financial Stability and Resiliency
3. Engage with our customers and communities in a welcoming and transparent way to
identify opportunities.
4. Take the best of private sector thinking to modernize the utility and add value to our
communities.
FISCAL IMPACT:
The estimated standby revenue for Property Tax Year 2026-2027 is $15K for Electric
and $95K for Water, consistent with budgeted revenue in the approved FY26
Budget. There are an estimated 1400 parcels in Nevada County and 60 parcels in
Placer County subject to Standby Charges.
Page 2 of 3
Page 18 of 161
ATTACHMENTS:
1. R2026-06 Standby Resolution-electric
2. R2026-07 Standby Resolution-water
3. R2026-08 Standby Resolution, Nevada County
4. R2026-09 Standby Resolution, Placer County
Page 3 of 3
Page 19 of 161
Public Utility District
Resolution No. 2026-06
Continuing and Fixing Electric Standby Charges
for the Fiscal Year 2026-2027
WHEREAS, on February 18, 1975, the Board of Directors of the Truckee Donner Public Utility District duly
adopted Ordinance No. 7501 fixing Electric Standby Charges on lands within the District boundaries and
providing a means for collection thereof; and
WHEREAS, on August 16, 1982, the Board of Directors adopted Resolution No. 8240 amending Ordinance
7501 to include Placer as well as Nevada County; and
WHEREAS, Ordinance No. 7501 prescribes that implementation of the actual charges shall be made by
resolution of the Board for each fiscal year.
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility
District as follows:
1. The Electric Standby Charge for the fiscal tax year 2026-2027 shall be the sum of$20 for any parcel
consisting of one acre or more, and the sum of$10 for any parcel of less than one acre.
2. The District shall determine the lands to be affected thereby for the current fiscal year and the charges to
be assessed, levied and collected on the lands and parcels, and upon the completion thereof a
subsequent Resolution shall be approved fixing and placing the electrical standby charges on the District
tax roll for collection by Placer and Nevada Counties.
3. Certified copies of this Resolution are to be forwarded along with the direct charges to the County
Auditor of the County of Placer and the County Auditor of the County of Nevada.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting
held within the District on April 1, 2026 by the following vote:
AYES:
NOES:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Tony Laliotis, President
ATTEST:
Brian Wright, General Manager
Page 20 of 161
TRUCKEE DONNER
Public Utility Di strict A
Resolution No. 2026-07
Continuing and Fixing Water Standby Charges
For the Fiscal Year 2026-2027
WHEREAS, on February 18, 1975, the Board of Directors of the Truckee Donner Public
Utility District duly adopted Ordinance No. 7501 fixing Water Standby Charges on lands
within the District boundaries and providing a means for collection thereof; and
WHEREAS, on August 16, 1982, the Board of Directors adopted Resolution No. 8240
amending Ordinance 7501 to include Placer as well as Nevada County; and
WHEREAS, on March 18, 1991, the Board of Directors adopted Ordinance No. 9103
amending Ordinance No. 7501 and Resolution No. 8240 to the extent that such ordinance
and resolution concern the fixing of Water Standby Charges in the County of Nevada; and
WHEREAS, on April 8, 1991, the Board of Directors adopted Ordinance No. 9105
amending Ordinance No. 7501 and Resolution No. 8240 to the extent that such ordinance
and resolution concern the fixing of water standby charges in the County of Placer; and
WHEREAS, Ordinance No. 7501 prescribes that implementation of the actual charges
shall be made by resolution of the Board for each fiscal tax year; and
WHEREAS, fees authorized by this resolution shall not be charged, assessed, levied and
collected in the District's Donner Lake or Glenshire Service areas.
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner
Public Utility District as follows:
1. The Water Standby Charge for the fiscal tax year 2026-2027 shall be the sum of$80 for
all parcels regardless of size.
2. The District shall determine the lands to be affected thereby for the current fiscal year,
which shall not include lands in Donner Lake or Glenshire Service areas, and the charges
to be assessed, levied and collected on the lands and parcels, and upon the completion
thereof a subsequent Resolution shall be approved fixing and placing the Water Standby
Charges on the District tax roll for collection by Placer and Nevada Counties.
3. Certified copies of this resolution be forwarded to the County Auditor of the County of
Placer and the County Auditor of the County of Nevada.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility
District at a meeting held within the District on April 1, 2026 by the following vote:
AYES:
NOES:
ABSENT:
Page 1 of 2
Page 21 of 161
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Tony Laliotis, President
ATTEST:
Brian Wright, General Manager
2
Page 22 of 161
iUCKEE r
■
ublic Utility District
Resolution No. 2026-08
Fixing and Placing Electric and Water Standby
Charges on County of Nevada Tax Roll for Collection
WHEREAS, on February 18, 1975, the Board of Directors of the Truckee Donner Public
Utility District duly adopted Ordinance No. 7501 fixing Electric and Water Standby Charges
on lands within the District boundaries and providing a means for collection thereof; and
WHEREAS, on August 16, 1982, the Board adopted Resolution No. 8240 amending
Ordinance 7501 to include Placer as well as Nevada County; and
WHEREAS, on March 18, 1991, the Board of Directors adopted Ordinance No. 9103
amending Ordinance No. 7501 and Resolution No. 8240 to the extent that such ordinance
and resolution concern the fixing of water standby charges in the County of Nevada; and
WHEREAS, on April 1, 2026, the Board adopted Resolution No. 2026-06 and 2026-07
continuing and fixing electric and water standby charges pursuant to Ordinances 7501,
9103 and 9105 for the fiscal tax year 2026-2027; and
WHEREAS, the District has now determined the lands affected thereby and the charges to
be assessed, levied and collected on the lands and parcels; and
WHEREAS, by Resolution No. 9723 adopted November 5, 1997, the Board of Directors of
the Truckee Donner Public Utility District approved execution of a continuous Standard
Form Tax Collection Services Contract with the County of Nevada.
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner
Public Utility District as follows:
1. That the Board of Supervisors of the County of Nevada, State of California, levy
the Standby Charges against the parcel numbers (APN) of record listed on the
computer itemization of unimproved parcels kept and maintained in the
Administrative Services Department of the District and made a part hereof by
reference, and that the County Auditor and Tax Collector be instructed to levy and
collect said charges in the same manner as County taxes as by law and in said
ordinance provided. Upon completion and correction of the current list through
June 30, 2026, a copy will be forwarded to the Auditor Controller of the County.
Page 1 of 2
Page 23 of 161
2. The District warrants and represents that charges imposed by the District and
being requested to be collected by Nevada County comply with all requirements of
state law, including but not limited to Articles XIIIC and XIIID of the California
Constitution (Proposition 218).
3. That a certified copy of this resolution be forwarded to the County Auditor of the
County of Nevada.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility
District at a meeting held within said District on April 1, 2026 by the following vote:
AYES:
NOES:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Tony Laliotis, President
ATTEST:
Brian Wright, General Manager
Page 2 of 2
Page 24 of 161
Public
Resolution No. 2026-09
Requesting Collection of Electric and Water Standby
Charges on Placer County Tax Roll
WHEREAS, the Truckee Donner Public Utility District requests the County of Placer collect
on the County tax rolls certain charges which have been imposed by the District pursuant
to Resolution No. 2026-06 and 2026-07 attached, and
WHEREAS, the County has required as a condition of the collection of said charges that
the District warrant the legality of said charges and defend and indemnify the County from
any challenge to the legality thereof.
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner
Public Utility District as follows:
1. The Auditor-Controller of Placer County is requested to attach for collection on
the County tax rolls those taxes, assessments, fees and/or charges, attached
hereto;
2. The District warrants and represents that the taxes, assessments, fees and/or
charges imposed by the District and being requested to be collected by Placer
County comply with all requirements of state law, including but not limited to
Articles XIIIC and MID of the California Constitution (Proposition 218);
3. The District releases and discharges County, and its officers, agents and
employees from any and all claims, demands, liabilities, costs and expenses,
damages, causes of action, and judgments, in any manner arising out of the
collection by County on the property tax toll of any taxes, assessments, fees
and/or charges on behalf of District;
4. In consideration for the County's collection of the charge through the County's
property tax roll, the District agrees to and shall defend, indemnify and hold
harmless the County, its officers, agents and employees (the "Indemnified
Parties") from any and all claims, demands, liabilities, costs and expenses,
damages, causes of action, and judgments, in any manner arising out of the
collection by County of any of District's said taxes, assessments, fees and/or
charges requested to be collected by County for District, or in any manner
arising out of District's establishment and imposition of said taxes, assessments,
fees and/or charges. District agrees that, in the event a judgment is entered in a
Page 1 of 2
Page 25 of 161
court of law against any of the Indemnified Parties as a result of the collection of
one of District's taxes, assessments, fees and/or charges,the County may offset
the amount of the judgment from any other monies collected by County on behalf
of District, including property taxes;
5. The District agrees that its officers, agents and employees will cooperate with
the County in answering questions referred to District by County from any person
concerning the District's taxes, assessments, fees and/or charges, and that
District will not refer such persons to County officers and employees for
response; and
6. The District agrees to pay the County for the reasonable and ordinary charges to
recoup its costs of placement and collection on the tax rolls at the agreed upon
rate of 1% of the taxes, assessments, fees and/or charges, as provided by
Government Code section 29304 and 51800.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility
District at a meeting held within said District on April 1, 2026 by the following vote:
AYES:
NOES:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Tony Laliotis, President
ATTEST:
Brian Wright, General Manager
Page 2 of 2
Page 26 of 161
AGENDA ITEM #9
Public Utility District
MEETING DATE: April 1, 2026
TO: Board of Directors
FROM: Scott Crow, IT Director/CIO - Assistant General Manager
SUBJECT: Consideration of Memorandum of Understanding with the Town of
Truckee for Aerial Mapping
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Authorize the General Manager to execute a Memorandum of Understanding with eight
public agencies in the Tahoe Truckee area for Aerial Mapping services in the amount of
$16,392.47, plus a 10% change order allowance, for a total not to exceed amount of
$18,032.
BACKGROUND:
About every five years eight area public agencies (Town of Truckee, North Tahoe
Public Utility District, Northstar Community Services District, Tahoe City Public Utility
District, Truckee Donner Public Utility District, Truckee Sanitary District, Truckee Tahoe
Airport District, and Truckee Fire Protection District) have collaborated and leveraged
resources to reduce the duplication of effort for similar data collected by each
agency. This has resulted, for aerial mapping, in improved data and resource costs for
our shared constituents.
ANALYSIS AND BODY:
Updated aerial orthophotos provides an accurate, current visual foundation for
planning, operations, and asset management. It helps to identify new construction,
vegetation encroachment, access constraints, and changes in land use. Up-to-date
orthophotography also supports more efficient project design. Engineers can perform
preliminary layouts, estimate quantities, and assess site conditions with fewer field
visits, saving time and reducing costs.
The project also provides an updated elevation model and contours, which are critical
for an accurate understanding of terrain, drainage patterns, and slope conditions that
directly affect infrastructure performance and design. When contours are outdated,
even small changes in topography caused by development, erosion, or natural events
can lead to design errors.
Additionally, the project will provide updated pavement and building footprint GIS data,
Page 1 of 3
Page 27 of 161
which offers current context for the location of infrastructure relative to the built
environment. This information is important for the engineering department during the
planning stage and assists operations during the construction of service locations,
water mains, and primary lines.
The project is scheduled to commence in April 2026 with the Town of Truckee being the
lead agency for procurement. See the Memorandum of Understanding in Attachment
1.
GOALS AND OBJECTIVES:
District Code 1.05.020 Objectives:
1. Responsibly serve the public.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1.05.030 Goals:
1. Manage for Financial Stability and Resiliency
2. Environmental Stewardship: Create a sustainable resilient environment for all our
communities.
FISCAL IMPACT:
The estimated District costs are based upon an estimated project total of
$130,850. The cost of the work will be divided among the agencies based on the area
of each agency. TDPUD is sharing portions of the project area with the Town of
Truckee, Truckee Sanitation District, and Truckee Fire Protection District, which
reduces the overall cost. The Town of Truckee is the lead procurement agency and
may approve change orders collectively not exceeding 10 percent of total project cost.
Agency Percentage of Total Cost To
Project Cost Agency
Truckee Donner Public Utility 12.53 $16,392.47
District
Truckee Sanitary District 12.53 $16,392.47
Town of Truckee 12.53 $16,392.47
Truckee-Tahoe Airport District 5.94 $7,771.64
Northstar Community Services 10.51 $13,746.87
District
North Tahoe Public Utility District 6.13 $8,020.31
Tahoe City Public Utility District 17.18 $22,478.45
Truckee Fire Protection District 22.66 $29,655.30
A similar agenda item was previously approved in May 2021 and capitalized in service
in June 2022 with a District portion of$25,839 and will be fully depreciated in April
2027. The agenda item amount of$16,392 (up to $18,032 including contingency) is
Page 2 of 3
Page 28 of 161
recommended to be capitalized and depreciated over five years, the estimated life-
cycle of the product received. Capital cost split 50%/50% between electric and water
utilities. Funding for the item is provided from the Information Technology FY26 capital
budget's contingency of$70,000. This is the first use of IT's capital contingency budget
for FY26, leaving $53,608 remaining in IT capital contingency.
ATTACHMENTS:
1. 2026_02_19_MOU Aerial Mapping Final
Page 3 of 3
Page 29 of 161
MEMORANDUM OF UNDERSTANDING
This Memorandum of Understanding ("MOU") is entered on the day of
, 2026 ("Effective Date"), between the Town of Truckee ("Town"), North
Tahoe Public Utility District ("NTPUD"), Northstar Community Services District ("NCSD"), Tahoe
City Public Utility District ("TCPUD"), Truckee Donner Public Utility District ("TDPUD"), Truckee
Sanitary District ("TSD"), Truckee-Tahoe Airport District ("TTAD"), and Truckee Fire Protection
District ("TFPD"), each individually a "Party" and collectively "Parties", to establish the terms and
conditions under which the Parties will cooperatively acquire digital orthophotography and LiDAR
data for the Truckee-North Tahoe region ("Project").
RECITALS
1. The Parties are all California public agencies possessing the authority to make the most
efficient use of their respective powers, and to cooperate with other public entities to obtain
mutual advantage and best meet the needs of local communities.
2. The Parties all have various needs for digital orthophotography and LiDAR data covering
their respective territories or service areas, and wish to collaborate in obtaining such
products in order to reduce the costs of doing so.
NOW THEREFORE, the Parties agree as follows:
1. PRODUCTS TO BE OBTAINED:
Town shall perform all Project management, and shall award a contract to Digital Mapping Inc.
("DMI") for the Project, comprised of the following (collectively, the "Work
Product"):
1.1 Aerial Photography Collection Deliverable:
Electronic Format: % mile x '/4 mile square (no overlap) tiles.
Tiff images with accompanying Tiff World File.
1.2 LiDAR Collection Deliverable
Contour Deliverable: Electronic Format: % mile x % mile (no overlap) tiles,
uninterrupted elevation-value attributed polylines. AutoCAD and shapefile Format.
Lidar Point Data Deliverable (Raw & Surface): Electronic Format: Bare Earth and
First Return elevation-value attributed points, LAS Format using the ASPRS
Guidelines and Standard LIDAR Point Classes set forth in the following publication;
ASPRS LAS Specification Version 1.4 — R13 (ensure legacy compatibility 1.1-1.
3).
1.3 Survey Control Deliverable
Electronic Format: Elevation-value attributed points. AutoCAD DXF Format.
Page 30 of 161
Excel Spreadsheet of every control point used in this project, with their
corresponding ID, X, Y, Z, X error, Y error, Z error, Parent Control ID.
1.4 GIS Feature Data Collection Deliverable:
Two Formats: ESRI Shapefile polygon and AutoCAD DXF format for features:
Building Footprint (Polygon), Pavement Surface (Polygon), and Water bodies
(Polygon).
2. OWNERSHIP OF WORK PRODUCT: Each Party will own the Work Product described in
Section 1, provided that derivative works or information produced by a Party from the Work
Product shall be owned solely by that Party Each Party may make such use of the Work
Product as it wishes, which uses shall not require the consent of any other Party.
3. COST SHARING: The cost of the Work Product listed in Section 1 herein shall be divided
among the Parties as set forth in the following table: the estimated costs listed below are
based upon an estimated Project cost of$130,850.00. In the event that the actual cost is
more or less than this amount, the Parties' respective cost shares shall be determined
using the percentages listed in the table. Town may approve change orders collectively
not exceeding 10% of the total Project cost. No change order(s) in excess of this amount
shall be approved without the written consent of all Parties.
Agency Percentage Cost
of Total Project Cost To Agency
Truckee Donner Public Utility 12.53 $16,392.47
District
Truckee Sanitary District 12.53 $16,392.47
Town of Truckee 12.53 $16,392.47
Truckee-Tahoe Airport District 5.94 $7,771.64
Northstar Community Services 10.51 $13,746.87
District
North Tahoe Public Utility District 6.13 $8,020.31
Tahoe City Public Utility District 17.18 $22,478.45
Truckee Fire Protection District 22.66 $29,655.30
4. PAYMENT SCHEDULE: Upon Town's receipt of the invoice(s)for the Project, Town shall
provide copies of such invoice(s)to each Party, together with a calculation of each Party's
Page 31 of 161
share. Each Party shall pay its share of each invoice to Town within thirty (30) days of
receipt of the invoice.
5. RISK AND INDEMNITY: Each Party using Work Product shall do so at the sole risk of
that Party; and each other Party shall not be liable to any other Party for any injury, loss,
or damage to any persons or property in any manner arising from the Work Product or the
use thereof. Each Party shall defend, indemnify, and hold harmless the other Parties from
and against any and all claims, demands, losses, damages, liabilities, fines, penalties,
charges, administrative and judicial proceedings and orders,judgments, and all costs and
expenses incurred in connection such Party's use of the Work Product or its preparation
or use of derivative works or information produced by such Party from the Work Product,
including, without limitation, actual attorneys' fees and costs of defense and costs and
expenses of all experts and consultants, arising directly or indirectly, in whole or in part,
out of the use of the Work Product by the indemnifying Party. The Town shall include
provisions in its agreement with consultants developing the Work Product requiring such
parties to defend, indemnify and hold the Parties harmless from any copyright or similar
claims for use of the Work Product consistent with this MOU.
6. GENERAL PROVISIONS:
6.1 Entire Agreement. This MOU contains the entire agreement of the Parties with
respect to the subject matter hereof, and supersedes all prior negotiations,
understandings or agreements. This MOU may only be modified by a writing
signed by all Parties.
6.2 Governing Law. This MOU shall be governed by the laws of the State of California.
Any action to interpret or enforce this MOU shall be brought in the Truckee branch
of the Nevada County Superior Court.
6.3 Assignment or Transfer. No Party's rights, obligations, and duties under this MOU
may be transferred in whole or in part to another party.
6.4 Construction; References; Captions. Since the Parties or their agents have
participated fully in the preparation of this MOU, the language of this MOU shall be
construed simply, according to its fair meaning, and not strictly for or against any
Party. Any term referencing time, days or period for performance shall be deemed
calendar days and not work days. The captions of the various articles and
paragraphs are for convenience and ease of reference only, and do not define,
limit, augment, or describe the scope, content, or intent of this MOU.
6.5 Waiver. No waiver of any default shall constitute a waiver of any other default or
breach, whether of the same or other covenant or condition. No waiver, benefit,
Page 32 of 161
privilege, or service voluntarily given or performed by a Party shall give the other
Party any contractual rights by custom, estoppel, or otherwise.
6.6 No Third-Party Beneficiaries. There are no intended third party beneficiaries of
any right or obligation assumed by the Parties.
6.7 Severability. If any portion of this MOU Agreement is declared invalid, illegal, or
otherwise unenforceable by a court of competent jurisdiction, the remaining
provisions shall continue in full force and effect.
TOWN OF TRUCKEE
Dated:
Jennifer Callaway, Town Manager
APPROVED AS TO FORM:
Dated:
Andrew Morris, Town Attorney
TRUCKEE TAHOE AIRPORT DISTRICT
Dated:
Robb Etnyre, General Manager
TRUCKEE SANITARY DISTRICT
Dated:
Sanna Schlosser, General Manager
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Page 33 of 161
Dated:
Brian Wright, General Manager
Dated:
Steve Gross, District Counsel
NORTHSTAR COMMUNITY SERVICES DISTRICT
Dated:
Mike Geary, General Manager
NORTH TAHOE PUBLIC UTILITY DISTRICT
Dated:
Brad Johnson, General Manager
TAHOE CITY PUBLIC UTILITY DISTRICT
Dated:
Sean Barclay, General Manager
Dated:
Steve Gross, District Counsel
TRUCKEE FIRE PROTECTION DISTRICT
Dated:
Kevin McKechnie, Fire Chief
Page 34 of 161
AGENDA ITEM #10
Public Utility District
MEETING DATE: April 1, 2026
TO: Board of Directors
FROM: Martina Rochefort, District Clerk/Executive Assistant
SUBJECT: Board Meeting Minutes
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Consider approval of the March 4, 2026 Regular Board Meeting minutes
BACKGROUND:
ANALYSIS AND BODY:
Draft March 4, 2026 board meeting minutes are attached for review.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
FISCAL IMPACT:
There is no fiscal impact associated with this item.
ATTACHMENTS:
1. Minutes 2026-03-04 DRAFT
Page 1 of 1
Page 35 of 161
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, MARCH 4, 2026
1. Call to Order
Meeting was called to order at 6:01 p.m.
2. Roll Call
Directors Present: Jeff Bender, Christa Finn, Steve Randall, Vice President Courtney
Murrell and President Tony Laliotis
Staff in attendance: Brian Wright, General Manager; Scott Crow, Chief Information
Officer/IT Director/Assistant General Manager; Mike Salmon, Chief Financial Officer;
Steven Poncelet, Public Information and Strategic Affairs Director; Chad Reed, Water
Utility Director; Jillian Steward, Director of Human Resources & Risk Management; Neil
Kaufman, Water System Engineer; Steven Keates, Special Projects Administrator;
Xander Thomassian, Network & Systems Administrator; Martina Rochefort, District
Clerk/Executive Assistant
Other Steve Gross, General Counsel
3. Pledge of Allegiance
Director Finn led the Pledge of Allegiance.
4. Changes to the agenda
Workshop item 17 was pulled from the agenda.
5. Public Comment
No public comment was received.
DIRECTOR UPDATE
6. Director Finn shared her appreciation for the work of the District and also shared
her insights on recent global and local events. President Laliotis thanked staff for
their work. Vice President Murrell heard a lot of kudos during the last storm cycle.
DEPARTMENT UPDATES
7. This item provides time for each Department to update the Board of Directors.
Department updates were presented by Scott Crow, CIO/Assistant General Manager,
Michael Salmon, Chief Financial Officer, and Jillian Steward, Director of Human
Resources and Risk Management.
CONSENT CALENDAR
8. Board Meeting Minutes
Consider approval of the February 4, 2026 Board Meeting Minutes
9. Approve the Treasurer's Report for March 2026
1
Page 36 of 161
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, MARCH 4, 2026
A. Approve preliminary fund balances for the month of December 2025
B. Approve disbursements for the month of January 2026
C. Accept report of semi-annual delinquent account write-offs by Treasurer
D. Accept report of annual employee vehicle use
10. Consideration of Annual Procurement Item Adjustment
Approve a correction to the Monday.com annual support contract increasing
the total amount not to exceed $31,776 from the previously approved amount
of $27,000 for FY2026.
11. Consideration of Scheduling a Public Hearing Related to Adoption of the Annual
Electric and Water Standby Charges
Schedule a Public Hearing at the regularly scheduled District Board Meeting
on April 1, 2026 at 6:00 PM, or as soon thereafter, for the purpose of receiving
input on the adoption of annual Electric and Water Standby Charges.
ACTION: Motion made by Director Bender to approve the Consent
Calendar as presented, seconded by Director Murrell.
AYES: Bender, Finn, Randall, Murrell and Laliotis
NAYS: none
ABSTAIN: none
ABSENT: none
Motion passed.
ACTION ITEMS
12. Consideration for Approval of the 2026 Unrepresented and Represented Salary
Schedule and New Positions
1) Approve the Unrepresented (Technical, Engineering and Management)
salary schedule as presented
2) Approve the updated salary schedule for IBEW 1245 represented
employees as presented
Director of Human Resources & Risk Management presented the item. No public
comment was received. Discussion was held.
ACTION: Motion made by Director Finn to approve the Unrepresented
(Technical, Engineering and Management) salary schedule
and updated salary schedule for IBEW 1245 represented
employees as presented, seconded by Director Randall.
AYES: Bender, Finn, Randall, Murrell and Laliotis
NAYS: none
ABSTAIN: none
2
Page 37 of 161
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, MARCH 4, 2026
ABSENT: none
Motion passed.
13. Consideration of a Contract to Design the Sitzmark Hydropneumatic Pump Station
Replacement
Authorize the General Manager to execute a contract and all associated
documents with Sauers Engineering to perform design of the Sitzmark
Hydropneumatic Pump Station Replacement project for an amount of
$143,300, plus a ten percent change order allowance for a total not to exceed
$157,600.
Neil Kaufman, Water System Engineer, presented the item. No public comment was
received. Discussion was held.
ACTION: Motion made by Director Bender to authorize the General
Manager to execute a contract and all associated
documents with Sauers Engineering to perform design of
the Sitzmark Hydropneumatic Pump Station Replacement
project for an amount of $143,300, plus a ten percent change
order allowance for a total not to exceed $157,600 as
presented, seconded by Director Murrell.
AYES: Bender, Finn, Randall, Murrell and Laliotis
NAYS: none
ABSTAIN: none
ABSENT: none
Motion passed.
General Counsel disclosed he assists the District with its Development Agreement and
his firm has a client relationship with J-Marr, LLC excluding the development
agreements being approved this evening.
14. Approval of Two Development Agreements For the Soaring Ranch Phase 2 and
Soaring Ranch Offsite Infrastructure Improvement Projects with J-Marr II, LLC
A. Authorize the General Manager to execute the Development Agreement and
associated documents between J-Marr II LLC and the District for the
Soaring Ranch Phase 2 project, in substantially the same form as
presented; and
B. Authorize the General Manager to execute the Development Agreement
and associated documents between J-Marr ll, LLC and the District for the
Soaring Ranch Offsite Infrastructure Improvement project, in substantially
the same form as presented
Water System Engineer presented the item. No public comment was received.
Discussion was held.
3
Page 38 of 161
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, MARCH 4, 2026
ACTION: Motion made by Director Bender to authorize the General
Manager to execute the Development Agreement and
associated documents between J-Marr II, LLC and the
District for the Soaring Ranch Phase 2 project, in
substantially the same form, and authorize the General
Manager to execute the Development Agreement and
associated documents between J-Marr II, LLC, and the
District for the Soaring Ranch Offsite Infrastructure
Improvement project, in substantially the same form as
presented, seconded by Director Finn.
AYES: Bender, Finn, Randall, Murrell and Laliotis
NAYS: none
ABSTAIN: none
ABSENT: none
Motion passed.
15. Considering Acceptance of the District's Fiscal Year End 2025 Budget
Performance Review and Fund Transfers
A. Accept this report of Budget Performance for 2025, which includes
variances identified since the adoption of the budget for 2025.
B. Authorize internal book fund transfers as of 12/31/2025 as follows:
1. Electric Utility - $1,500,000 from Operating Reserve to Capital Reserve
2. Water Utility - $1,600,000 from Operating Reserve to Capital Reserve
Chief Financial Officer presented the item. No public comment was received.
Discussion was held.
ACTION: Motion made by Director Finn to accept this report of
Budget Performance for 2025, which includes variances
identified since the adoption of the budget for 2025 and
authorize internal book fund transfers as of December 31,
2025 as follows: Electric Utility - $1,500,000 from Operating
Reserve to Capital Reserve and Water Utility - $1,600,000
from Operating Reserve to Capital Reserve as presented,
seconded by Director Bender.
AYES: Bender, Finn, Randall, Murrell and Laliotis
NAYS: none
ABSTAIN: none
ABSENT: none
Motion passed.
16. Consideration of Proposed Revisions to District Code, Title 5 and Appendix G
Consider approval of revisions to District Code, Title 5 and Appendix G as
proposed.
4
Page 39 of 161
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, MARCH 4, 2026
ACTION: Motion made by Director Murrell to approve revisions to
District Code, Title 5 and Appendix G as presented,
seconded by Director Randall.
AYES: Bender, Finn, Randall, Murrell and Laliotis
NAYS: none
ABSTAIN: none
ABSENT: none
Motion passed.
WORKSHOP
17. 2026 Public Information and Communication Plan
Receive this report and provide input and direction to staff.
Item was pulled from the agenda.
Open Session recessed at 7:37 p.m.
CLOSED SESSION
18. Closed Session Pursuant to Government Code Section 54957 Public General
Manager's Performance Plan Review
Open Session reconvened at 9:27 p.m.
No reportable action was taken in Closed Session.
ADJOURNMENT
Meeting adjourned at 9:27 p.m.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Tony Laliotis, President
Respectfully Submitted,
Martina Rochefort, District Clerk
5
Page 40 of 161
AGENDA ITEM #11
Public Utility District
MEETING DATE: April 1, 2026
TO: Board of Directors
FROM: Melanie Rives, Finance & Accounting Manager
SUBJECT: Treasurer's Report, April 2026
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Consider Approval of the Treasurer's Report for April 2026 including:
a. Fund Balances for the Month of January 2026
b. Disbursements for the Month of February 2026
BACKGROUND:
ANALYSIS AND BODY:
GOALS AND OBJECTIVES:
FISCAL IMPACT:
ATTACHMENTS:
1. 2026-04 Treasurer's Report
Page 1 of 1
Page 41 of 161
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
TREASURER'S REPORT
April 1 , 2026
Fund Balances for the Month January 31, 2026
(Preliminary — pending year-end close and annual audit)
And
Disbursements for the Month February 28, 2026
(includes Government Code section 53065.5 items)
Page 1 of 15
Page 42 of 161
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Summary report of fund balances for the month ending January 31, 2026 and
disbursements for February 2026.
1) REQUEST FOR APPROVAL OF DISBURSEMENTS and Check Summary
The attached listing of checks and ACH payments issued during February 2026 total
$3,622,510.86 in disbursements.
2) EMPLOYEE REIMBURSEMENT FOR INDIVIDUAL CHARGES
Per Government Code 53065.5:
Each special district, as defined by subdivision (a) of Section 56036, shall, at least annually, disclose any
reimbursement paid by the district within the immediately preceding fiscal year of at least one hundred
dollars ($100) for each individual charge for services or product received. "Individual charge" includes,
but is not limited to, one meal, lodging for one day, transportation, or a registration fee paid to any
employee or member of the governing body of the district. The disclosure requirement shall be fulfilled by
including the reimbursement information in a document published or printed at least annually by a date
determined by that district and shall be made available for public inspection.
The Disbursements listing referenced in 1) includes above subject reimbursements information, as
applicable.
3) STATEMENT OF GENERAL FUND:
As of January 31, 2026 the balance in the General Fund was $14,415,792 (Electric $7,230,181
and Water $7,185,610).
4) FUNDS STATUS REPORT:
The total of all funds held in cash and on deposit with US Bank, the Local Agency Investment
Fund, Placer County Investment Fund, Utah Public Treasurers' Investment Fund, California
CLASS, BNY and TVI Investments as of January 31, 2026 was $60,991,349 ($43,662,022 Electric
and $17,329,326 Water).
5) INVESTMENT STATUS REPORT:
The majority of the District's investments are in California's Local Agency Investment Fund (LAIF),
Utah Public Treasurers' Investment Fund (UPTIF), California CLASS, and the Placer County
Investment Fund (PCIF). The earnings rates for the last 13 months were:
LAIF PCIF UPTIF 1 YR T-BILL TVI CLASS
January 2025 4.37% 3.83% 4.55% 3.99% 0.55% 4.42%
February 2025 4.33% 4.10% 4.53% 3.91% 0.55% 4.41%
March 2025 4.31% 3.86% 4.49% 3.87% 0.55% 4.40%
April 2025 4.28% 4.00% 4.49% 3.71% 0.55% 4.39%
May 2025 4.27% 3.88% 4.47% 3.95% 0.55% 4.35%
June 2025 4.27% 3.90% 4.48% 3.95% 0.55% 4.34%
July 2025 4.26% 3.97% 4.47% 3.94% 0.55% 4.34%
August 2025 4.25% 3.86% 4.47% 3.70% 0.55% 4.33%
September 2025 4.21% 3.88% 4.38% 3.53% 0.55% 4.27%
October 2025 4.15% 3.76% 4.27% 3.56% 0.55% 4.19%
November 2025 4.10% 3.91% 4.13% 3.47% 0.55% 4.04%
December 2025 4.03% 3.77% 4.01% 3.35% 0.55% 3.88%
January 2026 3.87% 3.80% 3.86% 3.35% 0.55% 3.78%
Page 2 of 15
Page 43 of 161
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Request for Approval of Disbursements
The disbursements of the Truckee Donner Public Utility District for the month of February 2026
totaled $3,622,510.86. A listing of those disbursements is attached.
DISBURSEMENTS METRICS (excludes Payroll):
Accounts Payable (A/P) Metrics
$ A/P Disbursements
8,000,000.00
7,000,000.00
6,000,000.00
5,000,000.00 — —
4,000,000.00
3,000,000.00
2,000,000.00 —
1,000,000.00
0.00 —
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■2022 ■2023 ■2024 ■2025 2026
# A/P Payments Issued
350
300 ' I
250 — —
200
150
100
50
0 —
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■2022 ■2023 ■2024 ■2025 2026
# A/P I nvoices Vouchered
1,000 —
800
600 — —
400
200
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■2022 ■2023 ■2024 ■2025 2026
Page 3 of 15
Page 44 of 161
Truckee Donner Public Utility District
Check Register CA
February 2026 Go,Code
53605.5
Check/Tran Date Type Vendor Vendor Name Item Reference Amount
6515 2/1/2026 WIRE 10360 AFLAC EMPLOYEE PAID INSURANCE $ 1,848.48
6527 2/1/2026 WIRE 10737 US BANK GOVERNMENT SERVICES CREDIT CARD CHARGES 24,741.00
6518 2/2/2026 WIRE 5151 NRECA HEALTH 125 ADMINISTRATIVE FEES 472.50
49173 2/5/2026 DD 1537 AMAZON CAPITAL SERVICES,INC COMPUTER EXPENSES 2,913.55
49174 2/5/2026 DD 1642 ANCON MARINE ENVIRONMENTAL COMPLIANCE FEES 2,185.88
49175 2/5/2026 DD 9503810 CDW GOVERNMENT INC. HARDWARE REFRESH 3,256.77
49176 2/5/2026 DD 9205 SHANE CHRISTIAN* MEETING EXPENSES 236.00
49177 2/5/2026 DD 577 COOPERATIVE RESPONSE CENTER INC. ANSWERING SERVICE 3,579.17
49178 2/5/2026 DD 524 DE LAGE LANDEN OPERATIONAL SERVICES LLC XEROX COPIER LEASE 2,702.29
49179 2/5/2026 DD 1535 EPLUS TECHNOLOGY INC LICENSING,MAINTENANCE&SUPPORT 14,025.44
49180 2/5/2026 DD 1167 ERPR,LLC PROFESSIONAL SERVICES:MARKETING 1,000.00
49181 2/5/2026 DD 1633 EZ STAK MATERIALS&SERVICES 12,841.68
49182 2/5/2026 DD 5840 FERGUSON ENTERPRISES INC TOOLS 7,287.72
49183 2/5/2026 DD 949 FERGUSON ENTERPRISES INC 1423 MATERIALS&SERVICES 556.23
49184 2/5/2026 DD 361 FIRST CHOICE SERVICES FACILITY SUPPLIES 75.90
49185 2/5/2026 DD 2254 FULL HEART DESIGN PROFESSIONAL SERVICES:MARKETING 1,200.00
49186 2/5/2026 DD 3480 GRAINGER INC. MATERIALS&SERVICES 369.68
49187 2/5/2026 DD 1305 JW WELDING SUPPLIES&TOOLS MATERIALS&SERVICES 348.65
49188 2/5/2026 DD 115 KIMBALL-MIDWEST MISC PARTS&SUPPLIES 128.25
49189 2/5/2026 DD 1149 LOOMIS BANKING CHARGES 1,058.52
49190 2/5/2026 DD 9710 JENNIFER MASON POSTAGE 17.00
49191 2/5/2026 DD 1647 MCCANDLESS TRUCK CENTER LLC REPAIRS&MAINTENANCE 641.65
49192 2/5/2026 DD 10008 MOTION&FLOW CONTROL PRODUCTS,INC. MISC PARTS&SUPPLIES 263.68
49193 2/5/2026 DD 617 MOUNTAIN EAP EMPLOYEE RELATIONS&WELLNESS PROGRAM 225.00
49194 2/5/2026 DD 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 139.35
49195 2/5/2026 DD 1079 O'REILLY AUTO PARTS MISC PARTS&SUPPLIES 22.83
49196 2/5/2026 DD 820 ONESOURCE SUPPLY SOLUTIONS INVENTORY 1,341.39
49197 2/5/2026 DD 9504397 PACE SUPPLY MATERIALS&SERVICES 55.58
49198 2/5/2026 DD 5730 PORTER SIMON LEGAL SERVICES 7,658.50
49199 2/5/2026 DD 9924 RYAN PURSEL* MEETING EXPENSES 213.00
49200 2/5/2026 DD 1606 SAAS E SOLUTIONS,LLC PROFESSIONAL SERVICES:PROGRAM DELIVERY 5,000.00
49201 2/5/2026 DD 1532 SLATE ROCK FR EMPLOYEE UNIFORM 1,174.79
49202 2/5/2026 DD 10414 SNAP-ON INDUSTRIAL TOOLS 261.11
49203 2/5/2026 DD 3826 STONE'S COUNTRYTIRE TIRES 551.50
49204 2/5/2026 DD 6880 TAHOE INSTANT PRESS OFFICE SUPPLIES 83.93
49205 2/5/2026 DD 26 THE BANK OF NEW YORK MELLON 2022 WATER COP 212,078.99
49206 2/5/2026 DD 155 THE BANK OF NEW YORK MELLON OG MELLO ROOS ADMIN COSTS 2,035.00
49207 2/5/2026 DD 9976 EMPLOYEE VISION REIMBURSEMENT 653.08
49208 2/5/2026 DD 712 TRUCKEE DONNER PUD PURCHASED POWER-STAMPEDE HYDRO GEN 11,253.57
49209 2/5/2026 DD 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 819.00
49210 2/5/2026 DD 448 TRUCKEE TAHOE RADIO LLC MARKETING 2,611.70
49211 2/5/2026 DD 10584 UAMPS PURCHASED POWER-LAMPS 1,011,764.21
49212 2/5/2026 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 359.69
49213 2/5/2026 DD 643 UNITED SITE SERVICES OF NEVADA MATERIALS&SERVICES 287.94
49214 2/5/2026 DD 1538 USA FLEET SOLUTIONS MISC PARTS&SUPPLIES 1,461.00
49215 2/5/2026 DD 630 WESTERN AREA POWER ADMINISTRATION ENVIRONMENTAL COMPLIANCE FEES 6,399.61
49216 2/5/2026 DD 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 653.00
136799 2/5/2026 CHK 134 ANIXTER INC. TOOLS 4,172.52
136800 2/5/2026 CHK 657 AT&T COMMUNICATIONS 699.14
136801 2/5/2026 CHK 240 AUDIO ON-HOLD ON-HOLD PHONE SYSTEM 79.00
136802 2/5/2026 CHK 44444 SCHUYLER COLLETT INCENTIVES-AIR SOURCE HEATPUMP 700.00
136803 2/5/2026 CHK 1415 CRISIS INTERVENTION SERVICES PROFESSIONAL SERVICES:PROGRAM DELIVERY 4,662.50
136804 2/5/2026 CHK 5661 DOORKING,INC BUILDING MAINTENANCE 49.95
136805 2/5/2026 CHK 193 EASTERN REGIONAL LANDFILL LANDFILL CHARGES 33.80
136806 2/5/2026 CHK 1653 ELK GROVE CHEVROLET REPAIRS&MAINTENANCE 309.83
136807 2/5/2026 CHK 99999 CHARLES ENGLAND CUSTOMER REFUND-CLOSED ACCOUNT 172.46
136808 2/5/2026 CHK 44444 MARGARET A HEALEY INCENTIVES-DUCT LEAK MITIGATION&TEST 1,150.00
136809 2/5/2026 CHK 44444 MR KULIIT JAGPAL INCENTIVES-DUCTLESS MINI SPLIT HEATPMP 700.00
136810 2/5/2026 CHK 99999 MIRIAM A MORAN CUSTOMER REFUND-CLOSED ACCOUNT 46.09
136811 2/5/2026 CHK 99999 NEVADA COUNTY LIBRARY CUSTOMER REFUND-OVERPAYMENT 1,350.76
136812 2/5/2026 CHK 1054 NEVADA VISION GROUP VISION REIMBURSEMENT 160.00
136813 2/5/2026 CHK 5151 NRECA FEBRUARY 2026 INSURANCE 16,488.30
136814 2/5/2026 CHK 5150 NRECA GROUP BENEFITS TRUST FEBRUARY 2026 INSURANCE 248,888.40
136815 2/5/2026 CHK 5222 ODP BUSINESS SOLUTIONS LLC OFFICE SUPPLIES 932.97
136816 2/5/2026 CHK 44444 WILL PRINGLE INCENTIVES-PANEL UPGRADES,EV CHARGERS 1,950.00
136817 2/5/2026 CHK 44444 ETHAN RAVAGE INCENTIVES-AIR SOURCE HEAT PUMP 5,066.66
136818 2/5/2026 CHK 1398 SCHINDLER ELEVATOR CORP BUILDING MAINTENANCE 571.61
136819 2/5/2026 CHK 10761 SOUTHWEST GAS CORP. UTILITIES:NATURAL GAS 6,023.32
136820 2/5/2026 CHK 6920 TAHOE TRUCKEE SIERRA DISPOSAL LANDFILL CHARGES 3,138.32
136821 2/5/2026 CHK 999 CAITLIN THARP WO#2464449510236 DONNER PASS RD REFUND 3,763.18
136822 2/5/2026 CHK 10246 TRUCKEE FIRE PROTECTION DIST FIRE SUPRESSION AND PROTECTION SERVICES 2,686.02
136823 2/5/2026 CHK 7320 TRUCKEE TAHOE LUMBER CO MATERIALS&SERVICES 131.02
136824 2/5/2026 CHK 99999 JON VALDEZ CUSTOMER REFUND-CLOSED ACCOUNT 289.11
136825 2/5/2026 CHK 682 VERIZON WIRELESS CELL PHONE CHARGES 1,981.29
6526 2/10/2026 WIRE 1359 CALPERS OPEB-CERBT MONTHLY CONTRIBUTION 10,417.00
6517 2/12/2026 PL PL PAYROLL PAYROLL DIRECT DEPOSIT 248,424.65
6520 2/12/2026 WIRE 3824 MISSIONSQUARE 457/401A CONTRIBUTIONS PPE 02/06/2026 41,734.50
6521 2/12/2026 WIRE 540 CALPERS 457 DEFERRED COMP PRGM CALPERS 457 CONTRIBUTIONS PPE 02/06/2026 27,088.12
6522 2/12/2026 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING PPE 02/06/2026 126,504.36
6523 2/12/2026 WIRE 11233 CALPERS PENSION 79,228.90
6524 2/12/2026 WIRE 905 HEALTHEQUITY INC. EMPLOYEE HSA CONTRIBUTIONS PPE 02/06/26 1,267.81
6525 2/12/2026 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING PPE 02/06/2026 28,280.10
49292 2/12/2026 DD 856 ACLARA TECHNOLOGIES LLC LICENSING,MAINTENANCE&SUPPORT 31,237.45
49293 2/12/2026 DD 1537 AMAZON CAPITAL SERVICES,INC OFFICE SUPPLIES 426.39
49294 2/12/2026 DD 1542 CIVICPLUS LICENSING,MAINTENANCE&SUPPORT 12,336.00
49295 2/12/2026 DD 5840 FERGUSON ENTERPRISES INC MATERIALS&SERVICES 372.78
Page 1of3 Page 4 of 15
Page 45 of 161
Truckee Donner Public Utility District
Check Register CA
February 2026 Go,Code
53605.5
Check/Tran Date Type Vendor Vendor Name Item Reference Amount
49296 2/12/2026 DO 949 FERGUSON ENTERPRISES INC 1423 TOOLS 309.19
49297 2/12/2026 DO 361 FIRST CHOICE SERVICES FACILITY SUPPLIES 443.49
49298 2/12/2026 DO 9360 EMPLOYEE VISION REIMBURSEMENT 498.60
49299 2/12/2026 DO 3480 GRAINGER INC. MATERIALS&SERVICES 489.77
49300 2/12/2026 DO 3820 IBEW LOCAL 1245 UNION DUES-FEBRUARY EMPLOYEE CONTRIBUTIONS 7,395.29
49301 2/12/2026 DO 1647 MCCANDLESS TRUCK CENTER LLC REPAIRS&MAINTENANCE 141.81
49302 2/12/2026 DO 1099 MOANA NURSERY PROFESSIONAL SERVICES:OTHER 315.00
49303 2/12/2026 DO 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 160.36
49304 2/12/2026 DO 1639 MPLG CONSULTING,LLC ENVIRONMENTAL COMPLIANCE FEES 3,000.00
49305 2/12/2026 DO 1419 MUNICIPAL MAINTENANCE EQUIPMENT REPAIRS&MAINTENANCE 597.61
49306 2/12/2026 DO 289 NISC JANUARY 2026 PRINT SERVICES 22,795.39
49307 2/12/2026 DO 970 NORTHERN CALIFORNIAJOINT POLE ASSN MEMBERSHIP DUES 16.32
49308 2/12/2026 DO 1079 O'REILLY AUTO PARTS REPAIRS&MAINTENANCE 90.38
49309 2/12/2026 DO 775 ONLINE INFORMATION SERVICES CREDIT CHECK SERVICES 184.40
49310 2/12/2026 DO 9920 EMPLOYEE VISION REIMBURSEMENT 186.71
49311 2/12/2026 DO 322 POLLARDWATER MATERIALS&SERVICES -
49312 2/12/2026 DO 1556 PURCELL TIRE COMPANY TIRES 15,326.60
49313 2/12/2026 DO 1371 RUPPERT,INC. CONTRACT SERVICES:SNOW REMOVAL 1,331.84
49314 2/12/2026 DO 837 SIERRA OFFICE SOLUTIONS XEROX COPIER LEASE 11.45
49315 2/12/2026 DO 1532 SLATE ROCK FR EMPLOYEE UNIFORMS 1,364.99
49316 2/12/2026 DO 1584 STARTING FROM SCRATCH CAFE,LLC BOARD MEETING EXPENSES 523.20
49317 2/12/2026 DO 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 1,169.00
49318 2/12/2026 DO 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 308.65
49319 2/12/2026 DO 320 W&T GRAPHIX SCREEN PRINTING& PERSONNEL EXPENSES 54.17
49320 2/12/2026 DO 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 675.00
49321 2/12/2026 DO 5643 ZORO TOOLS,INC TOOLS -
136826 2/12/2026 CHK 657 AT&T COMMUNICATIONS 3,228.93
136827 2/12/2026 CHK 10489 CORELOGIC INFORMATION SOLUTIONS INC LICENSING,MAINTENANCE&SUPPORT 553.44
136828 2/12/2026 CHK 78 FEDERAL EXPRESS CORPORATION FEDERAL EXPRESS CHARGES 58.21
136829 2/12/2026 CHK 999 FRIENDS OF TRUCKEE BOYS SOCCER CHARGING COMMUNITIES FORWARD 100.00
136830 2/12/2026 CHK 99999 JOHN HUNT CUSTOMER REFUND-CLOSED ACCOUNT 503.69
136831 2/12/2026 CHK 10932 J&L FOOD MART&CARWASH REPAIRS&MAINTENANCE 110.00
136832 2/12/2026 CHK 6401 LIBERTY UTILITIES ELECTRIC FOR PUMP STATION 2,082.04
136833 2/12/2026 CHK 2258 NEVADA COUNTY SHERIFF WAGE GARNISHMENT PPE 02/06/2026 275.70
136834 2/12/2026 CHK 1054 NEVADA VISION GROUP VISION REIMBURSEMENT 605.00
136835 2/12/2026 CHK 5222 ODP BUSINESS SOLUTIONS LLC OFFICE SUPPLIES 22.72
136836 2/12/2026 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 43,086.22
136837 2/12/2026 CHK 10101 PITNEY BOWES OFFICE SUPPLIES 456.45
136838 2/12/2026 CHK 1631 STREAMLINE SOFTWARE,INC PROFESSIONAL SERVICES:MARKETING 32,500.00
136839 2/12/2026 CHK 99999 JACK ESWECK CUSTOMER REFUND-CLOSED ACCOUNT 29.16
136840 2/12/2026 CHK 6940 TAHOE TRUCKEE SANITATION AGENCY 2026 PIPELINE REPLACEMENT 100.00
136841 2/12/2026 CHK 6940 TAHOE TRUCKEE SANITATION AGENCY 2026 PIPELINE REPLACEMENT 100.00
136842 2/12/2026 CHK 10050 TOWN OF TRUCKEE CONTRACT SVCS:PAVING/SLURRY 222,400.00
136843 2/12/2026 CHK 7175 TRANSWORLD SYSTEMS INC COLLECTION SERVICES 136.07
136844 2/12/2026 CHK 99999 BRADLEY WRIGHT CUSTOMER REFUND-CLOSED ACCOUNT 254.75
49322 2/19/2026 DO 1537 AMAZON CAPITAL SERVICES,INC HARDWARE PURCHASES 235.32
49323 2/19/2026 DO 920 CALIFORNIA AIR RESOURCES BOARD ENVIRONMENTAL COMPLIANCE FEES 11,604.00
49324 2/19/2026 DO 9503810 CDW GOVERNMENT INC. HARDWARE REFRESH 4,276.33
49325 2/19/2026 DO 1535 EPLUS TECHNOLOGY INC LICENSING,MAINTENANCE&SUPPORT 1,293.59
49326 2/19/2026 DO 848 FASTENAL MATERIALS&SERVICES 27.02
49327 2/19/2026 DO 5840 FERGUSON ENTERPRISES INC METERS PURCHASE 18,428.85
49328 2/19/2026 DO 949 FERGUSON ENTERPRISES INC 1423 MATERIALS&SERVICES 832.78
49329 2/19/2026 DO 3340 GENERAL PACIFIC INC EMPLOYEE UNIFORM 283.18
49330 2/19/2026 DO 3349 GLOBAL RENTAL CO INC RENTAL VEHICLE 3,755.01
49331 2/19/2026 DO 3480 GRAINGER INC. MISC PARTS&SUPPLIES 783.55
49332 2/19/2026 DO 1577 HUNT&SONS,LLC FUEL/OIL FOR VEHICLES 6,065.21
49333 2/19/2026 DO 11025 MOONSHINE INK MARKETING 444.00
49334 2/19/2026 DO 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 583.67
49335 2/19/2026 DO 5130 NCPA MEMBERSHIP DUES 132,482.00
49336 2/19/2026 DO 161 NEW PIG CORPORATION MATERIALS&SERVICES 110.83
49337 2/19/2026 DO 1079 O'REILLY AUTO PARTS REPAIRS&MAINTENANCE 543.09
49338 2/19/2026 DO 820 ONESOURCE SUPPLY SOLUTIONS INVENTORY 5,725.96
49339 2/19/2026 DO 9924 RYAN PURSEL* EMPLOYEE DEVELOPMENT 276.00
49340 2/19/2026 DO 419 QCS LLC BUILDING MAINTENANCE 540.00
49341 2/19/2026 DO 9927 EMPLOYEE VISION REIMBURSEMENT 789.25
49342 2/19/2026 DO 1611 RITZ INSTRUMENT TRANSFORMERS,INC PURCHASE METERS 1,988.91
49343 2/19/2026 DO 9943 ALEXANDRA A SPYCHALSKY* MEETING EXPENSES 179.82
49344 2/19/2026 DO 712 TRUCKEE DONNER PUD PURCHASED POWER-STAMPEDE HYDRO GEN 4,692.92
49345 2/19/2026 DO 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 371.97
49346 2/19/2026 DO 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 308.65
49347 2/19/2026 DO 7380 UNITED PARCEL SERVICE UPS CHARGES 391.85
49348 2/19/2026 DO 320 W&T GRAPHIX SCREEN PRINTING& EMPLOYEE UNIFORMS 7,465.01
49349 2/19/2026 DO 1546 WATERS CHIROPRACTIC DMV PHYSICAL 150.00
49350 2/19/2026 DO 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 992.70
49351 2/19/2026 DO 9930 KYLE WHITELEY* EMPLOYEE DEVELOPMENT 227.00
136845 2/19/2026 CHK 134 ANIXTER INC. TOOLS 283.40
136846 2/19/2026 CHK 1527 AT&T MOBILITY CELL PHONE CHARGES 3,342.75
136847 2/19/2026 CHK 999 KEN BALL REFUND EF FEES 1,298.00
136848 2/19/2026 CHK 999 VICTOR GARCIA REFUNDTPP 844.00
136849 2/19/2026 CHK 1654 HUNT OIL OF CALIFORNIA MATERIALS&SERVICES 1,633.91
136850 2/19/2026 CHK 999 JEFFREY LASKER REFUNDTPP 844.00
136851 2/19/2026 CHK 99999 JESSICA LORING CUSTOMER REFUND-DEPOSIT REFUND 600.00
136852 2/19/2026 CHK 9665 JOSHUA LOUBET* EMPLOYEE DEVELOPMENT 227.00
136853 2/19/2026 CHK 1647 MCCANDLESS TRUCK CENTER LLC MISC PARTS&SUPPLIES 1,135.13
136854 2/19/2026 CHK 5222 ODP BUSINESS SOLUTIONS LLC OFFICE SUPPLIES 61.26
136855 2/19/2026 CHK 10101 PITNEY BOWES OFFICE SUPPLIES 226.11
Paget of Page 5 of 15
Page 46 of 161
Truckee Donner Public Utility District
Check Register CA
February 2026 Go,Code
53605.5
Checkrrran Date Type Vendor Vendor Name Item Reference Amount
136856 2/19/2026 CHK 999 PAUL SORENSEN REFUND TPP 836.00
136857 2/19/2026 CHK 6860 TAHOE FOREST HOSPITAL DISTRICT DMV PHYSICAL 389.00
136858 2/19/2026 CHK 11041 TRUCKEE PAINT MART INC. MATERIALS&SERVICES 10.10
136859 2/19/2026 CHK 99999 KRISTIN VALETTE CUSTOMER REFUND-CLOSED ACCOUNT 341.50
6531 2/24/2026 WIRE 6731 CALIFORNIA DEPARTMENT OF TAXAND FEE USE TAX PAYABLE 23.00
6530 2/26/2026 PL PL PAYROLL PAYROLL DIRECT DEPOSIT 258,797.41
6532 2/26/2026 WIRE 3824 MISSIONSQUARE 457/401A CONTRIBUTIONS PPE 02/20/2026 41,621.96
6533 2/26/2026 WIRE 11233 CALIPERS PENSION 78,551.26
6534 2/26/2026 WIRE 540 CALIPERS 457 DEFERRED COMP PRGM CALIPERS 457 CONTRIBUTIONS PPE 02/20/2026 26,641.18
6535 2/26/2026 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING PPE 02/20/2026 126,063.14
6536 2/26/2026 WIRE 905 HEALTHEQUITY INC. EMPLOYEE HSA CONTRIBUTIONS PPE 02/20/26 1,267.81
6537 2/26/2026 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING PPE 02/20/2026 28,504.53
49432 2/26/2026 DO 1537 AMAZON CAPITAL SERVICES,INC OFFICE SUPPLIES 631.16
49433 2/26/2026 DO 1642 ANCON MARINE ENVIRONMENTAL COMPLIANCE FEES 400.00
49434 2/26/2026 DO 2257 BAKER TILLY US,LLP PROFESSIONAL SERVICES:AUDIT 2,100.00
49435 2/26/2026 DO 893 DEBBIE MADERACLEANING SERVICE BUILDING CLEANING 7,004.00
49436 2/26/2026 DO 348 EDGES ELECTRICAL GROUP MATERIALS&SERVICES -
49437 2/26/2026 DO 5840 FERGUSON ENTERPRISES INC TOOLS 5,138.76
49438 2/26/2026 DO 1579 FIBER BROADBAND ASSOCIATION PROFESSIONAL SERVICES:STRATEGIC PLAN 1,200.00
49439 2/26/2026 DO 3340 GENERAL PACIFIC INC EMPLOYEE UNIFORM -
49440 2/26/2026 DO 3480 GRAINGER INC. TOOLS 79.44
49441 2/26/2026 DO 277 HACH COMPANY MATERIALS&SERVICES 345.60
49442 2/26/2026 DO 1581 J HARLEN COMPANY INC EMPLOYEE UNIFORM -
49443 2/26/2026 DO 9641 NINA KROMMENHOEK* EMPLOYEE DEVELOPMENT 155.99
49444 2/26/2026 DO 1647 MCCANDLESS TRUCK CENTER LLC MISC PARTS&SUPPLIES 5,694.44
49445 2/26/2026 DO 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 49.32
49446 2/26/2026 DO 573 NORTHWEST LINEMAN COLLEGE EMPLOYEE DEVELOPMENT 885.00
49447 2/26/2026 DO 820 ONESOURCE SUPPLY SOLUTIONS INVENTORY 542.57
49448 2/26/2026 DO 1556 PURCELL TIRE COMPANY TIRES 5,318.62
49449 2/26/2026 DO 419 QCS LLC BUILDING MAINTENANCE 5,312.00
49450 2/26/2026 DO 6402 SIERRA PACIFIC POWER CO PURCHASED POWER-SPPC&NEVADA POWER 80,130.80
49451 2/26/2026 DO 6604 SPIEGEL&MC DIARMID PROFESSIONAL SERVICES:FERC ISSUES 3,078.75
49452 2/26/2026 DO 215 SURVALENT TECHNOLOGY INC LICENSING,MAINTENANCE&SUPPORT 28,360.00
49453 2/26/2026 DO 7313 TAHOE SUPPLY COMPANY FACILITY SUPPLIES 646.84
49454 2/26/2026 DO 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 308.65
49455 2/26/2026 DO 1528 UNISYS CORPORATION LICENSING,MAINTENANCE&SUPPORT 1,590.61
49456 2/26/2026 DO 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 932.20
49457 2/26/2026 DO 7820 WESTERN NEVADA SUPPLY CO MATERIALS&SERVICES 55.37
49458 2/26/2026 DO 5643 ZORO TOOLS,INC TOOLS -
136860 2/26/2026 CHK 99999 MICHAELAANDRE CUSTOMER REFUND-CLOSED ACCOUNT 320.60
136861 2/26/2026 CHK 134 ANIXTER INC. TOOLS 4,866.85
136862 2/26/2026 CHK 657 AT&T COMMUNICATIONS 96.33
136863 2/26/2026 CHK 78 FEDERAL EXPRESS CORPORATION FEDERAL EXPRESS CHARGES 59.64
136864 2/26/2026 CHK 999 KAHN INVESTMENTS 25631314,REFUND-CXL'D PROJECT 214.83
136865 2/26/2026 CHK 2258 NEVADA COUNTY SHERIFF WAGE GARNISHMENT PPE 02/20/2026 496.23
136866 2/26/2026 CHK 10207 NRECA MEMBERSHIP DUES 23,714.00
136867 2/26/2026 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 32,006.48
136868 2/26/2026 CHK 6273 SAUERS ENGINEERING INC MULTIPLE PROJECTS 4,850.00
136869 2/26/2026 CHK 682 VERIZON WIRELESS CELL PHONE CHARGES 175.14
221 $ 3,622,510.86
*Denotes employee reimbursement containing multiple items with no individual item charge of$100 or greater.
Page 3of3 Page 6 of 15
Page 47 of 161
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
STATEMENT OF GENERAL FUND
Activity for the Month Ended 1/31/2026
Page 1 of 2
Electric Dept Water Dept Total
Balance in General Fund 12/31/2025 $9,275,336 $7,394,580 $16,669,915
Receipts:
Revenue received $4,553,059 $1,806,029 $6,359,089
Retired employees medical insurance 25,390 - 25,390
Record interest earned 30,009 68,716 98,725
FF transfer for refund 2,269 - 2,269
FF Funding&DL Surcharge Reimbursement for 2006 COP - 38,250 38,250
Cash clearing accounts(timing-prior month reversal) (181,997) - (181,997)
Cash clearing accounts(timing-current month) 165,588 - 165,588
Total Receipts $4,594,318 $1,912,996 $6,507,313
Disbursements:
Accounts payable/payroll disbursements $5,596,392 $1,628,419 $7,224,811
Transfer to Vehicle Reserve 844,000 484,000 1,328,000
Transfer to Rate Reserve 151,000 - 151,000
Restrict facilities fees - 226 226
Restrict Donner Lake surcharge - 9,320 9,320
Section 125 benefit disbursement 34,374 - 34,374
Bank charges 13,706 - 13,706
Total Disbursements $6,639,472 $2,121,965 $8,761,437
Balance in General Fund 01/31/2026 $7,230,181 $7,185,610 $14,415,792
3/9/2026 3:48 PM
I:\Treasurers Repo rt\Statement of General Fund\2026\2026-01 GF
Page 7 of 15
Page 48 of 161
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Funds Status Report
Activity for the Month Ended 1/31/2026
Page 2 of 2
Electric Dept Water Dept Total
Distribution of Operating Funds At Month-End:
Customer Services Operating Funds $2,400 $0 $2,400
Operating clearing accounts 165,588 - 165,588
U.S. Bank-General Fund 1,484,817 - 1,484,817
LAIF, UPTIF, PCIF, CLASS&TVI-General Fund 5,577,377 7,185,610 12,762,988
Total Operating Funds $7,230,181 $7,185,610 $14,415,792
Distribution of Designated&Restricted Funds at Month-End:
LAIF, UPTIF, PCIF,TVI &CLASS $36,326,508 $9,495,701 $45,822,209
UPTIF-Donner Lake Assessment District - 91,474 91,474
2015 COP Water Bonds, Principal Payment Fund - 249,186 249,186
2022 COP Issuance/Payment Fund 91,201 202,406 293,607
U S Bank-Donner Lake Assessment District 00-1 - 43,171 43,171
Total Designated&Restricted Funds $36,417,709 $10,081,939 $46,499,647
Total Market Adjustments 14,132 61,777 75,910
Total Funds Available $43,662,022 $17,329,326 $60,991,349
3/9/2026 3:48 PM
I:\Treasurers Repo rt\Statement of General Fund\2026\2026-01 GF
Page 8 of 15
Page 49 of 161
INVESTMENT STATUS REPORT
Activity for the Month Ended 1/31/2026
Balance Beg.Balance Month End Balance
%Current Month(%Last Month) 12/31/2025 12/31/2025 Activity 1/31/2026
ELECTRIC FUNDS
LOCAL AGENCY INVESTMENT FUND(LAIF)-3.87%(4.03%)
General Fund 1..136.1 $ 1,097,556 $ 1,097,556 $ (166,202) $ 931,355
Consolidate cash (177,610)
Quarterly investment income payment received 11,409
Capital Replacement Fund 1..136.41 9,659,626 9,659,626 100,467 9,760,093
Quarterly investment income payment received 100,467
Electric Rate Reserve Fund 1..136.35 510,640 510,640 5,302 515,942
Quarterly investment income payment received 5,302
AB 32 Cap&Trade Fund 1..136.58 341,584 341,584 3,543 345,127
Quarterly investment income payment received 3,543
Deferred Liabilites Reserve 1..136.42 2,369,514 2,369,514 24,627 2,394,140
Quarterly investment income payment received 24,627
LCFS Credits 1..136.59 117,132 117,132 1,206 118,338
Funds transfer to/from GF 1,206
Total LAIF Electric Investments 14,096,052 14,096,052 (31,056) 14,064,996
UTAH PUBLIC TREASURERS'INVESTMENT FUND(UPTIF)- 3.86%(4.01%)
General Fund 1..136.12 1,146,456 1,146,456 (988,745) 157,711
Restrict facility fees 2,269
Record monthly interest 3,985
Reserve fundings @ budget (995,000)
Facilities Fees 1..136.9 388,734 388,734 (918) 387,816
Restrict facilites fees (2,269)
Record monthly interest 1,351
Electric Rate Reserve Fund 1..136.45 2,007,961 2,007,961 157,980 2,165,941
Record monthly interest 6,980
Reserve fundings @ budget 151,000
Capital Replacement Fund 1..136.46 532,775 532,775 1,852 534,627
Record monthly interest 1,852
Electric Vehicle Reserve 1..136.13 1,843,672 1,843,672 850,409 2,694,081
Record monthly interest 6,409
Reserve funding @ budget 844,000
Total UPTIF Electric Investments 5,919,597 5,919,597 20,578 5,940,175
PLACER COUNTY INVESTMENT FUND(PCIF)- 3.80%(3.77%)
Electric General Fund PC 1..136.49 507,597 507,597 1,628 509,225
Record monthly interest 1,628
Electric Rate Reserve Fund 1..136.47 1,596,394 1,596,394 5,117 1,601,510
Record monthly interest 5,117
Capital Replacement Fund 1..136.48 1,387,992 1,387,992 4,449 1,392,441
Record monthly interest 4,449
Total PCIF County Electric Investments 3,491,983 3,491,983 11,193 3,503,176
TVI INVESTMENTS- 0.55%(0.55%)
Capital Replacement Fund 1..136.43 1,366,550 1,366,550 - 1,366,550
Electric Rate Reserve Fund 1..136.44 700,000 700,000 - 700,000
Total TVI Electric Investments 2,066,550 2,066,550 2,066,550
3/10/2026 12 47 PM Investments Status Report Page 9 of 15
r tmen
\7r....-,Report\invest stain,Report,\2026\2026-01 Im,,t,,nts stains Report Page 1 of 4
Page 50 of 161
INVESTMENT STATUS REPORT
Activity for the Month Ended 1/31/2026
Balance Beg.Balance Month End Balance
%Current Month(%Last Month) 12/31/2025 12/31/2025 Activity 1/31/2026
CLASS INVESTMENTS- 3.78%(3.88%)
General Fund 1..136.16 4,266,101 4,266,101 (287,013) 3,979,088
Record monthly interest 12,987
Transfer to/from US Bank (300,000)
Electric Rate Reserve Fund 1..136.22 2,392,046 2,392,046 7,833 2,399,878
Book transfer between funds 7,833
Vehicle Reserve Fund 1..136.23 525,608 525,608 1,721 527,329
Record monthly interest 1,721
Capital Reserve Fund 1..136.24 9,391,939 9,391,939 30,754 9,422,692
Record monthly interest 30,754
Total CLASS Electric Investments 16,575,693 16,575,693 (246,705) 16,328,987
Total Electric Investments $ 42,149,874 $ 42,149,874 $ (245,990) $ 41,903,885
3/10/2026 12 47 PM Investments Status Report Page 10 of 15
1:\7r....—,Report\inves tment stain,Report,\2026\2026-01 Im,,t,nents stains Report Page 2 of 4
Page 51 of 161
INVESTMENT STATUS REPORT
Activity for the Month Ended 1/31/2026
Balance Beg.Balance Month End Balance
%Current Month(%Last Month) 12/31/2025 12/31/2025 Activity 1/31/2026
WATER FUNDS
LOCAL AGENCY INVESTMENT FUND(LAIF)-3.87%(4.03%)
General Fund 2..136.1 4,512,859 4,512,859 240,936 4,753,796
Consolidate cash 177,610
Quarterly investment income payment received 63,552
Restrict facility fees (226)
Facilities Fees 2..136.90 1,407,058 1,407,058 14,851 1,421,909
Restrict facility fees 226
Quarterly investment income payment received 14,625
Capital Replacement Fund 2..136.41 4,155,814 4,155,814 26,562 4,182,376
Quarterly investment income payment received 26,562
Reserve funding @ budget -
Total LAIF Water Investments 10,075,732 10,075,732 282,349 10,358,081
UTAH PUBLIC TREASURERS'INVESTMENT FUND(UPTIF)- 3.86%(4.01%)
General Fund 2..136.12 1,485,549 1,485,549 (449,906) 1,035,643
Transfer to DLAD surcharge (9,320)
DL Surcharge Reimbursement for 2006 COP 8,333
FF Funding portion of 2006 COP 29,917
Reserve funding @ budget (484,000)
Record monthly interest 5,164
Facilities Fees 2..136.25 197,734 197,734 (29,229) 168,505
Record monthly interest 687
Transfer to GF for FF Funding portion of 2006 COP (29,917)
West River St.Assessment District 2..136.31 45,074 45,074 157 45,231
Record monthly interest 157
Prepaid Connection Fees 2..136.7 39,312 39,312 137 39,449
Record monthly interest 137
Transfer to GF-MW PR connections -
Donner Lake Assessment District Fund 2..136.84 91,158 91,158 317 91,474
Record monthly interest 317
Donner Lake Assessment District Surcharge Fund 2..136.61 247,713 247,713 1,848 249,560
DLAD surcharge collections 9,320
DL Surcharge reimbursement to GF for 2006 COP (8,333)
Record monthly interest 861
TSA SAD II Improvement Fund 2..136.85 21,745 21,745 76 21,820
Record monthly interest 76
Water Vehicle Reserve 2..136.13 503,750 503,750 485,751 989,501
Record monthly interest 1,751
Reserve fundings @ budget 484,000
Deferred Liabilites Reserve 2..136.42 125,787 125,787 437 126,224
Record monthly interest 437
Capital Replacement Fund 2..136.46 141,318 141,318 491 141,810
Record monthly interest 491
Total UPTIF Water Investments 2,899,140 2,899,140 10,078 2,909,218
PLACER COUNTY INVESTMENT FUND(PCIF)- 3.80%(3.77%)
Total PCIF Water Investments
TVI INVESTMENTS- 0.55%(0.55%)
Water General Fund TVI 2..136.15 1,396,171 1,396,171 - 1,396,171
Total TVI Water Investments 1,396,171 1,396,171 1,396,171
CLASS INVESTMENTS- 3.78%(3.88%)
Water Vehicle Reserve 2..136.24 2,102,432 2,102,432 6,884 2,109,316
Record monthly interest 6,884
Total CLASS Water Investments 2,102,432 2,102,432 6,884 2,109,316
Total Water Investments $ 16,473,474 $ 16,473,474 $ 299,312 $ 16,772,786
3/10/2026 12 47 PM Investments Status Report Page 11 of 15
1:\7r....-,Report\inves tment Stain,Report,\2026\2026-01 in�es<me„ts Stains Report Page 3 of 4
Page 52 of 161
INVESTMENT STATUS REPORT
Activity for the Month Ended 1/31/2026
Balance Beg.Balance Month End Balance
%Current Month(%Last Month) 12/31/2025 12/31/2025 Activity 1/31/2026
ELECTRIC&WATER INVESTMENTS,COMBINED TOTALS
Pre-Market Adjustments
Total LAIF Investments 42% 24,171,783 24,171,783 251,294 24,423,077
Total UPTIF Investments 15% 8,818,737 8,818,737 30,657 8,849,393
Total PCIF Investments 6% 3,491,983 3,491,983 11,193 3,503,176
Total TVlInvestments 6% 3,462,722 3,462,722 - 3,462,722
Total CLASS Investments 31% 18,678,124 18,678,124 (239,821) 18,438,303
Total Investments 100% Month End Bal.Mix $ 58,623,349 $ 58,623,350 $ 53,322 $ 58,676,671
Market Adjustments
Total LAIF Investments 52,730 52,730 - 52,730
Total UPTIF Investments 20,180 20,180 20,180
Total PCIF Investments 17,355 17,355 - 17,355
Total TVlInvestments (17,366) (17,366) (1) (17,367)
Total CLASS Investments 3,011 3,011 3,011
Total Investments $ 75,910 $ 75,910 $ (1) $ 75,909
Post-Market Adjustments
Total LAIF Investments 42% 24,224,514 24,224,514 251,294 24,475,807
Total UPTIF Investments 15% 8,838,916 8,838,916 30,657 8,869,573
Total PCIF Investments 6% 3,509,338 3,509,338 11,193 3,520,531
Total TVlInvestments 6% 3,445,356 3,445,356 (1) 3,445,355
Total CLASS Investments 31% 18,681,135 18,681,135 (239,821) 18,441,314
Total Investments 100% Month End Bal.Mix $ 58,699,258 $ 58,699,258 $ 53,322 $ 58,752,580
3/10/202612:47 PM Investments Status Report Page 12 of 15
I:\Treasurers Report\Investment Status Reports\2026\2026-01 Investments Status Report Page 4 of 4
Page 53 of 161
TRUCKEE DONNER PUD
INVESTMENT BALANCES
as of January 31,2026
Placer County Utah Public California TVI Fidelity Mmkt Morgan Stanley Dreyfus BNY US Bank Cashl
LAIF Invest Fund Invest Fund CLASS Investments Govt 57 Treas Sec Port Treas Security Treas Cash Res Checking cash Clearings Total
131.1
ELECTRIC FUNDS
General Fund $ 931,355 $ 509,225 $ 157,711 $ 3,979,088 $ $ $ $ $ $ 1,484,817 $ 167,988 $ 7,230,181
Facilities Fees - - 387,816 - - - 387,816
Rate Reserve Fund 515,942 1,601,510 2,165,941 2,399,878 700,000 7,383,272
Capital Reserve Fund 9,760,093 1,392,441 534,627 9,422,692 1,366,550 22,476,404
Deferred Liabilites Reserve/POB Fund 2,394,140 - - - - 2,394,140
Electric Vehicle Reserve Fund - 2,694,081 527,329 3,221,410
AB 32 Fund 345,127 - - 345,127
LCFS Credits 118,338 118,338
COP Project Fund - -
COP Issuance/Payment Fund - - - 91,201 91,201
Market Adjustments 30,741 17,355 13,546 2,692 50,202 14,132
Total Electric Investments 14,095,737 3,520,531 5,953,721 16,331,679 2,016,349 91,201 1,484,817 167,988 43,662,022
WATER FUNDS
General Fund $ 4,753,796 $ - $ 1,035,643 $ $ 1,396,171 $ $ $ $ $ $ 7,185,610
Facilities Fees 1,421,909 168,505 - 1,590,414
Capital Reserve Fund 4,182,376 141,810 2,109,316 6,433,502
2015 COP Funds - - - 249,186 249,186
West River St.Assessment District 45,231 - 45,231
Deferred Liabilites Reserve 126,224 126,224
Prepaid Connection Fees 39,449 39,449
DLAD Fund 91,474 43,171 134,645
DLAD Surcharge 249,560 - 249,560
TSA SAD II Improvement Fund 21,820 21,820
Water Vehicle Reserve 989,501 989,501
COP Issuance/Payment Fund - - - - 202,406 202,406
Market Adjustments 21,989 6,634 318 32,835 61,777
Total Water Investments 10,380,070 2,915,852 2,109,635 1,429,007 249,186 202,406 43,171 17,329,326
Electric and Water,subtotal 24,475,807 3,520,531 8,869,573 18,441,314 3,445,356 249,186 293,607 1,527,987 167,988 60,991,349
MELLO ROOS-OLD GREENWOOD - - - - - - 231,701 457,177 - - - 688,878
Total Mello Roos-Old Greenwood 231,701 457,177 688,878
MELLO ROOS-GRAY'S CROSSING 1,829,612 - - 1,496,252 3,325,864
Total Mello Roos-Gray's Crossing 1,829,612 1,496,252 3,325,864
Total Investments $ 26,305,419 $ 3,520,531 $ 8,869,573 $ 18,441,314 $ 3,445,356 $ 249,186 $ 231,701 $ 457,177 $ 1,789,859 $ 1,527,987 $ 167,988 $ 65,006,091
202512 Last Month End Balances 26,054,126 3,509,338 8,838,916 18,681,135 3,445,356 157,539 230,979 86 269,360 2,116,400 184,397 63,487,630
Change from last month 251,294 11,193 30,657 (239,821) - 91,647 723 457,092 1,520,499 (588,413) (16,409) 1,518,461
202501 PY Month End Balances 25,303,357 3,353,196 8,865,885 8,598,427 7,219,314 234,245 260,489 312,902 1,667,687 4,072,113 95,781 59,983,396
Change from PY Month 1,002,062 167,335 3,687 9,842,887 (3,773,958) 14,941 (28,788) 144,275 122,173 (2,544,125) 72,207 5,022,695
202512 PYE Balances 26,054,126 3,509,338 8,838,916 18,681,135 3,445,356 157,539 230,979 86 269,360 2,116,400 184,397 63,487,630
Change from PYE 251,294 11,193 30,657 (239,821) - 91,647 723 457,092 1,520,499 (588,413) (16,409) 1,518,461
I:\Treasurers Report\2026\2026-04 Treasurer's ReportWll Imertm-202601 ZS
Page 13 of 15
Page 54 of 161
Ai&I., TRUCKEE DONNER January 2026
Public Utility District
Electric Utility - Key Reserve Balances
$ thousands
$24,000
$22,476
$19,000
$14,000
$9,000 ■ ■ ■
■
$4,000
r$0 ■
-$1,000 YE 2021 YE 2022 YE 2023 YE 2024 YE 2025 PY Same Last Current YE YE GOAL
Month Month Month FORECAST
■ Operating Reserve ■ Rate Reserve ■ Capital Reserve 2022 COP Project Funds
3/10/2026 11:21AM Page 14 of 15
0 FR Report Pack 2026 01 MFS Sec A(3.4) Page 55 of 161
TRUCKEE DONNER January2026
Public Utility District
Water Utility - Key Reserve Balances
$ thousands
$14,000
$12,000
$10,000
$8,000 ■
■
■ ■ ■ ■ ■ S7.186 ■
■ ■ $6,434 ■
$6,000
■
■
$4,000
■
$2,000 • •
• • • • • $1,590 •
■ ■ ■ ■ $990
$0 $0
YE 2021 YE 2022 YE 2023 YE 2024 YE 2025 PY Same Last Current YE YE GOAL
Month Month Month FORECAST
■ Operating Reserve ■ Vehicle Reserve ■ Capital Reserve 2022 COP Project Funds ° • Facility Fees °
3/10/2026 11:21 AM
0 FR Report Pack 2026 01 MFS Sec A(3.4) Page 15 of 15
Page 56 of 161
AGENDA ITEM #12
Public Utility District
MEETING DATE: April 1, 2026
TO: Board of Directors
FROM: Martina Rochefort, District Clerk/Executive Assistant
SUBJECT: Resolution 2026-03 to Request Election Services
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Consider adoption of Resolution 2026-03 declaring an election be held in the District's
jurisdiction; requesting the Board of Supervisors of Nevada and Placer Counties,
respectively, to consolidate this election with any other election conducted on
November 3, 2026; and requesting election services by the respective County Clerks
BACKGROUND:
The Board of Directors are elected every four years on alternating terms. In an effort to
save costs, the District can consolidate elections with Nevada County and Placer
County.
Per California Elections Code Section 10509, the District is required to submit a
resolution from the Board of Directors to the Nevada County Elections Office and
Placer County Elections Office requesting election services. The resolution must be
submitted no later than July 1, 2026 to be included on the November 3, 2026 ballot.
ANALYSIS AND BODY:
The County Elections Offices require each resolution to address the following:
• Names of Directors up for election;
• Length of term;
• Manner of election;
• Length and payment style of Candidate Statement; and
• Tie vote procedures.
Resolution 2026-03 (Attachment 1) outlines the 4-year (regular) board terms for
Directors Laliotis and Finn will expire on December 4, 2026. Directors are elected "At
Large," meaning the District has no separate divisions and all voters within the District
vote for all candidates. Candidate Statements are limited to 200 words and the cost is
Page 1 of 2
Page 57 of 161
paid for by the Candidate. Tie votes will be determined by lot. Resolution 2026-03 also
specifically requests election services from both County Elections Offices.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
FISCAL IMPACT:
The District's costs for election services in 2026 are unknown at this time. Projected
costs would be similar to the previous election. The District reimbursed $17,252.95 to
Nevada County and $1,123.75 to Placer County for election services in 2024. The
FY26 budget for GL 1/2.1.930.20.527 Board Election Expenses is $25,000.
ATTACHMENTS:
1. Resolution 2026-03 Election Services
Page 2 of 2
Page 58 of 161
Public Utility District m
Resolution No. 2026 - 03
RESOLUTION OF THE BOARD OF DIRECTORS DECLARING AN
ELECTION BE HELD IN ITS JURISDICTION; REQUESTING THE
BOARD OF SUPERVISORS OF NEVADA AND PLACER COUNTIES,
RESPECTIVELY, TO CONSOLIDATE THIS ELECTION WITH ANY
OTHER ELECTION CONDUCTED ON SAID DATE; AND
REQUESTING ELECTION SERVICES BY THE RESPECTIVE
COUNTY CLERKS
WHEREAS, the Truckee Donner Public Utility District Governing Body order an election to be
held in its jurisdiction on November 3, 2026;
WHEREAS, the General Election shall be to fill vacancies for the following Board Members
whose terms will expire on Friday, December 4, 2026;
Tony Laliotis - Regular Term
Christa Finn - Regular Term
WHEREAS, California Elections Code Sections 10509 and 13307 permit each candidate to
prepare a candidate's statement and the Board of Directors to require each candidate to pay
for the publication of their statement and to limit the number of words in each statement; and
WHEREAS, California Elections Code Sections 10555 and 10400, et seq. authorize the
canvass of election returns by the Boards of Supervisors respectively of Nevada and Placer
Counties;
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner
Public Utility District as follows:
1. That the Truckee Donner Public Utility District General Election in November 2026
for the purpose of electing two (2) persons to the Board of Directors thereof be
consolidated and held with the Statewide General Election on November 3, 2026
in the manner prescribed in Elections Code Section 10418.
2. That the two (2) positions to be filled at such election be designated as follows:
Tony Laliotis — At Large — 4 Year Term
Christa Finn — At Large — 4 Year Term
3. That the candidate is to pay for the publication of the candidate's statement,
pursuant to Elections Code Section 13307. The limitation on the number of words
Page 11
Page 59 of 161
that a candidate may use in their candidate's statement is 200 words.
4. That the two (2) candidates for the Board of Directors, receiving the highest
number of votes for their respective offices and who have filed the required
disclosure statement, shall be declared elected for their respective terms
beginning when first administered the oath of office, and ending when their
successors are elected and qualified.
5. That the Board of Supervisors respectively of Nevada and Placer Counties are
hereby requested and authorized to canvass the returns of said election of District
officers as to the respective election precincts comprising District territory with
each county.
6.That a copy of this Resolution shall be sent to the Boards of Supervisors of Nevada
and Placer Counties respectively not later than July 1, 2026, for purposes, among
others, of notice thereto of consolidation and authorization to canvass returns.
7. That the District does not request Measure(s) be decided at this election.
8. The County Clerk for Nevada County and the County Clerk for Placer County are
requested, authorized, and directed to provide all necessary election services for
their respective County and the District shall pay each County all applicable costs.
9. That there have been no changes to the District boundaries since our last election.
10. In the case of a tie vote, the procedure to be followed is to decide by lot, in
accordance with Election Code Section 10551(b).
11. That this resolution is hereby adopted and becomes effective and in full force
immediately upon its adoption.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility
District at a meeting held within said District on April 1, 2026 by the following vote-
AYES-
NOES:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Tony Laliotis, President of the Board
ATTEST:
Martina Rochefort, District Clerk
Page 12
Page 60 of 161
AGENDA ITEM #13
Public Utility District
MEETING DATE: April 1, 2026
TO: Board of Directors
FROM: Brian Wright, General Manager
Jillian Steward, Director of Human Resources & Risk Management
SUBJECT: Resolution 2026-04 to Nominate Director John Pang of Tahoe City
Public Utility District to ACWA-JPIA Captive Insurance Company
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Adopt Resolution 2026-04, Nominating Tahoe City Public Utility District Board Director
John Pang to the Association of California Water Agencies Joint Powers Insurance
Authority Captive Insurance Company Fund Board
BACKGROUND:
The District is a member of the Association of California Water Agencies (ACWA) and,
as a member, has access to and has used insurance services through their Joint
Powers Insurance Authority (JPIA) for many years. ACWA JPIA wholly owns the
California Water Insurance Fund (CWIF), a private captive insurance company. CWIF
manages and finances reinsurance risk for the JPIA liability program.
Each member agency must designate an elected representative to the ACWA JPIA
Board of Directors and an alternate (staff). TDPUD Board President, Tony Laliotis is
the District's elected representative on the ACWA JPIA Board of Directors and Director
of Human Resources/Risk Management, Jillian Steward, is the District's
alternate. Each member agency that participates in the ACWA JPIA Liability Program
and at least one additional JPIA program may nominate a Board of Director to serve on
the California Water Insurance Fund Board (CWIF). Nomination of a candidate to serve
on the CWIF Board must be made by the governing body of the member agency with
the concurrent nomination by the governing board of at least three additional member
agencies.
Director John Pang has served as Tahoe City Public Utility District (TCPUD) elected
board representative to ACWA JPIA since 2014, and continues to serve in that
capacity. Director Pang was appointed to fill a vacated seat on the CWIF Board in
2025. That board seat is now up for election and Director Pang wishes to continue in
this role. Director Pang and TCPUD have requested support for his nomination to the
Page 1 of 2
Page 61 of 161
CWIF Board. A copy of Director Pang's Statement of Qualifications has been attached
to this staff report for review (Attachment 1).
ANALYSIS AND BODY:
As a neighboring public utility and special district in the North Lake Tahoe region,
TCPUD represents very similar interests in terms of liability and risks for a public utility
in the eastern Sierra Nevada. The District participates in several joint powers efforts
and partnerships within the larger public utility industry. Staff believes Director Pang
has and will continue to represent Truckee-Tahoe's interests.
On March 12, 2026, the TCPUD Board of Directors nominated Director John Pang by
way of TCPUD Resolution No. 26-12 (Attachment 2).
The Board may nominate Director Pang for election to the CWIF Board by resolution. A
copy of the draft Resolution No. 2026-04 has been provided as an attachment to this
staff report (Attachment 3). If the Board approves the nomination, staff will submit it to
ACWA/JPIA by Saturday, April 4, 2026. A copy of the Nomination Procedures has been
provided as an attachment to this staff report (Attachment 4).
Staff is recommending the Board nominate TCPUD Director Pang to serve on the CWIF
Board by adoption of District Resolution 2026-04.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
3. Engage with our customers and communities in a welcoming and transparent way to
identify opportunities.
FISCAL IMPACT:
There is no direct fiscal impact associated with this item.
ATTACHMENTS:
1. Pang Statement of Qualifications
2. TCPUD Resolution 26-12
3. Resolution 2026-04
4. CWIF-Nominating-Procedures - Copy
Page 2 of 2
Page 62 of 161
Attachment 1
Candidate Statement of Qualifications
for California Water Insurance Fund Board
John Pang Was first elected to the TCPUD Board in 2014 and
successfully re-elected twice, in 2018 and 2022. John Was appointed
by the TCPUD Board to serve as a member of the ACWA JPIA Board of
Directors in January 2015 in recognition of his experience in risk
management and safety. John has been an actively engaged ACWA
JPIA board member since his appointment in 2015,attending the spring
and fall conferences each year and participating in the ACWA
Headwaters Workgroup. In 2025 John Was appointed to serve a
vacated seat on the California Water Insurance Board and he Would
Like to continue to serve in the role. He wiLL Work hard to serve your
interests.
Contact: John Pang • Elected TCPUD Board Director-2014,2018,2022
o Past Board President(2018 and 2022)
o Current Chair,TCPUD Finance Committee
Phoneo Member,TCPUD Ad-Hoc Long-Term Financial Planning Committee
• • o Past Chair,TCPUD Sewer and Water Committee
• Board Director-ACWA/JPIA(2015-Present)
Wl
Member-ACWA Headwaters Workgroup
jpang@tcpud.org
Q Address
Experience ,
221 Fairway Dr.,T City CA iA
ahoe
Retired Fire Chief- Meeks Bay Fire Protection District(19 years)
o Prioritized employee and public safety,and wildfire prevention
• Active Volunteer-Tahoe Nordic Search and Rescue Team(since 1995)
• Active Volunteer- Loyalton Fire(since 2015)
• Former Vice President-TaLmont Resort Improvement District(7 years)
• Former Director-Olympic Valley Public Service District(7 years)
• Former Director-Sierra Watershed Education Partnership(7 years)
• Former Member- Lake Tahoe Federal Advisory Committee
• Former Member- EL Dorado County"Fire Advisory Board"(so years)
• Former Founding Chair-Tahoe Fire and FueLs Team(addressing forest
health)
Education
Certified Chief Officer for the State of California(Fire Chief Certification)
• Certificate in Special.District Management from Special.District
Tahoe City Public Management Institute
• Graduate California Special District Governance Academy
• Numerous classes including District Advanced Finance, Leadership,
Building a healthy mountain Infrastructure Security, Public Governance,etc.
community through our passion • Graduate University of California, Davis
for public service.
Page 63 of 161
Attachment 2
RESOLUTION NO. 26-12
A RESOLUTION OF THE TAHOE CITY PUBLIC UTILITY DISTRICT
NOMINATING ITS ACWA JPIA BOARD MEMBER TO THE
CALIFORNIA WATER INSURANCE FUND BOARD
AN ACWA JPIA CAPTIVE INSURANCE COMPANY
WHEREAS,the Tahoe City Public Utility District is a member district of the ACWA JPIA that
participates in the JP1A's Liability Program, Property Program,and Workers'Compensation Program;
and
WHEREAS,the Nominating Procedures for the California Water Insurance Fund Board provide that in order
for a nomination to be made to the California Water Insurance Fund Board, the member district must place
into nomination its member of the ACWA JPIA Board of Directors for such open position;
NOW,THEREFORE, BE IT RESOLVED by the Board of Directors of the Tahoe City Public Utility District that
its member of the ACWA JPIA Board of Directors,John Pang,be nominated as a candidate for the California
Water Insurance Fund Board for the election to be held on May 4, 2026.
BE IT FURTHER RESOLVED that the ACWA JPIA staff is hereby requested,upon receipt of the formal
concurrence of three other member districts to affect such nomination.
BE IT FURTHER RESOLVED that the District Clerk is hereby directed to transmit a certified copy of this
resolution to the ACWA JPIA at P.O. Box 619082, Roseville, CA 95661-9082,forthwith.
PASSED AND ADOPTED on the 20th day of March 2026 at a regular meeting of the Board of Directors of
Tahoe City Public Utility District by the following vote:
AYES: Friedman, Beals,Wilkins, Pang,Scoville
NOES: None
ABSENT: None
TAHOE CITY PUBLIC UTILITY DISTRICT
BY: ATTEST:
Gail Scoville, Pre ident Terri Viehmann, District Clerk
Resolution No.26-12 Adopted March 20,2026 Page 1 of 1
Page 64 of 161
This document is to certify that the attached Resolution No. 26-12 is an accurate copy of the
resolution passed by the Board of Directors of the Tahoe City Public Utility District at a
meeting on March 20, 2026.This resolution is effective as of March,20,2026
Signed this 20th day of March 2026:
Terri Viehmann District Clerk ! ` _
Name Signature
Tahoe City Public Utility District-Certified Copy of Resolution
Page 65 of 161
Attachment 3
TRUCKEE DONNER
Public Utility District
Resolution No. 2026 - 04
RESOLUTION OF THE TRUCKEE DONNER PUBLIC UTILITY
DISTRICT BOARD OF DIRECTORS CONCURRING IN
NOMINATION TO THE CALIFORNIA WATER INSURANCE
FUND BOARD, AN ACWA JPIA CAPTIVE INSURANCE
COMPANY
WHEREAS, Truckee Donner Public Utility District is a member district of the Association
of California Water Agencies (ACWA) Joint Powers Insurance Authority (JPIA); and
WHEREAS, the Nominating Procedures for the California Water Insurance Fund Board
provide that in order for a nomination to be made to the California Water Insurance Fund
Board, three member districts must concur with the nominating district, and
WHEREAS, another ACWA JPIA member district, the Tahoe City Public Utility District
has requested that this District concur in its nomination of its member of the ACWA JPIA
Board of Directors to the California Water Insurance Fund Board;
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner
Public Utility District that this District concurs with the nomination of John Pang of the
Tahoe City Public Utility District, to the California Water Insurance Fund Board.
BE IT FURTHER RESOLVED that the District Clerk is hereby directed to transmit a
certified copy of this resolution to the ACWA JPIA at P.O. Box 619082, Roseville, CA
95661-9082, forthwith.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility
District at a meeting held within said District on April 1, 2026 by the following vote-
AYES-
NOES:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Tony Laliotis, President of the Board
ATTEST:
Martina Rochefort, District Clerk
Page 66 of 161
Attachment 4
California Water Insurance Fund Board
An ACWA JPIA Captive Insurance Company
Nomination Procedures
Approximately 120 Days before Election (January 4, 2026)
All ACWA JPIA Directors and Member Districts are to be notified of:
A) Date and place of Election;
B) California Water Insurance Fund Board positions and terms of office to be filled by
election; and
C) Nomination Procedures.
Up until 30 Days before Election (April 4, 2026)
A) A district (that participates in the JPIA Liability Program and at least one of the other
programs: Property, Workers' Compensation, or Employee Benefits) may place into
nomination its member of the Board of Directors of ACWA JPIA with the
concurrence of three districts, then members of the ACWA JPIA, in addition to the
nominating district.
B) Sample resolutions are available on the ACWA JPIA website.
C) The district is solely responsible for timely submission of the nominating
resolution and the three additional concurring in nomination resolutions of its
candidate for office.
30 Days before Election (April 4, 2026)
A) Deadline and location for receiving the nominating and concurring in nomination
resolutions in the ACWA JPIA office:
Saturday — April 4, 2026.
Laura Davis, Communications & Events Specialist
ACWA JPIA
P. O. Box 619082, Roseville, CA 95661-9082
(Idavis@acwajpia.com)
B) Candidates' statement of qualifications must be submitted, if desired, with the
nominating resolutions. The statement of qualifications must be submitted on one
side of an 8'/2 x 11" sheet of paper suitable for reproduction and distribution to all
districts. (MSWord or PDF documents preferred).
14 Days before Election (April 20, 2026
Final notice of the upcoming Election and CWIF Election members will be included as
part of the Board of Directors' meeting packet. Final notice shall include:
A) Date, Time, and Place of Election;
B) Name and District of all qualified candidates;
C) Candidate's statement of qualifications (if received); and
D) Election Procedures and Rules.
Page 67 of 161
AGENDA ITEM #14
Public Utility District
MEETING DATE: April 1, 2026
TO: Board of Directors
FROM: Brian Wright, General Manager
SUBJECT: Consideration of an Updated Firm Electric Service Allocation
Assignment Agreement with the City of Fallon
APPROVED BY:
Z-
Brian C. Wright, General Manager
RECOMMENDATION:
Authorize the Board President to execute an updated Firm Electric Service Allocation
Agreement with the City of Fallon
BACKGROUND:
The Western Area Power Administration (WAPA) markets surplus generation from, and
operates a high voltage transmission system as part of the Central Valley Project
(CVP). The District and the City of Fallon receive allocations of Base Resources (BR)
for Firm Electric Service (FES) under the WAPA Sierra Nevada Region (SNR) 2005
Resource Pool contracts. WAPA's 2005 BR contracts expired on December 31,
2024. The District and the City of Fallon executed new BR contracts with WAPA for the
period beginning January 1, 2025, through the end of the calendar year, December 31,
2054 (the 2025 BR Contract). This BR contract includes electric service allocations
from the CVP and Stampede Hydro-Generation.
Previously, because the District and the City of Fallon do not have direct economically
feasible transmission access to the entitled energy allocations provided by the CVP, the
City of Fallon assigned its allocation to the District, the District assigned its allocation to
Plumas-Sierra Rural Electric Cooperative (Plumas-Sierra), and Plumas-Sierra assigned
its allocation to the Northern California Power Agency (NCPA). This ensured beneficial
use of the BR allocation through scheduling by NCPA who has direct transmission
access to the resource.
ANALYSIS AND BODY:
WAPA has recently adopted its updated 2025 Power Marketing Plan, requiring
participating agencies to update their respective Firm Electric Service Allocation
Agreements. The City of Fallon has requested to continue its BR allocations to the
District as previously executed. A copy of the agreement as approved by the Mayor of
the City of Fallon has been included as an attachment to this staff report. Staff is
recommending to the Board that the District renew its agreement with the City of Fallon
Page 1 of 2
Page 68 of 161
to ensure continued beneficial use of the resource allocation through resource
scheduling with NCPA. Provided the Board authorize the renewal of this agreement, it
would also require the District to consider renewal of the BR allocation agreement with
Plumas-Sierra. Staff would bring an item for consideration by the Board for the renewal
of this agreement with Plumas-Sierra at a later date.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
2. Provide a healthy and safe work environment for all District employees.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
5. Manage the District in an environmentally sound manner.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
2. Environmental Stewardship: Create a sustainable resilient environment for all our
communities.
3. Engage with our customers and communities in a welcoming and transparent way to
identify opportunities.
4. Modernize the utility and add value to our communities through collaboration and
innovation.
5. Developing an inclusive culture drives organizational integration and success.
FISCAL IMPACT:
There is no direct fiscal impact associated with this item.
ATTACHMENTS:
1. 2026-03_WAPA Base Resource Assignment
Page 2 of 2
Page 69 of 161
Western Area Power Administration
Sierra Nevada Region (SNR)
2025 Power Marketing Plan
Firm Electric Service Allocation Assignment Agreement
AGREEMENT NUMBER AND EFFECTIVE DATE:
Agreement No. 25-SNR-03319 Effective Date: Execution
ORIGINAL ALLOCATION HOLDER("FALLON"):
Company/Municipality
City of Fallon
Name:
Type of Organization: Municipality
Street Address: 55 West Williams Ave Point of Contact: Sean Rowe
City: Fallon Title: Deputy City Attorney
State: Nevada Office Phone Number: (775)423-2106
Zip: 89406 Cell Phone Number:
State Formed/Organized Under: NV E-mail: srowe@fallonnevada.gov
ASSIGNED ALLOCATION HOLDER("TDPUD"):
Company Name: Truckee Donner Public Utilities District
Type of organization: Public Utility District
Street Address: 11570 Donner Pass Road Point of Contact: Brian C. Wright
City: Truckee Title: General Manager
State: California Office Phone Number: (530)582-3957
Zip: 96161 Cell Phone Number:
State Formed/Organized Under: CA E-mail: brianwright@tdpud.org
RELATIONSHIP OF FALLON TO TDPUD:
The two entities are physically located near each other. Neither have an economic avenue to
physically receive the Base Resource from the Sierra Nevada Region.
1. PREAMBLE: This Agreement is made pursuant to the Acts of Congress approved
June 17, 1902 (32 Stat. 388); August 4, 1977 (91 Stat. 565); October 24, 1992 (106 Stat. 2776,
2799-2803);August 8, 2005 (119 Stat. 594);other acts that specifically apply to the projects
involved; and acts amendatory or supplementary to the foregoing Acts, among the United
States Of America, acting by and through the Administrator, Western Area Power
Administration, Department of Energy, hereinafter called"WAPA,"represented by the officer
Page 70 of 161
Assignment 25-SNR-03319
executing this Agreement or a duly appointed successor; Fallon; and TDPUD, hereinafter
sometimes collectively called the Parties.
2. EXPLANATORY RECITALS:
2.1 WAPA markets the surplus generation from, and operates a high-voltage transmission
system as part of, the Central Valley Project(CVP).
2.2 WAPA published the Final 2025 Power Marketing Plan (Marketing Plan) in the Federal
Register on August 15, 2017, (82 FR 38675). The Marketing Plan is effective January 1,
2025,through December 31, 2054.
2.3 WAPA has allocated Federal hydropower under the provisions of the Marketing Plan.
2.4 Fallon and TDPUD received allocations of Base Resource(BR) for Firm Electric Service
(FES)under the 2005 Resource Pool. Fallon and TDPUD also received additional
allocations under the 2025 Resource Pool.
2.5 WAPA's 2005 BR Contracts expired December 31, 2024. Fallon and TDPUD executed
new BR Contracts with WAPA for the period beginning January 1, 2025, through the end
of the calendar day on December 31,2054 (the 2025 BR Contract).
2.6 Previously, Fallon assigned its allocation to TDPUD, TDPUD assigned its allocation to
Plumas-Sierra Rural Electric Cooperative (Plumas-Sierra), and Plumas-Sierra assigned its
allocation to the Northern California Power Agency.
2.7 Fallon and TDPUD requested that WAPA assign Fallon's BR allocation to TDPUD for
the term of the 2025 BR Contracts to continue the relationship and operations existing
prior to 2025.
2.8 WAPA will revise the applicable exhibits under Fallon's BR Contract 20-SNR-02327 to
reflect a 0%BR percentage and TDPUD's BR Contract 20-SNR-02339 to include
Fallon's BR allocation with TDPUD's BR allocation.
3. AGREEMENT:
3.1 Fallon assigns to TDPUD,pursuant to the terms of this Agreement, Fallon's 2025 BR
allocation.
3.2 TDPUD accepts the assignment and agrees to take responsibility for Fallon's BR
allocation and assumes all the rights, duties,and obligations associated with receiving
Fallon's BR allocation.
2
Page 71 of 161
Assignment 25-SNR-03319
3.3 WAPA and TDPUD will incorporate Fallon's 2025 BR allocation and this Agreement
into TDPUD's 2025 BR Contract.
3.4 Fallon and TDPUD shall jointly and severally indemnify and hold WAPA harmless from
and against all claims,damages, losses, and expenses, including attorney's fees, arising
out of or resulting from this Assignment, including any arising out of or resulting from
any Party issuing a notice to terminate or termination of this Assignment.
3.5 Termination of this Agreement:
3.5.1 Fallon or TDPUD may terminate this Agreement by giving WAPA and the other
Party written notice of its intent to do so at least ninety (90) calendar days prior to
the effective date of the termination.
3.5.2 In the event TDPUD's BR Contract terminates for any reason,this Agreement shall
be deemed terminated concurrently with termination of TDPUD's BR Contract.
TDPUD will notify Fallon if TDPUD's BR Contract is terminated.
3.5.3 Upon termination of this Agreement pursuant to Section 3.5.1 or 3.5.2 of this
Agreement, TDPUD agrees that its BR Contract will be modified to reflect the
termination of the assignment of Fallon's BR allocation.
4. TERM OF AGREEMENT: This Agreement will become effective upon execution by
WAPA's Administrator and Chief Executive Officer and will terminate at the end of the
calendar day on December 31,2054; Provided, That this Agreement may terminate earlier
under the provisions set forth in Section 3.5 of this Agreement.
5. GENERAL POWER CONTRACT PROVISIONS: The General Power Contract Provisions
(GPCP)effective July 17, 2025,attached hereto, are hereby made a part of this Agreement the
same as if they had been expressly set forth herein; Provided,That Provisions 2 through 30
shall not be applicable hereunder; Provided further, That the word"Contractor" in the GPCP
refers to both the TDPUD and Fallon.
6. EXECUTION BY COUNTERPARTS: This Agreement may be executed in any number of
counterparts and, upon execution and delivery by each party,the executed and delivered
counterparts together shall have the same force and effect as an original instrument as if all
parties had signed the same instrument. Any signature page of this Agreement may be
detached by any counterpart of this Agreement without impairing the legal effect of any
signatures thereon and may be attached to another counterpart of this Agreement identical in
form hereto, by having attached to it one or more signature pages.
3
Page 72 of 161
Assignment 25-SNR-03319
7. ELECTRONIC SIGNATURES: The parties agree that this Agreement may be executed by
handwritten signature or digitally signed using Adobe Sign or DocuSign. An electronic or
digital signature is the same as a handwritten signature and shall be considered valid and
acceptable.
8. AUTHORITY TO EXECUTE: Each individual signing this Agreement certifies that the Party
represented has duly authorized such individual to execute this Agreement that binds and
obligates the Party.
CITY OF FALLON:
Signature: kLl"
Name: KG I nrl.l".c-
Title: o
Date:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT:
Signature:
Name:
Title:
Date:
WESTERN AREA POWER ADMINISTRATION:
Signature:
Name:
Title:
Date:
4
Page 73 of 161
Assignment 25-SNR-03319
RESOLUTION
(To be completed by Fallon)
BE IT RESOLVED by the City Counsel of the City of Fallon, that�a t— -,L is
hereby authorized to execute for and on behalf of the City of Fallon,the attached Base Resource
Allocation Assignment Agreement(Agreement), among the Western Area Power
Administration, Truckee Donner Public Utility District and City of Fallon which was duly
presented to the City Counsel, and which Agreement is hereby approved.
(State of V 2 42
(Insert State)
) SS
(County of
(Insert County)
I,
6 PI CI 1 , the duly appointed and qualified Cleric of the
City of Yall4on, do hereby certify that the foregoing is a true, accurate, complete copy of a
resolution duly passed and adopted at a regular meeting of the City Counsel of the City of Fal loll,
held on WA 7,fA„ )
(Month and Day) (Year)
Dated: #/`� By:
( ignatureofClerk)
Title:
Page 74 of 161
Assignment 25-SNR-03319
RESOLUTION
(To be completed by TDPUD)
BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District, that
is hereby authorized to execute for and on behalf of the
Truckee Donner Public Utility District, the attached Base Resource Allocation Assignment
Agreement(Agreement), among the Western Area Power Administration,Truckee Donner
Public Utility District and City of Fallon which was duly presented to the Board of Directors of
the Truckee Donner Public Utility District, and which Agreement is hereby approved.
(State of )
(Insert State)
Ss
(County of )
(Insert County)
I, , the duly appointed and qualified Secretary of
the Board of the Truckee Donner Public Utility District,do hereby certify that the foregoing is a
true, accurate, complete copy of a resolution duly passed and adopted at a regular meeting of the
Board of Directors of the Truckee Donner Public Utility District, held on
(Date)
Dated: By:
(Signature of Clerk)
Title:
b
Page 75 of 161
AGENDA ITEM #15
Public
MEETING DATE: April 1, 2026
TO: Board of Directors
FROM: Steven Poncelet, Public Information Officer/Strategic Affairs Director
SUBJECT: Consideration of a professional services contract with Probolsky
Research for the 2026 District Customer Survey.
APPROVED BY:
Z_
Brian C. Wright, General Manager
RECOMMENDATION:
Authorize the General Manager to execute a professional services contract with
Probolsky Research for the 2026 TDPUD Customer Survey in the amount of $29,750,
plus a 10% change order authorization of$2,975, for a total not to exceed contract
amount of $32,725.
BACKGROUND:
The District has periodically conducted formal customer surveys using research firms
with expertise in developing and implementing meaningful and statistically valid
customer surveys. The District's last survey was conducted at the end of 2020 by
Probolsky Research with the results presented to the Board and public in early 2021.
The survey methodology is based on obtaining a margin of error of +/- 5%, with a
confidence level of 95%. This is achieved by inviting a cross-section of our customers
the opportunity to participate via phone interviews, online via email and text message,
and by mail. The survey sample size and respondent demographics are designed
based on the unique make-up of the District's customer base and typically results in
contacting -1,000 District customers to get the -400 responses needed to be
statistically valid. The survey was offered in both English and Spanish.
The advantages of using this methodology include maximizing accuracy and reach,
while minimizing response bias. Because respondents are not self-selecting using this
methodology, the sample is more random and more accurate. The result is participation
from a more diverse group of respondents and better results.
The customer survey measured customer satisfaction, service priorities, communication
preferences, and community expectations for the District's water and electric services.
The District's 2020 survey had about 75% of the questions that are common for almost
all electric and/or water utilities and provides a baseline for customer preferences,
priorities, and the District's performance. This allows for comparison across the utility
industry and by asking these same questions over time, the District can see and
Page 1 of 3
Page 76 of 161
address trends in customer responses. The remaining questions for the 2020 survey
(-25%) related to the District's process for developing a District strategic plan and
Board strategic initiatives. These questions sought customer input on their concerns,
needs, and priorities. The overarching goal of the customer surveys is to provide clear,
actionable data to guide decisions.
ANALYSIS AND BODY:
District staff recommend conducting the next customer survey and recommend using
Probolsky Research again. Probolsky Research is familiar with the District and
performed well during the last survey. The state-of-the-art for customer surveys
continues to progress, driven primarily by advances in technology and
connectivity. Probolsky Research remains one firm that has risen to the top of the field
in California and nationally and has a proven track record working with public
utilities. Established in 1992, Probolsky Research specializes in independent opinion
research. They have conducted thousands of projects similar to the one the District is
planning, with extensive experience researching public awareness and a specific focus
on public agencies, including utilities. They are headquartered in California and Adam
Probolsky would directly lead the team. Probolsky Research, having done the District's
previous survey and with many questions repeated, can not only effectively administer
the survey but has the historical data to provide trend data.
District Code, Title 3, Section 3.08.050 Special Services allows for direct procurement
with no formal Request for Proposals process for vendors that provide specialized
services or products to the District. These special services include specialized software,
hardware, and unique services. The nature of the District's customer survey scope and
the unique value that Probolsky Research provides qualifies this procurement as a
Special Service. Probolsky Research is eager to work with the District again and is
capable of serving the District's needs in a professional, timely, and efficient manner.
District staff requested a proposal from Probolsky Research for the 2026 TDPUD
Customer Survey which is Attachment 1. The proposal is for a fixed firm cost of
$29,750, which is the same cost for the survey in 2020. If approved by the Board, the
customer survey is planned for this spring and would involve a process for reviewing
and updating the survey questions and the final results would be brought back to the
Board in a public workshop.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
2. Provide a healthy and safe work environment for all District employees.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
5. Manage the District in an environmentally sound manner.
6. Manage the District in an effective, efficient and fiscally responsible manner.
Page 2 of 3
Page 77 of 161
District Code 1.05.030 Goals:
1. Manage for Financial Stability and Resiliency
2. Environmental Stewardship: Create a sustainable resilient environment for all our
communities.
3. Engage with our customers and communities in a welcoming and transparent way to
identify opportunities.
4. Modernize the utility and add value to our communities through collaboration and
innovation.
5. Developing an inclusive culture drives organizational integration and success.
FISCAL IMPACT:
The requested contract authorization of $32,725 was included in the approved FY26
and FY27 budgets under GL 1/2.2.923.00.744 in the amount of$30,000. Staff forecast
the total account 923 budget of$303,000 to have sufficient contingency in other
categories to cover the $2,725 overage in activity code 744 surveys.
ATTACHMENTS:
1. Probolsky Research - Truckee Donner PUD - Proposal Memo
Page 3 of 3
Page 78 of 161
To: Steven Poncelet Adam Probolsky, President
Truckee Donner Public Utility District Probolsky Research
100 Pine Street Suite 1250
From: Adam Probolsky San Francisco CA 94111
Probolsky Research adam@probolskyresearch.com
Date: March 6, 2026 Telephone: 415-870-8150
Subject: Customer Survey Proposal
We look forward to continuing our work with Truckee Donner Public Utility District (TDPUD) on a new customer
survey- building directly on the insights from our last survey.
We will measure customer satisfaction, service priorities, communication preferences, and community
expectations for TDPUD's water and electric services. We want to provide clear, actionable data to guide
decisions.
I will personally lead this project. You can count on us to be available for meetings, briefings, custom reporting,
and presentations- in-person or virtually-as much as needed.
As you know, Probolsky Research brings extensive experience conducting customer and community surveys
for public agencies, including utilities throughout California and nationally.
Established in 1992, we are a woman- and Latina-owned firm and a certified small-business enterprise with
multilingual research capabilities.
Meet our diverse and talented Probolsky Research team:
Desiree Probolsky
45
GEO
Ar
Dr.Adam Probolsky
President
Shalom VeHer
Technology Director
:y
Alton Smith AnaAlo Jiml-abilles Joshua Emeneger Dr.Alyce Basil Sergio Martinez Rose Regio Elija Marie del Rosario Shai Javier
Disability& Research Research Principal Managing Research Research Marketing Visualization
Diversity Advisor Assistant Assistant Researcher Researcher Analyst Analyst Strategist Analyst
PROBOLSKY
RESEARCH 1
ge79of161
Project Approach
Project Kick-off Agenda Memo
Prior to our first meeting with staff, we will provide TDPUD with a project kick-off agenda memo that outlines
the objectives, processes, and next steps. You can view an example of a project kick-off agenda memo here.
Survey Design
Our kick-off meeting with TDPUD will focus on goal planning and question development. This requires close
collaboration with your team.
Using the information gleaned from meetings, calls, past research, background information, and our open-
source research, we will make methodological recommendations and draft the survey questionnaire through
an iterative process that incorporates feedback from TDPUD. We establish proportions to ensure we include a
diverse group of TDPUD's customers, community, and stakeholders.
After programming, the survey is tested for logic and presentation. Our quality control process continues
throughout the survey process, checking for correct skip patterns, randomization and rotation, and
completeness of responses.
Research Process and Community Outreach
Prior to launching the survey, we will provide TDPUD with a research process memo that explains the
purpose, timing, and how it will be conducted. This document can be used to inform staff and policymakers
about the survey. You can view an example research process memo here.
Survey Methodology
With our extensive national experience in conducting customer surveys, we propose a statistically valid
multimode approach that allows respondents to respond in their preferred mode, including telephone, online,
and mail, to reach the broadest possible and most diverse and representative group of respondents. This
approach allows for better coverage across different demographics and more reliable insights. This
methodology will provide TDPUD with the most comprehensive, accurate, and actionable data.
Telephone respondents are called by our live interviewers on their landline or mobile phone. We also offer an
option for respondents to call a toll-free phone number to speak with a live interviewer anytime.
Online respondents can complete the survey from any device: computer, tablet, or mobile phone after
receiving an email, text message, or other online outreach with a unique survey link.
Mail respondents can scan a custom QR code to take them to their survey, go to a website like
TDPUDCustomerSurvey.com, or call a toll-free number to reach our interviewers.
UsEa cm 2
L ge80of161
Ay.nrvr•w1Y��N�^� - 'las nar
}4 F..an S.rKt,rwl �^ r rlrela
yr.
&Z41
Ki
ns•t"�°` ,,,a,r.aN•""�r'�w w•,s oR.woe cus omer pars cammunih water 1xa+atler,is
TRUCKEE OQNNER us r,c: reomwenliel.t np m Your ParUclpaNan is
J r4aiic pnilrr ei3lriez _ - Ptad Weaas we,
the
•wrvaa"" ..ea -
�e,nr..v�. �,..ia� �ra..cww wwr wao-x•. ..
riA 'w" u���� r.:3ar:v L.i.:yvlc Slsky Research is canrlucti..y=}rloal�mn0'0�' ��y. ryemail,text mdv. Phonela survey bn
P^' �.r.sv1'"m`tl -r`tl` " . mPorynt antl hQl ape.ar can if we tlan't
•c""..g:a'c-..iia 4s for ywr Patti Mul to uMarstantlinp Wr
Pa ion!
Scan Mit 4R cM*to Refer Complete th
+++a1A "Mpleu9.0 a0my. by Phone?catiaga.6".0742
Ge�S'm'r 07s2 II
EXAMPLE:(from left) Mail(Truckee Sanitary District), Mail invitation Mock up(Truckee Donner Public Utility District),
Postcard(East Bay Municipal Utility District)
Regardless of mode, respondents can choose their preferred language at the onset of their survey experience.
Our surveys are designed to be user-friendly across all modes - online, phone, or mail, yielding high-quality
responses. We use security measures to maintain data integrity. Respondents are only allowed to complete
the survey once.
All responses are combined and analyzed together. Additionally, results will be cross-tabulated by collection
mode.
The advantages of this multimode methodology include maximizing accuracy and reach, while minimizing
response bias. Because respondents are not self-selecting using this methodology, the sample is more
random and more accurate. We consistently achieve participation from a more diverse group of respondents
using this multimode approach.
We are happy to discuss changes to this approach and we will accommodate TDPUD's preferences.
Accessibility Standards
Our online survey platform adheres to the most current accessibility standards (ADA), including compliance
with the Web Content Accessibility Guidelines (WCAG) 2.1 AA and Section 508 of the U.S.
Rehabilitation Act. It is designed to be accessible to people with a diverse range of sight, hearing,
movement, and cognitive abilities, including users with impairments. Features include screen-reader and
keyboard navigation compatibility, responsive survey layouts, high-contrast themes for the visually impaired,
and rigorous accessibility testing.
Our reporting also meets new standards by incorporating searchable text, proper tagging (headings, lists,
logical reading order), alternative text for images, sufficient color contrast, and clear structure, making them
usable with assistive technologies like screen readers.
Cyber Security & Confidentiality
We take data integrity and confidentiality seriously.All client materials are hosted in U.S.-based secure
256-bit Advanced Encryption cloud computers. Your internal data will be secure. Research is only released
per your direction.
UsEa cm 3
L ge81 of161
Sample Size
Relationship of Margin of Error to Sample Size
20%
16%
16%
sampleof 400
customers will yield a +/-5% margin of 14%
error at a 95% level of confidence. 2
The science-based, representative
Ww
U to%
random •le will allow for
comparisons a • • all subgroups •the target population (e.g., by S°lo
6%
demographic and geographic
varia• 4% ---------
S4-wie Bice=499
2% Margin of Errors+!•5.0%
0 t40 240 NQ 400 WQ 500 700 NO 900 1.000
sample size(Number of Respondents)
Sample Stratification
The statistically valid sample file of TDPUD's customers will be secured by Probolsky Research at our
expense from consumer and government data sources.
Stratified Random Sampling at the Point of Collection
Probolsky
correctingsample from the start, rather than for imbalance after the survey is complete.
Rather than adjusting results after the fact, we control sample composition during data collection to ensure
responses are gathered from the correct proportion of respondents across key demographic and geographic
characteristics. This method ensures every completed interview represents a real customer and contributes
equally to the final results.
FpProb.l.lkyl
DatabaseResearch
(Lour Approach,
No corrective modeling required
FPH.w
Others", Customer
•.-
Approach the
D.
Process
L �A Results depend on statistical assumptions
Post-survey weighting techniques mathematically adjust results to compensate for under- or over-represented
groups. While this is an accepted practice, these adjustments can amplify a small number of responses and
limit the reliability of detailed insights, particularly for open-ended feedback.
By using a stratified random sample from the outset, Probolsky Research eliminates the need for corrective
weighting and ensures that each response reflects a real customer in the correct proportion. This preserves the
integrity, richness, and reliability of both quantitative results and qualitative insights, providing decision-makers
with findings grounded in authentic customer perspectives rather than statistical reconstruction.
7BOIS 4
ge82of161
Data Analysis
We complete comprehensive statistical analyses of the research results, utilizing software programs, including
IBM SPSS and R to conduct statistical testing, such as multiple regression analysis. Both qualitative and
quantitative data will be analyzed in a scientifically valid manner. This helps us discover and present
statistically significant results—beyond the broad opinions—and understand the specific factors that contribute
to attitudes and beliefs. Such analyses are crucial in identifying gaps in perception and awareness. Once we
have run all analyses on results, cross tabulations are developed, graphics are generated, and other elements
of the report are prepared.
Verbatim Responses to Open-Ended Questions
For open-ended questions - which can yield qualitative results - we code the responses into categories. Once
these categorizations have been quantified, we take our analysis a step further. We analyze the tone and word
choices and overlay demographic data for each response. This demographic overlay will provide TDPUD with
a unique understanding of the opinions by age, ethnicity, gender, language, party preference, vote propensity,
residence type, etc., when reading their comments. Here is an example:
1English, • . County
Question: What is your biggest concern for the future of your community?
Answer.-Keeping the neighborhood fee/
Example of a verbatim response with demographic overlay
Analysis and Reporting
We will complete comprehensive data analyses and develop reporting to deliver accurate and actionable data
insights. Our reporting is comprehensive and immediately usable by decision-makers. Our reporting includes:
Reporting will include methodology, key findings, charts, visualized tracking data,
cross-tabulations, conclusions, and recommendations
+ a more detailed report on results with open-ended responses and demographic
overlays
6°— Presentations as directed
0
O�O In person meetings, presentations, custom reporting, and ongoing consulting
Final Reporting, Presentations, and Ongoing Consulting
After completing our reports, we will send our deliverables for feedback and approval. We will incorporate
requested changes before finalizing and making presentations as directed. We are available to present
findings virtually or in-person. We also welcome the chance to work with TDPUD and other consultants, to
ensure the research results are fully utilized. We will make strategy recommendations based on the survey
results. We remain available for media coaching, media interviews, and custom reporting.
"SEM cH 5
L ge83of161
Geospatial Mapping
Geospatial mapping of results is included. We will map survey respondents and their responses to different
questions geographically. Our method ensures that individual respondents cannot be identified.
gee
ep
oo C-P
yrj
00
0jo 0 O
0 0110
EXAMPLE: Truckee Donner Public Utility District customers mapped(left-not exact district boundaries).
Respondents mapped by geography and questions(San Dimas, CA -right).
Cross tabulations
We will provide demographic and geographic cross tabulations for each question, offering a better analysis of
how opinions vary across different subgroups. Our sampling method ensures that respondents will accurately
represent the TDPUD customers, community, and stakeholders. Below is an example of our cross tabulations.
Results by gender, age group, ethnicity, and
Glendale Water and Power job rating
Question ll: Agree or disagree:It is important that Glendale Water&Power has a plan to address the impacts of climate change
Male t0.ss5mlllllllmr'�
Female 11.1%
18-29 9-7%
30-39 713%
40-49 6.8%
50-64 12.0%
65+ 150% m Agree
Latino/Hispanic, Unsure
While/Caucasian 1 3_7% -Disagree
BlacklAfrican-Annerican
AskardPacific Islander 11,8%
Other 13.3%
GVVP Job Rating-Good 10.2%
GVVP Job Rating-Poor 12.9%
GWP Job Rating-Unsure 16.0%
67
EXAMPLE:Cross tabulations(Glendale Water and Power)
PROBOLSICY
RESEARCH 6
ge 84 of 161
Results Tracking
We will provide results tracking comparing data from previous surveys. Below is an example of our results
tracking over time. We can provide tracking results from past surveys conducted for TDPUD.
45% have not heard or seen anything about
EB UD lately, but 3o% have heard about water
cost and water rate increase
Question 3; Have you seen or heard anything about East Bay Municipal Utility District,also known as East Bay MUD lady?
amen 443% 40.9% 146%
Radars 40-6% 50.1% 9.3%
42.8% 45.0%
M M 12.2%
Yes No Unsure
rn.
63.0% 5r 2ar
d2 a?e Yee
xr.osb
37 D°6 w�HoM1lmua
23. 21.U96
2010 20% 2023 20M
'Results in 2016 and 2019 were recorded as Holllnsure,2023 and 2025 results are combined above for comparison.
EXAMPLE:Results tracking over time (East Bay Municipal Utility District)
v
Timeline
We can meet any timeline requested by TDPUD. We can start our work for you immediately. Below is an
example timeline that can be modified according to TDPUD's needs.
Week 1 Week 1 Week 2 Week 2 Week 3-7 Week 8
ReportSurvey Ilk Research Submit for Finalize Et
DevelopmentApproval
Development
Process
• Kick-off meeting Write poll • Submit for approval Finalize survey Conduct survey Deliver reporting
• Collect 8 analyze questionnaire Make requested • Translate Initial data provided Present results as requested
background Send draft for edits Ongoing consulting
information review 8 edits
Probolsky Research has the necessary capacity to deliver high-quality work within the TDPUD's timeline and
budget. In over thirty years of business, we have never initiated a change order; we have always delivered on
time and within budget.
rxoao>sxr
nEs�cx 7
ge85of161
Pricing
Our pricing is all-inclusive, fixed firm. We do not charge by the hour, for travel or any other expenses. We
welcome the chance to develop the ideal methodology and budget in discussion with staff. We are flexible.
Approximate Poll Universe Min. No. of Poll Margin of Error Fixed Firm Cost
Length Respondents
Approx. 15 minutes Truckee Donner Public Utility 400 +/-5% $29,750
District customers
rxoao�sxr
nEs�cx 8
ge86of161
AGENDA ITEM #16
Public
MEETING DATE: April 1, 2026
TO: Board of Directors
FROM: Brian Yohn, General Services Manager
Michael Salmon, Chief Financial Officer
SUBJECT: Consideration of award of contract with West Coast Paving for the
District Asphalt Replacement 2026 project
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Authorize the General Manager to execute a construction services contract and
associated documents with West Coast Paving for the District Asphalt Replacement
2026 project for the bid amount of $122,942, plus a change order authorization of 10%,
or $12,294, for a total contract authorization not to exceed $135,236.
BACKGROUND:
Code section 3.08.030 — Bid Procedure for Issuance of Service Contracts over $15,000
The FY26 budget for the Water Utility has Budget Capital Funds for the lifecycle
replacement of deteriorating asphalt for facility access roads and District asphalt
parking areas. Staff have identified two (2) water locations where asphalt replacement
is recommended due to the asphalt area being in poor condition, with heavily
11alligatored" areas with many large cracks that can no longer be filled.
Additionally, several areas of asphalt in the yard at District Headquarters are in poor
condition and due for replacement. Staff measured the areas and assembled the
scope of the project to remove and replace the asphalt. Scope development
considered asphalt replacement for a total estimated area of approximately 16,185
square feet as detailed below.
Site Description Square Feet
A Falcon Point Tank
12564 Falcon Point, 3,200
Truckee CA 96161
Page 1 of 4
Page 87 of 161
B Herringbone Tank
13892 Herringbone Way, 6,575
Truckee CA, 96161
C District Headquarters —
East Yard and NW 6,410
retaining wall 11570
Donner Pass Rd.
Truckee, CA 96161
The District issued a Request for Bids on February 5, 2026, for the District Asphalt
Replacement project. The Request for Bids was published in the Sierra Sun
newspaper.
Bid opening for the District Asphalt Replacement 2026 project was held at 2:OOpm on
March 17, 2026.
ANALYSIS AND BODY:
The District Asphalt Replacement 2026 project covers approximately 16,185 square
feet of asphalt. The bidding documents were structured with a base bid and an additive
alternate. The base bid covers about 9,775 square feet of asphalt at two (2) Water
Department locations with the additive alternate covering the remaining 6,410 square
feet of asphalt at District Headquarters.
Seven (7) bids were received. Six (6) bids were considered responsive, with one (1)
bid unresponsive.
SUMMARY OF BIDS
Bidder Location Base Bid Base Bid + Responsive
Additive
Alternate
West Coast Paving Reno, NV $60,765.00 $122,942.00 Yes
Heavy Equip Truckee, CA $92,687.50 $150,377.50 No
Hanson Bros Grass
Enterprises Valley, CA $71,785.00 $151,910.00 Yes
Lakeside Paving Carnelian
and Sealing, Inc. Bay, CA $84,296.00 $172,818.10 Yes
Alcon Construction South Lake
and Engineering Tahoe, CA $121,405.50 $207,427.70 Yes
B&M Civil LLC Rancho
Cordova,
CA $156,050 $258,610 Yes
Page 2 of 4
Page 88 of 161
FW Carson Co. Incline
Village, NV $257,175.00 $455,885.00 Yes
Following a review of the bids received for responsiveness and compliance with District
standards, West Coast Paving, from Reno, NV, was determined to be the lowest
responsive bidder with a bid of$122,942.00 for the Base Bid plus the Additive
Alternate.
These items support the following objectives and goals identified by the District.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
2. Provide a healthy and safe work environment for all District employees.
5. Manage the District in an environmentally sound manner.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
2. Environmental Stewardship: Create a sustainable, resilient environment for all our
communities.
4. Modernize the utility and add value to our communities through collaboration and
innovation.
FISCAL IMPACT:
The fiscal impact of the award of contract for the Asphalt Replacement 2026 project is
the total bid amount of $122,942.00, plus a change order authorization of 10%, or
$12,294.00, for a total construction contract authorization not to exceed
$135,236.00. The recommendation is to contract for the scope of work for both the
Base Bid and the Additive Alternate for the proposed asphalt replacements. This
agenda item qualifies as a capital expenditure, whereas, periodic asphalt sealing is an
expense expenditure.
The Board approved FY26 Water Capital Expenditure budget for asphalt replacement is
$120,000. The water sites(2) portion of the not-to-exceed recommendation is $66,842,
resulting in an under-spend to budget of $53,158. The water sites portion of cost is
$6.84 per SF.
The Board approved FY26 Electric Capital Funds for the District Office facility
(other/contingency) at District Headquarters(HQ) is $100,000. The HQ portion of the
not-to-exceed recommendation is $68,394, resulting in $31,606 remaining in this capital
expenditure line item. The District Office facility portion of the cost is $10.67 per SF,
higher than water sites, primarily due to the thickness of the existing asphalt.
ATTACHMENTS:
None
Page 3 of 4
Page 89 of 161
Page 4 of 4
Page 90 of 161
AGENDA ITEM #17
Public Utility District
MEETING DATE: April 1, 2026
TO: Board of Directors
FROM: Josh Campbell, Senior Electric Engineer
Mike Swanson, Director of Electric Engineering & Operations
SUBJECT: Consideration of Rejecting All Bids Received for Martis Valley
Substation Civil Construction - 2026
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Reject all bids received for the Martis Valley Substation Civil Construction - 2026, and
direct staff to rebid the project.
BACKGROUND:
The District's Martis Valley Substation (MV Sub) was built, commissioned, and placed
into service in 1982. MV Sub serves areas including the Town of Truckee's
administrative building, the Truckee Tahoe Airport, Truckee Sanitary District, Sierra
Meadows, the West and East River Street corridors, Truckee Crossroads shopping
center, and the Coldstream development. MV Sub is the District's only substation being
served by the 120kV transmission system and serves as a critical backup for redundant
distribution system operation.
Over the life of MV Sub, various capital improvements have been made including
seismic anchoring, protective relay upgrades, and civil infrastructure maintenance.
Similar to past substation modernization and rebuild projects like the Donner Lake
Substation rebuild completed in 2010, the Tahoe Donner Substation rebuild completed
in 2014, and the Truckee Substation rebuild completed in 2021, MV Sub has fully
depreciated, is nearing the end of its service life, and requires modernization to ensure
reliable operation into the future. MV Sub is the District's only remaining substation that
has not undergone a modernization and rebuild project.
Since 2021, District engineering staff have been developing plans for the revitalization
and modernization of MV Sub. Over the past few years, District engineering staff has
worked with its Board-approved engineering consultant, Qualus LLC (Qualus), to
develop a complete scope of work for the proposed substation improvements. The
overall scope of the project includes:
Page 1 of 3
Page 91 of 161
1. Relocating the substation's outdoor 12.5kV distribution bus into an indoor
Switchgear Control Enclosure (SCE);
2. Replacement of the 1980's vintage SF6 high-voltage circuit switcher with a
Vacuum Circuit Breaker (Breaker);
3. Repair or replacement of structural components including spalling concrete
foundations;
4. Relocation of the DC backup battery system to an indoor enclosure;
5. Adding a secondary electric station service for redundancy;
6. Replacement of non-operational, non-loadbreak bus tie switches with a
switchgear transfer bus;
7. Replacement of porcelain insulators with polymer insulators;
8. Upgrades to the existing SCADA system hardware; and
9. Improvements to civil infrastructure addressing aging infrastructure, grading and
drainage, substation security, and making provisions for future distribution
feeders and alternative energy storage solutions.
On August 7, 2024, the Board of Directors approved the procurements of the SCE and
the Breaker for the MV Substation Modernization project. Due to the civil improvements
required within the substation yard prior to delivery, staff decided to split the substation
construction scope into two phases. The first phase, completed in 2025, included civil
infrastructure work in the storage area inside the existing substation fence. On June 6,
2025, the Board of Directors approved the award of the Phase 1 construction contract
to Ruppert, Inc. This phase was completed during the summer and early fall months
without impacting the operation of the existing substation electric infrastructure and
allowed the District to take delivery of the SCE and the Breaker in the fall of 2025.
ANALYSIS AND BODY:
The second phase of construction will include the following:
1. Demolition of the existing distribution bus;
2. Grading and installation of drainage infrastructure;
3. Asphalt paving of additional storage area inside the substation fence;
4. Civil improvements required to accommodate the new Breaker and control wiring
from the new SCE;
5. Installation of the Breaker;
6. Grounding grid improvements;
7. Rerouting and reconductoring the substation feeder getaways;
8. Substation security upgrades;
9. Installation of a secondary station service; and
10. Testing and commissioning.
Completion of the second phase will require an extended outage to MV Sub during the
majority of construction. The proposed scope of the MV Sub Modernization project
ensures improved reliability, operability, station systems visibility, and improved
maintainability of the substation for the next 40 years.
Page 2 of 3
Page 92 of 161
On February 13, 2026, the District released the request for bids for the 2026 Martis
Valley Sub Civil Construction. The bid was advertised in the Sierra Sun on February 20,
2026. Bids were opened on March 24, 2026. The bid process resulted in 2 responses.
The bid results can be found in the table below:
Contractor Total Bid Amount
Ruppert, Inc. $2,038,795.04
RK Contractors $2,482,400.00
The total of 2 bid responses was substantially less than expected. The 2025 portion of
the project received 4 bids with a much smaller scope of work. A clerical error resulted
in delayed notifications to potential bidders that had signed up on the TDPUD website
to receive notifications when bids are posted. Staff reposted the bids and rescheduled
the pre-bid meetings to accommodate interested bidders. Due to these factors, staff
cannot confidently conclude that the bids received accurately reflect current market
pricing, confidently ensure bid requests reached the broader inventory of contractors or
provide the best value to the District. Therefore, staff recommends that the Board reject
all bids received and direct staff to re-bid the project. Re-bidding the project will provide
the opportunity to broaden contractor participation, validate pricing, and ensure the
District receives the most advantageous outcome.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
5. Manage the District in an environmentally sound manner.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
4. Modernize the utility and add value to our communities through collaboration and
innovation.
FISCAL IMPACT:
There is no direct fiscal impact associated with this item. Staff intends to re-bid the
project and bring a proposal to award the contract for this work to the Board at a future
date. The FY26 budget for electric capital expenditures included $3.OM for this item.
ATTACHMENTS:
None
Page 3 of 3
Page 93 of 161
AGENDA ITEM #18
Public Utility District
MEETING DATE: April 1, 2026
TO: Board of Directors
FROM: Brian Wright, General Manager
SUBJECT: Consideration of Adopting Resolution 2026-05 Approving the
Amended and Restated Pooling Agreement with Utah Associated
Municipal Power Systems
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
A. Adopt Resolution 2026-05 Authorizing and Approving the Amended and
Restated Power Pooling Agreement with the Utah Associated Municipal Power
Systems for the Pool Project; Authorizing Execution and Delivery thereof; and
related matters; and
B. Authorize Board President to execute the Pooling Agreement Certificate on
behalf of the District
BACKGROUND:
The District has been a member agency of the Utah Associated Municipal Power
Systems (UAMPS) since August 2000. Membership with UAMPS has offered great
benefits to the District and its electric utility customers, offering critical services such as
energy scheduling, joint participation in multiple power generation projects, negotiation
of purchase power agreements (PPA) with carbon free energy sources, forecasted and
real time energy procurements within available markets, maintaining affordable energy
costs, and assistance with regulatory reporting requirements. As a member of UAMPS,
the District experiences the benefit of increased purchasing power through joint action
that far exceeds that of an individual utility the size of TDPUD as well as a significant
reduction in administrative and technical staffing costs that would be required for
energy forecasting, Procurements and scheduling.
The District is a participating member of multiple UAMPS projects, including the Horse
Butte Wind Project, Firm Power Supply Project (Red Mesa Solar), Nebo Natural Gas
Project, Veyo Heat Recovery Project and the Pool Project. As a participating member
in each of these projects (and others), the District maintains a representative seat on
the Board and Project Management Committees for each project.
Page 1 of 4
Page 94 of 161
The District joined the Pool Project in 2005. The Pool Project provides an hourly
resource clearinghouse where UAMPS acts as agent for the scheduling and dispatch of
resources, including the purchase of any resources required to meet each member's
electric system load, the sale of any member's resources which are deemed surplus to
meet its load, the utilization of transmission rights to effect resource deliveries, and
sales by each member. The Pool Project serves as a mechanism to acquire additional
energy resources to meet additional energy load that has not already been secured
through firm generation resources and PPA's.
ANALYSIS AND BODY:
The energy generation and transmission landscapes continue to experience significant
changes over the past several years. Increasing demand for clean, affordable and
dispatchable resources has placed pressure on energy markets across the west and
amplified the need for additional transmission infrastructure to enhance access to new
power generation opportunities. In recognition of the evolving energy markets and
anticipated changes in energy procurement requirements, UAMPS staff and Project
Committee Members have adopted revisions to the existing Pooling Agreement
language to support mandatory participation in organized wholesale power markets.
The fundamental purpose of these changes include:
• Update the 1980 Pooling Agreement to support mandatory participation in
organized wholesale power markets;
• Align UAMPS operations with PacifiCorp's entry into the Extended Day-Ahead
Market (EDAM) effective May2026; and
• Provide clear, modern framework for governance, planning, cost allocation, and
risk management.
Some of the primary reasons why the amendments to the Pooling Agreement are
necessary include:
• PacifCorp's participation in EDAM requires UAMPS and its member agencies to
comply with centralized market rules.
• The current Pooling Agreement was designed for a bilateral market and does not
address today's market complexity.
• The amended agreement ensures continued, compliant participation while
preserving UAMPS' agency role.
In addition to the effort to modernize the agreement to reflect today's energy markets,
the Amended Pooling Agreement is designed to meet the energy market requirements
to be imposed by PacifiCorp's participation in EDAM beginning May 2026. Participation
in EDAM will require all load-serving entities to meet Resource Sufficiency
Requirements whereby members will be required to secure power generation resources
in excess of their forecasted load to ensure the stability of energy scheduling and
resource planning within the energy balancing authority. To meet these requirements,
the UAMPS Pool Project will need the ability to coordinate resources in advance to
Page 2 of 4
Page 95 of 161
meet the aggregate load and Resource Sufficiency Requirements of all members.
Procurement, scheduling and dispatching of resources to meet these requirements will
necessitate UAMPS Pool Project Members to delegate authority and consignment of all
resources, where in the past, transactions were executed bilaterally in the day-ahead or
real-time markets.
It is important to understand that the District is not a load-serving entity
within PacifCorp's Energy Balancing Authority (PAC). Therefore, the requirements of
EDAM in May 2026 will not directly impact the District. However, the District is a load-
serving entity within the NV Energy Balancing Authority who have already committed to
participating in EDAM in 2028. While the District will not be directly impacted by the
requirements in May 2026, it is anticipated that NV Energy's participation in EDAM in
2028 will impose similar requirements. The District's continued participation in the
UAMPS Pool Project will continue to offer benefits in the interim with respect to
procurement and dispatch of energy resources to meet local energy load requirements
in excess of secured firm power purchase agreements, and position the District for
2028.
Key Changes in the Amended Pooling Agreement:
• Obligates Participants to purchase power and Resource Sufficiency
Requirements in excess of owned resources through UAMPS (does not apply to
the District until 2028);
• Establishes formal market planning tools, including:
o Annual Purchase Plan
o Load and Resource Forecasts
• Authorizes UAMPS to make market purchases on behalf of Participants under
an approved annual purchase plan; and
• Disributed cost allocations to participating members, proportional to their
respective responsibility for the additional cost.
The Amended Pooling Agreement includes a provision that participants consign all of
their generation resources to the Pool Project for UAMPS to schedule. However, there
is a carve-out that provides for participants to build or acquire new additional generation
resources provided that the new resource capacity does not exceed 10% of the
participants' total load requirements or is approved by the Project Management
Committee in advance. This provision will preserve the District's ability to consider
development of local generation resources outside the UAMPS Pool Project, such as
the community solar project currently under evaluation or other carbon-free generation
projects.
To supplement this staff report, the following documents have been included as
attachments for review:
1. Amended Pooling Agreement Authorization Resolution;
2. Amended and Restated Pooling Agreement;
3. Comparison of Terms in the Current and Amended Pooling Agreement; and
Page 3 of 4
Page 96 of 161
4. Pooling Agreement Certificate
Staff is recommending the District continue to be a participating member of the UAMPS
Pool Project to ensure continued resource resiliency in allignemnt with the District's
long term Integrated Resource Plan (IRP).
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
2. Provide a healthy and safe work environment for all District employees.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
5. Manage the District in an environmentally sound manner.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
2. Environmental Stewardship: Create a sustainable resilient environment for all our
communities.
3. Engage with our customers and communities in a welcoming and transparent way to
identify opportunities.
4. Modernize the utility and add value to our communities through collaboration and
innovation.
5. Developing an inclusive culture drives organizational integration and success.
FISCAL IMPACT:
There is no direct fiscal impact associated with the Amended and Restated Pooling
Agreement.
ATTACHMENTS:
1. Amended Pooling Agr Authorizing Resolution _ TDPUD
2. Amended and Restated Pooling Agreement_ TDPUD
3. Orginal vs Revised Pooling Agreement Comparison
4. Pooling Agreement Certificate _ TDPUD
5. TDPUD Pooling Agreement Opinion
Page 4 of 4
Page 97 of 161
RESOLUTION NO.
A RESOLUTION AUTHORIZING AND APPROVING THE AMENDED AND
RESTATED POWER POOLING AGREEMENT WITH THE UTAH
ASSOCIATED MUNICIPAL POWER SYSTEMS FOR THE POOL PROJECT;
AUTHORIZING EXECUTION AND DELIVERY THEREOF; AND RELATED
MATTERS.
WHEREAS,Truckee Donner Public Utility District,California(the "Member")is a member
of Utah Associated Municipal Power Systems ("UAMPS")pursuant to the provisions of the Utah
Associated Municipal Power Systems Amended and Restated Agreement for Joint and
Cooperative Action, as amended(the "Joint Action Agreement");
WHEREAS, one of the purposes of UAMPS under the Joint Action Agreement is assisting
its members in providing reliable, competitive, supplies of electric power and energy and related
services through joint and cooperative action;
WHEREAS, UAMPS has developed and administers a power pooling project, known as the
"Pool Project," pursuant to which UAMPS procures, schedules, dispatches, and sells electric
power and electric energy, including participation in organized wholesale electric markets for the
collective benefit of participating members;
WHEREAS, the Member is currently a party to a prior power pooling agreement with
UAMPS governing its participation in the Pool Project;
WHEREAS,UAMPS has presented to the Member an Amended and Restated Power Pooling
Agreement (the "Amended Pooling Agreement"), which amends and restates the Prior Pooling
Agreement in its entirety and updates the terms and conditions governing participation in the Pool
Project, including provisions relating to market participation, allocation of costs and revenues,
governance through a project management committee,payment obligations, and related matters;
WHEREAS, the governing board of the Member ("Governing Body") has reviewed, or
caused to be reviewed on its behalf, the Amended Pooling Agreement and related materials
provided by UAMPS,has had the opportunity to ask questions and receive additional information,
and has determined that entering into the Amended Pooling Agreement is in the best interests of
the Member and the efficient, reliable, and economical operation of its electric system; and
WHEREAS, the Member now desires to authorize and approve the Amended Pooling
Agreement and its execution and delivery by the Member;
- 1 -
Page 98 of 161
Now, THEREFORE, BE IT RESOLVED by the Governing Body of Truckee Donner Public
Utility District, as follows:
Section 1. Approval of the Amended Pooling Agreement. The Amended and Restated
Power Pooling Agreement,in substantially the form presented to the Governing Body and attached
hereto as EXHIBIT A, is hereby authorized and approved. The President is hereby authorized,
empowered, and directed to execute and deliver the Amended Pooling Agreement on behalf of the
Member, and the Clerk is hereby authorized to attest and countersign such execution and affix the
corporate seal of the Member, with such changes therein as shall be approved by the President,
such approval to be conclusively evidenced by execution thereof.
Section 2. Participant's Representative. (a) The appointment of Brian Wrights as the
Participant's Representative to UAMPS is hereby confirmed.
(b) Such Representative (or, in his or her absence, such alternate(s)) is hereby
delegated full authority to (i) approve any appendix to the Amended Pooling Agreement between
UAMPS and the Participant that may be necessary or desirable in connection with the Amended
Pooling Agreement, and (ii) act on all matters that may come before the Project Management
Committee established by the Amended Pooling Agreement, and shall be responsible for reporting
regularly to the Governing Body regarding the activities of the Project Management Committee
Section 3. Further Authority. The President, Clerk and other appropriate officers and
employees of the Member are hereby authorized and directed to execute and deliver such
certificates and additional undertakings of the Member as shall be necessary in connection with
financing related to the Amended Pooling Agreement. Legal counsel for the Member is hereby
authorized to provide an approving opinion with respect to the authorization, execution and
enforceability of the Amended Pooling Agreement.
Section 4. Miscellaneous; Effective Date. (a) This resolution shall be and remain
irrepealable until the expiration or termination of the Amended Pooling Agreement in accordance
with its terms.
(b) All previous acts and resolutions in conflict with this resolution or any part hereof are
hereby repealed to the extent of such conflict.
(c) In case any provision in this resolution shall be invalid, illegal or unenforceable, the
validity, legality and enforceability of the remaining provisions shall not in any way be affected or
impaired thereby.
(d) This resolution shall take effect immediately upon its adoption and approval.
- 2 -
Page 99 of 161
ADOPTED AND APPROVED this day of , 2026.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT,
CALIFORNIA
By
President
ATTEST:
Clerk
[SEAL]
- 3 -
Page 100 of 161
EXHIBIT A
[AMENDED POOLING AGREEMENT]
Page 101 of 161
AMENDED AND RESTATED POWER POOLING AGREEMENT
BETWEEN
UTAH ASSOCIATED MUNICIPAL POWER SYSTEMS
AND
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
This Amended and Restated Power Pooling Agreement made and entered into as of
May 1, 2026 ("Agreement"), is by and between Utah Associated Municipal Power Systems, a
political subdivision of the State of Utah("UAMPS") and Truckee Donner Public Utility District
(the "Participant").
RECITALS
WHEREAS, UAMPS is a political subdivision of the state of Utah organized under the
Interlocal Cooperation Act (the "Act") and the Joint Action Agreement to provide joint and
cooperative action, including securing present and future power supply resources for its
members;
WHEREAS, UAMPS has the power under the Act and Joint Action Agreement to (i) enter
into contracts to obtain a supply of electric power and electric energy and ancillary services and
transmission services, (ii) enter into contracts for the sale of wholesale energy services with its
Members and others and (iii) adopt and implement risk management policies and enter into
related agreements, including but not limited to forward purchase and sale contracts, hedging,
tolling and swap agreements, and other instruments;
WHEREAS,balancing areas in the western electric markets, including the PacifiCorp East
balancing area where most Members are located, are moving toward mandatory participation in
organized markets;
WHEREAS, the Participant has entered into, or contemplates entering into power sales
contracts with UAMPS and other instruments for the purchase or sale of electric power and
electric energy; and
WHEREAS, subject to the terms and conditions of this Agreement, each Participant
desires to appoint UAMPS as such Participant's agent for(i) scheduling and dispatching electric
power; (ii)purchasing power, energy, and related products to meet load and reserve
requirements; (iii) selling Participant's power and energy inside or outside organized markets;
(iv) managing transmission rights and services; (v) handling payments/receipts and distributing
market revenues; (vi) conducting transmission studies; and(vii) optimizing Participant's
resources and transmission.
NOW THEREFORE, the Participant and UAMPS hereby agree, as follows:
I
Page 102 of 161
Section 1. Definitions and Rules of Construction.
(a) As used in this Agreement and in the Recitals set out above:
"Act"means the Interlocal Cooperation Act, Title 11, Chapter 13, Utah Code Annotated 1953,
as amended.
"Agreement"means this Amended and Restated Power Pooling Agreement as dated above
between UAMPS and the Participant and any duly authorized amendments.
"Amended and Restated Power Pooling Agreement"means, collectively, this Agreement and the
other Amended and Restated Power Pooling Agreements between UAMPS and the other
Participants.
"Annual Purchase Plan"means the plan approved by the Project Management Committee
setting forth the projected timing and pricing for market purchases over the fiscal year it is in
effect. A form of the Annual Purchase Plan is attached to this Agreement as Exhibit 1, which
shall be completed for each fiscal year upon the approval of, and may be modified from time to
time by, the Project Management Committee.
"Authorized Officer of UAMPS"means the Chairman of the Board of Directors, the Vice
Chairman of the Board, the Chairman of the Project Management Committee, the Secretary, the
Treasurer and the Chief Executive Officer of UAMPS and any other officer or employee
authorized or having delegated authority to perform specific acts or duties under the Amended
and Restated Power Pooling Agreement by resolution duly adopted by the Board.
"Billing Period"means such period of time as shall be established from time to time by UAMPS
for the preparation, calculation and billing of the amounts payable by the Participant hereunder
and includes (i) all charges, credits, settlements, and other amounts attributable in that period of
time, and(ii) any resettlements, recalculations, adjustments, or true-ups issued by any applicable
organized market and received by UAMPS during that same calendar month, regardless of the
market period to which such resettlements or adjustments relate.
"Board"means the Board of Directors of UAMPS or such other governing body of UAMPS as
may be established from time to time pursuant to the Joint Action Agreement and the Act.
"Commercially Reasonable" or "Commercially Reasonable Efforts" means, with respect to any
action required to be made, attempted or taken by a party under this Agreement, such efforts as a
reasonably prudent business would undertake, consistent with good industry practice and the past
practices of such parry, for the protection of its own interest under the conditions affecting such
action, including the amount of notice of the need to take such action,the duration and type of the
action, the competitive environment in which such action occurs, and the contractual and legal
obligations of, and the risk to, such party in connection with such action;provided, however, an
obligation to act in a "Commercially Reasonable" manner or to exercise "Commercially
Reasonable Efforts" does not include taking actions that would, individually or in the aggregate,
2
Page 103 of 161
cause the party subject to such obligation to incur costs, or suffer any other detriment, that is out
of reasonable proportion to the benefits to the other party under this Agreement.
"Cost Causation"means the principle that market charges and revenues should be allocated to
the Participants whose actions directly cause such costs to be incurred or revenues to be received,
including but not limited to charges and revenues relating to Resource Sufficiency Obligations
and congestion charges and revenue.
"Credit Agreement"means (i) lines of credit and other credit arrangements to provide working
capital, liquidity and/or reserves in connection with the operation and administration of the
Project and(ii) any portion of the borrowing capacity under a line of credit or other credit
arrangement that is dedicated, set aside or used to provide working capital, liquidity and/or
reserves for the Project.
"Effective Date"means such date as shall be approved by the Project Management Committee
as set forth in Section 2 of this Agreement.
"Electric System"means the Participant's electric utility system as established, maintained and
operated pursuant to applicable State and local law. With respect to any Participant that does not
own and operate an electric utility system that serves retail customers, the term"Electric
System" shall be deemed to refer to the applicable utility system.
"Entitlement Share"means the percentage determined by dividing (i)the sum of the
Participant's purchases through the Project for the previous fiscal year (ii) the sum of the total
Project purchases during the previous fiscal year. For the avoidance of doubt, each Participant's
Entitlement Share under this Agreement shall be its Percentage Entitlement Share for purposes
of the Joint Action Agreement.
"Forecasted Deficiency"means the forecasted electricity need for each Participant for the
following fiscal year taking into account Load and Resource Forecasts as determined in advance
of Project Management Committee approval of the Annual Purchase Plan.
"Joint Action Agreement"means the Utah Associated Municipal Power Systems Amended and
Restated Agreement for Joint and Cooperative Action dated as of March 20, 2009, as amended
and supplemented from time to time.
"Limited Participant"means a Participant that does not use UAMPS to schedule its full load and
whose obligations with respect to purchases and sales are governed by a Pooling Appendix.
"Load Ratio Share"means for the applicable Billing Period, the ratio of(i)the total quantity of
electric power and electric energy purchased by a Participant through the Project during such
Billing Period excluding resources that are not participating in an organized market to (ii) the
total quantity of electric power and electric energy purchased by all Participants through the
Project during such Billing Period, taking into account any resources excluded from participation
in an applicable organized market.
3
Page 104 of 161
"Load and Resource Forecast"means the forward-looking estimate prepared by UAMPS, in
consultation with Participant, of such Participant's projected electric load and available electric
supply resources for a specified planning period, including owned resources, contracted
resources, Outside Resources, and applicable regulatory or market obligations. A form of Load
and Resource Forecast is attached to this Agreement as Exhibit 2, which shall be approved and
may be modified from time to time by the Project Management Committee.
"Members"means, collectively, each entity which has executed the Joint Action Agreement or a
supplement thereto.
"Outside Resource"means any Participant resource that is not a UAMPS project, a purchase
through a UAMPS project or a market purchase through UAMPS.
"Participant"means the party defined as the Participant in the preamble of this Agreement and
its permitted successors and assigns hereunder.
"Participants"means the parties, including the Participant, other than UAMPS, to the Amended
and Restated Power Pooling Agreement.
"Participant's Representative"means (i)the officer, employee or other agent of the Participant
designated from time to time by the Participant as the Representative of the Participant for
purposes of the Joint Action Agreement, to whom all notices and other communications to be
given by UAMPS to the Participant hereunder shall be sent or(ii) in the event that the individual
appointed as the Participant's Representative is unavailable to act on behalf of the Participant,
the individual duly appointed or designated by the Participant as its alternate Representative
pursuant to the Joint Action Agreement.
"Prior Agreement"means, collectively, the Power Pooling Agreements of various dates between
UAMPS and the Members.
"Project"means the UAMPS project created by this Agreement to procure, schedule, dispatch,
and sell electric power and energy, including the bidding of such resources into organized
markets for the collective benefit of the Participants.
"Project Management Committee"means the committee of the Participants established pursuant
to Section 5 which shall make certain decisions and recommendations with respect to the
management and acquisition of electric power, electric energy and transmission service as
provided herein.
"Pooling Appendix"means an appendix to this agreement that sets forth specific terms relating
to the purchase and sale of Participant resources.
"Required Approvals"means all governmental, regulatory and lender approvals, consents and
authorizations required or necessary for(i) the execution, delivery and performance of this
Agreement (or any amendment hereto)by the Participant and(ii) this Agreement(or any
amendment hereto)to be the legal, valid and binding obligation of the Participant.
4
Page 105 of 161
"Resource Sufficiency Obligation"means a requirement from an organized market that is
imposed on UAMPS to demonstrate sufficient supply, flexibility, and reserves to meet its own
forecasted demand and uncertainty in advance or during real-time operations.
"UAMPS"means Utah Associated Municipal Power Systems, a political subdivision organized
and existing under the laws of the State of Utah, the Act and the Joint Action Agreement, and its
successors. All references to UAMPS in this Agreement shall include Authorized Officers of
UAMPS and their delegees acting pursuant to specific authorization by the Board.
"Uncontrollable Force"means any cause beyond the control of the party affected, including
failure of facilities, flood, earthquake, storm, lightning, fire, explosion, epidemic, pestilence, war,
riot, an act of domestic or international terrorism, civil disturbance, labor disturbances, sabotage,
or an act of civil or military authorities, including court orders, injunctions, or orders of
governmental agencies with proper jurisdiction, which by due diligence and foresight such party
could not reasonably have been expected to avoid.
(b) References to Articles, Sections, Schedules and Exhibits are to the Articles and Sections
of and Schedules and Exhibits to this Agreement,unless otherwise provided. Article and Section
headings are included herein for convenience of reference only and shall not constitute a part of
this Agreement for any other purpose or be given any substantive effect. Any of the defined
terms may, unless the context otherwise requires, be used in the singular or the plural, depending
on the reference. The use of the word "include" or its derivations shall not be construed as
language of limitation.
Section 2. Effective Date; Term; and Termination.
(a) The Effective Date of the Amended and Restated Power Pooling Agreement shall be
May 1, 2026. As of the Effective Date, the Amended and Restated Power Pooling Agreement
shall replace the Prior Agreement in its entirety, except that the Prior Agreement shall remain in
effect with respect to any Participants that have not obtained all Required Approvals until such
Approvals have been received. Appendices to the Power Pooling Agreement shall become
appendices to the Amended and Restated Power Pooling Agreement unless substituted and
signed by the affected Participant. A Member of UAMPS becomes a Participant by executing
this Agreement as a separate contract from other agreements between UAMPS and the
Participant.
(b) The Agreement shall remain in effect from the Effective Date until terminated by written
notice by either party served at least five years prior to the stated termination date,unless a
shorter notice period is approved by the Project Management Committee, or the date on which
the Participant has terminated its participation in all UAMPS projects and completed all
associated obligations, whichever is later. However, such termination shall not (i) relieve such
Participant or UAMPS of any obligation incurred under or pursuant to this Agreement before
such termination or(ii)result in the loss or availability of any right or benefit of such Participant
or UAMPS which exists under any agreement or arrangement made hereunder between the
Participant and UAMPS before such termination which extends beyond the noticed date of
termination.
5
Page 106 of 161
(c) No Agreement between UAMPS and a Participant may be entered into or amended so as
to provide terms and conditions that are substantially and materially different from those herein
contained except upon approval of the Project Management Committee, and upon similar
amendment being made to the Agreement of any other Participants requesting such amendment
after receipt by such Participant of notice of such amendment.
Section 3. Pool Administration
(a) Participants hereby establish the Project Management Committee, which shall consist of
one voting representative from each Participant (who shall be the Participant's Representative or
in the absence of the Participant's Representative its Alternate Representative) and shall be
chaired by a Participant Representative elected by the Project Management Committee. The
Participant has delegated full and complete authority to its Participant's Representative to act on
all matters and decisions that come before the Project Management Committee. Each
Representative appointed by the Participant shall serve on the Project Management Committee
until the Participant appoints a successor. An Authorized Officer of UAMPS shall attend all
meetings of the Project Management Committee and shall cause minutes to be kept of all such
meetings.
(b) The Joint Action Agreement and the bylaws of UAMPS shall govern the procedures for
and the voting rights on the Project Management Committee,provided that:
(i) The Participant's Representative of any Participant that is in default hereunder
(A) shall not be entitled to vote on any matter during the period of such default, and the
consent or approval of such Participant or such Participant's Representative shall not be
required during the existence of such default and (B) shall be disregarded for purposes of
determining whether a quorum of the Project Management Committee is present at any
meeting;
(ii) All decisions made by the Project Management Committee shall be made by
resolution, order or other appropriate action of the Project Management Committee and,
except in those instances when the Project Management Committee is acting pursuant to
delegated authority from the Board, before such resolution, order or action of the Project
Management Committee shall take effect, the same shall be ratified and approved by
resolution, order or action of the Board, acting in accordance with the Joint Action
Agreement and the bylaws of DAMPS.
(iii) The Participants acknowledge that the Joint Action Agreement provides,
among other things, that decisions of the Board with respect to the Project shall be made
only upon the recommendation of the Project Management Committee and that weighted
votes may be called for on any recommendation or decision to be made by the Project
Management Committee or the Board, respectively, all as more fully provided in the
Joint Action Agreement.
6
Page 107 of 161
(c) The Project Management Committee may from time to time direct UAMPS to
commission, obtain and provide such power supply and transmission studies as it deems
reasonably necessary or desirable with respect to the Project.
(d) With the approval of the Project Management Committee, UAMPS may enter into Credit
Agreements for the Project. UAMPS may require reasonable credit support or adequate
assurance of payment from Participants consistent with market or lender requirements.
Section 4. Electric Power and Electric Energy Sales, Purchases and Allocation of Charges and
Revenues
(a) UAMPS shall prepare an individual Load and Resource Forecast with each Participant to
determine its Forecasted Deficiency. UAMPS and each Participant shall work in good faith to
mutually agree upon the Participant's Load and Resource Forecast. Each Participant shall
provide UAMPS with such load data, resource information, and other inputs as UAMPS may
reasonably request in order to prepare and update such forecasts, including periodic updates as
conditions change.
(b) Based on the Forecasted Deficiencies determined pursuant to Section 4(a), UAMPS shall
develop, and the Project Management Committee shall approve, an Annual Purchase Plan to
meet the aggregate Forecasted Deficiency of the Participants. The individual Participant
Forecasted Deficiencies will be aggregated to determine the total UAMPS purchasing need,
which will be included in the Annual Purchase Plan.
(c) UAMPS is hereby authorized to make purchases without additional authorization from
the Participant
(i) to meet Resource Sufficiency Obligation according to policies adopted by the
Project Management Committee. Purchases to meet Resource Sufficiency Obligation
shall be allocated to Participants during market settlements based on Participant's
contribution to deficiency and
(ii) to meet Forecasted Deficiency, provided that(x) Participants may withdraw
UAMPS' authorization to make purchases under this clause (ii) only upon such terms and
conditions as shall be approved by the Project Management Committee and(y)UAMPS
purchases will be based on the aggregate Forecasted Deficiency of all Participants who
have not withdrawn their authorization. Purchases to meet Forecasted Deficiency shall be
allocated to Participants at the time the purchase is made.
(d) Except for Limited Participants, each Participant shall be obligated to purchase through
the Project all of its electric power and electric power requirements and associated Resource
Sufficiency Obligations in excess of its purchased or owned resources. UAMPS may schedule or
bid Participant contracted or consigned resources into an organized market and may purchase
from the market to meet the load of Participants. Notwithstanding the foregoing, any Outside
Resource shall not be scheduled, dispatched, or bid into any organized market by UAMPS unless
and until such Resource is expressly declared available for such scheduling or bidding by the
7
Page 108 of 161
Participant. In addition, UAMPS must relay and not deviate from the schedule provided by the
Participant.
(e) Except for Limited Participants, each Participant must consign the output of all Outside
Resources to UAMPS pursuant to a Pooling Appendix, a form of which is attached to this
Agreement as Exhibit 3, which may be modified from time to time by the Project Management
Committee. UAMPS shall act as scheduling agent for consigned Outside Resources. UAMPS
shall not be obligated to pay for Outside Resources. Consignment of the output of Outside
Resources shall not relieve the Participant of responsibility under any resource-related contracts.
Absent approval by the Project Management Committee, a Participant may not consign more
resources to UAMPS than is reasonably necessary to meet its forecasted load. With Project
Management Committee Approval, UAMPS may impose a scheduling fee for consigned
resources to participate in an organized market.
(f) A Limited Participant may recall Outside Resources previously consigned to UAMPS for
its own needs upon reasonable notice to UAMPS, taking into account any market scheduling
requirements, UAMPS' established schedule, commitments to other Participants, and the needs
of the recalling Participant.
(g) UAMPS may offer excess Participant resources that are not Outside Resources for sale to
other Participants or may bid such resources into an organized market without additional
authorization from the Participant. UAMPS shall prioritize contracted resources for which it has
made firm contractual commitments when making bilateral sales.
(h) UAMPS will allocate other charges and revenues incurred or received through
participation in an organized market to Participants according to Cost Causation. Charges and
revenues directly attributable to a specific Participant's actions, resources or deficiencies shall be
allocated to that Participant. Charges and revenues not attributable to a specific Participant will
be allocated among the Participants according to the Load Ratio Share, or such other reasonable
method as determined by the Project Management Committee
(i) The Project Management Committee shall adopt policies and procedures to govern the
allocation charges and revenues consistent with the foregoing principles.
0) The Project Management Committee may, from time to time and in its discretion,
establish one or more advisory committees to assist in the development, review, and
recommendation of policies,procedures and related exhibits under this Agreement. Any such
advisory committee shall consist of representatives designated by the chair of the Project
Management Committee and approved by the Project Management Committee and shall include
representatives representing different size and resource composition. The advisory committee
shall work in coordination with UAMPS staff and may evaluate and make recommendations
regarding, among other matters, forecasting methodologies,billing practices, scheduling
procedures, data requirements, reporting formats, and proposed exhibits or amendments to
exhibits addressing such matters. Advisory committees shall serve solely in an advisory capacity
and shall have not authority to bind UAMPS or the Participants. Any policies,procedures, or
exhibits developed by an advisory committee shall be recommended to the Project Management
8
Page 109 of 161
Committee for consideration in accordance with this agreement. The Project Management
Committee may define the scope and duration of any advisory committee and may dissolve such
committee at any time.
(k) Nothing in this Agreement shall limit the Participant from contracting for, incurring debt
to build or otherwise obtaining an ownership interest in resources for such Participant's own
needs. Such additional resources, if any, shall not relieve the Participant of any prior obligations
incurred by such Participant to UAMPS.
(1) Unless otherwise approved by DAMPS, the Participant shall use all of the power and
energy it purchases under this Agreement to serve retail customers located in the established
service area of its electric utility system and to meet its own requirements.
(m) UAMPS shall use Commercially Reasonable Efforts to provide each Participant with
timely access to data necessary for operational decision-making to the extent such data is
available. The Project Management Committee shall adopt policies specifying data formats,
delivery methods, and reporting timelines.
Section 5. Participant Payment Obligations.
(a) Each Participant shall pay UAMPS for all electric power, electric energy, energy
capacity, ancillary services, and other electricity-related products or services purchased,
scheduled, or otherwise procured by UAMPS on behalf of such Participant to meet such
Participant's Forecasted Deficiency or contribution to Resource Sufficiency Obligation
deficiency as described in Section 4(c). Such payment obligation shall apply without regard to
whether the Participant ultimately uses, resells, or requires such power or energy, and the
Participant shall bear all market benefits and detriments associated with such purchases,
including price differences, congestion losses, imbalance charge, and settlement adjustments.
(b) In addition to payments for power, energy, and transmission, each Participant shall pay
its Entitlement Share of all administrative, general, overhead, and other costs and expenses of
UAMPS related to the Project, including but not limited to professional services, software and
systems, financing costs, credit support, market participation fees, and other expenses incurred
by UAMPS that are not otherwise recovered through market settlements or specific Participant
charges relating to market participation. To the extent that revenues received by UAMPS from
market settlements,bilateral sales, or other sources are insufficient to fully recover the costs and
expenses described in this Section 5, the unrecovered balance shall be billed to Participants in
proportion to their respective Entitlement Shares, unless otherwise allocated pursuant to Cost
Causation principles approved by the Project Management Committee.
(c) Participant acknowledges and agrees that it is necessary for UAMPS to recover all of the
costs and expenses associated with the Project, including the repayment of amounts due under
Credit Agreements, through billings to and payments by the Participants under this Agreement.
(d) Payments required to be paid by the Participant to UAMPS shall be due and payable to
UAMPS at its principal office or by wire transfer to such account as UAMPS shall designate in
9
Page 110 of 161
writing to the Participant, on the 1 Oth day of the Month following the Month in which the billing
statement was rendered(or if such day is not a business day, the next succeeding business day)
or at such other time as may be established by UAMPS through its annual budgeting process.
Upon approval of the Project Management Committee, UAMPS may modify the billing
schedule, frequency, due date, or other payment terms. Any such modification shall be
communicated in writing to Participants and shall thereafter be binding as if originally stated in
this Agreement.
(e) If payment in full is not made by the Participant on or before the close of business on the
due date,UAMPS shall impose a delayed payment charge on the unpaid amount due for each
day overdue at a rate equal to the lesser of one percent per month, compounded monthly, or the
maximum rate lawfully payable by the Participant; provided, however, that UAMPS, acting upon
the direction of the Project Management Committee, may elect to waive such delayed payment
charge (or portion thereof)but only to the extent that any such waiver will not adversely affect
the ability of UAMPS to meet its payment obligations under any contract entered into pursuant
to this Agreement.
(f) The obligation of the Participant to make the payments under this Agreement is a several
obligation and not a joint obligation with those of any other Participant. The obligation of the
Participant to make such payments shall constitute a cost of purchased electric power and electric
energy. In all cases, the obligation of the Participant to make the payments required by this
Section shall be payable as an operating expense and solely from the revenues and other legally
available funds of its Electric System. In no event shall the Participant be obligated or required
to levy or collect ad valorem property taxes or assessments to meet its payment obligations under
this Agreement. Such payments shall be made whether or not any market structure,program, or
arrangement is modified, suspended, or terminated, and notwithstanding any interruption,
curtailment, or limitation of market access, transmission availability, or other services, for any
reason whatsoever, in whole or in part. The obligations of the Participant to make such payments
shall not be subject to any reduction, whether by offset, counterclaim, or otherwise, and shall not
be conditioned upon the performance by UAMPS under this or any other agreement or
instrument
(g) In the event of any dispute as to any portion of the billing statement for such Billing
Period, the Participant shall nevertheless pay the full amount of the disputed charges when due
and shall give written notice of the dispute to UAMPS not later than the 60th day after such
billing statement was submitted. Such notice shall identify the disputed billing statement, state
the amount in dispute and set forth a full statement of the grounds for such dispute. No
adjustment shall be considered or made for disputed charges unless such notice is given by the
Participant. UAMPS shall give consideration to and shall consult with the Project Management
Committee with respect to such dispute and shall advise the Participant with regard to its
position relative thereto within sixty (60) days following receipt of such written notice. Upon
final determination(whether by agreement or determination by the Project Management
Committee) of the correct amount, any difference between such correct amount and such full
amount shall be accounted for in the billing statement next submitted to the Participant after such
determination.
10
Page 111 of 161
Section 6. Rate Covenant. Each Participant covenants and agrees to establish, maintain, and
collect rates, fees, and charges for electric service furnished through its Electric System that are
sufficient together with other legally available funds of its Electric System to (1)pay all amounts
payable by the Participant to UAMPS under this Agreement, including costs associated with
power, energy, capacity, transmission, ancillary services, market settlements, administrative fees,
and all other charges allocated pursuant to this Agreement; (2)pay all operation and maintenance
expenses of the Participant's Electric System; (3)provide for the payment of principal and
interest on any bonds or other indebtedness payable from the revenues of the Participant's
Electric System, as and when the same become due and payable; and(4) establish reasonable
reserves and margins, consistent with prudent utility practice, to ensure continued financial
stability of the Participant's Electric System and compliance with any financial covenants
imposed by bond resolutions, ordinances, or other financing agreements. Each Participant shall
enforce the collection of such rates, fees, and charges and shall not furnish free electric service to
any person, firm, or corporation, except as permitted under applicable law.
Section 7. Audit Rights.
(a) UAMPS shall conduct, or cause to be conducted, an annual review of market operations
and settlement activity associated with the Project, settlements received from organized markets
and related charge and revenue allocations to Participants. Such review shall be performed for
the purpose of verifying the accuracy and consistency of settlement processing and allocation
methodologies and evaluating operational decision making in the market for the purposes of
improving future market operations. UAMPS shall report the results of such review to the
Project Management Committee, including a summary of findings, any identified material
discrepancies, and any corrective actions taken or proposed. The Project Management
Committee may provide direction regarding follow-up actions or process improvements based on
such report. Nothing in this Section shall be construed to expand or limit any audit rights of a
Participant under this Agreement, nor to require UAMPS to engage an independent auditor
unless otherwise directed by the Project Management Committee.
(b) At its cost, the Participant may, upon the giving of not less than 60 days' prior written
notice to DAMPS, but not more often than once during any two-year period, inspect and audit
the books and records of UAMPS for the purpose of verifying the amounts payable by the
Participant under this Agreement within the three-year period preceding the commencement of
the audit. UAMPS agrees to make available to the Participant, to the extent Commercially
Reasonable, all relevant records and all requested information relating to the subject matter of
any such audit, subject in all cases to any confidentiality restrictions applicable to third-party
information or contracts; provided that UAMPS shall make Commercially Reasonable Efforts to
obtain a waiver of such restrictions for purposes of the audit and the Participant shall execute
such non-disclosure agreements as may be reasonably requested by UAMPS. Any audit shall be
conducted during normal business hours, and the Participant will use Commercially Reasonable
Efforts to complete any audit within one month, subject to the availability of relevant records and
information and the absence of material accounting irregularities
(c) If any audit discloses that an overpayment or underpayment has been made during the
three-year period described above, the amount of the overpayment or underpayment will be
11
Page 112 of 161
promptly paid by the appropriate party, together with interest calculated at an annual rate equal
to the Secured Overnight Funding Rate (SOFR)reported on the website of the Federal Reserve
Bank of New York, or reported by any successor to the Federal Reserve Bank of New York as
administrator of SOFR,plus 100 basis points, compounded daily and on the basis of a 360-day
year, from the date or dates of any such overpayment or underpayment through and including the
date of the payment correcting the overpayment or underpayment. Any payment made by
UAMPS pursuant to this Section shall constitute a cost of electric power and electric energy.
Section 8. Representations and Warranties.
(a) The Participant represents and warrants to UAMPS as follows:
(i) the Participant is a political subdivision, duly created and validly existing under
the laws of the State of California and has all corporate power and authority necessary to
enter into and perform its obligations under this Agreement;
(ii) the Participant has all corporate power and authority necessary to enter into and
perform its obligations under this Agreement;
(iii) this Agreement has been duly authorized, executed and delivered by the
Participant and constitutes its legal, valid and binding obligation enforceable in
accordance with its terms;
(iv) the execution, delivery and performance by the Participant of this Agreement does
not and will not(A) conflict with any constitutional, statutory or regulatory provision,
judgment, decree or order applicable to the Participant and(B) constitute a breach of or a
default under any bond ordinance, resolution or indenture or any contract or agreement to
which the Participant is a party or to which any of the property, assets or revenues of its
Electric System is subject;
(v) all Required Approvals have been obtained; and
(vi) to the Participant's knowledge, there is no pending or threatened action or
proceeding affecting the Participant which purports to affect the authorization, legality,
validity or enforceability of this Agreement or the Joint Action Agreement.
(b) UAMPS represents and warrants to the Participant as follows:
(i) UAMPS is a political subdivision of the State of Utah and an energy services
interlocal entity, duly created and validly existing under the Act and the Joint Action
Agreement;
(ii) UAMPS has all corporate power and authority necessary to enter into and perform
its obligations under this Agreement;
12
Page 113 of 161
(iii) This Agreement has been duly approved by the Project Management Committee
and the Board and has been duly authorized, executed and delivered by UAMPS and
constitutes its legal, valid and binding obligation enforceable in accordance with its
terms;
(iv) the execution, delivery and performance by UAMPS of this Agreement does not
and will not (A) conflict with any constitutional, statutory or regulatory provision,
judgment, decree or order applicable to UAMPS and(B) constitute a breach of or a
default under any bond ordinance, resolution or indenture or any contract or agreement to
which UAMPS is a party or to which any of its property, assets or revenues is
subject; and
(v) to UAMPS' knowledge, there is no pending or threatened action or proceeding
affecting UAMPS which purports to affect the authorization, legality, validity or
enforceability of this Agreement or the Joint Action Agreement.
Section 9. Indemnification and Liability
(a) UAMPS and the Participant shall defend and hold each other harmless from any and all
claims, liability, and expense, including attorneys' fees, litigation expenses, and any judgment
arising out of any bodily injury, death, or damage to property(other than bodily injury, death, or
damage to property proximately caused by the other party or its servants or employees),
occurring on their respective properties, including such injury, death, or damage as may be
suffered by UAMPS or the Participant or by third parties, except that UAMPS and the
Participant shall each be responsible for all claims of its respective employees, agents, and
servants under workmen's compensation laws or any similar statutes. In no event shall either
UAMPS or the Participant be liable to each other for any indirect, special, incidental, or
consequential damages with respect to any claim arising out of this Agreement whether based on
contract, tort, strict liability, or otherwise.
(b) The Participant acknowledges that(i) effective performance by UAMPS of its obligations
under this Contract will require exercise of business judgment by UAMPS officers, directors,
managers,personnel, and consultants on the basis of information available to them, and(ii) while
UAMPS' aim will be to enhance value and reduce risk to the Participants, it is not reasonable to
expect that value will be ideally maximized or that risk will be fully eliminated. In no event shall
a claim of breach or event of default by UAMPS be based on the dissatisfaction of one or more of
the Participants with transactions managed or entered into by UAMPS pursuant to this Contract,
or with the nature or level of savings, costs, or risks associated therewith, absent a showing of
gross negligence or willful misconduct by UAMPS. The sole remedy available to the Participant
or another Participant that is dissatisfied with UAMPS' ability to achieve UAMPS' goals is to
terminate this Contract in accordance with the Agreement; provided that upon a showing of gross
negligence or willful misconduct by UAMPS the Participant may terminate this Agreement upon
written notice to UAMPS, notwithstanding the five-year notice period otherwise applicable under
Section 2, which notice will not become effective until the date on which the Participant has
terminated its participation in all UAMPS projects and completed all associated obligations, and
13
Page 114 of 161
shall not relieve the Participant or UAMPS of any obligation incurred prior to the effective date of
termination.
(c) No member of the Board or the Project Management Committee, no officer or employee
of DAMPS, no member of the governing body of the Participant nor any officer or employee of
the Participant shall be individually or personally liable for any amount payable under this Power
Supply Contract or be subject to any personal liability or accountability by reason of the execution
and performance of this Power Supply Contract;provided, however, that this Section shall not be
construed to relieve any officer or employee of UAMPS or the Participant from the performance
of any official duty imposed by law or this Agreement.
Section 10. Uncontrollable Force. Neither UAMPS nor the Participant shall be considered to be
in default in respect to any obligation hereunder(other than the obligation of the Participant to
pay obligations under Section 5) if prevented from fulfilling such obligations by reason of an
Uncontrollable Force. The parry claiming an Uncontrollable Force shall give notice and
reasonable details of any potential or actual Uncontrollable Force to the other parry as soon as is
reasonably practicable, shall provide regularly updated information as to the anticipated
occurrence or duration of the Uncontrollable Force, and shall provide prompt notice when it is
able to resume performance of those obligations that were affected as a result of the
Uncontrollable Force. Either party rendered unable to fulfill any obligation by reason of an
Uncontrollable Force shall exercise due diligence to remove such inability with all reasonable
dispatch.
Section 11. Default; Dispute Resolution
(a) In the event of a failure of the Participant to observe,keep and perform any of the
covenants, agreements or obligations on its part contained in the Agreement, UAMPS may, in
addition to its other rights hereunder, bring any suit, action, or proceeding in law or in equity,
including mandamus, injunction and action for specific performance, as may be necessary or
appropriate to enforce any covenant, agreement or obligation of this Agreement against the
Participant.
(b) In the event of any default by UAMPS under any covenant, agreement or obligation of
this Agreement, the Participant's sole remedy for such default shall be limited to mandamus,
injunction, action for specific performance or any other available equitable remedy as may be
necessary or appropriate and in no event shall the Participant withhold or offset any payment
owed to UAMPS hereunder.
(c) Prior to and as a condition to the filing of any action with respect to this Agreement under
paragraph(a) above, the Participant shall first submit the dispute or matter in question to the
Project Management Committee for mediation by giving notice in writing to UAMPS and the
Chair of the Project Management Committee describing the dispute or matter and the issue or
issues to be resolved. The Participant agrees to participate fully and in good faith in all
mediation proceedings of the Project Management Committee. In the event that the Project
Management Committee is unable to resolve or mediate such dispute or matter within 120 days
14
Page 115 of 161
after UAMPS has received written notice of the dispute, the Participant shall have the right to
initiate such proceedings as it may deem necessary.
(d) No member of the governing body, nor any officer or employee of UAMPS or the
Participant shall be individually or personally liable for any payment under this Agreement or be
subject to any personal liability or accountability by reason of the execution of this Agreement;
provided, however, that this Section shall not relieve any officer or employee of UAMPS or the
Participant from the performance of any official duty imposed by law or this Agreement.
Section 12. Notices.
(a) All notices, demands or other communications made pursuant to this Contract (each, a
"Notice")may be sent by electronic mail, other mutually acceptable electronic means,a nationally
recognized overnight courier service, first class mail or hand delivery. Notice shall be deemed
given when received by the addressee, unless received on a day that is not a business day or
received after 5:00 p.m. (receiving parry's local time)on a business day,in which case Notice shall
be deemed to have been received on the next following business day. In the absence of proof of
the actual receipt date, the following presumptions will apply: (i) Notice sent by electronic mail
shall be deemed to have been received upon the sending party's receipt of electronic confirmation
of successful transmission; (ii) Notice sent by overnight mail or courier shall be deemed to have
been received on the next business day after it was sent or such earlier time as is confirmed by the
receiving party; and(iii)Notice sent by first class mail shall be deemed to have been received five
business days after mailing.
(b) All Notices shall be sent by UAMPS to the business address or e-mail address of the
Participant's Representative. All Notices shall be sent by the Participant to the business address
or designated e-mail address of UAMPS. Either party may change its Notice address(es)by Notice
to the other parry.
Section 13. Miscellaneous.
(a) Assignment. This Agreement shall inure to the benefit of and shall be binding upon the
respective successors and assigns of the parties to this Agreement; provided, however, that
neither this Agreement nor any interest herein shall be transferred or assigned by either parry
without the prior written consent of the other party.
(b) Severability. If any section,paragraph, clause or provision of this Agreement shall be
finally adjudicated by a court of competent jurisdiction to be invalid, the remainder of this
Agreement shall remain in full force and effect as though such section, paragraph, clause or
provision or any part thereof so adjudicated to be invalid had not been included herein.
(c) No Merger. This Agreement constitutes the entire and complete agreement of UAMPS
and the Participant in respect of the Project and shall not be nor shall it be deemed to be
modified, amended or superseded by any other agreement or contract between UAMPS and the
Participant in respect of any other project or subject.
15
Page 116 of 161
(d) No Waiver. No failure or delay by UAMPS or the Participant in exercising any right,
remedy, or power under this Agreement shall operate as a waiver of such right, remedy, or
power. No single or partial exercise of any right, remedy, or power shall preclude any other or
further exercise thereof or the exercise of any other right, remedy, or power. Any waiver of a
provision of this Agreement shall be effective only if made in writing and signed by the party
against whom the waiver is asserted, and no such waiver shall be deemed a continuing waiver
unless expressly stated.
(e) Relationship between the Parties. This Contract is not intended to create, nor shall it be
deemed to create, any relationship between UAMPS and the Participant other than that of
independent parties contracting with one another for the purpose of effectuating the provisions of
this Contract.
(f) Survival. The termination of this Contract shall not discharge either party thereto from
any obligation it owes to the other party under this Contract by reason of any transaction, loss,
cost, damage, expense, or liability which shall occur or arise (or the circumstances, events, or
basis of which shall occur or arise)prior to such termination. It is the intent of the parties hereby
that any such obligation owed(whether the same shall be known or unknown at the termination
of this Contract or whether the circumstances, events, or basis of the same shall be known or
unknown at the termination of this Contract) shall survive the termination of this Contract.
Cancellation, expiration, or termination of this Contract shall not relieve the parties of
obligations that expressly survive or by their nature should survive such cancellation, expiration,
or termination.
(g) No Third-Party Beneficiary. This Contract is intended solely for the benefit of the parties
hereto. Except as necessary to enter into a Credit Agreement, subject to approval by the Project
Management Committee, nothing in this Contract shall be construed to create any duty to, or
standard of care with reference to, or any liability to, any person not a party to this Contract.
(h) Governing Law. This Agreement is made under and shall be governed by the law of the
State of Utah; provided however, that if the Participant is organized or created pursuant to the
laws of another state, then the authority of the Participant to execute and perform its obligations
under this Agreement shall be determined under the laws of such state. All judicial proceedings
brought against either party arising out of or relating hereto shall be brought exclusively in the
courts of the State of Utah or of the United States of America for the District of Utah. By
executing and delivering the Agreement, each party irrevocably accepts generally and
unconditionally the nonexclusive jurisdiction and venue of such courts,waives any defense of
forum non conveniens; agrees that service of all process in any such proceeding in any such court
may be made by registered or certified mail, return receipt requested, to the party; and agrees that
service as provided above is sufficient to confer personal jurisdiction over the party in any such
proceeding in any such court, and otherwise constitutes effective and binding service in every
respect.
(i) Entire Agreement. This Contract supersedes all previous representations, understandings,
negotiations, and agreements, either written or oral,between the parties or their representatives
16
Page 117 of 161
with respect to the subject matter hereof and constitutes the entire agreement of the parties with
respect to the subject matter hereof.
0) Counterparts. This Contract may be executed in counterparts, each of which shall be
deemed to be an original, but all of which together shall constitute one and the same instrument.
[Signature Page Follows]
17
Page 118 of 161
Dated this day of , 2026.
TRUCKEE DONNER PUBLIC UTAH ASSOCIATED MUNICIPAL
UTILITY DISTRICT POWER SYSTEMS
President Chairman
ATTEST ATTEST
Clerk Secretary
18
Page 119 of 161
EXHIBIT 1
FORM OF ANNUAL PURCHASE PLAN
Plan Information
Fiscal Year
PMC Approval Date
Effective Period
Planning Overview
Aggregate Forecasted Deficiency MWh
Peak Forecasted Deficiency(MW)
Planning Assumptions/Notes
Forecasted Deficiency Purchase Targets
Procurement Horizon Target Coverage
12 months ---> 1 month ahead Up to 80%
1 month --* 2 days ahead Up to 100%
Day Ahead/Real-Time As needed
Planned Purchase Volumes
Month Forecasted Purchased to Date Remaining Uncovered
Deficiency
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Resource Sufficiency Evaluation (RSE)
Standard Approach 100%procured Day Ahead
Exceptions/Notes
Flexible Resource Strategies (if applicable)
Tolling Agreement ❑ Yes ❑ No
Dis atchable Resource ❑ Yes ❑ No
Firm Market Purchase ❑ Yes ❑ No
Other
1
Page 120 of 161
Fine-tuned Load-following Purchases
Specific plans for shaping to be added here.
Attribution Statement
Forecasted Deficiency purchases are attributed to Participants at the time of purchase based on
forecasted need. RSE purchases are made at the UAMPS level and allocated after-the-fact to
Participants with RSE need.
Approval
PMC Chair
Date
2
Page 121 of 161
EXHIBIT 2
FORM OF MEMBER LOAD & RESOURCE FORECAST
Forecast Information
Participant
Fiscal Year
Forecast Version ❑ Draft ❑ Final
Date Prepared
Summary Forecast
Gross Load(MWh)
Gross Load MW—Peak
Total Resources Capacity(MW)
Total Resources MWh
Forecasted Deficiency/(Surplus)
Monthly Energy Summary
Month Gross Load(MWh) Resources (MWh) Deficiency
(Surplus)
Apr
May
Jun
Jul
Au
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Monthly Peak Summary
Month Gross Peak Load Resources (MW) Deficiency/
MW (Surplus)
Apr
May
Jun
Jul
Au
Se
Oct
Nov
Dec
1
Page 122 of 161
Jan
Feb
Mar
Resource Detail
Resource Type Capacity Energy (MWh) Notes
Name MW
Forecast Assumptions & Notes
Member Review & Confirmation
Approval Status ❑ Approved ❑ Approved with
corrections
Member Representative
Date
2
Page 123 of 161
EXHIBIT 3
CONSIGNED RESOURCE [Non-DAMPS RESOURCE]
WHEREAS, [Participant] (the "Member") is a participant of the UAMPS Pool Project;
WHEREAS, in order for the Member to schedule its [Non-UAMPS Resource] as part of
their resource portfolio, it is necessary for the Member to enter into this Pooling Appendix to
provide for responsibilities and authorities of each party and document the procedures to be used,
and;
WHEREAS, Member desires that UAMPS act as its scheduling agent for scheduling
services ("Scheduling Agent") for its [Non-UAMPS Resource].
NOW, THEREFORE,the Member and UAMPS agree to the following.
SECTION 1. TERM
The term of this Pooling Appendix will begin May 1, 2026 and extends through the
earlier of 1)the termination of the Amended and Restated Power Pooling Agreement; or 2)
termination at the option of either Party upon the later of 30 days or the end of the scheduling
month with written notice to the other Party or as provided for in Section 2 of the Amended and
Restated Pooling Agreement and alternative procedures acceptable to UAMPS are in place.
SECTION 2. PURPOSE
This Pooling Appendix specifies the procedures for scheduling [Non-UAMPS Resource]
as part of its resource portfolio due to the implementation of Extended Day-Ahead Market
protocols ("EDAM Protocols") administered by PacifiCorp in conjunction with the California
Independent System Operator("CAISO"). Member agrees that their scheduling of[Non-
UAMPS Resource] is subject to the terms and conditions of this Pooling Appendix which may be
amended from time to time by the agreement of the parties.
SECTION 3. MEMBER OBLIGATIONS,AUTHORITIES AND LIABILITIES
The Member shall provide preschedules to UAMPS according to the timeline specified in
Attachment A hereto. Attachment A may be amended by UAMPS upon written notice to the
Member. All scheduling of the [Non-UAMPS Resource] by the Member will be submitted
through the UAMPS web scheduling interface. Except in instances where the web interface is
not available, submittal of schedules by phone, email or other means of communication will not
be acceptable.
For the purposes of UAMPS power billing, [Non-UAMPS Resource] will be deemed to
[information will be entered here on whether or not the Non-UAMPS Resource is in the CAISO
1
Page 124 of 161
Full Network Model and whether or not the Non-UAMPS Resource incurs transmission costs]
and the UAMPS pool will continue to be used to balance the Member's load pursuant to EDAM
Protocols or policies established by the Pool Project's Project Management Committee.
Differences, if any, between scheduled output that the Member has entered into UAMPS' billing
database and the output measured by [Non-UAMPS Resource] meter(s)will be invoiced as
imbalance energy.
SECTION 4. UAMPS OBLIGATIONS,AUTHORITIES AND LIABILITIES
UAMPS shall use the [Non-UAMPS Resource] schedules submitted from the Member
according to the timeline specified in Attachment A in integrating and scheduling the Member's
resources scheduled and billed by UAMPS to serve the Member's loads.
UAMPS will bid and schedule the Member's [Non-UAMPS Resource] in accordance
with the Member's specific instructions.
SECTION 5. SCHEDULING AGENT SERVICE CHARGE
The Member will be charged a scheduling fee, transmission fee, and any other fee as
adopted by the UAMPS Board of Directors from time to time.
Member also agrees to pay any other costs, if any, and any applicable administrative
overheads as approved by the UAMPS Board of Directors that UAMPS may incur in the
performance of this Pooling Appendix.
DATED this day of , 2026.
[PARTICIPANT] UAMPS
2
Page 125 of 161
Attachment A
Duration for 1 Month and Longer(Term) Schedules:
The Member must notify UAMPS by the 19th of the prior month.
Day-Ahead Schedules:
The Member must notify UAMPS by 6:00 AM, 7 business days prior to the trade date. To the
extent allowed under WECC and Balancing Authority criteria, UAMPS will accept changes to
the 7 day schedule made by 6:00 a.m. [2] business days prior to the trade date.
Notification parties for Term, Balance of the Month, and Day Ahead transactions:
Pre-Scheduler preschedulingkuamps.com 801-568-0497
Kelton Andersen keltonguamps.com 801-214-6406
Notification parties for unplanned outages or emergency situations:
Shift Scheduler sched(kuamps.com 801-568-0496
801-568-0596
To report scheduling problems:
Jordan Garcia jordan(kuamps.com 385-377-2567
3
Page 126 of 161
COMPARISON OF TERMS
IN THE CURRENT VS THE REVISED POOLING AGREEMENT
Original Pooling Agreement
Terms and current practices Amended Pooling Agreement
Termination Termination requires 5-years Termination requires 5-years
written notice written notice or earlier upon
approval of the PMC
Financing Silent(authority unclear) Allows UAMPS to enter Credit
Agreements with PMC approval
Load Forecasts Silent(UAMPS performs Annual Purchase Plan based on
annually but not required by Load and Resource Forecasts
contract) informs purchasing
Purchase and Sale Unplanned Purchases without Resource sufficiency purchases
Authorization authorization; advanced without authorization; advanced
purchases (more than day purchases based on Annual
ahead ) require authorization Purchase Plan without further
authorization unless Participant
has opted out
Consignment Agreement allows consignment; Participants required to consign
(UAMPS dispatches practice requires Participants to all resources pursuant to a
Participant consign all resources pursuant pooling appendix except for
resources per to pooling appendix except for Limited Participants
pooling appendix) Limited Participants
Cost Causation Members pay other members in Market settlements, charges,
the pool for resources used to and revenues, are allocated by
serve their loads; other costs Load Ratio Share; some costs
not addressed in the agreement allocated by historical average;
resource costs allocated by
generator ownership
Governance Silent Consistent with UAMPS JAA,
Bylaws and power sales
contracts
Billing and Billing Silent; subject to UAMPS Consistent with other power
Disputes procedures sales contracts
Other Legal Silent Consistent with other power
Provisions sales contracts
Page 127 of 161
CERTIFICATE OF PARTICIPANT
The undersigned hereby certify that they are the President and Clerk of Truckee Donner
Public Utility District, California (the "Participant"), a member of Utah Associated Municipal
Power Systems ("UAMPS"), and that as such they are authorized to execute this Certificate on
behalf of the Participant and hereby certify as follows:
1. This Certificate is delivered in connection with the execution and delivery of the
Amended and Restated Power Pooling Agreement, dated as of May 1, 2026 (the "Agreement"),
between the Participant and UAMPS. Capitalized terms used and not otherwise defined herein
have the meanings assigned to them in the Agreement.
2. The Participant is a political subdivision of the State of California (the "State") and
is governed by a Board of Directors (the "Governing Body").
3. Attached hereto as Exhibit A is a true, complete and correct copy of a resolution
authorizing the execution and delivery of the Agreement and (the "Contract Resolution"). The
Contract Resolution was duly adopted by a majority of the Governing Body present and voting at
a public meeting of the Governing Body at which a quorum was present and acted throughout.
4. The meeting of the Governing Body at which the Contract Resolution was adopted
was duly called, noticed and held in conformity with applicable laws of the State and procedural
rules of the Governing Body. The Contract Resolution is in full force and effect and has not been
amended, modified, repealed or supplemented.
5. The names of the President and the Clerk authorized to execute and deliver the
Agreement on behalf of the Participant are as follows:
NAME OFFICE
Tony Laliotis President
Brian Wright Clerk/General Manager
6. (a) No petition was filed with the Participant or any of its officers seeking to
refer the Contract Resolution to the electors of the Participant in accordance with the provisions
of State law; and (b)no litigation has been instituted, is pending or has been threatened to require
a referendum election on the Contract Resolution.
7. The Participant owns and operates an electric utility system (the "System") that
distributes and furnishes electric energy to consumers located within the established service area
of the System. Under the Agreement, the Participant agrees to use all of the electric energy from
its Entitlement Share to serve retail customers located in the established service area of the System
and to meet its own requirements.
Pooling Agreement Certificate_TDPUD
Page 128 of 161
8. The Participant has previously executed the Utah Associated Municipal Power
Systems Amended and Restated Agreement for Joint and Cooperative Action dated as of
March 20, 2009, and all amendments thereof and supplements thereto (the "Joint Action
Agreement") and that certain Power Pooling Agreement (the "Pooling Agreement") between the
Participant and UAMPS relating to the power pool administered by UAMPS. The Joint Action
Agreement and the Pooling Agreement are each in full force and effect and constitute the legal,
valid and binding agreements of the Participant.
9. The representations and warranties of the Participant in Section 8 of the Agreement
are true and correct on and as of the date of this certificate.
Dated: , 2026.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT,
CALIFORNIA
By
President
By
Clerk
[SEAL]
- 2 -
Page 129 of 161
[ATTACH CONTRACT RESOLUTION]
A - 1
Page 130 of 161
OPINION OF COUNSEL TO THE PARTICIPANT
, 2026
Utah Associated Municipal Power Systems
155 North 400 West, Suite 480
Salt Lake City,UT 84103
Ladies and Gentlemen:
I have acted as counsel to Truckee Donner Public Utility District, California (the
"Participant")in connection with the Amended and Restated Power Pooling Agreement, dated as
of May 1,2026(the "Agreement"),between the Participant and Utah Associated Municipal Power
Systems ("UAMPS").
In connection with the opinions set forth herein, I have examined(i)the resolution adopted
by the Participant's governing body authorizing the execution and delivery of the Agreement, (ii)
an executed counterpart of the Agreement, and (iii) such other documents, information, facts and
matters of law as are necessary for me to render the opinions contained herein.
Based upon the foregoing, I am of the opinion that:
1. The Participant has full legal right, power and authority to enter into the Agreement
and to perform its obligations thereunder.
2. The Agreement has been duly authorized, executed and delivered by the Participant
and constitutes its legal, valid and binding obligation and is enforceable in accordance with its
terms, except as enforceability may be limited by bankruptcy, insolvency, moratorium,
reorganization or other laws affecting creditors' rights generally or usual equity principles in the
event equitable remedies should be sought.
3. There is no pending or, to my knowledge, threatened, action or proceeding affecting
the Participant (nor to my knowledge is there any basis therefor), which purports to affect the
authorization, legality, validity or enforceability of the Agreement.
4. The execution,delivery and performance by the Participant of the Agreement will not
conflict with or constitute a breach of or default under any agreement, indenture, bond, note,
resolution or other instrument to which the Participant or any applicable law, ruling, regulation,
ordinance, judgment, order or decree to which the Participant (or any of its officers in their
respective capacities as such) or its properties is subject.
Respectfully submitted,
Page 131 of 161
AGENDA ITEM #19
Public Utility District
MEETING DATE: April 1, 2026
TO: Board of Directors
FROM: Scott Crow, IT Director/CIO - Assistant General Manager
SUBJECT: Consideration of Award of a Contract for the SCADA Reliability
Improvement Project Phase 6
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Authorize the General Manager to execute a contract with Ruppert Inc. for the SCADA
Reliability Improvement Project Phase 6, in an amount of $1,387,753, plus a ten
percent change order allowance of $138,775, for a total authorization not to exceed
$1,526,528.
BACKGROUND:
The District operates 5 electric and 57 water facilities across the service territory,
including electric substations, pump stations, well sites, storage tanks, and control
valves. Monitoring and control of these assets relies heavily on Supervisory Control
and Data Acquisition (SCADA) systems. Historically, SCADA communications have
depended on a mix of leased data circuits, dial-up telephone lines, cellular modems,
and various radio systems, technologies that present ongoing challenges related to
reliability, bandwidth limitations, and outdated security protocols.
To address these risks, the District initiated a long-term modernization effort in 2011 to
upgrade the communications infrastructure supporting SCADA operations. Through the
multi-phase SCADA Reliability Improvement Project (SRIP), the District has installed
fiber optic communications cable and associated equipment to replace legacy systems
and improve operational resilience. To date, fiber has been extended from the District
office to 31 remote facilities across the first five phases of the project.
SRIP Phase Board Approvals
• Phase 1: October 2011
• Phase 2: June 2012
• Phase 3: August 2013
• Phase 4: July 2016
• Phase 5: June 2019
Page 1 of 3
Page 132 of 161
When fully implemented, the fiber communications network will interconnect 55 remote
facilities with the District's main office in a multi-loop configuration designed to provide
redundancy, enhance system reliability, and support secure, modern SCADA
operations.
ANALYSIS AND BODY:
Staff has prepared bid documents for the procurement, installation, and testing of fiber
optic communication cables for the proposed SRIP Phase 6 project. This phase will
connect 1 electric facility and 5 water facilities to the District's fiber network and will
extend the primary communications loop to the South East of the District office. Project
construction is scheduled to begin in May 2026, with completion anticipated by
December 2026.
The District issued a request for bids and advertised in the Sierra Sun. The bid opening
was held at 3:30 pm on March 10, 2026. One bidder had a minor mathematical error in
their bid ($6,138.96). Two responsive bids were received, and the corrected values are
given in the table below:
SUMMARY OF BIDS
Bidder Location Bid Amount Responsive
Ruppert Inc Truckee, CA $1,387,753.00 Yes
Fibertel LLC Sacramento, CA $1,887,971.26 Yes
Following the review of all received bids for compliance with District standards and
satisfaction of all bid requirements, staff has determined Ruppert Inc. to be the lowest
responsive bidder.
In addition, this project will extend fiber infrastructure within the Truckee community,
further advancing the Community Broadband Board initiative and enabling our partner,
Plumas Sierra Telecommunications, to reach additional residents.
GOALS AND OBJECTIVES:
District Code 1.05.020 Objectives:
1. Responsibly serve the public.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
5. Manage the District in an environmentally sound manner.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1.05.030 Goals:
1. Manage for Financial Stability and Resiliency
Page 2 of 3
Page 133 of 161
4. Modernize the utility and add value to our communities through collaboration and
innovation.
FISCAL IMPACT:
Rupert Inc. submitted the lowest responsive bid with a total bid price of
$1,387,753. Staff is recommending a 10% change order allowance of$138,775 to
account for any unforeseen changes in scope of work, for a total contract authorization
not to exceed $1,526,528.
This item is included in the FY26 Electric capital expenditure budget in the amount of
$2,750,000. Therefore, this agenda item is $1,223,472 less than the budget. However,
to wholly complete the project, there is also over 90 poles which need to be
upgraded. This pole upgrade portion of project is in the process of bidding and
included in the FY26 budget electric capital expenditure item of system reliability for
$6.OM. Depending upon the bid outcome of this pole upgrade portion of the SRIP6
project, staff will be recommending either to increase the MOM line item budget for
FY26 and or up to $1.22M of the savings will increase capital reserve for future
project(s). Electric's capital reserve balance is $22.3M as of December 31, 2024.
ATTACHMENTS:
None
Page 3 of 3
Page 134 of 161
AGENDA ITEM #20
Public Utility District
MEETING DATE: April 1, 2026
TO: Board of Directors
FROM: Neil Kaufman, System Engineer
Keith Renshaw, Electric Engineering Manager
Mike Swanson, Director of Electric Engineering & Operations
Chad Reed, Water Utility Director
SUBJECT: Approval of the Amended Development Agreements For the Soaring
Ranch Phase 2 Utility Infrastructure Project and Soaring Ranch
Offsite Infrastructure Improvement Project with J-Marr II, LLC
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
A. Authorize the General Manager to execute the revised Development Agreement
and associated documents between J-Marr II LLC and the District for the
Soaring Ranch Phase 2 project, in substantially the same form as presented;
and
B. Authorize the General Manager to execute the revised Development Agreement
and associated documents between J-Marr II, LLC and the District for the
Soaring Ranch Offsite Infrastructure Improvement project, in substantially the
same form as presented
BACKGROUND:
The Joerger Ranch Specific Plan is a Town of Truckee overall planning document that
covers land along Brockway Road, Joerger Drive and Soaring Way to the south and
west of the Truckee Airport. The Specific Plan also identifies new backbone electric
and water system infrastructure that is necessary to serve the anticipated
development. A component of this utility work involves the installation of approximately
3,000 feet of water and electric utility infrastructure along Joerger Drive from Soaring
Way to the Riverview Sports Park. Installation of approximately 2,800' of additional
electric utility distribution infrastructure is also required east along Joerger Drive from
Riverview Sports Park to the Truckee-Tahoe Unified School District Transportation
Maintenance & Operations facility. Attached are two documents taken from the
Specific Plan. Attachment 1 shows the extent of the properties covered under the
Specific Plan. Attachment 2 shows the water main installation. Also included is
Attachment 3 which shows the extent of the water and electric utility improvements
Page 1 of 3
Page 135 of 161
required along Joerger Drive.
The Soaring Ranch Phase 2 project involves the construction of two structures located
at 10501 Soaring Way. The northerly structure is a single-story building with about
23,600 square feet of commercial space. The southerly structure is a four-story
building with 86 residential rental units ranging from studios to three-bedroom
apartments. Work on this property also includes associated improvements such as
paving, landscaping, sidewalks and underground utilities.
Per District Code Sections 6.04.030.1 and 7.12.030.1, approval by the Board of
Directors is required for any development agreement where the total value of
improvements being installed by the applicant to be conveyed to the District for
ownership, operation and maintenance exceeds $400,000.
Two development agreements have been prepared for this project. One agreement
covers the on-site utility infrastructure. The other covers the off-site utilities along
Joerger Drive. It is expected that the combined value of the electrical and water system
facilities covered under both these agreements will exceed the $400,000 threshold.
At the District's March 4, 2026 Board Meeting, the Board authorized the General
Manager to execute the Soaring Ranch Phase II Development Agreements with JMAR
II LLC for both the on-site utility infrastructure construction and the off-site utilities along
Joerger Drive.
ANALYSIS AND BODY:
Following the March 4, 2026 Board meeting, staff and representatives of JMAR II LLC
began the process of executing the Development Agreements. During this process,
further discussions were held with regard to the ability to complete the utility
infrastructure improvements and meet the District's standards for final unconditional
acceptance within the timeframe provided (December 2026) in the approved
Development Agreement. Staff have reviewed the terms of the development
agreement for both of the on-site and off-site utility infrastructure and are in agreement
with the request made by JMAR II, LLC to extend this term to December 2027.
Included with the revised development agreements are more detailed breakdown of the
estimated costs and fees for additional clarification.
The Board approval of the development agreements on March 4, 2026 were "in
substantially the form presented." Staff has reviewed with District General Counsel and
have determined the revisions and extensions in construction timelines out to 2027 are
significant enough in the overall scope of the project to require the Development
Agreements be brought back to the Board for approval.
Copies of the draft revised agreements for Soaring Ranch Phase II Water and Electric
Infrastructure, Soaring Ranch Phase II Water and Electric Off-Site Improvements ,
Page 2 of 3
Page 136 of 161
calculated fees schedule for water improvements , and calculated fees for electric utility
improvements have been included as attachments to this staff report.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
2. Provide a healthy and safe work environment for all District employees.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
5. Manage the District in an environmentally sound manner.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
2. Environmental Stewardship: Create a sustainable resilient environment for all our
communities.
3. Engage with our customers and communities in a welcoming and transparent way to
identify opportunities.
4. Modernize the utility and add value to our communities through collaboration and
innovation.
5. Developing an inclusive culture drives organizational integration and success.
FISCAL IMPACT:
There is no direct fiscal impact associated with this item. The project is subject to the
normal Connection Fees and Facilities Fees schedules and the developer will be
responsible to pay the District's costs associated with construction inspection for the
project and other expenses.
ATTACHMENTS:
1. Specific Plan Extents
2. Water Improvements
3. Soaring Ranch Offsites Map
4. Soaring Ranch II Electric Water DA -Unconditional-Offsite DA Required
5. Soaring Ranch Offsite Infrastructure Electric Water DA -Unconditional 3.27.26
6. Soaring Ph2 Electric Fee
7. Estimated Costs and Calculation of Fees - March 2026
8. Estimated Costs and Calculation of Fees - Off-Site - March 2026
Page 3 of 3
Page 137 of 161
••
77,
7,
- u
i _ w
OAP h+ti
&1 AC
40
AC CL-1
27 xc
Page 1 161
LBUEM
=�-- r2GF0SED 16•WATER MUN
1 r ED 12'WATER MAN
► 1 C3 WATM MAIN MM AS NMM)
JOEIR M RANCH 9PBMI PI AN AREA
} CCUqNELr NEW 16"WATSB
MAII+T T EXMI G 24
WATHfi MAIN
ti� I
2'V CAIS M
ACROSS HWY 267
�1
Y �11DWN 80[IIMRY
4 ff cwmicrmw
1b"WATER NE&IN
w� TO KMTB4016"
WATER MAIN
QONNECr NEW
W WA'11R MAIN
TO MCME i[314"
WATER MAM
Pzfge 139 of 161
T■U(KEEDONNE■Public Utility District Figure 3 - Soaring Ranch Offsite Infrastructure Improvements
�
River,",,
■ ■
if 2
■ L ■ . %
x % . -_---
% A■ p -- -
�
■
a�f■■ f e k �« ,
�■ �
�
_
jef
! # /
& f 2 4
R% _ « ty
y
■ ■ � &�� � � � � /�.
�#
% x�%■ � e.
� % # � ■ % ■ �� ± � �. �
■ \ ® J % .tom
� ■ � , _ f,
�L �'
�* �a ����� � �� . � |��� �
. � ®
This mop:»user generated stotic output�:yreference only.o,laye s that appear on this mapare approximations 2� 7l026
1&5.94 B 7271.97 lag Feet and may not&accurate,� or m�z reliable.
Page 140 G 161
ELECTRIC AND WATER DEVELOPMENT AGREEMENT
BETWEEN THE
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
AND
J-Mar II, LLC
APN 19-620-066
Soaring Ranch Phase II
This Agreement is entered into between the TRUCKEE DONNER PUBLIC UTILITY DISTRICT,
a local public agency of the State of California, hereafter referred to as "the District," and J-Mar
11, LLC, hereafter referred to as "Developer," with respect to the following facts:
RECITALS
A. Developer is the owner of that certain real property located within Nevada County,
California, bearing Assessor's Parcel Number 019-620-066 on which Developer intends to
construct a "Construction of two new buildings with 23,635 sq. ft. (gross-calculated from
wall). The single story commercial building consists of retail, office and restaurant space.
The four-story residential building contains 86 multifamily residential units. The project will
also have 272 parking spaces, along with all necessary infrastructure to support the new
development."
B. Developer intends to construct a complete electric distribution system for the Project in
accordance with the approved plans and specifications. Such system shall hereafter be
referred to as the "electric distribution system."
C. Developer intends to construct a complete water distribution system for the Project for
domestic and fire protection use, including pipes, valves, service laterals, and related
equipment, in accordance with the approved plans and specifications. Such system shall
hereafter be referred to as the "water distribution system."
D. The electric and water distribution systems is a necessary part of the Project, and Developer
has requested that the District accept the system by including it within the District's existing
integrated system. Developer has further requested that, upon completion, the District
thereafter own, operate, maintain, repair, and replace the electric and water distribution
systems as necessary. If the total value of the projects on-site improvements being installed
by the Developer to be conveyed to the District for ownership, operation and maintenance
exceeds $400,000, the Development Agreement will be brought to District's Board of
Directors for review. The total value will be calculated by the engineer of record.
E. The District is willing to accept the electric and water distribution systems providing it is
properly constructed in accordance with the approved plans, specifications and terms of this
Agreement.
F. Complete plans and specifications for the construction of the electric and water distribution
systems have been prepared in accordance with the District's Rules and Regulations and
with the requirements and specifications as hereafter set forth. Copies of the approved plans
Page 1 of 8
Page 141 of 161
and specifications are on file in the District's Department.
G. Developer has selected contractors for construction of the electric and water portions of this
Project. The names of the contracting firms, contact persons, mailing addresses, telephone
numbers, California Contractor License, insurance coverage verification and a schedule of
construction dates have been included on data sheets entitled Contractor Firm Data Sheets,
and are on file in the District's Electric and Water Departments.
H. The following items are on file in the District office and incorporated herein by reference:
• Development agreement application
• Contracting firm data sheet—electric
• Contracting firm data sheet—water
• Temporary Blanket Public Utility Easement
• Proof of Insurance
• Project parcel map
• Site and Improvement plans - electric
• Site and Improvement plans -water
• Estimated costs and calculation of fees— electric
• Estimated costs and calculation of fees —water
• Improvements by and Responsibilities of Developer— electric
• Improvements by and Responsibilities of Developer-water
• Improvements by and Responsibilities of District— electric
• Improvements by and Responsibilities of District-water
• Project documentation policy
• TDPUD Electric Construction Standards
• TDPUD Water Construction Standards
The parties agree as follows:
1. Payment of Costs and Fees. The District has prepared an estimate of its costs for
materials, labor, consultants, and legal expenses that the District expects to expend for
administrative, design, inspection, and actual construction (hereafter collectively referred
to as the "construction costs"). Upon start of construction, Developer shall deposit with
the District amounts that shall be applied to the actual construction costs incurred by the
District. If the actual cost exceeds the amount deposited, Developer shall pay such
excess within thirty (30) days of receipt of the District's invoice. If the actual cost is less
than the amount deposited, the District shall refund the difference within sixty (60) days of
the date of unconditional acceptance of the electric and water distribution systems. Upon
execution of this Agreement, Developer shall also pay to the District the fees set forth in
the estimated construction costs and calculation of fees.
2. N/A
3. N/A
4. Provision of Easements - Permission to Enter Land. Developer will execute a temporary
blanket easement granting the right to do all things necessary for the construction of the
electric and water facilities including, but not limited to, a right to ingress and egress, a
right to temporarily store equipment and materials, to excavate, to drive vehicles over, to
Page 2 of 8
Page 142 of 161
place markers on, to survey, to inspect and repair, and to remove rocks, boulders, trees
and plant life in the course of excavation or re-excavation. The temporary easement will
be abandoned upon receipt by the District of a permanent easement for the maintenance
and repair of the electric and water distribution systems.
5. Provision of Insurance - Upon execution of this agreement, Developer shall provide the
District with satisfactory evidence of an insurance policy written upon a form and by a
company which meets with the approval of the District, insuring the District, its officers,
agents and employees against loss or liability which may arise during the construction, or
which may result from any of the work or construction herein required to be done,
including all costs of defending any claims arising as a result thereof. The minimum limits
of such policy shall be in the amount of $1,000,000 for the death of or injury to any
person in any one accident and $2,000,000 for the death of or injury to more than one
person in any one accident and $1,000,000 for property damage in any one accident.
Such policy shall be written in favor of Developer or its general contractor and
subcontractors and also in favor of the District, its officers, agents and employees and
shall be maintained in full force and effect until the electric and water distribution systems
are unconditionally accepted by the District. Such insurance policy shall state by its terms
or by an endorsement that it shall not be canceled without thirty (30) days prior written
notice to the District that the right of subrogation is waived and that the coverage is
provided on a primary and non-contributory basis.
6. Indemnification by Developer. Developer shall indemnify, defend and save harmless the
District, its officers, agents and employees, and each of them, of and from any and all
claims, demands, causes of action, damages, costs, expenses, losses, or liabilities, in
law or in equity, of every kind and nature whatsoever, for, but not limited to, injury to or
death of Developer, any subcontractor of Developer, or any officers, agents or employees
of the District, of Developer, or of any subcontractor, or any other person, and damages
to or destruction of property of the District or any other person, arising out of or in any
manner directly or indirectly connected with the work to be performed under this
Agreement, however caused, regardless of any negligence of the District or its officers,
agents or employees, except for the active negligence or willful misconduct of the District.
7. Improvements by and Responsibilities of Developer - Electric. Developer shall perform
and be responsible for all labor and material expenses involved in performing the
distribution system improvements described in the design drawings and outlined under
the general construction notes entitled Customer to Supply and Install.
8. Improvements by and Responsibilities of Developer - Water. Developer shall perform
and be responsible for all labor and material expenses involved in performing the water
distribution system improvements described in the attachment entitled Improvements by
and Responsibilities of Developer (Exhibit A).
9. Improvements by and Responsibilities of District - Electric. The District shall assign a
Project Administrator to oversee the Project. The District shall perform electric
distribution system improvements at Developer's expense as described in the design
drawings and outlined under the general construction notes entitled TDPUD to Supply to
the Customer, for Installation by the Customer and TDPUD to Supply and Install at
Customers Expense. The construction costs deposited with the District shall be applied to
the actual construction costs unless otherwise indicated. If the actual construction costs
Page 3 of 8
Page 143 of 161
exceed such deposit, Developer shall pay such excess within thirty (30) days of receipt of
the District's invoice.
10. Improvements by and Responsibilities of District — Water. The District shall assign a
Project Administrator to oversee the Project. The District shall perform water distribution
system improvements at Developer's expense as described in the attachment entitled
Improvements by and Responsibilities of District (Exhibit B). The construction costs
deposited with the District shall be applied to the actual construction costs unless
otherwise indicated. If the actual construction costs exceed such deposit, Developer shall
pay such excess within thirty (30) days of receipt of the District's invoice.
11. Construction Inspection. The District shall inspect the construction from time to time, in
order to determine that the electric and water distribution systems are installed in
accordance with the approved improvement plans, construction specifications and the
terms of this agreement.
a. The District shall notify the Developer and/or the Developer's representatives in
writing as to any deviation from the approved improvement plans, construction
specifications and the terms of this agreement. The Developer and/or the
Developer's representatives shall correct such deviation or failure as soon as is
reasonably practicable.
12. Timely Construction Required. Construction of the electric and water distribution systems
shall be completed, as defined herein, within twenty-four (24) months from the date of
execution of this agreement. In the event Developer fails to complete the electric and
water distribution systems within that time, the District may in its discretion (1) increase
any and all fees and costs to equal the District's current charges, (2) require Developer's
plans and specifications to be updated and redrawn to comply with the District's current
standards, and (3) terminate this Agreement and recover from Developer the full cost of
all expenses and charges incurred by the District, including but not limited to material,
labor, backfill, paving and outside services.
13. Developer's Warranty. Developer warrants and guarantees that all labor and materials
supplied by Developer are of a good and workmanlike quality, free of any defects of any
type whatsoever for a period of one (1) year after unconditional acceptance by the
District. Within the period of this warranty, Developer shall repair or replace, at
Developer's expense, any defective material or workmanship. The District shall notify
Developer of any malfunction or nonconformity promptly upon discovery. Within fifteen
(15) business days after receiving notice from the District, Developer shall commence to
repair or replace the defective part and will expeditiously pursue such work to completion
and acceptance by the District. Emergency repairs will be coordinated by District and
charged to the Developer.
14. No Early Use of Project. Developer shall not request or obtain a temporary occupancy
permit, final inspection approval, nor shall Developer use, or permit anyone else to use,
any portion of the electric and water distribution systems on the Project, nor shall
Developer use or permit anyone else to use any electric and water service supplied by
the District, until the District has granted Conditional Acceptance in writing. Developer
may, however, with the District's written permission and prior to conditional acceptance,
use electricity or water for metered construction purposes. The District shall be entitled to
Page 4 of 8
Page 144 of 161
terminate, without notice, any electric and water usage by Developer or any other person,
other than that required for construction purposes, occurring prior to unconditional
acceptance by the District of the entire electric and water distribution systems.
15. Completion of the System. Construction shall be deemed complete when the District
determines that the electric and water distribution systems have been entirely finished,
properly tested, and ready to service the Project in accordance with the District's Rules
and Regulations and qualifies for Unconditional Acceptance.
16. Requirements for Unconditional Acceptance. Prior to providing electric and/or water
service, the Developer shall fully comply with all steps set forth below, and upon such full
compliance, the District shall unconditionally accept the electric and water distribution
systems.
a. Delivery of Electric and Water service will be contingent on the execution of a
Development Agreement for the required offsite water and electric improvements.
Those required offsite improvements will be referred to as the Soaring Ranch Offsite
Improvement Protect.
b. Developer shall execute an offer of dedication for the electric and water distribution
systems to the District in a form satisfactory to the District, without cost, free, and
clear of all liens and encumbrances.
C. Developer shall certify that the Project was constructed with approved materials and
in compliance with the development agreement and the approved plans, except as
noted on the Project documentation drawings.
d. Developer shall provide the District with Project documentation drawings in
compliance with District policy.
e. Developer shall provide the District with the appropriate permanent easements.
f. Developer shall provide the District with a maintenance bond in a form satisfactory to
the District in a sum equal to fifteen percent (15%) of the ultimate construction costs
of the water distribution system. This bond shall remain in effect for a period of one
(1) year after unconditional acceptance of the water distribution system and protect
against any defects or failures in the system that may develop during that time.
g. Developer shall provide the District with a statement of the "as-built" dollar value of
the installed electric and water distribution systems with documentation to
substantiate the stated value.
h. Developer shall pay any outstanding costs and fees.
17. Responsibilities After Unconditional Acceptance. Prior to unconditional acceptance of the
electric and water distribution systems by the District, Developer shall be responsible for
all maintenance and repair of the electric and water distribution systems. Upon
unconditional acceptance of the electric and water distribution systems by the District, the
District shall thereafter own, operate, maintain, repair and replace the electric and water
distribution systems, unless such repairs or replacements are covered by Developer's
warranty. Thereafter, the District shall use its best efforts to provide adequate electric and
Page 5 of 8
Page 145 of 161
water service to the Project upon request, completion of any permit requirements and
payment of all appropriate fees and charges, in accordance with California law Town of
Truckee, County of Nevada requirements and District Rules and Regulations.
18. Notices. Notices or requests from either party to the other shall be in writing and
delivered or mailed, postage prepaid, to the following addresses:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Attention: Contract Administrator
11570 Donner Pass Road
Truckee, California 96161
Phone: (530) 582-3944
J-MAR II, LLC
Attention: Arthur Chapman
P.O. Box 217
Truckee, California 96160
19. Successors and Assigns. This Agreement shall be binding upon and inure to the benefit
of the successors and assigns of all parties; however, Developer shall not assign any of
its rights, duties or obligations under this Agreement without the prior written consent of
the District.
19. District Powers. Nothing contained herein shall be deemed to limit, restrict, or modify any
right, duty, or obligation given, granted, or imposed upon the District by the laws of the
State of California now in effect, or hereafter adopted, nor to limit or restrict the power or
authority of the District. The District may enact rules, regulations, resolutions, or
ordinances, including, without limitation, creation of service zones and rate differentials
applicable within the Project area that may not be applicable elsewhere, at its discretion.
20. Severability. In the event that any part or provision of this Agreement is found to be
illegal or unconstitutional by a court of competent jurisdiction, such findings shall not
affect the remaining parts, portions, or provisions of this Agreement.
21. Attorneys' Fees. In the event of any litigation concerning any controversy, claim or
dispute between the parties hereto, arising out of or relating to this Agreement or the
breach hereof, or the interpretation hereof, the prevailing party shall be entitled to recover
from the other party reasonable attorneys' fees and costs incurred therein or in the
enforcement or collection of any judgment or award rendered therein.
22. Entire Agreement. This Agreement contains the entire agreement of the parties and
supersedes any prior written or oral agreements between them concerning the subject
matter contained herein. There are no representations, agreements, arrangements, or
understandings, oral or written, between the parties relating to the subject matter
contained in this Agreement which are not fully expressed herein. The provisions of this
Agreement may be waived, altered, amended or repealed in whole or in part only upon
the written consent of all parties to this Agreement.
Page 6 of 8
Page 146 of 161
23. Dispute Resolution. If at any time during the Development Agreement process issues
arise that need resolution, the Developer should submit a written request to the Project
Administrator responsible for the Project in question. Such request shall state all of the
items of concern. The Developer can expect a response within 10 business days from
receipt of request. If no resolution is reached, the Developer can request a meeting with
the District's General Manager. If still no resolution is reached, the Developer can
request a meeting before the Board to resolve the issue. The item shall be agendized
before the Board for the next scheduled regular Board meeting. Scheduling shall be
consistent with the Brown Act and must occur with at least 72 hours prior notice. Only
after this process is exhausted without resolution of the dispute may the parties proceed
to litigation. If either party commences a court action against the other based on a
dispute or claim to which this paragraph applies without first complying with the
provisions of this paragraph, the party commencing the court action shall not be entitled
to recover attorney's fees or costs, even if they would otherwise be available in such
court action.
24. Forum. Any litigation to enforce or interpret the provisions of this Agreement or the
parties' rights and liabilities arising out of this Agreement or the performance hereunder
shall be maintained only in the courts in the Superior Court in and for the County of
Nevada, California, if in state court, or the Federal Court for the Eastern District of
California, if in federal court.
25. Captions. The captions and headings of the different paragraphs of this Agreement are
inserted for convenience of reference only, and are not to be taken as part of this
Agreement or to control or affect the meaning, construction, or effect of the same.
26. Necessary Acts. Each party to this Agreement agrees to perform any further acts and
execute and deliver any further documents that may be reasonably necessary to carry
out the provisions of this Agreement.
27. No Waiver. The waiver by one party of the performance of any covenant, condition or
promise shall not invalidate this Agreement, nor shall it be considered as a waiver by
such party of any other covenant, condition or promise. The delay in pursuing any
remedy or insisting upon full performance for any breach or failure of any covenant,
condition or promise shall not prevent a party from later pursuing remedies or insisting
upon full performance for the same or any similar breach or failure.
28. Governing Law. This Agreement shall be governed by and construed in accordance
with the laws of the State of California.
Page 7 of 8
Page 147 of 161
This Agreement shall be binding upon the parties only when signed by all parties. The District
representative shall not sign this Agreement until Developer has provided all costs, fees and
items required to be provided by Developer "upon execution of this Agreement."
Dated:
Arthur Chapman Developer/Owner
J-MAR II, LLC
Dated:
Brian C. Wright, General Manager
Truckee Donner Public Utility District
Page 8 of 8
Page 148 of 161
AMENDED
ELECTRIC AND WATER DEVELOPMENT AGREEMENT
BETWEEN THE
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
AND
JI-Mar II, LLC
Soaring Ranch Offsite Infrastructure Improvements
This Agreement is entered into between the TRUCKEE DONNER PUBLIC UTILITY DISTRICT,
a local public agency of the State of California, hereafter referred to as "the District," and J-Mar
11, LLC, hereafter referred to as "Developer," with respect to the following facts:
RECITALS
A. Developer intends to construct, within the Town of Truckee right-of-way, off-site infrastructure
improvements to support the Joerger Ranch Specific Plan by completing a water line loop
from the Soaring Way/Joerger Drive intersection to the TDPUD's existing water line near
Riverview Park and an electric distribution system tie from the same intersection to the
TDPUD's existing electric switch near 12485 Joerger Drive. These combined improvements
are hereafter referred to as the "Project.
B. District and Developer entered into those certain Water and Electric Development
Agreement executed by J-Mar II, LLC and JMA Ventures, LLC on June 5, 2019, pursuant to
which Developer agreed to construct and the District agreed to accept a water and electric
distribution systems for Developer's Phase 1 of a commercial center including Raley's
grocery market and additional retail on Developer's real property within Nevada County,
California bearing Assessor's Parcel Number 19-620-60, which is included within the area
subject to the Joerger Ranch Specific Plan. That water distribution system for Phase 1 has
been constructed by Developer and accepted by the District.
C. The Project is necessary not only to support the future development within the area subject
to the Joerger Ranch Specific Plan; it is necessary to provide resilience and reliability to the
water and electric distribution systems constructed for Developer's Phase 1 of a commercial
center including Raley's grocery market and additional retail on Developer's real property
within Nevada County, California bearing Assessor's Parcel Number 19-620-60. Therefore,
time is of the essence and it is necessary that Developer complete the Project strictly within
the time limits set forth in this Agreement.
D. Developer intends to construct the Project for domestic water and fire protection use,
landscape irrigation use, including pipes, valves, service laterals, and related equipment, and
electric distribution infrastructure, including electric and communication conduits, cables,
transformers, switches, vaults, boxes, and related equipment, in accordance with the
approved plans and specifications. Such system shall hereafter be referred to as the"Project."
E. Developer intends to construct the Project for electric
Page 1 of 10
Page 149 of 161
F. Developer has requested that the District accept the Project by including it within the District's
existing integrated water and electric systems. Developer has further requested that, upon
completion, the District thereafter own, operate, maintain, repair, and replace the Project as
necessary. If the total value of the Project to be conveyed to the District for ownership,
operation and maintenance exceeds $400,000, the Development Agreement will be brought
to District's Board of Directors for review. The total value will be calculated by the engineer
of record.
G. The District is willing to accept the Project provided it is properly constructed in accordance
with the approved plans, specifications and terms of this agreement.
H. Complete plans and specifications for the construction of the electric and water distribution
systems have been prepared in accordance with the District's Rules and Regulations and with
the requirements and specifications as hereafter set forth. Copies of the approved plans and
specifications are on file in the District's Department.
I. Developer has selected contractors for construction of the electric and water portions of this
Project. The names of the contracting firms, contact persons, mailing addresses, telephone
numbers, California Contractor License, insurance coverage verification and a schedule of
construction dates have been included on data sheets entitled Contractor Firm Data Sheets,
and are on file in the District's Electric and Water Departments.
J. The following items are on file in the District office and incorporated herein by reference:
• Development agreement application
• Contracting firm data sheet—electric
• Contracting firm data sheet—water
• Temporary Blanket Public Utility Easement
• Proof of Insurance
• Project parcel map
• Site and Improvement plans - electric
• Site and Improvement plans -water
• Estimated costs and calculation of fees— electric
• Estimated costs and calculation of fees—water
• Improvements by and Responsibilities of Developer— electric
• Improvements by and Responsibilities of Developer-water
• Improvements by and Responsibilities of District— electric
• Improvements by and Responsibilities of District-water
• Project documentation policy
• TDPUD Electric Construction Standards
• TDPUD Water Construction Standards
• Performance Bond
The parties agree as follows:
1. Payment of Costs and Fees. The District has prepared an estimate of its costs for materials,
labor, consultants, and legal expenses that the District expects to expend for administrative,
design, inspection, and actual construction (hereafter collectively referred to as the
"construction costs"). Upon start of construction, Developer shall deposit with the District
Page 2 of 10
Page 150 of 161
amounts that shall be applied to the actual construction costs incurred by the District. If the
actual cost exceeds the amount deposited, Developer shall pay such excess within thirty (30)
days of receipt of the District's invoice. If the actual cost is less than the amount deposited,
the District shall refund the difference within sixty (60) days of the date of unconditional
acceptance of the electric and water distribution systems. Upon execution of this Agreement,
Developer shall also pay to the District the fees set forth in the estimated construction costs
and calculation of fees.
2. The Developer must provide a performance bond in the amount of 120% of the total project
cost to complete the required water and electric offsite improvement work. The total project
cost shall be agreed upon by the District and the Developer before execution of the
Development Agreement. The Bond shall guarantee substantial completion of work by
12/31/27. Failure to achieve substantial completion by 12/31/27 will automatically constitute a
default and the District will draw upon the bond to complete the project or recover associated
damages. No extensions to the completion date will be granted except by written amendment
to the development agreement. Provision of Easements - Permission to Enter Land.
Developer will execute a temporary blanket easement granting the right to do all things
necessary for the construction of the electric and water facilities including, but not limited to,
a right to ingress and egress, a right to temporarily store equipment and materials, to
excavate, to drive vehicles over, to place markers on, to survey, to inspect and repair, and to
remove rocks, boulders, trees and plant life in the course of excavation or re-excavation. The
temporary easement will be abandoned upon receipt by the District of a permanent easement
for the maintenance and repair of the electric and water distribution systems.
3. Provision of Insurance- Upon execution of this agreement, Developer shall provide the District
with satisfactory evidence of an insurance policy written upon a form and by a company which
meets with the approval of the District, insuring the District, its officers, agents and employees
against loss or liability which may arise during the construction, or which may result from any
of the work or construction herein required to be done, including all costs of defending any
claims arising as a result thereof. The minimum limits of such policy shall be in the amount of
$1,000,000 for the death of or injury to any person in any one accident and $2,000,000 for the
death of or injury to more than one person in any one accident and $1,000,000 for property
damage in any one accident. Such policy shall be written in favor of Developer or its general
contractor and subcontractors and also in favor of the District, its officers, agents and
employees and shall be maintained in full force and effect until the electric and water
distribution systems are unconditionally accepted by the District. Such insurance policy shall
state by its terms or by an endorsement that it shall not be canceled without thirty (30) days
prior written notice to the District that the right of subrogation is waived and that the coverage
is provided on a primary and non-contributory basis.
4. Indemnification by Developer. Developer shall indemnify, defend and save harmless the
District, its officers, agents and employees, and each of them, of and from any and all claims,
demands, causes of action, damages, costs, expenses, losses, or liabilities, in law or in equity,
of every kind and nature whatsoever, for, but not limited to, injury to or death of Developer,
any subcontractor of Developer, or any officers, agents or employees of the District, of
Developer, or of any subcontractor, or any other person, and damages to or destruction of
property of the District or any other person, arising out of or in any manner directly or indirectly
connected with the work to be performed under this Agreement, however caused, regardless
of any negligence of the District or its officers, agents or employees, except for the active
negligence or willful misconduct of the District.
Page 3 of 10
Page 151 of 161
5. Improvements by and Responsibilities of Developer - Electric. Developer shall perform and
be responsible for all labor and material expenses involved in performing the distribution
system improvements described in the design drawings and outlined under the general
construction notes entitled Customer to Supply and Install.
6. Improvements by and Responsibilities of Developer- Water. Developer shall perform and
be responsible for all labor and material expenses involved in performing the water
distribution system improvements described in the attachment entitled Improvements by
and Responsibilities of Developer (Exhibit A).
7. Improvements by and Responsibilities of District - Electric. The District shall assign a
Project Administrator to oversee the Project. The District shall perform electric distribution
system improvements at Developer's expense as described in the design drawings and
outlined under the general construction notes entitled TDPUD to Supply to the Customer,
for Installation by the Customer and TDPUD to Supply and Install at Customers Expense.
The construction costs deposited with the District shall be applied to the actual construction
costs unless otherwise indicated. If the actual construction costs exceed such deposit,
Developer shall pay such excess within thirty (30) days of receipt of the District's invoice.
8. Improvements by and Responsibilities of District—Water. The District shall assign a Project
Administrator to oversee the Project. The District shall perform water distribution system
improvements at Developer's expense as described in the attachment entitled
Improvements by and Responsibilities of District (Exhibit B). The construction costs
deposited with the District shall be applied to the actual construction costs unless otherwise
indicated. If the actual construction costs exceed such deposit, Developer shall pay such
excess within thirty (30) days of receipt of the District's invoice.
9. Construction Inspection. The District shall inspect the construction from time to time, in
order to determine that the electric and water distribution systems are installed in
accordance with the approved improvement plans, construction specifications and the
terms of this agreement.
a. The District shall notify the Developer and/or the Developer's representatives in writing
as to any deviation from the approved improvement plans, construction specifications
and the terms of this agreement. The Developer and/or the Developer's
representatives shall correct such deviation or failure as soon as is reasonably
practicable.
1. Timely Construction Required.
2. Offsite Improvements must be substantially complete by 12/31/27
b. In the event Developer fails to complete the electric and water distribution systems
within that time, the District may in its discretion (1) increase any and all fees and costs
to equal the District's current charges, (2) require Developer's plans and specifications
to be updated and redrawn to comply with the District's current standards, and (3)
terminate this Agreement and recover from Developer the full cost of all expenses and
charges incurred by the District, including but not limited to material, labor, backfill,
paving and outside services. Additionally, no further development of parcels will be
allowed prior to completion of Project (see table below).
Page 4 of 10
Page 152 of 161
Address APN
10300 Martis Dr. 019-620-001
11467 Brockway Rd. 019-620-002
11545 Hope Ct. 019-620-004
10110 Soaring Way 019-620-061
10000 Soaring Way 019-620-062
10501 Soaring Way 019-620-066
10701 Soaring Way 019-620-067
10. Developer's Warranty. Developer warrants and guarantees that all labor and materials
supplied by Developer are of a good and workmanlike quality, free of any defects of any
type whatsoever for a period of one (1) year after unconditional acceptance by the District.
Within the period of this warranty, Developer shall repair or replace, at Developer's
expense, any defective material or workmanship. The District shall notify Developer of any
malfunction or nonconformity promptly upon discovery. Within fifteen (15) business days
after receiving notice from the District, Developer shall commence to repair or replace the
defective part and will expeditiously pursue such work to completion and acceptance by
the District. Emergency repairs will be coordinated by District and charged to the
Developer.
11. No Early Use of Project. Developer shall not request or obtain a temporary occupancy
permit, final inspection approval, nor shall Developer use, or permit anyone else to use,
any portion of the electric and water distribution systems on the Project, nor shall Developer
use or permit anyone else to use any electric and water service supplied by the District,
until the District has granted Unconditional Acceptance in writing. Developer may, however,
with the District's written permission and prior to conditional acceptance, use electricity or
water for metered construction purposes. The District shall be entitled to terminate, without
notice, any electric and water usage by Developer or any other person, other than that
required for construction purposes, occurring prior to unconditional acceptance by the
District of the entire electric and water distribution systems.
12. Completion of the System. Construction shall be deemed complete when the District
determines that the electric and water distribution systems have been entirely finished,
properly tested, and ready to service the Project in accordance with the District's Rules and
Regulations and qualifies for Unconditional Acceptance.
13. Requirements for Unconditional Acceptance. Prior to providing electric and/or water
service, the Developer shall fully comply with all steps set forth below, and upon such full
compliance, the District shall unconditionally accept the electric and water distribution
systems.
a. Developer shall execute an offer of dedication for the electric and water distribution
systems to the District in a form satisfactory to the District, without cost, free, and clear
of all liens and encumbrances.
Page 5 of 10
Page 153 of 161
b. Developer is required to dedicate the facilities to the District. The District may accept
dedication of the facilities from a third-party provided that JAMR II and the third-party
otherwise comply with all provisions of this Agreement, including but not limited to
installing/constructing the facilities in accordance with the plans approved by the
District, prior to installation/construction the District has been informed of and
approved the contractor that will install/construct the facilities, the District has been
given the opportunity to inspect the facilities during installation/construction, the
facilities have been tested and accepted by the District, and as-built drawings have
been provided to the District.
C. Developer shall certify that the Project was constructed with approved materials and
in compliance with the development agreement and the approved plans, except as
noted on the Project documentation drawings.
d. Developer shall provide the District with Project documentation drawings in
compliance with District policy.
e. Developer shall provide the District with the appropriate permanent easements.
f. Developer shall provide the District with a maintenance bond in a form satisfactory to
the District in a sum equal to fifteen percent (15%) of the ultimate construction costs
of the water distribution system. This bond shall remain in effect for a period of one (1)
year after unconditional acceptance of the water distribution system and protect
against any defects or failures in the system that may develop during that time.
g. The Developer must dedicate, at no cost to the District, all portions of water and
electric infrastructure which were installed as part of the 2020 Soaring Ranch Offsite
project. The Developer shall obtain and provide all consents, assignments, releases,
and other documentation necessary to convey and dedicate ownership of those
facilities to the District.
Developer shall provide the District with a statement of the "as-built" dollar value of
the installed electric and water distribution systems with documentation to
substantiate the stated value.
h. Developer shall pay any outstanding costs and fees.
14. Responsibilities After Unconditional Acceptance. Prior to unconditional acceptance of the
electric and water distribution systems by the District, Developer shall be responsible for
all maintenance and repair of the electric and water distribution systems. Upon
unconditional acceptance of the electric and water distribution systems by the District, the
District shall thereafter own, operate, maintain, repair and replace the electric and water
distribution systems, unless such repairs or replacements are covered by Developer's
warranty. Thereafter, the District shall use its best efforts to provide adequate electric and
water service to the Project upon request, completion of any permit requirements and
payment of all appropriate fees and charges, in accordance with California law Town of
Truckee, County of Nevada requirements and District Rules and Regulations.
15. Notices. Notices or requests from either party to the other shall be in writing and delivered
or mailed, postage prepaid, to the following addresses:
Page 6 of 10
Page 154 of 161
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Attention: Contract Administrator
11570 Donner Pass Road
Truckee, California 96161
Phone: (530) 582-3944
J-MAR II, LLC
Attention: Art Chapman
P.O. Box 217
Truckee, California 96160
16. Successors and Assigns. This Agreement shall be binding upon and inure to the benefit
of the successors and assigns of all parties; however, Developer shall not assign any of its
rights, duties or obligations under this Agreement without the prior written consent of the
District.
19. District Powers. Nothing contained herein shall be deemed to limit, restrict, or modify any
right, duty, or obligation given, granted, or imposed upon the District by the laws of the
State of California now in effect, or hereafter adopted, nor to limit or restrict the power or
authority of the District. The District may enact rules, regulations, resolutions, or
ordinances, including, without limitation, creation of service zones and rate differentials
applicable within the Project area that may not be applicable elsewhere, at its discretion.
20. Severability. In the event that any part or provision of this Agreement is found to be illegal
or unconstitutional by a court of competent jurisdiction, such findings shall not affect the
remaining parts, portions, or provisions of this Agreement.
21. Attorneys' Fees. In the event of any litigation concerning any controversy, claim or dispute
between the parties hereto, arising out of or relating to this Agreement or the breach hereof,
or the interpretation hereof, the prevailing party shall be entitled to recover from the other
party reasonable attorneys' fees and costs incurred therein or in the enforcement or
collection of any judgment or award rendered therein.
22. Entire Agreement. This Agreement contains the entire agreement of the parties and
supersedes any prior written or oral agreements between them concerning the subject
matter contained herein. There are no representations, agreements, arrangements, or
understandings, oral or written, between the parties relating to the subject matter contained
in this Agreement which are not fully expressed herein. The provisions of this Agreement
may be waived, altered, amended or repealed in whole or in part only upon the written
consent of all parties to this Agreement.
23. Dispute Resolution. If at any time during the Development Agreement process issues arise
that need resolution, the Developer should submit a written request to the Project
Administrator responsible for the Project in question. Such request shall state all of the
items of concern. The Developer can expect a response within 10 business days from
receipt of request. If no resolution is reached, the Developer can request a meeting with
the District's General Manager. If still no resolution is reached, the Developer can request
a meeting before the Board to resolve the issue. The item shall be agendized before the
Board for the next scheduled regular Board meeting. Scheduling shall be consistent with
Page 7 of 10
Page 155 of 161
the Brown Act and must occur with at least 72 hours prior notice. Only after this process is
exhausted without resolution of the dispute may the parties proceed to litigation. If either
party commences a court action against the other based on a dispute or claim to which this
paragraph applies without first complying with the provisions of this paragraph, the party
commencing the court action shall not be entitled to recover attorney's fees or costs, even
if they would otherwise be available in such court action.
24. Forum. Any litigation to enforce or interpret the provisions of this Agreement or the parties'
rights and liabilities arising out of this Agreement or the performance hereunder shall be
maintained only in the courts in the Superior Court in and for the County of Nevada,
California, if in state court, or the Federal Court for the Eastern District of California, if in
federal court.
25. Captions. The captions and headings of the different paragraphs of this Agreement are
inserted for convenience of reference only, and are not to be taken as part of this
Agreement or to control or affect the meaning, construction, or effect of the same.
26. Necessary Acts. Each party to this Agreement agrees to perform any further acts and
execute and deliver any further documents that may be reasonably necessary to carry out
the provisions of this Agreement.
27. No Waiver. The waiver by one party of the performance of any covenant, condition or
promise shall not invalidate this Agreement, nor shall it be considered as a waiver by such
party of any other covenant, condition or promise. The delay in pursuing any remedy or
insisting upon full performance for any breach or failure of any covenant, condition or
promise shall not prevent a party from later pursuing remedies or insisting upon full
performance for the same or any similar breach or failure.
28. Governing Law. This Agreement shall be governed by and construed in accordance with
the laws of the State of California.
Page 8 of 10
Page 156 of 161
This Agreement shall be binding upon the parties only when signed by all parties. The District
representative shall not sign this Agreement until Developer has provided all costs,fees and items
required to be provided by Developer "upon execution of this Agreement."
Dated:
Arthur Chapman Developer/Owner
J-MAR II, LLC
Dated:
Brian C. Wright, General Manager
Truckee Donner Public Utility District
Page 9 of 10
Page 157 of 161
Page 10 of 10
Page 158 of 161
ESTIMATED ELECTRIC FEES
FACILITIES, CONNECTION,AND METERING
Soaring Ranch Phase 2
WO#25-644511
Date: 12/12/2025
1.FACILITIES FEES
Qty Charge Total
30 3000A 120/208V 2 $29,221.00 $58,442.00
Total Facilities Fees $58,442.00
2.CONNECTION FEES
Design, installation and inspection of primary and Material cost $ 87,335.11
secondary cables,transformers and electric meters. Labor cost $ 44,747.03
Total Connection Fees $132,082.14
3.METERING FEES
(5)9S CL20 meters
(6) 15S CL200 meters
(86) 12S CL 200 meters Material cost $28,558.32
Labor Cost $26,268.00
Setup&Admin Fee $11,155.00
Total Metering Fees $65,981.32
TOTAL $256,505.46
Project Documentation Deposit (see note 1.) 5.0% $9,903.17
$1000 minimum deposit
GRAND TOTAL $266,408.63
Deposit Received 9/4/2025 Deposit Received ($1,000.00)
BALANCE DUE $265,408.63
Note:
1.The Project Documentation Deposit will be refunded to the developer when the project
as-built drawings have been submitted to and accepted by the District in accordance
with District policy, See Development Agreement for As-Built policy.
2. Long lead times may exist for required project materials. Project materials will not
be ordered until fees are paid in full to the District.
Page 1 of 1 1/29/2026
Page 159 of 161
Estimated Costs
Soaring Ranch - Phase 2 WO# -25-744511
The Estimated Costs are as follows:
Administrative and design $ 1,000.00
Engineering & modeling 0.00
Construction Inspection (80 hours @ 200/hr) 16,000.00
PUD Internal Labor(Engineering + Field Crew+Admin) 4,000.00
Project documentation deposit 7,000.00
Total Deposit(Estimated Costs) $28,000.00
The Fees as follows from 2026 Fee Schedule:
Facilities Fee—Building D—Commercial— 1.5" meter $31,874.00
Facilities Fee—Building E—Residential—3" meter $95,620.00
Facilities Fee—Irrigation—5/8"x 3/4" meter $6,373.00
Connection Fee—Building D—Commercial— 1.5" meter $2,800.00
Connection Fee—Building E—Residential—3" meter $4,500.00
Connection Fee— Irrigation—5/8"x 3/4" meter $2,036.00
Total Fees $ 143,203.00
Total Estimated Costs & Fees $ 171,203.00
Less Deposit Paid in Advance ( 1,000.00)
BALANCE DUE $ 170,103.00
Page 1
Page 160 of 161
Estimated Costs
Soaring Ranch - Phase 2— Off-Site Infrastructure WO# - 19-744404
The Estimated Costs are as follows:
Administrative and design $0.00
Engineering & modeling 0.00
Construction Inspection (120 hours @ 200/hr) 24,000.00
PUD Internal Labor(Engineering + Field Crew+Admin) 6,000.00
Project documentation deposit 0.00
Total Deposit(Estimated Costs) $30,000.00
Total Fees $0.00
Total Estimated Costs & Fees $30,000.00
Less Deposit Paid in Advance 0.00
BALANCE DUE $30,000.00
Page 1