HomeMy WebLinkAboutAgenda Packet 2026-01-21 REVISED Board of Directors General Manager
Jeff Bender • Brian C. Wright
Christa Finn Executive Leadership
Tony Laliotis Chad J. Reed
Courtney Murrell Mike Swanson
Steve Randall REGULAR BOARD MEETING Michael Salmon
11570 DONNER PASS ROAD, TRUCKEE Steven Poncelet
6:00 PM, Wednesday, January 21, 2026 Scott Crow
AGENDA Jillian Steward
Martina Rochefort
1. Call to Order
2. Roll Call
3. Pledge of Allegiance
4. Changes to the agenda
5. Public Comment— This is time set aside for the public to address the Board on
any matter not on the agenda. Testimony related to any agendized matter should
be addressed at the time that that item is considered.
(The public may comment on any subject that is not on the agenda. Each
speaker will be limited to three minutes, but speaker time may be reduced at
the discretion of the Board President if there are a large number of speakers
on any given subject.)
DIRECTOR UPDATE
6. This item provides time for Directors to comment on any item within the purview of
the District.
DEPARTMENT UPDATES
7. Department Updates
CONSENT CALENDAR
These items are generally interpreted as routine in nature or the subject matter has
been previously presented to the Board for discussion. They are intended to be acted
upon by the Board without additional discussion. Any Board Member may request an
item to be removed from the Consent Calendar for discussion prior to voting on the
Consent Calendar.
8. Consideration of Approving the Safety Incentive Award for FY25
a
%LIP A SPECIAL RISIRIUN i.....
LEADERSHIP FORNDRIION
Wn R, nmdn u.,- ... ..... ....
11570 Donner Pass Road,Truckee,CA 96161 Phone-530-587-3896-www.tdpud.org
Page 1 of 64
Approve the FY26 Safety Incentive Award in the amount of$300 to each
District employee with no lost-time accident(s) in FY25.
9. Consideration of Snowplow Upgrades on Two Water Department Service Trucks
Authorize the General Manager to execute a contract with Jordan's Truck and
Trailer Equipment Sales and Service for the procurement and installation of
two Western Products MVP Plus snow plows for a cost of $24,308, plus a
10% contingency of $2,431, for a total authorization not to exceed $26,739.
10. Approval of Board Meeting Minutes
Consider approval of December 3, 2025 Board Meeting Minutes
11. Consider Approval of the Treasurer's Report, January 2026
Approve the Treasurer's Report for January 2026 which includes:
a. Fund Balances for the Month of October 2025
b. Disbursements for the Month of November 2025
12. Consideration of Closeout of the Martis Valley Substation Civil Construction - 2025
Contract
Adopt Resolution 2026-01 accepting the Martis Valley Substation Civil
Construction - 2025 project as complete and authorize the filing of the Notice
of Completion.
13. Dispense with Competitive Bidding and Negotiate Directly with Vendors for the
FY26 Procurement of Bulk Sodium Hypochlorite
a. Make a finding to dispense with competitive bidding for the 2026
procurement of sodium hypochlorite.
b. Authorize the General Manager to negotiate directly with qualified vendors
for the purchase and delivery of sodium hypochlorite for calendar year 2026,
in an amount not to exceed $60,000.
ACTION ITEMS
14. Resolution 2026-02 Commending Dan Wilkins
Adopt Resolution 2026-02 in recognition of Dan Wilkins for his many years of
service, leadership and collaboration as the Town of Truckee's Public Works
Director
Page 2 of 64
15. Consideration of Approval for a Electric Utility Construction Services Contract
Authorize the General Manager to execute a contract with VIP Powerline Corp
for Electric Utility Construction Services to provide dock crew and storm
response services, in an amount not to exceed $1,000,000, plus a
contingency allowance of 10 percent ($100,000), inclusive of applicable taxes
and fees, for a total contract amount not to exceed $1,100,000.
16. Consideration of a Contract with Generikal Design for Photographer-Videographer
Services
Authorize the General Manager to execute a contract with Generikal Design
for 2026 Photographer-Videographer Services in an amount not to exceed
$30,000, plus a ten percent change order authorization of $3,000, for a total
contract amount not to exceed $33,000.
WORKSHOP
17. Consideration of Monthly Reliability Metrics Reporting
Receive an informational Workshop presentation on electric system reliability
metrics—System Average Interruption Frequency Index (SAIFI), System
Average Interruption Duration Index (SAIDI), and Customer Average
Interruption Duration Index (CAIDI) and provide feedback and direction to
staff.
ADJOURNMENT
The agenda is available for review at the TDPUD Administrative Office and the District's
internet website. Posted on Friday, January 16, 2026.
Martina Rochefort, District Clerk
A copy of the agenda packet is available for public review, during normal business hours, at the District
Administrative Office located at 11570 Donner Pass Road. Public participation is encouraged. The
meeting location is accessible to people with disabilities. Every reasonable effort will be made to
accommodate participation of the disabled in all of the Districts public meetings. If particular
accommodations for the disabled are needed (i.e. disability-related aids, or other services), please
contact the District Clerk at (530) 582-3923 or martinar@tdpud.org, at least 24 hours in advance of the
meeting.
Any person with a disability may submit a request for reasonable modification or accommodation to the
above-described means for accessing and offering comment at the meeting to Martina Rochefort, District
Clerk, or email at martinar@tdpud.org, who will swiftly resolve such a request.
Page 3 of 64
AGENDA ITEM #7
Public Utility District m
MEETING DATE: January 21, 2026
TO: Board of Directors
FROM:
SUBJECT: Department Updates
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
BACKGROUND:
Department updates are attached to the staff report.
ANALYSIS AND BODY:
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
2. Provide a healthy and safe work environment for all District employees.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
5. Manage the District in an environmentally sound manner.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
2. Environmental Stewardship: Create a sustainable resilient environment for all our
communities.
3. Engage with our customers and communities in a welcoming and transparent way to
identify opportunities.
4. Modernize the utility and add value to our communities through collaboration and
innovation.
5. Developing an inclusive culture drives organizational integration and success.
Page 1 of 2
Page 4 of 64
FISCAL IMPACT:
There is no fiscal impact associated with this item.
ATTACHMENTS:
1. Water Department Update - January 2026
2. Electric Department Update - January 2026
3. CFO Department Update - January 2026
4. PIO and Strategic Affairs Department Update - January 2026
5. Human Resources & Risk Management Department Update - January 2026
Page 2 of 2
Page 5 of 64
Public
MEETING DATE: January21, 2026
FROM: Chad J. Reed, Water Utility Director
SUBJECT: Water Department Update
Water Supply
Figure 1 illustrates water production for the month of November and reflects continued
seasonal reductions.
Water production during November 2025 continued to trend downward as expected with
cooler temperatures. Compared to November 2024, total pumping decreased by 4%,
reflecting both seasonal conditions and ongoing customer conservation efforts.When
compared to the average of the past three Novembers, production was 11% lower,
demonstrating a consistent pattern of declining late-season demand.
Year-to-date (January—November)totals remain relatively stable. Overall pumping for 2025
is 4% lower than the same period in 2024, indicating systemwide efficiency and a
continued transition into winter operations
Ovate.P-d.ai.r(GJ j
o,.
f
m
r
,a ,. Aia„ iwr we,i swemee, a.�. rrmamee, ...
•]025 ProEu¢ion •2QiG Protluction n3Year Average
Page 1 of 3
Page 6 of 64
System Updates
As the District moves further into the winter season, a primary operational focus for the
Water Department is snow removal at Water Department facilities and, when needed,
support at Electric Department assets. Currently, four of the District's ten potable wells are
in service, with the remaining wells offline for the winter season.
Two major well projects previously reported to the Board include Well 20 and the
Hirschdale Well rehabilitation. Well 20 is complete and fully operational. Rehabilitation
work at the Hirschdale Well is substantially complete; however, due to the nature of the
improvements, additional flushing is ongoing to ensure that only optimal water quality is
delivered to customers.
Field crews continue to respond promptly to system leaks to minimize water loss and
maintain reliability. Most recently, the Distribution Crew responded to and repaired a
mainline leak along North Woods Drive.
;k4 z
k
i.
b
Y
:j
id
A l
a{'.
k
Figure 1 Photos of recent leak response 11235 North Woods Drive in the Tahoe Donner Community. Crews continue to
repair leaks quickly to reduce water losses and maintain service reliability.
2026 Construction Season Preparation
The Water Department is actively preparing for the 2026 construction season and is
advancing several capital projects for Board consideration, bidding, and award.
Page 2of3
Page 7 of 64
Hirschdale Pipeline Construction Project
The project was awarded at the November Board Meeting and is scheduled to proceed in
May 2026.
Martis Woods Pump Station Project
Staff has brought an item to the January 21 regular Board meeting recommending approval
to update the engineering design for the Martis Woods Pump Station. This work is
necessary to prepare the project for the 2026 construction schedule and to ensure long-
term system reliability.
Pipeline Rehabilitation Project
Staff plans to bring this item to the February Board meeting. The project involves slip-lining
several pipeline segments within the District where traditional excavation methods are not
feasible. Two of the proposed segments include creek crossings and a crossing beneath
Highway 89.
2026 Pipeline Replacement Project
This project will also be presented to the Board in February. The scope includes
replacement of the remaining pipeline segments serving the Ski Bowl Condominiums.
Portions of this system were previously replaced concurrently with the Ski Lodge facility
improvements, and this project completes the remaining work.
Page 3 of 3
Page 8 of 64
TRUCKEE DONNER
Public Utility District
MEETING DATE: January 21, 2026
FROM: Mike Swanson, Director of Electric Operations & Engineering
SUBJECT: Electric Department Update
Electric Engineering & Operations
The District experienced a significant winter storm event on Christmas Eve and Christmas
Day, resulting in multiple outages across the electric system ranging from brief service
interruptions to longer duration outages requiring line crew response. The bulk of the
outages occurred in the Tahoe Donner and Donner Lake areas, where heavy snow loading
and winter conditions impacted overhead lines. Two crews were staffed and actively
responding throughout the event. Most customers who experienced outages were restored
within a few hours of the initial outage start time, with intermittent outages continuing
through December 28 as storm conditions persisted.
Between December 24 and December 28, the District experienced approximately 40
sustained multiple-customer outages and 60 single-customer outages.
Of the sustained outages:
• Transmission lines experienced five sustained outages, impacting
approximately 12,000 customers.
• Distribution lines experienced 35 sustained multiple-customer outages,
impacting approximately 8,000 customers.
• The longest outage durations occurred in the Wolfgang/Pinnacle Loop area of
Tahoe Donner, with an outage lasting 18 hours and 37 minutes, and in the Ski Slope
area, where outages lasted approximately 13 hours.
Engineering
Engineering staff continue to work with the District's consultant on development of the
Electric Master Plan, which will guide long-term system planning, capital investment
priorities, system hardening efforts, and overall reliability improvements across the electric
system.
Engineering is also advancing work on the Martis Valley Substation project contract, with
the current schedule targeting issuance of the construction package for bid in March 2026.
Operations
Operations staff remain focused on winter storm preparedness and response, including
Page 1 of 2
Page 9 of 64
vehicle readiness, material staging, and development of storm-specific work plans to
support safe and efficient restoration efforts.
Looking ahead, crews are developing plans to reframe existing poles in targeted locations
to mitigate snow-related outages, particularly in the Donner Lake and Tahoe Donner areas.
Operations are also preparing for installation of the District's Gridware "Gridscope" line-
monitoring devices, which will improve system visibility and support faster outage
identification and response.
Vegetation Management
The Vegetation Management team has received LiDAR data from the District's consultant.
This information will be used to refine vegetation risk assessments and will directly inform
development of the 2026 vegetation work plan, as well as longer-term vegetation
management strategies in future years.
Page 2 of 2
Page 10 of 64
TRUCKEE DONNER
Public Utility District
MEETING DATE: January 21, 2026
FROM: Michael Salmon, CFO
SUBJECT: CFO Department Update
Customer Service
- Electric Time of Use Residential, account enrollment as of Dec.2025 (Dec.2024):
o Primary 38 (32) +0 from November
o Secondary 22 (17) +0 from November
- 907 YTD December kWh billed per account per month average
o Down 2.8% to last year
o Down 4.4% to three-year average
- 7,595 YTD December gallons billed per account per month average
o Down 1.1% to last year
o Up 3.5% to three-year average
- $2.02 Million YTD December 2025 Power Cost Adjustment (PCA) credits billed
- $0.2402 YTD December 2025 per kWh retail, post-PCA
o Up 8.7% to prior year
- YTD December Billing Information:
Page 1 of 4
Page 11 of 64
2025 Account Billing Totals
$in thousands
Electric Water
Jan $ 3,720 $ 1,592
Feb 4,365 1,618
Mar 3,494 1,585
Apr 3,111 1,580
May 3,283 1,619
Jun 2,770 1,747
Jul 2,824 1,876
Aug 3,330 1,980
Sep 2,831 1,842
Oct 2,632 1,749
Nov 3,196 1,650
Dec 2,990 1,571
YTD $ 38,547 $ 20,410
Accounts 14,881 13,768
change topy 0.3% 0.4%
- Customer Service Satisfaction Scores, December 2025
Overall, how satisfied were you with the experience w... ❑ 4
Answered:25 Wpped:0
100%
90%
80%
70%
GO%
50%
40%
30%
20% ■10%
0%
Extremely Very Somewhat Not so Not at all
satisfied satisfied satisfied satisfied satisfied
How much time did it take us to address your questio... EL Q
Arswered:25 Skipped:0
10CIA
90%
30%
7CIA
Go%
50%
40%
30%
20%
10%
Much Shorter Aboutwhat Larger Much
shorter than lexpected than longer than
than expected expected expected
expected
Page 2 of 4
Page 12 of 64
Please categorized the reason(s)for your service call LJ
Answered:IS Skipped:7
100%
80%
60%
40%
20% ■
0%
Billing Payment New Power Water leak New
question question Service or outage Commercial
Stop Service
Service...
• Customer Payment Kiosk
o The new customer payment kiosk went live in early November. Activity
primarily during regular business hours by those chosing self-serve. The
District recently added an account number bar code to statements to aid in
kiosk utilizaiton and in coming months will be promoting kiosk as a payment
option. Activity for the two months of November and December:
Kosk Totals-Nov/Dec 2025
Type Count Total AvgTran Max Tran
Cash 14 $ 3,751 $ 268 $ 1,425
Qed i t 15 $ 1,176 $ 78 $ 250
o Total 29 $ 4,927 $ 170 $ 1,425
Finance and Acccounting
• UAMPS provided power sources combined cost per MWh continues to be favorable
Year to Date (YTD) November
Page 3 of 4
Page 13 of 64
$100
• $74.41 • $72.86 $75
� 5fi9.38
- $50
YTD 51MWH Change
$0
YTD Nov 242 2 YTD Nov 2023 YTD Nov 2424 YTD Nov 2025
• f M1H
• UAMPS YTD November MW hours purchased of 156,650 are 0.2% greater
than last year and 0.5% less than the 3 year average ('22-24).
• Closed and reported on November financials, Treasurer's Report completed.
• Year-End December close and January board meeting preparations
• Year rolling of reporting systems and new budget system updates
• Annual 2025 tax (W-2, 1099) and other annual reporting preparations
General Services
• District Fleet - 21,717 miles in December 2025 and 300,115 miles for 2025
• SMOG and weekly BIT inspections completed
• Fire alarms, sprinklers, and exit lights testing/inspections
• Building security enhancements evaluation and planning
• Water VacCon truck back in service as of 1/12/2025!
• Snowquip blower transported to Sacramento for repair
Page 4 of 4
Page 14 of 64
TRUCKEE DONNER
Public Utility District
MEETING DATE: January 21, 2026
FROM: Steven Poncelet, Public Information & Strategic Affairs Director
SUBJECT: PIO and Strategic Affairs Department Update
Communications and Outreach
The District ended 2025 with a significant amount of "winter preparedness and safety"
communications, along with timely outage communications during the peaks of our winter
storms. In addition, staff spent significant time compiling recaps of the District's 2025
accomplishments, which were shared across all communications channels, including the
website, social media, radio interview, digital advertising, lobby screens and a press
release that was picked up by local media. Timed with the spirit of the holidays, staff also
created advertising and a social media post to share the District's gratitude for the
community that we serve and the Board and staff that make the District excel. At the
February 4t" Board Meeting, there will be a workshop covering the District's
communications during 2025.
Strategic Affairs
Staff continue to work with our joint-action groups in Sacramento (California Municipal
Utilities Association (CMUA), Northern California Power Agency (NCPA), Association of
California WaterAgencies (ACWA), and California Special Districts Association (CSDA))on
tracking the implementation of new and existing laws along with preparing for the 2026
legislative session. The 2026 legislative session began on January 5, 2026, with the last
day to introduce new bills being February 20, 2026, and the last day to approve bills being
August 31 , 2026. The Governor also submitted the next fiscal year budget on January 10,
2026 which is also being reviewed and analyzed for the impacts on public power and water.
Two key upcoming events that support the above efforts are NCPA's Strategic Issues
Conference January 20-22nd and CMUA/NCPA's Capitol Day on January 261". Both
meetings provide the opportunity to hear from industry and political leaders on key trends,
along with continuing to build strong and productive relationships with legislators,
regulators, political leaders, and industry colleagues. During Capitol Day, District staff and
our joint-action groups will be meeting with the District's elected State representatives
(Senator Marie Alvarado-Gill and Assemblymember Heather Hadwick) along with key
regulatory agencies including the California Air Resources Board (GARB), California
Energy Commission (CEC), Wildfire Safety Advisory Board (WSAB), State Water
Resources Control Board (SWRCB), and Department of Water Resources (DWR).
Page 1 of 1
Page 15 of 64
TRUCKEE DONNER
Public Utility District
MEETING DATE: January 21, 2026
FROM: Jillian Steward, HR & Risk Director
SUBJECT: Human Resources and Risk Department Update
Staffing
• Vehicle Maintenance Foreman - Accepting applications internally from 1/12/26 to
1/14/26, skills testing to be scheduled before the end of January
Culture
• 1/21 — Meditation & Mocktails
Safety and Risk
• Overall workplace incidents reduced by 20% from FY24
Page 1 of 1
Page 16 of 64
AGENDA ITEM #8
Public Utility District m
MEETING DATE: January 21, 2026
TO: Board of Directors
FROM: Jillian Steward, Director of Human Resources & Risk Management
SUBJECT: Consideration of Approving the Safety Incentive Award for FY25
APPROVED BY.
Brian C. Wright, General Manager
RECOMMENDATION:
Approve the FY26 Safety Incentive Award in the amount of $300 to each District
employee with no lost-time accident(s) in FY25.
BACKGROUND:
To promote the District's Core Value of Safety and organizational culture, the Board
has historically awarded a safety incentive to employees. From 2014-2017, the District
awarded those employees who did not have a lost-time accident an incentive of$250
each year. Since 2020, the District has awarded those employees who did not have a
lost-time accident in the previous FY an incentive of $300.
The District's commitment to safety as our number one Core Value is highly dependent
on our employees living the safety culture and diligent application of safe
practices. Regular trainings facilitated by staff and industry experts, safety tailgate
meetings, equipment inspection and testing, the establishment of a Safety Committee
and regular peer review of "near misses" and incident reports are all part of the program
to keep safe work practices a priority during the work day.
ANALYSIS AND BODY:
The District's goal and incentive program of no lost-time injuries has been effective for
many years. in 2023 and 2024 the District achieved the goal of zero lost-time
injuries. In 2025 the District experienced one lost-time injury. However, with the
challenging work environments inherent to the utility industry and the more than
146,000 work hours recorded (average of 76 employees, working an average of 1920
hours FY25), having only 1 lost-time injury is still a commendable record for 2025.
Acknowledging safe behavior and practices is an effective way to promote and maintain
our successful safety culture.
Staff is proposing to continue with the goal of no lost-time injuries or accidents, and
award employees who did reach this goal. With the help of the District's Safety
Page 1 of 2
Page 17 of 64
Committee, the District proposes that each employee reaching this goal receives a
$300 incentive for FY25.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
2. Provide a healthy and safe work environment for all District employees.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
2. Environmental Stewardship: Create a sustainable resilient environment for all our
communities.
3. Engage with our customers and communities in a welcoming and transparent way to
identify opportunities.
4. Modernize the utility and add value to our communities through collaboration and
innovation.
5. Developing an inclusive culture drives organizational integration and success.
FISCAL IMPACT:
The cost of the FY25 Safety Incentive Award will not exceed $21,500. 72 employees were
eligible for the entire $300 safety incentive, 3 employees were eligible for a prorated safety
incentives based on their 2025 hire date, and 1 employee was ineligible due to a lost-time
injury. This is a budgeted expense in the FY26 Board approved budget for each department
under GL Code: 925.00.333
ATTACHMENTS:
None
Page 2 of 2
Page 18 of 64
AGENDA ITEM #9
Public Utility District m
MEETING DATE: January 21, 2026
TO: Board of Directors
FROM: Brian Yohn, General Services Manager
Michael Salmon, Chief Financial Officer
SUBJECT: Consideration of Snowplow Upgrades on Two Water Department
Service Trucks
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Authorize the General Manager to execute a contract with Jordan's Truck and Trailer
Equipment Sales and Service for the procurement and installation of two Western
Products MVP Plus snow plows for a cost of $24,308, plus a 10% contingency of
$2,431, for a total authorization not to exceed $26,739.
BACKGROUND:
The Water Department has a need to upgrade two 2025 Chevrolet Silverado 2500HD
service trucks with a Western Plow MVP Plus with Ultramount 2 to improve snow
removal operations during winter. The snowplow upgrades would benefit the District as
follows:
- Reduce wear and tear on the District's large equipment during and after snowstorms
due to not "roading" heavy equipment from one side of town to the other.
- Improve operating efficiency: Water staff visit pump stations and well sites daily and,
with trucks equipped with plow blades, can perform snow removal at lower elevation
locations with lower snow volumes. This reduces the need to send water distribution
operators to do snow removal at sites like Glenshire system, Sierra Meadows system,
Prosser system, and the Hirschdale System. This can help provide the larger snow
removal equipment the opportunity to prioritize the Tahoe Donner and Donner Lake
system locations, where snow volumes are typically higher. This strategy will increase
efficiency for snow removal operations for the District while reducing unnecessary wear
and tear on the larger heavy equipment.
- The upgrades may also qualify the two 2025 Chevrolet Silverado 2500HD service
trucks for the California Air Resouces Board (GARB) Advanced Clean Fleet (ACF)
"Intermittent Snow Removal Vehicle Exemption," which may be helpful for current
Page 1 of 3
Page 19 of 64
CARB ACF reporting requirements and provide for future compliance at vehicle
replacement.
ANALYSIS AND BODY:
Staff solicited a Sourcewell estimate from Jordan's Truck and Trailer Equipment Sales
and Service, from Reno, NV, for the procurement and installation cost for two Western
8 ft. 6 in. MVP Plus Ultramount 2 snowplows with a cost of$24,308.
Sourcewell, formerly National Joint Purchasing Alliance, has identified Western
Products (Sourcewell Contract # 062222-DDY) as a competitive bidder through an RFP
process for snow and ice equipment. Section 3.08.060 of the District Code (Joint
Purchasing with the State of California and other public agencies) permits the District to
take advantage of other agencies' competitive procurement processes. Jordan's Truck
and Trailer Equipment Sales and Service is a qualified Sourcewell vendor for Western
Products with a quote consistent with District Code requirements. Further, Jordan's
location in Reno, NV is advantageous for any future service needs.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
2. Provide a healthy and safe work environment for all District employees.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
4. Modernize the utility and add value to our communities through collaboration and
innovation.
FISCAL IMPACT:
The fiscal impact of the procurement and installation of the two Western Plows is
$24,308, plus a 10% contingency of $2,431, for a total authorization not to exceed
$26,739. This agenda item was not specifically budgeted for in water's vehicle reserve
expenditures for FY26 or FY27. However, the Water Vehicle Reserve Fund has
adequate funds available to support the Western Products procurement and installation
on the two 2025 Chevrolet 250OHD Service trucks. Water Vehicle Reserve
information is as follows:
Water Vehicle Actual Forecast Budget
Reserve 2025 2026 2026
Beginning Balance $ 728,607 $ 498,800 $ 475,000
Funding 327,000 484,000 484,000
Expenditures (614,057) (628,700) (602,000)
Investment Income 47,750 11,000 11,000
Asset Sale Proceeds 9,500 60,000 60,000
Ending Balance $ 498,800 $ 425,100 $ 428,000
Page 2 of 3
Page 20 of 64
Staff estimates there is sufficient contingency in the water vehicle reserves expenditure
budget for 2026 to accommodate this $26,739 expenditure. Further, with the close-out
of FY25 actuals in March 2026, should operating results favorably exceed forecast, an
additional transfer to water vehicle reserve from operating will be recommended to
replenish the estimated $2,900 forecast 2026 variance to the Budget.
ATTACHMENTS:
None
Page 3 of 3
Page 21 of 64
AGENDA ITEM #10
Public Utility District m
MEETING DATE: January 21, 2026
TO: Board of Directors
FROM: Martina Rochefort, District Clerk/Executive Assistant
SUBJECT: Approval of Board Meeting Minutes
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Consider approval of December 3, 2025 Board Meeting Minutes
BACKGROUND:
ANALYSIS AND BODY:
Draft December 3, 2025 minutes are attached.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
6. Manage the District in an effective, efficient and fiscally responsible manner.
FISCAL IMPACT:
There is no fiscal impact associated with this item.
ATTACHMENTS:
1. Minutes 2025-12-03 DRAFT
Page 1 of 1
Page 22 of 64
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, DECEMBER 3, 2025
1. Call to Order
Meeting was called to order at 6:00 p.m.
2. Roll Call
Directors Present: Courtney Murrell, Steve Randall, Jeff Bender, Vice President Tony
Laliotis and President Christa Finn
Staff in attendance: Brian Wright, General Manager; Scott Crow, Chief Information
Officer/IT Director/Assistant General Manager; Mike Salmon, Chief Financial Officer;
Jillian Steward, Director of Human Resources & Risk Management; TJ Dwyer, Water
Operations Manager; Trey Griffin, Senior Network & Systems Administrator; Alex
Spychalsky, Communications Project Manager; Nina Krommenhoek, Contracts
Administrator; Martina Rochefort, District Clerk/Executive Assistant
Other Steve Gross, General Counsel
3. Pledge of Allegiance
Director Bender led the Pledge of Allegiance.
4. Changes to the agenda
No changes were made to the agenda.
5. Public Comment
No public comment was received.
DIRECTOR UPDATE
6. Director Bender reminded fellow board members and public of the "Speak Your
Peace" civility project. Director Murrell engaged with members of the public after the
water rate meeting. President Finn reflected on the last year.
DEPARTMENT UPDATES
7. Department updates were received from Mike Swanson, Director of Electric
Operations & Engineering; Alex Spychalsky, Communications Program Manager;
Jillian Steward, Director of Human Resources & Risk Management; and Scott Crow, IT
Director/Chief Information Officer/Assistant General Manager.
CONSENT CALENDAR
8. Consider Approval of the Treasurer's Report, December 2025
Approve the Treasurer's Report for December 2025 which includes:
a. Fund Balances for the Month of September 2025
1
Page 23 of 64
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, DECEMBER 3, 2025
b. Disbursements for the Month of October 2025
9. Approval of Board Meeting Minutes
Consider approval of November 19, 2025 Board Meeting Minutes
10. Consideration of a Second Contract Amendment for Hirschdale Well Rehabilitation
Authorize the General Manager to execute a second contract amendment with
Eaton PumpsCo., LLC in the amount of $24,444.00 for the Rehabilitation of
the Hirschdale Well project, resulting in a revised total not-to-exceed contract
amount of $121,280.51
No public comment was received.
ACTION: Motion made by Director Laliotis to approve the Consent
Calendar as presented, seconded by Director Bender.
AYES: Murrell, Randall, Bender, Laliotis and Finn
NAYS: none
ABSTAIN: none
ABSENT: none
Motion passed.
ACTION ITEMS
11. Consideration of FY26 Annual Contracts and Procurements
a) Authorize FY26 routine annual procurements totaling $16,464,050 from the
vendors listed in Attachment 1
b) Authorize the General Manager to execute the required documents
necessary to procure the products and services listed in Attachment 1
Michael Salmon, Chief Financial Officer, presented the item. No public comment was
received. Discussion was held.
ACTION: Motion made by Director Laliotis to authorize FY26 routine
annual procurements totaling $16,404,050 from the vendors
listed in Attachment 1 and authorize the General Manager to
execute the required documents necessary to procure the
products and services list in Attachment 1 and as revised to
exclude Western Nevada Supply (sodium hydrochorite)
$60,000 from Schedule 1.F. as presented, seconded by
Director Bender.
AYES: Murrell, Randall, Bender, Laliotis and Finn
NAYS: none
ABSTAIN: none
2
Page 24 of 64
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, DECEMBER 3, 2025
ABSENT: none
Motion passed.
12. Electric 2022 Debt Proceeds Expenditures Authorization
Authorize $7,202,596 in recent electric capital expenditures to be funded from
Electric's 2022 debt issuance proceeds and transfer $7,202,596 to the electric
capital reserve fund.
CFO presented the item. No public comment was received. Discussion was held.
ACTION: Motion made by Director Bender to authorize $7,202,596 in
recent electric capital expenditures to be funded from
Electric's 2022 debt issuance proceeds and transfer
$7,202,596 to the electric capital reserve fund as presented,
seconded by Director Finn.
AYES: Murrell, Randall, Bender, Laliotis and Finn
NAYS: none
ABSTAIN: none
ABSENT: none
Motion passed.
13. Consideration of Review of the District's Investment Policy as described in District
Code Title 3, Chapter 3.20.012.9
a) Review the District's Investment Policy as described in District Code Title 3,
Chapter 3.20.012.9 and affirm no changes or provide direction as needed; and
b) Delegate authority to Michael Salmon, Treasurer, to invest District funds
according to the District's Investment Policy
CFO presented the item. No public comment was received. Discussion was held.
ACTION: Motion made by Director Finn to review the District's
Investment Policy as described in District Code Title 3,
Chapter 3.20.012.9 and affirm no changes and delegate
authority to Michael Salmon, Treasurer, to invest District
funds according to the District's Investment Policy as
presented, seconded by Director Bender.
AYES: Murrell, Randall, Bender, Laliotis and Finn
NAYS: none
ABSTAIN: none
ABSENT: none
Motion passed.
14. Annual Election of Board Officers
3
Page 25 of 64
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, DECEMBER 3, 2025
The Board of Directors will nominate and elect the Board President and Board
Vice President for the next twelve months.
ACTION: Motion made by Director Finn to nominate Director Laliotis
as Board President, seconded by Director Murrell.
AYES: Murrell, Randall, Bender, Laliotis and Finn
NAYS: none
ABSTAIN: none
ABSENT: none
Motion passed.
ACTION: Motion made by Director Finn to nominate Director Murrell
as Board Vice President, seconded by Director Randall.
AYES: Murrell, Randall, Bender, Laliotis and Finn
NAYS: none
ABSTAIN: none
ABSENT: none
Motion passed.
15. 2026 Board Calendar
Consider approval of the 2026 Board Meeting calendar
No public comment was received. Discussion was held.
ACTION: Motion made by Director Randall to approve the proposed
2026 Board Meeting Calendar as presented, seconded by
Director Murrell.
AYES: Murrell, Randall, Bender, Laliotis and Finn
NAYS: none
ABSTAIN: none
ABSENT: none
Motion passed.
Open Session recessed at 7:16 p.m.
CLOSED SESSION
16. Closed Session Pursuant to Government Code Section 54957 Public General
Manager's Performance Plan Review
Open Session reconvened at 9:42 p.m.
There was no reportable action taken in Closed Session.
4
Page 26 of 64
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, DECEMBER 3, 2025
ADJOURNMENT
Meeting adjourned at 9:42 p.m.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Tony Laliotis, President
Respectfully Submitted,
Martina Rochefort, District Clerk
5
Page 27 of 64
AGENDA ITEM #11
Public Utility District m
MEETING DATE: January 21, 2026
TO: Board of Directors
FROM: Melanie Rives, Finance & Accounting Manager
Michael Salmon, Chief Financial Officer
SUBJECT: Consider Approval of the Treasurer's Report, January 2026
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Approve the Treasurer's Report for January 2026 which includes:
a. Fund Balances for the Month of October 2025
b. Disbursements for the Month of November 2025
BACKGROUND:
ANALYSIS AND BODY:
GOALS AND OBJECTIVES:
FISCAL IMPACT:
ATTACHMENTS:
1. 2026-01 Treasurers Report
Page 1 of 1
Page 28 of 64
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
TREASURER'S REPORT
January 21 , 2026
Fund Balances for the Month October 31, 2025
And
Disbursements for the Month November 30, 2025
(includes Government Code section 53065.5 items)
Page 1 of 15
Page 29 of 64
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Summary report of fund balances for the month ending October 31, 2025 and
disbursements for November 2025.
1) REQUEST FOR APPROVAL OF DISBURSEMENTS and Check Summary
The attached listing of checks and ACH payments issued during November 2025 total
$5,958,136.91 in disbursements.
2) EMPLOYEE REIMBURSEMENT FOR INDIVIDUAL CHARGES
Per Government Code 53065.5:
Each special district, as defined by subdivision (a) of Section 56036, shall, at least annually, disclose any
reimbursement paid by the district within the immediately preceding fiscal year of at least one hundred
dollars ($100) for each individual charge for services or product received. "Individual charge" includes,
but is not limited to, one meal, lodging for one day, transportation, or a registration fee paid to any
employee or member of the governing body of the district. The disclosure requirement shall be fulfilled by
including the reimbursement information in a document published or printed at least annually by a date
determined by that district and shall be made available for public inspection.
The Disbursements listing referenced in 1) includes above subject reimbursements information, as
applicable.
3) STATEMENT OF GENERAL FUND:
As of October 31, 2025 the balance in the General Fund was $19,450,192 (Electric $11,050,478
and Water $8,399,714).
4) FUNDS STATUS REPORT:
The total of all funds held in cash and on deposit with US Bank, the Local Agency Investment
Fund, Placer County Investment Fund, Utah Public Treasurers' Investment Fund, California
CLASS, BNY and TVI Investments as of October 31, 2025 was $63,193,004 ($45,138,520 Electric
and $18,054,483 Water).
5) INVESTMENT STATUS REPORT:
The majority of the District's investments are in California's Local Agency Investment Fund (LAIF),
Utah Public Treasurers' Investment Fund (UPTIF), California CLASS, and the Placer County
Investment Fund (PCIF). The earnings rates for the last 13 months were:
LAIF PCIF UPTIF 1 YR T-BILL TVI CLASS
October 2024 4.52% 3.66% 5.04% 4.08% 0.55% 5.00%
November 2024 4.48% 3.79% 4.87% 4.11% 0.55% 4.83%
December 2024 4.43% 3.73% 4.74% 4.11% 0.55% 4.64%
January 2025 4.37% 3.83% 4.55% 3.99% 0.55% 4.42%
February 2025 4.33% 4.10% 4.53% 3.91% 0.55% 4.41%
March 2025 4.31% 3.86% 4.49% 3.87% 0.55% 4.40%
April 2025 4.28% 4.00% 4.49% 3.71% 0.55% 4.39%
May 2025 4.27% 3.88% 4.47% 3.95% 0.55% 4.35%
June 2025 4.27% 3.90% 4.48% 3.95% 0.55% 4.34%
July 2025 4.26% 3.97% 4.47% 3.94% 0.55% 4.34%
August 2025 4.25% 3.86% 4.47% 3.70% 0.55% 4.33%
September 2025 4.21% 3.88% 4.38% 3.53% 0.55% 4.27%
October 2025 4.15% 3.76% 4.27% 3.56% 0.55% 4.19%
Page 2 of 15
Page 30 of 64
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Request for Approval of Disbursements
The disbursements of the Truckee Donner Public Utility District for the month of November 2025
totaled $5,958,136.91. A listing of those disbursements is attached.
DISBURSEMENTS METRICS (excludes Payroll):
Accounts Payable (A/P) Metrics
$ A/P Disbursements
8,000,000.00
7,000,000.00
6,000,000.00
5,000,000.00
4,000,000.00
3,000,000.00
2,000,000.00
1,000,000.00
0.00
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■2021 ■2022 ■2023 ■2024 2025
# A/P Payments Issued
400
350
300
250
200
150
100
50 I� _
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■2021 ■2022 ■2023 ■2024 r 2025
# A/P I nvoices Vouchered
1,200
1,000
800
600
400 —
200 �� I
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■2021 ■2022 ■2023 ■2024 ■2025
Page 3 of 15
Page 31 of 64
Truckee Donner Public Utility District
Check Register CA
November 2025 Gov.Code
53605.5
Check/Tran Date Type Vendor Vendor Name Item Reference Amount
6430 11/1/2025 WIRE 6731 CALIFORNIA DEPARTMENT OF TAXAND FEE ELECTRICAL ENERGY SURCHARGE $ 10,770.00
6431 11/1/2025 WIRE 540 CALIPERS 457 DEFERRED COMP PRGM CALIPERS 457 CONTRIBUTIONS 9985 FINAL 1,173.08
6433 11/1/2025 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING 9985 FINAL 895.36
6436 11/1/2025 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING 9985 FINAL 3,676.62
6443 11/1/2025 WIRE 10737 US BANK GOVERNMENT SERVICES CREDIT CARD CHARGES 32,987.82
6429 11/5/2025 WIRE 1359 CALIPERS OPEB-CERBT MONTHLY CONTRIBUTION 10,417.00
6428 11/6/2025 PL PL PAYROLL PAYROLL DIRECT DEPOSIT 300,680.97
6432 11/6/2025 WIRE 540 CALIPERS 457 DEFERRED COMP PRGM CALIPERS 457 CONTRIBUTIONS PPE 10/31/2025 20,922.43
6434 11/6/2025 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING PPE 10/31/2025 35,147.18
6435 11/6/2025 WIRE 905 HEALTHEQUITY INC. EMPLOYEE HSA CONTRIBUTIONS PPE 10/31/25 1,218.00
6437 11/6/2025 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING PPE 10/31/2025 127,209.45
6438 11/6/2025 WIRE 3824 MISSIONSQUARE 457/401A CONTRIBUTIONS PPE 10/31/2025 47,934.55
6439 11/6/2025 WIRE 10360 AFLAC EMPLOYEE PAID INSURANCE 1,232.32
6440 11/6/2025 WIRE 11233 CALIPERS CALIPERS CONTRIBUTIONS PPE 10/31/2025 72,148.12
48200 11/6/2025 DD 1414 ALPINE SMITH,INC. MULTIHOG MXC130 W/SNOWBLOWER 625.00
48201 11/6/2025 DD 1537 AMAZON CAPITAL SERVICES,INC FACILITY SUPPLIES 1,074.14
48202 11/6/2025 DD 9086 EMPLOYEE VISION REIMBURSEMENT 523.92
48203 11/6/2025 DD 515 BRAGG CRANE SERVICE CONTRACT SERVICES:ROW TREE CLEARING 9,152.00
48204 11/6/2025 DD 10367 CCMEDIA PUBLISHING,LLC. MARKETING 2,175.00
48205 11/6/2025 DD 577 COOPERATIVE RESPONSE CENTER INC. ANSWERING SERVICE 3,416.47
48206 11/6/2025 DD 1555 CTOS RENTALS,LLC RENTAL VEHICLE 14,858.88
48207 11/6/2025 DD 1587 DILLARD ENVIRONMENTAL SERVICES ENVIRONMENTAL COMPLIANCE FEES 450.00
48208 11/6/2025 DD 1167 ERPR,LLC PROFESSIONAL SERVICES:MARKETING 1,000.00
48209 11/6/2025 DD 736 FACTORY MOTOR PARTS MISC PARTS&SUPPLIES 678.05
48210 11/6/2025 DD 9347 EMPLOYEE VISION REIMBURSEMENT 482.00
48211 11/6/2025 DD 361 FIRST CHOICE SERVICES FACILITY SUPPLIES 185.00
48212 11/6/2025 DD 1530 FORTRA,LLC LICENSING,MAINTENANCE&SUPPORT 1,881.34
48213 11/6/2025 DD 2254 FULL HEART DESIGN PROFESSIONAL SERVICES:MARKETING 937.50
48214 11/6/2025 DD 277 HACH COMPANY MATERIALS&SERVICES 365.21
48215 11/6/2025 DD 74 HEAVY EQUIP INC. 2025 PIPELINE REPLACEMENT 32,300.00
48216 11/6/2025 DD 1577 HUNT&SONS,LLC FUEL/OIL FOR VEHICLES 6,892.45
48217 11/6/2025 DD 3820 I BEW LOCAL 1245 UNION DUES-NOVEMBER-EE CONTRIBUTIONS 7,256.06
48218 11/6/2025 DD 1305 JW WELDING SUPPLIES&TOOLS MATERIALS&SERVICES 643.01
48219 11/6/2025 DD 9654 JESSE LEDESMA* EMPLOYEE DEVELOPMENT 952.00
48220 11/6/2025 DD 1149 LOOMIS BANKING CHARGES 941.97
48221 11/6/2025 DD 617 MOUNTAIN EAP EMPLOYEE RELATIONS&WELLNESS PROGRAM 225.00
48222 11/6/2025 DD 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 128.47
48223 11/6/2025 DD 5130 NCPA MEMBERSHIP DUES 9,159.00
48224 11/6/2025 DD 1588 NORCAL CONTAINERS MISC PARTS&SUPPLIES 6,800.00
48225 11/6/2025 DD 1079 O'REILLY AUTO PARTS MISC PARTS&SUPPLIES 251.31
48226 11/6/2025 DD 820 ONESOURCE SUPPLY SOLUTIONS INVENTORY 1,574.70
48227 11/6/2025 DD 775 ONLINE INFORMATION SERVICES CREDIT CHECK SERVICES 270.20
48228 11/6/2025 DD 5730 PORTER SIMON LEGAL SERVICES 8,939.00
48229 11/6/2025 DD 846 REAL GRAPHIC MARKETING 662.18
48230 11/6/2025 DD 552 RK CONTRACTORS INC. NORTHWOODS REBUILD 243,675.00
48231 11/6/2025 DD 1606 SAAS E SOLUTIONS,LLC PROFESSIONAL SERVICES:PROGRAM DELIVERY 5,000.00
48232 11/6/2025 DD 837 SIERRA OFFICE SOLUTIONS XEROX COPIER LEASE 150.16
48233 11/6/2025 DD 10414 SNAP-ON INDUSTRIAL MISC PARTS&SUPPLIES -
48234 11/6/2025 DD 6604 SPIEGEL&MC DIARMID PROFESSIONAL SERVICES:FERC ISSUES 4,202.50
48235 11/6/2025 DD 3826 STONE'S COUNTRYTIRE TIRES 322.14
48236 11/6/2025 DD 1357 SWIFT COMMUNICATIONS OF CALIFORNIA GENERAL ADVERTISEMENT 1,666.00
48237 11/6/2025 DD 7313 TAHOE SUPPLY COMPANY FACILITY SUPPLIES 428.00
48238 11/6/2025 DD 26 THE BANK OF NEW YORK MELLON DEBT PAYMENTS MONTHLY FUNDINGS(3 COPS) 146,448.58
48239 11/6/2025 DD 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 710.00
48240 11/6/2025 DD 448 TRUCKEE TAHOE RADIO LLC MARKETING 2,595.20
48241 11/6/2025 DD 10584 UAMPS PURCHASED POWER-LAMPS 993,826.41
48242 11/6/2025 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 222.99
48243 11/6/2025 DD 1528 UNISYS CORPORATION LICENSING,MAINTENANCE&SUPPORT 1,616.32
48244 11/6/2025 DD 643 UNITED SITE SERVICES OF NEVADA VARIOUS PROJECTS 1,409.66
48245 11/6/2025 DD 1538 USA FLEET SOLUTIONS MISC PARTS&SUPPLIES 1,420.00
48246 11/6/2025 DD 320 W&TGRAPHIX SCREEN PRINTING& EMPLOYEE UNIFORMS 5,152.98
48247 11/6/2025 DD 1546 WATERS CHIROPRACTIC DMV PHYSICAL 420.00
48248 11/6/2025 DD 9961 MATTHEW WELLISE 53605.5 AIRFARE,MEETING EXPENSES 1,132.56
136485 11/6/2025 CHK 999 ALPENSWING 25631302,METER SET REFUND 407.07
136486 11/6/2025 CHK 134 ANIXTER INC. INVENTORY 16,203.13
136487 11/6/2025 CHK 657 AT&T COMMUNICATIONS 686.79
136488 11/6/2025 CHK 240 AUDIO ON-HOLD ON-HOLD PHONE SYSTEM 79.00
136489 11/6/2025 CHK 99999 MONICAD BEAVERS CUSTOMER REFUND-CLOSED ACCOUNT 126.65
136490 11/6/2025 CHK 99999 AMANDA BOUTWELL CUSTOMER REFUND-CLOSED ACCOUNT 270.20
136491 11/6/2025 CHK 1006 CALIFORNIA STATE DISBURSEMENT UNIT CHILD SUPPORT PPE 10/31/2025 115.38
136492 11/6/2025 CHK 99999 ALLEN CHARLTON CUSTOMER REFUND-CLOSED ACCOUNT 105.36
136493 11/6/2025 CHK 1415 CRISIS INTERVENTION SERVICES PROFESSIONAL SERVICES:PROGRAM DELIVERY 2,825.00
136494 11/6/2025 CHK 1601 CROWN TECHNICAL SYSTEMS,LLC MARTS VALLEY SUBSTATION MODERNIZATION 1,068,345.32
136495 11/6/2025 CHK 999 EDC BUILDERS,INC REFUND EF FEES 649.00
136496 11/6/2025 CHK 3096 EMPLOYMENT DEVELOMENT DEPT. UNEMPLOYMENT INSURANCE 3,878.00
136497 11/6/2025 CHK 99999 MR SEVERO GONZALEZ CUSTOMER REFUND-CLOSED ACCOUNT 149.80
136498 11/6/2025 CHK 99999 PABLO HEIT CUSTOMER REFUND-CLOSED ACCOUNT 8.17
136499 11/6/2025 CHK 99999 STEVEN JORDAN CUSTOMER REFUND-CLOSED ACCOUNT 1.44
136500 11/6/2025 CHK 6401 LIBERTY UTILITIES ELECTRIC FOR PUMP STATION 475.63
136501 11/6/2025 CHK 5151 NRECA INSURANCE NOVEMBER 2025 16,793.22
136502 11/6/2025 CHK 5150 NRECA GROUP BENEFITS TRUST INSURANCE NOVEMBER 2025 237,664.02
136503 11/6/2025 CHK 999 RICHARD PAGEY REFUNDTPP 844.00
136504 11/6/2025 CHK 1398 SCHINDLER ELEVATOR CORP BUILDING MAINTENANCE 549.36
136505 11/6/2025 CHK 9928 KOLBY SILKWOOD 53605.5 EMPLOYEE DEVELOPMENT,AIRFARE 1,224.00
136506 11/6/2025 CHK 99999 SHINING SUN CUSTOMER REFUND-CLOSED ACCOUNT 302.44
136507 11/6/2025 CHK 6920 TAHOE TRUCKEE SIERRA DISPOSAL LANDFILL CHARGES 2,336.62
Page l of Page 4 of 15
Page 32 of 64
Truckee Donner Public Utility District
Check Register CA
November 2025 Gov.Code
53605.5
Check/Tran Date Type Vendor Vendor Name Item Reference Amount
136508 11/6/2025 CHK 7040 TEICHERT&SON INC CREDIT DE MATERIALS&SERVICES 9,766.46
136509 11/6/2025 CHK 7320 TRUCKEE TAHOE LUMBER CO MATERIALS&SERVICES 243.65
136510 11/6/2025 CHK 526 WESTERN INDUSTRIAL PARTS INC. MISC PARTS&SUPPLIES 496.28
6445 11/10/2025 WIRE 905 HEALTHEQUITY INC. HSA EMPLOYER DEPOSIT 402.25
48249 11/13/2025 DD 1537 AMAZON CAPITAL SERVICES,INC TOOLS 2,551.63
48250 11/13/2025 DD 1624 CLOUDFIRE INC PROFESSIONAL SERVICES:OTHER 30,500.00
48251 11/13/2025 DD 9224 EMPLOYEE VISION REIMBURSEMENT 739.02
48252 11/13/2025 DD 1432 DOWL,LLC 2025 CAPITAL IMPROVEMENT PLAN 205.00
48253 11/13/2025 DD 10650 EUROFINS EATON ANALYTICAL INC. WATER SAMPLE ANALYSIS 70.00
48254 11/13/2025 DD 3340 GENERAL PACIFIC INC EMPLOYEE UNIFORM 616.72
48255 11/13/2025 DD 3480 GRAINGER INC. MATERIALS&SERVICES 642.13
48256 11/13/2025 DD 74 HEAVY EQUIP INC. 2025 PIPELINE REPLACEMENT 211,115.37
48257 11/13/2025 DD 11227 INLAND ECOSYSTEMS 2025 PIPELINE REPLACEMENT 750.00
48258 11/13/2025 DD 1305 JW WELDING SUPPLIES&TOOLS MATERIALS&SERVICES 327.25
48259 11/13/2025 DD 1099 MOANA NURSERY PROFESSIONAL SERVICES:OTHER 315.00
48260 11/13/2025 DD 11025 MOONSHINE INK MARKETING 428.00
48261 11/13/2025 DD 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 450.38
48262 11/13/2025 DD 289 NISC OCTOBER 2025 PRINT SERVICES 21,827.81
48263 11/13/2025 DD 970 NORTHERN CALIFORNIA JOINT POLE ASSN MEMBERSHIP DUES 12.41
48264 11/13/2025 DD 1079 O'REILLY AUTO PARTS MATERIALS&SERVICES 19.61
48265 11/13/2025 DD 1410 OAK HARBOR FRIEGHT LINES,INC. MISC PARTS&SUPPLIES 631.17
48266 11/13/2025 DD 820 ONESOURCE SUPPLY SOLUTIONS INVENTORY 14,807.43
48267 11/13/2025 DD 9504397 PACE SUPPLY INVENTORY 244.34
48268 11/13/2025 DD 1371 RUPPERT,INC. MARTIS VALLEY SUBSTATION MODERNIZATION 60,945.15
48269 11/13/2025 DD 1532 SLATE ROCK FIR EMPLOYEE UNIFORMS 362.80
48270 11/13/2025 DD 1328 TRAFFIC MANAGEMENT,INC. NORTHWOODS REBUILD-A44 TO SNOWPEAK 19,400.70
48271 11/13/2025 DD 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 482.00
48272 11/13/2025 DD 7300 TRUCKEE RENTS INC MATERIALS&SERVICES 62.85
48273 11/13/2025 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 242.45
48274 11/13/2025 DD 7380 UNITED PARCEL SERVICE UPS CHARGES 178.16
48275 11/13/2025 DD 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 1,334.10
48276 11/13/2025 DD 7820 WESTERN NEVADA SUPPLY CO MATERIALS&SERVICES 56.90
136511 11/13/2025 CHK 134 ANIXTER INC. INVENTORY 13,200.39
136512 11/13/2025 CHK 657 AT&T COMMUNICATIONS 3,217.78
136513 11/13/2025 CHK 99999 MR RAFAEL CAPETILLO CUSTOMER REFUND-CLOSED ACCOUNT 45.71
136514 11/13/2025 CHK 1073 CLEAN MACHINE REPAIRS&MAINTENANCE 540.00
136515 11/13/2025 CHK 1518 COLUMN SOFTWARE PBC GENERAL ADVERTISEMENT 1,765.39
136516 11/13/2025 CHK 10489 CORELOGIC INFORMATION SOLUTIONS INC LICENSING,MAINTENANCE&SUPPORT 553.44
136517 11/13/2025 CHK 193 EASTERN REGIONAL LANDFILL LANDFILL CHARGES 477.92
136518 11/13/2025 CHK 348 EDGES ELECTRICAL GROUP TOOLS 161.85
136519 11/13/2025 CHK 905 HEALTHEQUITY INC. HSA ADMINISTRATIVE FEES 83.85
136520 11/13/2025 CHK 10932 J&L FOOD MART&CARWASH REPAIRS&MAINTENANCE 120.00
136521 11/13/2025 CHK 99999 BRUCE JOHNSON CUSTOMER REFUND-CLOSED ACCOUNT 127.42
136522 11/13/2025 CHK 1592 JR CONSTRUCTION CUSTOMER PAYMENT KIOSK 8,906.00
136523 11/13/2025 CHK 9600 EMPLOYEE VISION REIMBURSEMENT 401.51
136524 11/13/2025 CHK 44444 DENISE M KOWAL INCENTIVES-EV CHARGERS,EFFICIENT WIND 2,197.05
136525 11/13/2025 CHK 6401 LIBERTY UTILITIES ELECTRIC FOR PUMP STATION 237.10
136526 11/13/2025 CHK 44444 STEVEN MCDONALD INCENTIVES-DUCTLESS MINI SPLIT HEATPMP 875.00
136527 11/13/2025 CHK 5222 ODP BUSINESS SOLUTIONS LLC OFFICE SUPPLIES 480.23
136528 11/13/2025 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 45,610.84
136529 11/13/2025 CHK 322 POLLARDWATER MATERIALS&SERVICES 170.33
136530 11/13/2025 CHK 44444 BRIAN RENEHAN INCENTIVES-EFFICIENT WINDOWS 951.65
136531 11/13/2025 CHK 5912 RESOURCE DEVELOPMENT COMPANY MULTIHOG MXC330 W/SNOWBLOWER 2,000.00
136532 11/13/2025 CHK 99999 RICHARD AND LYNNEHILDEBRAND R CUSTOMER REFUND-CLOSED ACCOUNT 384.67
136533 11/13/2025 CHK 675 SHERWIN-WILLIAMS MATERIALS&SERVICES 148.23
136534 11/13/2025 CHK 999 SIERRA COMMUNITY HOUSE CHARGING COMMUNITIES FORWARD 1,000.00
136535 11/13/2025 CHK 6940 TAHOE TRUCKEE SANITATION AGENCY 2025 PIPELINE REPLACEMENT 25.00
136536 11/13/2025 CHK 6920 TAHOE TRUCKEE SIERRA DISPOSAL LANDFILL CHARGES 1,553.81
136537 11/13/2025 CHK 7175 TRANSWORLD SYSTEMS INC COLLECTION SERVICES 98.96
136538 11/13/2025 CHK 10284 UNITED RENTALS MATERIALS&SERVICES 483.35
136539 11/13/2025 CHK 44444 GARY WALKER INCENTIVES-ENERGY STAR HT PMP WRT HTR 1,000.00
136540 11/13/2025 CHK 99999 JENNIFER WINN CUSTOMER REFUND-CLOSED ACCOUNT 269.70
136541 11/13/2025 CHK 5643 ZORO TOOLS,INC TOOLS 53.94
6446 11/17/2025 WIRE 6731 CALIFORNIA DEPARTMENT OF TAX AND FEE USE TAX PAYABLE 1,115.00
6444 11/20/2025 PL PL PAYROLL PAYROLL DIRECT DEPOSIT 286,901.62
6447 11/20/2025 WIRE 11233 CALPERS CALPERS CONTRIBUTIONS PPE 11/14/2025 66,853.43
6448 11/20/2025 WIRE 540 CALPERS 457 DEFERRED COMP PRGM CALPERS 457 CONTRIBUTIONS PPE 11/14/2025 21,547.77
6449 11/20/2025 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING PPE 11/14/2025 31,946.83
6450 11/20/2025 WIRE 905 HEALTHEQUITY INC. EMPLOYEE HSA CONTRIBUTIONS PPE 11/14/25 1,213.36
6451 11/20/2025 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING PPE 11/14/2025 116,533.55
6452 11/20/2025 WIRE 3824 MISSIONSQUARE 457/401A CONTRIBUTIONS PPE 11/14/2025 47,009.65
48357 11/20/2025 DD 1393 ACWAIPIA AUTO&GENERAL LIABILITY INSURANCE 484,095.06
48358 11/20/2025 DD 1537 AMAZON CAPITAL SERVICES,INC FACILITY SUPPLIES 2,226.51
48359 11/20/2025 DD 1489 CAROLLO ENGINEERS 6170A TANK INTERIOR REHAB 3,988.75
48360 11/20/2025 DD 9503810 CDW GOVERNMENT INC. LICENSING,MAINTENANCE&SUPPORT 75,804.84
48361 11/20/2025 DD 1251 CONSTRUCTION MATERIALS ENGINEERS,INC. VARIOUS PROJECTS 41,962.50
48362 11/20/2025 DD 893 DEBBIE MADERA CLEANING SERVICE BUILDING CLEANING 7,004.00
48363 11/20/2025 DD 1614 DUNCAN WEINBERG GENZER&PEMBROKE,P.C. PROFESSIONAL SERVICES:FERC ISSUES 270.00
48364 11/20/2025 DD 992 E&M ELECTRIC&MACHINERY INC LICENSING,MAINTENANCE&SUPPORT 12,850.00
48365 11/20/2025 DD 2263 EMPIRE SOUTHWEST,LLC. REPAIRS&MAINTENANCE 79.78
48366 11/20/2025 DD 949 FERGUSON ENTERPRISES INC 1423 MATERIALS&SERVICES 97.00
48367 11/20/2025 DD 1484 FUENTES CONSULTING LLC SAFETY MEETING 3,546.59
48368 11/20/2025 DD 3340 GENERAL PACIFIC INC EMPLOYEE UNIFORM 933.09
48369 11/20/2025 DD 3480 GRAINGER INC. TOOLS 168.62
48370 11/20/2025 DD 9467 EMPLOYEE VISION REIMBURSEMENT 120.00
48371 11/20/2025 DD 1577 HUNT&SONS,LLC FUEL/OIL FOR VEHICLES 5,008.51
Paget of Page 5 of 15
Page 33 of 64
Truckee Donner Public Utility District
Check Register CA
November 2025 Gov.Code
53605.5
Check/Tran Date Type Vendor Vendor Name Item Reference Amount
48372 11/20/2025 DD 115 KIMBALL-MIDWEST MISC PARTS&SUPPLIES 543.39
48373 11/20/2025 DD 9733 EMPLOYEE VISION REIMBURSEMENT 227.96
48374 11/20/2025 DD 9737 EMPLOYEE VISION REIMBURSEMENT 897.47
48375 11/20/2025 DD 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 262.25
48376 11/20/2025 DD 494 NVS,INC. VARIOUS PROJECTS 71,876.50
48377 11/20/2025 DD 820 ONESOURCE SUPPLYSOLUTIONS INVENTORY 24,268.08
48378 11/20/2025 DD 9504397 PACE SUPPLY INVENTORY 5,341.89
48379 11/20/2025 DD 5070 PLATT MATERIALS&SERVICES 2,428.87
48380 11/20/2025 DD 890 QUALUS,LLC MARTIS VALLEY SUBSTATION MODERNIZATION 9,948.00
48381 11/20/2025 DD 1611 RITZ INSTRUMENT TRANSFORMERS,INC PURCHASE TRANSFORMERS 11,715.48
48382 11/20/2025 DD 2245 SI SUPPLY TOOLS 181.45
48383 11/20/2025 DD 1532 SLATE ROCK FIR EMPLOYEE UNIFORM 462.16
48384 11/20/2025 DD 10414 SNAP-ON INDUSTRIAL PERSONALCHARGE-F.HESTON 922.59
48385 11/20/2025 DD 3826 STONE'S COUNTRYTIRE TIRES 1,526.54
48386 11/20/2025 DD 6880 TAHOE INSTANT PRESS OFFICE SUPPLIES 83.93
48387 11/20/2025 DD 7313 TAHOE SUPPLY COMPANY FACILITY SUPPLIES 40.53
48388 11/20/2025 DD 1157 TAIT NORTH AMERICA,INC MISC PARTS&SUPPLIES 752.41
48389 11/20/2025 DD 1328 TRAFFIC MANAGEMENT,LLC. NORTHWOODS REBUILD-A44 TO SNOWPEAK 2,666.20
48390 11/20/2025 DD 712 TRUCKEE DONNER PUD PURCHASED POWER-STAMPEDE HYDRO GEN 5,087.10
48391 11/20/2025 DD 10380 ULINE MATERIALS&SERVICES 413.31
48392 11/20/2025 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 260.87
48393 11/20/2025 DD 1528 UNISYS CORPORATION LICENSING,MAINTENANCE&SUPPORT 1,612.58
48394 11/20/2025 DD 320 W&TGRAPHIX SCREEN PRINTING& EMPLOYEE UNIFORM 133.53
48395 11/20/2025 DD 934 WEST COAST PAVING INC CONTRACT SVCS:PAVING/SLURRY 7,200.00
48396 11/20/2025 DD 10678 WILLDAN FINANCIAL SERVICES GC ARBITRAGE REBATE SERVICES 2,500.00
48397 11/20/2025 DD 9948 EMPLOYEE VISION REIMBURSEMENT 189.00
48398 11/20/2025 DD 1561 ZOHO CORPORATION LICENSING,MAINTENANCE&SUPPORT 1,635.00
136542 11/20/2025 CHK 1507 ALESHIRE&WYNDER LLP PROFESSIONAL SERVICES:OTHER 75.00
136543 11/20/2025 CHK 6 ALPINE LOCK AND KEY MARTIS VALLEY SUBSTATION MODERNIZATION 19.95
136544 11/20/2025 CHK 134 ANIXTER INC. MATERIALS&SERVICES 2,509.57
136545 11/20/2025 CHK 1527 AT&T MOBILITY CELL PHONE CHARGES 3,213.30
136546 11/20/2025 CHK 99999 HAYES BATTEN CUSTOMER REFUND-CLOSED ACCOUNT 10.95
136547 11/20/2025 CHK 99999 ETHIOPIA BEKELE CUSTOMER REFUND-CLOSED ACCOUNT 4.47
136548 11/20/2025 CHK 6730 CALIFORNIA DEPARTMENT OF TAX AND FEE ENVIRONMENTAL COMPLIANCE FEES 2,141.04
136549 11/20/2025 CHK 1006 CALIFORNIA STATE DISBURSEMENT UNIT CHILD SUPPORT PPE 11/14/2025 115.38
136550 11/20/2025 CHK 193 EASTERN REGIONAL LANDFILL LANDFILL CHARGES 381.20
136551 11/20/2025 CHK 341 HANSEN BROS.ENTERPRISES VARIOUS PROJECTS 173,554.62
136552 11/20/2025 CHK 1622 HOWARD INDUSTRIES,INC CUSTOMER PAYMENT KIOSK 19,445.99
136553 11/20/2025 CHK 10225 MCMASTER-CARR SUPPLY COMPANY MATERIALS&SERVICES 92.38
136554 11/20/2025 CHK 1599 MEIDEN AMERICA SWITCHGEAR,INC. MARTIS VALLEY SUBSTATION MODERNIZATION 305,950.22
136555 11/20/2025 CHK 99999 SAMANTHA MEYERS CUSTOMER REFUND-CLOSED ACCOUNT 229.52
136556 11/20/2025 CHK 10138 NEVADA COUNTY CDA HAZARDOUS MATERIAL COMPLIANCE 5,223.90
136557 11/20/2025 CHK 5222 ODP BUSINESS SOLUTIONS LLC OFFICE SUPPLIES 41.86
136558 11/20/2025 CHK 1276 ON THE HOOF VARIOUS VEHICLES 1,085.00
136559 11/20/2025 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 58,175.63
136560 11/20/2025 CHK 10101 PITNEY BOWES OFFICE SUPPLIES 88.29
136561 11/20/2025 CHK 6273 SAUERS ENGINEERING INC INNSBRUCK TANK DESIGN/REBUILD 7,275.00
136562 11/20/2025 CHK 10720 SNOQUIP REPAIRS&MAINTENANCE 326.23
136563 11/20/2025 CHK 7040 TEICHERT&SON INC CREDIT DE MATERIALS&SERVICES 377.23
136564 11/20/2025 CHK 682 VERIZON WIRELESS CELL PHONE CHARGES 175.14
136565 11/20/2025 CHK 5643 ZORO TOOLS,INC TOOLS 152.49
223 $ 5,958,136.91
*Denotes employee reimbursement containing multiple Items with no individual item charge of$100 or greater.
Page 3of3 Page 6 of 15
Page 34 of 64
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
STATEMENT OF GENERAL FUND
Activity for the Month Ended 10/31/2025
Page 1 of 2
Electric Dept Water Dept Total
Balance in General Fund 9/30/2025 $11,016,742 $8,844,464 $19,861,206
Receipts:
Revenue received $3,274,249 $1,865,517 $5,139,766
Retired employees medical insurance 21,840 - 21,840
Record interest earned 42,114 79,419 121,532
FF Funding&DL Surcharge Reimbursement for 2006 COP - 38,234 38,234
Cash clearing accounts(timing-prior month reversal) (396,378) - (396,378)
Cash clearing accounts(timing-current month) 52,186 - 52,186
Total Receipts $2,994,010 $1,983,170 $4,977,180
Disbursements:
Accounts payable/payroll disbursements $2,875,757 $2,375,697 $5,251,453
Distribute UPTIF interest 22,394 11,544 33,938
Restrict facilities fees 11,397 31,370 42,766
Restrict Donner Lake surcharge - 9,309 9,309
Section 125 benefit disbursement 37,831 - 37,831
Bank charges 12,896 - 12,896
Total Disbursements $2,960,274 $2,427,919 $5,388,194
Balance in General Fund 10/31/2025 $11,050,478 $8,399,714 $19,450,192
11/17/2025 5:08 PM
I:\Treasurers Repo rt\Statement of General Fund\2025\2025-10 GF
Page 7 of 15
Page 35 of 64
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Funds Status Report
Activity for the Month Ended 10/31/2025
Page 2 of 2
Electric Dept Water Dept Total
Distribution of Operating Funds At Month-End:
Customer Services Operating Funds $2,400 $0 $2,400
Operating clearing accounts 52,186 - 52,186
U.S. Bank-General Fund 2,003,367 - 2,003,367
LAIF, UPTIF, PCIF, &TVI -General Fund 8,992,525 8,399,714 17,392,239
Total Operating Funds $11,050,478 $8,399,714 $19,450,192
Distribution of Designated&Restricted Funds at Month-End:
LAIF, UPTIF, PCIF,TVI &CLASS $33,994,460 $8,063,046 $42,057,506
UPTIF-Donner Lake Assessment District - 90,504 90,504
2015 COP Water Bonds, Principal Payment Fund - 905,259 905,259
2022 COP Issuance/Payment Fund 293,466 605,125 898,591
U S Bank-Donner Lake Assessment District 00-1 - 43,171 43,171
Total Designated&Restricted Funds $34,287,926 $9,707,105 $43,995,031
Total Market Adjustments (199,884) (52,336) (252,219)
Total Funds Available $45,138,520 $18,054,483 $63,193,004
11/17/2025 5:08 PM
I:\Treasurers Repo rt\Statement of General Fund\2025\2025-10 GF
Page 8 of 15
Page 36 of 64
INVESTMENT STATUS REPORT
Activity for the Month Ended 10/31/2025
Balance Beg.Balance Month End Balance
%Current Month(%Last Month) 12/31/2024 9/30/2025 Activity 10/31/2025
ELECTRIC FUNDS
LOCAL AGENCY INVESTMENT FUND(LAIF)-4.15%(4.21%)
General Fund 1..136.1 $ 6,294,941 $ 1,558,995 $ 528,084 $ 2,087,079
Consolidate cash 510,180
Quarterly investment income payment received 17,904
Capital Replacement Fund 1..136.41 2,181,606 2,277,706 26,170 2,303,876
Quarterly investment income payment received 26,170
Electric Rate Reserve Fund 1..136.35 - 500,000 - 500,000
AB 32 Cap&Trade Fund 1..136.58 481,113 272,279 3,138 275,417
Reimbursement from GF for Horse Butte Power 3,138
Deferred Liabilites Reserve 1..136.42 2,267,444 2,343,593 26,926 2,370,520
Quarterly investment income payment received 26,926
LCFS Credits 1..136.59 112,056 115,841 1,317 117,158
Funds transfer to/from GF 1,317
2022 COP Project Fund 1..132.95 7,039,834 7,276,275 83,581 7,359,855
Quarterly investment income payment received 83,581
Total LAIF Electric Investments 16,195,388 14,344,689 669,216 15,013,905
UTAH PUBLIC TREASURERS'INVESTMENT FUND(UPTIF)- 4.27%(4.38%)
General Fund 1..136.12 521,095 468,672 (32,134) 436,538
Distribute UPTIF interest (22,394)
Restrict facility fees (11,397)
Record monthly interest 1,656
Facilities Fees 1..136.9 653,845 831,317 14,335 845,651
Restrict facilites fees 11,397
Record monthly interest 2,938
Electric Rate Reserve Fund 1..136.45 1,868,991 1,985,804 7,019 1,992,822
Record monthly interest 7,019
Capital Replacement Fund 1..136.46 495,353 525,609 1,858 527,466
Record monthly interest 1,858
Electric Vehicle Reserve 1..136.13 1,428,687 2,160,063 7,634 2,167,697
Record monthly interest 7,634
Total UPTIF Electric Investments 4,967,970 5,971,464 (1,289) 5,970,175
PLACER COUNTY INVESTMENT FUND(PCIF)- 3.76%(3.88%)
Electric General Fund PC 1..136.49 908,374 738,390 2,352 740,743
Record monthly interest 2,352
Electric Rate Reserve Fund 1..136.47 1,115,617 1,345,545 4,286 1,349,831
Record monthly interest 4,286
Capital Replacement Fund 1..136.48 1,335,212 1,374,760 4,380 1,379,140
Record monthly interest 4,380
Total PCIF County Electric Investments 3,359,204 3,458,696 11,019 3,469,714
TVI INVESTMENTS- 0.55%(0.55%)
Capital Replacement Fund 1..136.43 2,966,550 1,366,550 - 1,366,550
Electric Rate Reserve Fund 1..136.44 1,500,000 700,000 - 700,000
Total TVI Electric Investments 4,466,550 2,066,550 2,066,550
11/19/20259:39 AM Investments Status Report Page 9 of 15
r tmen
\7r....-,Report\invest stain,Report,\202s\m „� ain 2s-10 i ,-�t,sts Report Page 1 of 4
Page 37 of 64
INVESTMENT STATUS REPORT
Activity for the Month Ended 10/31/2025
Balance Beg.Balance Month End Balance
%Current Month(%Last Month) 12/31/2024 9/30/2025 Activity 10/31/2025
CLASS INVESTMENTS- 4.19%(4.27%)
General Fund 1..136.16 503,934 2,707,965 3,020,201 5,728,165
Record monthly interest 20,201
Transfer from US Bank 3,000,000
Electric Rate Reserve Fund 1..136.22 1,511,598 2,367,928 8,380 2,376,308
Record monthly interest 8,380
Vehicle Reserve Fund 1..136.23 503,934 520,309 1,841 522,150
Record monthly interest 1,841
Capital Reserve Fund 1..136.24 4,031,201 7,812,369 27,648 7,840,017
Record monthly interest 27,648
Total CLASS Electric Investments 6,550,668 13,408,570 3,058,071 16,466,641
Total Electric Investments $ 35,539,781 $ 25,841,399 $ 678,945 $ 26,520,345
11/19/20259:39 AM Investments Status Report Page 10 of 15
1:\7r....—,Report\inves tment stain,Report,\2025\2025-10 i ns ain,—�t,sts Report Page 2 of 4
Page 38 of 64
INVESTMENT STATUS REPORT
Activity for the Month Ended 10/31/2025
Balance Beg.Balance Month End Balance
%Current Month(%Last Month) 12/31/2024 9/30/2025 Activity 10/31/2025
WATER FUNDS
LOCAL AGENCY INVESTMENT FUND(LAIF)-4.15%(4.21%)
General Fund 2..136.1 3,090,636 6,675,675 (464,861) 6,210,814
Consolidate cash (510,180)
Quarterly investment income payment received 76,688
Restrict facility fees (31,370)
Facilities Fees 2..136.90 1,411,527 1,343,382 46,808 1,390,190
Restrict facility fees 31,370
Quarterly investment income payment received 15,438
Capital Replacement Fund 2..136.41 1,210,177 2,527,847 29,028 2,556,875
Quarterly investment income payment received 29,028
Reserve funding @ budget -
Total LAIF Water Investments 5,712,340 10,546,904 (389,026) 10,157,878
UTAH PUBLIC TREASURERS'INVESTMENT FUND(UPTIF)- 4.27%(4.38%)
General Fund 2..136.12 908,092 772,617 20,112 792,729
Transfer to DLAD surcharge (9,309)
Distribute UPTIF interest (11,544)
DL Surcharge Reimbursement for 2006 COP 8,160
FF Funding portion of 2006 COP 30,074
Record monthly interest 2,731
Facilities Fees 2..136.25 495,007 285,200 (29,066) 256,134
Record monthly interest 1,008
Transfer to GF for FF Funding portion of 2006 COP (30,074)
West River St.Assessment District 2..136.31 43,090 44,593 158 44,751
Record monthly interest 158
Prepaid Connection Fees 2..136.7 88,057 91,131 322 91,453
Record monthly interest 322
Donner Lake Assessment District Fund 2..136.84 87,144 90,185 319 90,504
Record monthly interest 319
Donner Lake Assessment District Surcharge Fund 2..136.61 223,320 241,655 2,002 243,658
DLAD surcharge collections 9,309
DL Surcharge reimbursement to GF for 2006 COP (8,160)
Record monthly interest 854
TSA SAD II Improvement Fund 2..136.85 20,787 21,513 76 21,589
Record monthly interest 76
Water Vehicle Reserve 2..136.13 728,607 1,100,716 3,890 1,104,606
Record monthly interest 3,890
Deferred Liabilites Reserve 2..136.42 120,249 124,446 440 124,885
Record monthly interest 440
Capital Replacement Fund 2..136.46 1,131,023 139,811 494 140,305
Record monthly interest 494
Total UPTIF Water Investments 3,845,376 2,911,867 (1,253) 2,910,615
PLACER COUNTY INVESTMENT FUND(PCIF)- 3.76%(3.88%)
Total PCIF Water Investments
TVI INVESTMENTS- 0.55%(0.55%)
Water General Fund TVI 2..136.15 2,996,171 1,396,171 - 1,396,171
Total TVI Water Investments 2,996,171 1,396,171 1,396,171
CLASS INVESTMENTS- 4.19%(4.27%)
Water Vehicle Reserve 2..136.24 2,015,738 2,081,234 7,366 2,088,600
Record monthly interest 7,366
Total CLASS Water Investments 2,015,738 2,081,234 7,366 2,088,600
Total Water Investments $ 14,569,625 $ 16,936,177 $ (382,913) $ 16,553,264
11/19/20259:39 AM Investments Status Report Page 11 of 15
1:\7r....-,Report\inves tment stain,Report,\2025\2025-10 I....t-t,stains Report Page 3 of 4
Page 39 of 64
INVESTMENT STATUS REPORT
Activity for the Month Ended 1013112025
Balance Beg.Balance Month End Balance
%Current Month(%Last Month) 12/31/2024 9/30/2025 Activity 10/31/2025
ELECTRIC&WATER INVESTMENTS,COMBINED TOTALS
Pre-Market Adjustments
Total LAIF Investments 42% 21,907,728 24,891,593 280,190 25,171,783
Total UPTIF Investments 15% 8,813,347 8,883,332 (2,542) 8,880,790
Total PCIF Investments 6% 3,359,204 3,458,696 11,019 3,469,714
Total TVlInvestments 6% 7,462,722 3,462,722 - 3,462,722
Total CLASS Investments 31% 8,566,405 15,489,804 3,065,436 18,555,240
Total Investments 100% Month End Bal.Mix $ 50,109,405 $ 56,186,147 $ 3,354,102 $ 59,540,249
Market Adjustments
Total LAIF Investments (9,106) (9,106) - (9,106)
Total UPTIF Investments 16,492 16,492 16,492
Total PCIF Investments (16,653) (16,653) - (16,653)
Total TVI Investments (243,495) (242,745) (43) (242,789)
Total CLASS Investments (165) (165) (165)
Total Investments $ (252,761) $ (252,177) $ (43) $ (252,220)
Post-Market Adjustments
Total LAIF Investments 43% 21,898,622 24,882,487 280,190 25,162,677
Total UPTIF Investments 15% 8,829,839 8,899,824 (2,542) 8,897,282
Total PCIF Investments 6% 3,342,552 3,442,043 11,019 3,453,062
Total TVlInvestments 5% 7,219,227 3,219,977 (43) 3,219,933
Total CLASS Investments 31% 8,566,240 15,489,639 3,065,436 18,555,075
Total Investments 100% Month End Bal.Mix $ 49,856,479 $ 55,933,969 $ 3,354,060 $ 59,288,029
11/19/2025 9:39AM Investments Status Report Page 12 of 15
e ain
\Treasurers Report\Investment status Reports\2025\2025-10 Investments Sts Report Page 4 of 4
Page 40 of 64
TRUCKEE DONNER PUD
INVESTMENT BALANCES
as of October 31,2025
Placer County Utah Public California TVI Fidelity Mmkt Morgan Stanley Dreyfus BNY US Bank Cash/
LAIF Invest Fund Invest Fund CLASS Investments Govt 57 Treas Sec Port Treas Security Treas Cash Res Checking Cash Clearings Total
131.1
ELECTRIC FUNDS
General Fund $ 2,087,079 $ 740,743 $ 436,538 $ 5,728,165 $ $ $ $ $ $ 2,003,367 $ 54,586 $ 11,050,478
Facilities Fees - - 845,651 - - - 845,651
Rate Reserve Fund 500,000 1,349,831 1,992,822 2,376,308 700,000 6,918,962
Capital Reserve Fund 2,303,876 1,379,140 527,466 7,840,017 1,366,550 13,417,050
Deferred Liabilites Reserve/POB Fund 2,370,520 - - - - 2,370,520
Electric Vehicle Reserve Fund - 2,167,697 522,150 2,689,847
AB 32 Fund 275,417 - - 275,417
LCFS Credits 117,158 117,158
COP Project Fund 7,359,855 7,359,855
COP Issuance/Payment Fund - - - 293,466 293,466
Market Adjustments 6,947 16,653 9,297 127 185,454 199,884
Total Electric Investments 15,006,958 3,453,062 5,979,472 16,466,514 1,881,096 293,466 2,003,367 54,586 45,138,520
WATER FUNDS
General Fund $ 6,210,814 $ - $ 792,729 $ $ 1,396,171 $ $ $ $ $ $ 8,399,714
Facilities Fees 1,390,190 256,134 - 1,646,324
Capital Reserve Fund 2,556,875 140,305 2,088,600 4,785,780
2015 COP Funds - - - 905,259 905,259
West River St.Assessment District 44,751 - 44,751
Deferred Liabilites Reserve 124,885 124,885
Prepaid Connection Fees 91,453 91,453
DLAD Fund 90,504 43,171 133,675
DLAD Surcharge 243,658 - 243,658
TSA SAD II Improvement Fund 21,589 21,589
Water Vehicle Reserve 1,104,606 1,104,606
COP Issuance/Payment Fund - - 605,125 605,125
Market Adjustments 2,159 7,196 39 57,333 52,336
Total Water Investments 10,155,719 2,917,810 2,088,561 1,338,838 905,259 605,125 43,171 18,054,483
Electric and Water,subtotal 25,162,677 3,453,062 8,897,282 18,555,075 3,219,934 905,259 898,591 2,046,537 54,586 63,193,004
MELLO ROOS-OLD GREENWOOD - - - - - - 269,730 85 - - - 269,815
Total Mello Roos-Old Greenwood 269,730 85 269,815
MELLO ROOS-GRAY'S CROSSING 1,829,612 - 232,487 2,062,099
Total Mello Roos-Gray's Crossing 1,829,612 232,487 2,062,099
Total Investments $ 26,992,289 $ 3,453,062 $ 8,897,282 $ 18,555,075 $ 3,219,934 $ 905,259 $ 269,730 $ 85 $ 1,131,078 $ 2,046,537 $ 54,586 $ 65,524,917
202509 Last Month End Balances 26,866,591 3,442,043 8,891,634 15,489,639 3,219,977 811,679 268,843 - 833,638 5,187,113 398,778 57,159,757
Change from last month 125,698 11,019 5,648 3,065,436 (42) 93,580 887 85 297,440 (3,140,575) (344,192) 8,365,161
202410 PY Month End Balances 24,355,510 6,768,260 8,888,647 5,000,000 6,877,020 875,492 317,502 304 1,067,446 3,597,082 62,371 57,809,636
Change from PY Month 2,636,779 (3,315,199) 8,635 13,555,075 (3,657,086) 29,767 (47,772) (219) 63,631 (1,550,545) (7,785) 7,715,282
2024 12 PYE Balances 25,999,121 3,342,552 8,891,634 8,566,240 7,219,227 142,863 259,524 306 313,210 2,266,449 220,427 57,159,757
Change from PYE 993,168 110,510 5,648 9,988,835 (3,999,293) 762,396 10,206 (221) 817,867 (219,911) (165,840) 8,365,161
I:\Treasurers Report\2026\2026-01 Treasurer'',ReportWll lmertm-202510555
Page 13 of 15
Page 41 of 64
Ai&I., TRUCKEE DONNER October 2025
Public Utility District
Electric Utility - Key Reserve Balances
$ thousands
$17,000
$15,000
$13,000 $13,417
$11,000 ■ ■ ■ ■ ■ r $11,050
■
$9,000 ■
■
■ $7,360
$7,000 y y $6,919 ■
■
$5,000
$3,000
$1,000 ■
-$1,000 YE 2020 YE 2021 YE 2022 YE 2023 YE 2024 PY Same Last Current YE YE GOAL
Month Month Month FORECAST
■ Operating Reserve ■ Rate Reserve ■ Capital Reserve 2022 COP Project Funds
11/17/2025 5:13 PM Page 14 of 15
0 FR Report Pack 202510 MFS Sec A(3.4) Page 4 of 64
TRUCKEE DONNER October 2025
Public Utility District
Water Utility - Key Reserve Balances
$ thousands
$14,000
$12,000
$10,000
■
$8,000 ■ ■ $8,400
$6,000
■
■
■ r $4,786
$4,000 ■ ■
$2,000 • • • • •
• • $1,646 •
■ ■ ■ ■ ■ ■ $1,105
■
$0 ^ ■ ■ $0 ■
YE 2020 YE 2021 YE 2022 YE 2023 YE 2024 PY Same Last Current YE YE GOAL
Month Month Month FORECAST
■ Operating Reserve ■ Vehicle Reserve ■ Capital Reserve 2022 COP Project Funds ° • Facility Fees °
11/17/2025 5:13 PM Page 15 of 15
0 FR Report Pack 202510 MFS Sec A(3.4) Page 43 of 64
AGENDA ITEM #12
Public Utility District m
MEETING DATE: January 21, 2026
TO: Board of Directors
FROM: Josh Campbell, Senior Electric Engineer
Mike Swanson, Director of Electric Engineering & Operations
SUBJECT: Consideration of Closeout of the Martis Valley Substation Civil
Construction - 2025 Contract
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Adopt Resolution 2026-01 accepting the Martis Valley Substation Civil Construction -
2025 project as complete and authorize the filing of the Notice of Completion.
BACKGROUND:
In June 2025, the Board awarded a construction contract for the Martis Valley Substation Civil
Construction—2025 project to Ruppert, Inc. of Truckee, California. The scope of the project included
the following items:
• Site work improvements including trenching, excavation and backfill;
• Installation of conduits, pre-fabricated vault and boxes;
• Installation of ground grid improvements;
• Removal, installation and repair or resurfacing of asphalt pavement; and
• Concrete foundation installation for switchgear and control enclosure (SCE).
The bid price was $547,443. The Board also established a ten percent change order allowance of
$54,744, for a total authorization not to exceed $602,187.
Ruppert, Inc. began work on the project in June 2025 and reached substantial completion in October
2025. District staff performed a final walkthrough in November 2025.
ANALYSIS AND BODY:
The work performed is complete and staff recommends acceptance by the District.
Attached is Resolution 2026-01 and the Notice of Completion (Attachment 1) accepting
the project and directing that the Notice of Completion be filed.
During the course of the project, three change order requests were submitted and
reviewed by staff. After review and discussion, the District and Ruppert, Inc. agreed on
a total of $18,161.05 for all change orders. The change orders were required to
accomplish the following work:
Page 1 of 3
Page 44 of 64
• Grounding clamps for conduit sweeps in the switchgear;
• Thermal concrete testing;
• Concrete slurry design change;
In addition to the three change order requests, there were two items that resulted in
credits to the District in the amount of $5,948.75. The first credit was for TDPUD staff
labor for assisting in the installation of the two light poles, and the second credit was for
labor and materials for items which were originally bid but deemed unnecessary during
construction. The total change order amount for the project totaled $12,212.30.
Although most of the items in the contract were lump-sum, the asphalt paving was on a
unit price basis. The estimated paving amount in the bid slightly exceeded the actual
amount, resulting in a reduction to the contract amount. There was also no rock work
required during the project, so the rock work portion of the contract amount was not
paid out. These two items resulted in an additional credit to the District of $19,156.80. A
summary of the change orders and credits can be found in the Table below:
Item Amount
Change Order 1: Rigid Conduit Grounding $1936.31
Clamps
Change Order 2: Thermal Resistivity $3,827.92
Testing for Slurry Mix
Change Order 3: Trench Slurry Mix Design $12,396.82
Change
Credit 1: Labor for Light Pole Installation ($2,000.00)
Credit 2: Labor and Materials for ($3,948.75)
Miscellaneous Grounding and Conduit
work
Credit 3: AC Paving Reduction ($2116.80)
Credit 4: Rock Work Not Required ($17,040.00)
Total ($6,944.50)
The final contract price, including the Change Orders and Credits, is $540,498.50. The
original bid price approved by the Board of Directors was $547,443.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
2. Provide a healthy and safe work environment for all District employees.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
6. Manage the District in an effective, efficient and fiscally responsible manner.
Page 2 of 3
Page 45 of 64
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
2. Environmental Stewardship: Create a sustainable resilient environment for all our
communities.
4. Modernize the utility and add value to our communities through collaboration and
innovation.
FISCAL IMPACT:
There is no direct fiscal impact associated with this item. The overall financial details of
the project are provided below.
The final contract price is $540,498.50, which is below the Board's authorized not to
exceed amount of$602,187. A summary of the final contract price can be found in the
Table below:
Item Amount
Original bid price $547,443.00
Approved change order requests$18,161.05
Credit from Contractor ($25,105.55)
Total $540,498.50
In June 2025, the Board approved the contract award, including any change orders, for
a total not to exceed $602,187. Therefore, the contract close-out total is $61,688.50
less than the approved amount.
The District's FY24 & FY25 Budget (and related 10-year CIP plan) allocated the
following amounts for the Martis Valley Substation project:
Budget - Martis Valley Substation Rebuild Project
2024 2025 2026 3-Yr Total
Capital $2,000,000 $2,500,000 $3,000,000 $7,500,000
Reserves
Facility Fees - $500,000 - $500,000
Total Budget $2,000,000 $3,000,000 $3,000,000 $8,000,000
Actuals through $217,117 $3,522,454 - $3,743,206
the end of 2025
Due to milestone invoicing delays for long-lead time equipment purchases, the
approved equipment expenditures for 2024 occurred in 2025. The approved FY26-27
Electric Capital Budget includes $3M allocated in FY26 for the next (and final) phase of
the project. Staff intends to present to the Board an item for consideration later this
spring for the 2026 scope of work for the project.
ATTACHMENTS:
1. Item 12 Attachment 1, Resolution 2026-01
Page 3 of 3
Page 46 of 64
PublicDistrict
Resolution No. 2026-01
AUTHORIZING THE ACCEPTANCE OF THE MARTIS VALLEY
SUBSTATION CIVIL CONSTRUCTION — 2025 PROJECT AND
DIRECTING FILING OF THE NOTICE OF COMPLETION
WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to
undertake the Martis Valley Substation Civil Construction— 2025 project; and
WHEREAS, Ruppert, Inc. was selected by the District to perform the work; and
WHEREAS, Ruppert, Inc. has completed all of the Work included in the Project; and
NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows:
1. That the District hereby accepts the Martis Valley Substation Civil Construction — 2025 project as
complete.
2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a
copy of which is attached hereto.
3. That 35 days following the filing of the Notice of Completion, the monies retained from the contractor
payments be released to the contractor if no claims have been made to the District by material suppliers or
laborers.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on
the 21 St day of January 2026, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Tony Laliotis, President of the Board
ATTEST:
Martina Rochefort, District Clerk
Page 47 of 64
RECORDING REQUESTED BY:
Truckee Donner Public Utility District
WHEN RECORDED, RETURN TO:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Martina Rochefort, District Clerk
11570 Donner Pass Road
Truckee, CA 96161-4947
THE UNDERSIGNED DECLARES
DOCUMENTARY TRANSFER TAX- NONE
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN:
1. That the name and address of the public entity for whom the improvement project was done, as
owner thereof, is the Truckee Donner Public Utility District, 11570 Donner Pass Road, Truckee, CA
96161.
2. Nature of interest or estate of owner: beneficial interest of a public utility of electric and water
facilities.
3. That on January 21, 2026 the hereinafter described improvements were accepted as complete
pursuant to Resolution 2026-01 of the Truckee Donner Public Utility District, the awarding authority.
4. That the subject improvements of the notice are generally described and identified as follows:
Martis Valley Substation Civil Construction —2025 project.
5. That the name and address of the contractor for such project was: Ruppert, Inc., 11168 W River St,
Truckee, CA 96161
1 certify under penalty of perjury under the laws of the State of
California that the foregoing is true and correct.
Dated: TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Brian Wright, General Manager
MAIL TAX STATEMENTS TO:
Legal References: CC-3093,CCP-2003 (oath), 2015.5 (unsworn statement)
Page 48 of 64
SAME AS ABOVE
Legal References: CC-3093,CCP-2003 (oath), 2015.5 (unsworn statement)
Page 49 of 64
AGENDA ITEM #13
Public Utility District m
MEETING DATE: January 21, 2026
TO: Board of Directors
FROM: Chad Reed, Water Utility Director
SUBJECT: Dispense with Competitive Bidding and Negotiate Directly with
Vendors for the FY26 Procurement of Bulk Sodium Hypochlorite
Z--
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
a. Make a finding to dispense with competitive bidding for the 2026 procurement of
sodium hypochlorite.
b. Authorize the General Manager to negotiate directly with qualified vendors for the
purchase and delivery of sodium hypochlorite for calendar year 2026, in an amount not
to exceed $60,000.
BACKGROUND:
The District utilizes sodium hypochlorite as a critical water disinfectant chemical to
ensure compliance with state and federal drinking water regulations and to maintain
safe, reliable drinking water service. Continuous and timely procurement of this
chemical is essential to daily water system operations and regulatory compliance.
Historically, sodium hypochlorite has been procured through the District's annual
procurement process. It was originally anticipated that the 2026 sodium hypochlorite
purchase would be included in the annual procurement cycle; however, no bids were
received under that solicitation. To ensure uninterrupted water treatment operations
and continued regulatory compliance, the Water Department re-issued the solicitation
as a standalone bid. Despite this second advertising effort, on January 8th no
responsive bids were received.
Bid documents were prepared and publicly advertised in accordance with District
procurement requirements on two separate occasions, including specifications for unit
pricing, delivery of 12.5% sodium hypochlorite in both 55-gallon drums and bulk
deliveries, and compliance with all safety, regulatory, and insurance requirements. Both
Page 1 of 2
Page 50 of 64
requests for bids were advertised in the Sierra Sun, and neither solicitation resulted in
any responsive bids.
ANALYSIS AND BODY:
One option available to the District would be to re-advertise the bid for a third time.
However, based on the lack of response from two separate and properly advertised
solicitations, staff believes it is unlikely that further re-advertisement would result in a
different outcome. Similar to other routine and operationally critical procurement, the
pool of qualified vendors capable of meeting the District's technical, regulatory, and
delivery requirements is limited and the District's realativily small size may impact bid
responses.
Sodium hypochlorite procurement is routine and recurring in nature, and any delay in
securing a reliable supply poses operational and regulatory risks to the District's water
system. Dispensing with competitive bidding will allow staff to work directly with
qualified vendors to secure pricing and delivery terms that meet operational needs
while maintaining fiscal responsibility.
Staff therefore recommends that the Board make a finding to dispense with competitive
bidding for the 2026 procurement of sodium hypochlorite and authorize the General
Manager to negotiate directly with qualified vendors.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
5. Manage the District in an environmentally sound manner.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
FISCAL IMPACT:
The 2026 sodium hypochlorite purchase is included in the FY 2026-27 Water
Department Operating Budget in the amount of$60,000 (GL 2.7.681 .843). The contract
is structured as a unit-price agreement, and expenditures will occur only as material is
ordered and delivered.
ATTACHMENTS:
None
Page 2 of 2
Page 51 of 64
AGENDA ITEM #14
Public Utility District m
MEETING DATE: January 21, 2026
TO: Board of Directors
FROM: Brian Wright, General Manager
SUBJECT: Resolution 2026-02 Commending Dan Wilkins
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Adopt Resolution 2026-02 in recognition of Dan Wilkins for his many years of service,
leadership and collaboration as the Town of Truckee's Public Works Director
BACKGROUND:
Dan Wilkins has announced his retirement at the end of 2025 following a 27 year career
with the Town of Truckee Public Works. Dan is leaving behind a remarkable legacy of
dedication, innovation, and infrastructure that has defined Truckee's evolution. First
hired in 1998 as an Associate Engineer, he quickly rose through the ranks to become
the Public Works Director and Town Engineer by 2001. In that role, Dan led
transformational projects that have become hallmarks of Truckee's landscape and
identity. Through his work as Public Works Director, Dan embraced the philosophy of
strong partnerships and collaboration with all the community stakeholders, including the
Truckee Donner Public Utility District and the many public agencies within the Truckee
community.
The legacy of Dan's leadership, collaboration and partnership are found in the Town of
Truckee improvement projects, including the Envision Donner Pass Rd corridor project,
Brickelltown Streetscape Improvement Project, the West River Streetscape
Improvement Project, the Downtown Railroad Loop Project, the Reimagine Bridge
Street Project, in addition to the many roadway, drainage and street scape projects, just
to name a few. In each of these projects, Dan's leadership set the tone for diligent
strategic planning and collaboration with the District and the many other stakeholders to
ensure utility infrastructure improvements and development strategies were
incorporated into these often challenging public works projects.
Most recently, Dan and his team worked closely with District engineers to ensure the
West River Streetscape Project accounted for and addressed the design, operation and
maintenance needs of local utility infrastructure. Timely completion of this project
required communication across multiple stakeholders and public agencies, including
utilities, telecommunications, public works, railroad and local property owners and
Page 1 of 3
Page 52 of 64
businesses. Most notably, Dan's efforts always maintained the goal of identifying
win/wins and pathways to success through communication and partnership across
multiple agencies.
Dan's leadership and service to the community wasn't limited to his employment with
the Town of Truckee. Dan is also a local Rotarian, a member of the Board of Directors
for Tahoe City Public Utility District and the Tahoe-Truckee Sanitation Agency, where
he has played an integral role in the development and support of critical infrastructure
planning strategies that impact the residents and businesses of the Truckee Tahoe
Basin.
ANALYSIS AND BODY:
Dan Wilkins' tenure as the Town of Truckee's Director of Public Works has come to a
conclusion with the announcement of his retirement as he and his family embrace the
next phase of life. The legacy Dan leaves behind is one of commitment to excellence
and the continuous improvement in the quality of life afforded by the Truckee
community. Upon his retirement, Dan's passion for strategic planning and infrastructure
improvement, always through the lens of sustainability, safety and value to the
community he serves, will be carried forward by the highly skilled and motivated team
he leaves behind. With his retirement, Truckee Donner Public Uitlity District wishes to
recognize the tremendous partnership and community service accomplished through
his leadership and collaboration with the adoption of Resolution No. 2026-02
commending his service to the community of Truckee. The District wishes Dan and his
family a healthy and enjoyable retirement.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
2. Provide a healthy and safe work environment for all District employees.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
5. Manage the District in an environmentally sound manner.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
2. Environmental Stewardship: Create a sustainable resilient environment for all our
communities.
3. Engage with our customers and communities in a welcoming and transparent way to
identify opportunities.
4. Modernize the utility and add value to our communities through collaboration and
innovation.
5. Developing an inclusive culture drives organizational integration and success.
FISCAL IMPACT:
Page 2 of 3
Page 53 of 64
There is no fiscal impact associated with this item.
ATTACHMENTS:
1. Resolution No 2026-02
Page 3 of 3
Page 54 of 64
TRUCKEE DONNER
Public Utility Districtr
Resolution No. 2026-02
Commending Dan Wilkins for His Years of Service
WHEREAS, Dan Wilkins has been employed with the Town of Truckee Public Works
Department since 1988; and
WHEREAS, during his tenure of employment with the Town of Truckee he has served as
Public Works Director since 2001; and
WHEREAS, over the course of the 27 years with the Town of Truckee, Dan's leadership,
innovation, collaboration and work ethic have led to the successful completion of many critical
infrastructure improvement projects throughout the Truckee Community: and
WHEREAS, Dan has been an extremely valuable partner in his collaboration and support
with the Truckee Donner Public Utility District
WHEREAS, Dan has earned the respect and admiration of his team, peers and the
community he serves for his commitment to enhancing the quality of life in Truckee; and
WHEREAS, Dan has announced his intent to retire from his position as Public Works Director
for the Town of Truckee at the end of 2025.
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner
Public Utility District as follows:
• Dan Wilkins be commended for his exemplary contributions and exceptional service
to the Town of Truckee; and
• Thank Dan for his valuable partnership and collaboration with the District.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility
District at a meeting held within said District on January 21, 2026 by the following vote:
AYES:
NOES:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Tony Laliotis, President of the Board
Page 1 of 2
Page 55 of 64
ATTEST:
Martina Rochefort, District Clerk
Page 2 of 2
Page 56 of 64
AGENDA ITEM #15
Public Utility District m
MEETING DATE: January 21, 2026
TO: Board of Directors
FROM: Mike Swanson, Director of Electric Engineering & Operations
SUBJECT: Consideration of Approval for a Electric Utility Construction Services
Contract
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Authorize the General Manager to execute a contract with VIP Powerline Corp for
Electric Utility Construction Services to provide dock crew and storm response services,
in an amount not to exceed $1,000,000, plus a contingency allowance of 10 percent
($100,000), inclusive of applicable taxes and fees, for a total contract amount not to
exceed $1,100,000.
BACKGROUND:
The District intends to use electric utility construction contractors to support
construction, maintenance, and emergency response activities related to the District's
12.47kV and 14.4kV electric distribution systems, often referred to as a "Dock Crew".
The District has also utilized contractors, as well as mutual aid support during storm
conditions, to ensure timely system restoration and maintain reliability during major
weather events. These contracted services are an important component of maintaining
system reliability, public and employee safety, and supporting restoration efforts during
adverse weather.
To ensure operational demands are met, and capital project schedules remain on track,
contract crews are used only as needed to supplement the internal workforce.
The Dock Crew serves as a flexible contingency resource that:
• Provides additional labor capacity during high workload periods;
• Assists with New Business construction;
• Supports system hardening and reliability efforts;
• Provides coverage during vacations or unexpected absences; and
• Works in parallel with District crews to maintain project progress.
The Dock Crew is a key component of the District's contingency plan, ensuring that the
electric capital plan can be executed even during periods of increased workload or
Page 1 of 3
Page 57 of 64
staffing limitations. During major outages or severe weather, contractor personnel may
also be used as a Storm Response Crew, enabling rapid restoration of electric service.
On October 28, 2025, the District publicly opened bids for Electric Utility Construction
Services — 2026. The Request for Bids (RFB) was issued in accordance with District
policy and the California Public Contract Code, and required bidders to meet minimum
qualification standards, including appropriate contractor licensing, safety compliance,
insurance, and bonding capacity. The contract was bid as a Time and Equipment
Contract, with bidders providing hourly labor rates, daily equipment rates,
mobilization/demobilization charges (if any), and an optional rate escalation percentage
for the contract's renewal years.
ANALYSIS AND BODY:
The District received four (4) bids by the submission deadline. To determine the lowest
responsive and responsible bidder, staff calculated a standardized total evaluated cost
for each proposer. The evaluation was based on the aggregate of the following bid
components, applied consistently across all bids:
1) hourly labor rates for Crew Foreman, Lineman, Apprentice Lineman, and
Groundman classifications;
2) daily rates for electric construction-related equipment;
3) mobilization and demobilization charges; and
4) the rate escalation percentage proposed by each bidder for optional renewal years.
This standardized evaluation methodology allowed staff to equitably compare total
anticipated costs and identify the lowest overall bid.
Company Cost (Base plus Option
Years)
VIP Powerline Corp $13,260.00
Diversified Utility Services $25,727.56
Wilson Construction $120,887.03
Mountain G. Enterprises $165,701 .54
Based on the evaluation methodology above, VIP Powerline Corp was determined to
be the lowest responsive bidder. Although VIP Powerline Corp submitted higher hourly
labor rates than several competitors, their overall pricing was significantly more
competitive because:
• Substantially lower equipment rates
• No mobilization or demobilization charges
• No percentage increase for the option years, resulting in stable pricing
The contract provides Time and Equipment pricing for as-needed Dock Crew and
Storm Response services, ensuring the District can supplement internal resources only
when necessary to complete planned work, support reliability improvements, and
execute the capital plan.
Page 2 of 3
Page 58 of 64
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
2. Provide a healthy and safe work environment for all District employees.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
4. Modernize the utility and add value to our communities through collaboration and
innovation.
FISCAL IMPACT:
The total authorization for Electric Utility Construction Services (Dock Crew and Storm
Response) with VIP Powerline Corp is $1,100,000, which includes a 10% contingency.
Funding for this work is included in the approved FY 2026 Electric Utility's operating
expense and capital expenditure budgets, as applicable. The vast majority of the $1.1
million is anticipated to be charged to capital projects, with Electric's capital expenditure
budget for FY26 of $13,760,000, excluding land & building related items, approximately
double the annual average.
ATTACHMENTS:
None
Page 3 of 3
Page 59 of 64
AGENDA ITEM #16
Public Utility District m
MEETING DATE: January 21, 2026
TO: Board of Directors
FROM: Alex Spychalsky, Communications Program Manager
Steven Poncelet, Public Information Officer/Strategic Affairs Director
SUBJECT: Consideration of a Contract with Generikal Design for Photographer-
Videographer Services
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Authorize the General Manager to execute a contract with Generikal Design for 2026
Photographer-Videographer Services in an amount not to exceed $30,000, plus a ten
percent change order authorization of $3,000, for a total contract amount not to exceed
$33,000.
BACKGROUND:
The District uses photos and/or videos to promote the mission, values, employees, and
programs that serve our community. The need for the District to produce and
disseminate compelling digital content has become increasingly important as social
media and digital channels have exploded over the last decade.
The District issued a Request for Proposals (RFP) seeking a professional photo and
video consultant to work with the District's General Manager Department to produce
professional-grade photos and videos to support District programs, communications,
and other efforts. Included in the scope of work was on-call photo/video and production
services to be billed on an hourly basis with rates to be provided for taking photos
and/or videos, plus post-production services.
The services required include but are not limited to the following tasks:
• Professional-grade photo and video execution and post-production;
• On-call availability with established lead-time notice from the District;
• Ability to shoot photos and video of utility work in active work zones in cross-
country terrain;
• Event coverage; and
• Post-production services; and electronic delivery of final photos and/or videos in
a format acceptable to the District.
Page 1 of 3
Page 60 of 64
Additional services requested but not required included:
• Social media video content creation, at the direction of District Staff and/or a
consultant;
• Filming sit-down and in-the-field interviews with District Board, Staff and others;
and
• Editing video packages to support major educational/marketing campaigns.
The District issued the RFP on November 20, 2025, advertised in the Sierra Sun as
required, and proposals were due on December 18, 2025. The annual budgeted cost
for a Photography-Videography Services Consultant for 2026 is not to exceed $30,000.
ANALYSIS AND BODY:
The District received seven responses to the RFP. In the past, this contract has
primarily been focused on professional photography needs with some requests for
video as well. This year, the scope of the contract was expanded to focus more heavily
on videography as well as video production, as these are growing needs the District
has identified. Of the seven companies that responded to the RFP, three companies
were based in Southern California, two were based in Reno/Sparks, one was based in
Incline Village and one was based in Truckee.
A cross-departmental scoring committee was created which reviewed all the RFPs. The
scoring committee selected Generikal Design as having provided the proposal most
advantageous to the District. While many of the proposals provided high-quality
photography, videography and production/editing samples, they were also evaluated on
the quality and relevance of their proposal, their experience working with local Truckee-
Tahoe businesses and agencies, their cost proposal, and their references. Weighing all
of these factors, Truckee-based Generikal Design's proposal was found to be most
advantageous to the District.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
3. Engage with our customers and communities in a welcoming and transparent way to
identify opportunities.
4. Modernize the utility and add value to our communities through collaboration and
Page 2 of 3
Page 61 of 64
innovation.
5. Developing an inclusive culture drives organizational integration and success.
FISCAL IMPACT:
The contract with Generikal Design for 2026 Photographer-Videographer Services is for
an amount not to exceed $30,000, plus a ten percent change order authorization of
$3,000, for a total contract amount not to exceed $33,000. The $33,000 total is included
in the approved District FY26 budget under GL Codes 1/2.2.930.10.753 (Professional
Services Marketing) and 1/2.2.930.10.655 (Digital Marketing).
ATTACHMENTS:
None
Page 3 of 3
Page 62 of 64
AGENDA ITEM #17
Public Utility District m
MEETING DATE: January 21, 2026
TO: Board of Directors
FROM: Mike Swanson, Director of Electric Engineering & Operations
SUBJECT: Consideration of Monthly Reliability Metrics Reporting
APPROVED BY.
Brian C. Wright, General Manager
RECOMMENDATION:
Receive an informational Workshop presentation on electric system reliability metrics—
System Average Interruption Frequency Index (SAIFI), System Average Interruption
Duration Index (SAIDI), and Customer Average Interruption Duration Index (CAIDI) and
provide feedback and direction to staff.
BACKGROUND:
Electric utilities nationwide rely on standardized reliability indicators established by the
Institute of Electrical and Electronics Engineers (IEEE). These metrics include SAIFI,
SAIDI, and CAIDI to measure outage frequency, systemwide outage duration, and
restoration performance, respectively.
• System Average Interruption Frequency Index (SAIFI)
• System Average Interruption Duration Index (SAIDI)
• Customer Average Interruption Duration Index (CAIDI)
All three metrics include planned outages, consistent with IEEE reporting requirements,
enabling uniform benchmarking across utilities.
ANALYSIS AND BODY:
Electric reliability for the District is measured using three standardized IEEE metrics:
• SAIFI — Measures how often customers experience outages
• SAIDI — Measures the average outage duration across all customers,
regardless of whether they lost power
• CAIDI — Measures how long affected customers were out of power
Page 1 of 2
Page 63 of 64
To improve transparency and align with industry best practices, staff prepared a
Workshop presentation introducing these metrics and outlining the District's approach
to ongoing tracking and reporting. These metrics represent the predominant
performance indicators used across public power, cooperatives, and investor-owned
utilities and include planned outages to maintain consistency with national reliability
benchmarks.
Using these indicators allows the District to:
• Monitor overall electric system performance;
• Track trends over time related to operational and capital improvement efforts;
• Communicate reliability clearly to the Board and the public; and
• Compare performance to regional peers.
To increase transparency and support ongoing oversight, SAIFI, SAIDI, and CAIDI are
planned to be incorporated into the monthly Engineering & Operations Department
Update beginning next month.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
2. Provide a healthy and safe work environment for all District employees.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
5
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
3. Engage with our customers and communities in a welcoming and transparent way to
identify opportunities.
5. Developing an inclusive culture drives organizational integration and success.
FISCAL IMPACT:
There is no direct fiscal impact associated with this Workshop presentation or the
initiation of monthly reliability reporting.
ATTACHMENTS:
None
Page 2 of 2
Page 64 of 64