Loading...
HomeMy WebLinkAboutAgenda Packet 2026-01-21 Board of Directors General Manager Jeff Bender • Brian C. Wright Christa Finn Executive Leadership Tony Laliotis Chad J. Reed Courtney Murrell Mike Swanson Steve Randall REGULAR BOARD MEETING Michael Salmon 11570 DONNER PASS ROAD, TRUCKEE Steven Poncelet 6:00 PM, Wednesday, January 21, 2026 Scott Crow AGENDA Jillian Steward Martina Rochefort 1. Call to Order 2. Roll Call 3. Pledge of Allegiance 4. Changes to the agenda 5. Public Comment— This is time set aside for the public to address the Board on any matter not on the agenda. Testimony related to any agendized matter should be addressed at the time that that item is considered. (The public may comment on any subject that is not on the agenda. Each speaker will be limited to three minutes, but speaker time may be reduced at the discretion of the Board President if there are a large number of speakers on any given subject.) DIRECTOR UPDATE 6. This item provides time for Directors to comment on any item within the purview of the District. DEPARTMENT UPDATES 7. Department Updates CONSENT CALENDAR These items are generally interpreted as routine in nature or the subject matter has been previously presented to the Board for discussion. They are intended to be acted upon by the Board without additional discussion. Any Board Member may request an item to be removed from the Consent Calendar for discussion prior to voting on the Consent Calendar. 8. Consideration of Approving the Safety Incentive Award for FY25 a %LIP A SPECIAL RISIRIUN i..... LEADERSHIP FORNDRIION Wn R, nmdn u.,- ... ..... .... 11570 Donner Pass Road,Truckee,CA 96161 Phone-530-587-3896-www.tdpud.org Page 1 of 63 Approve the FY26 Safety Incentive Award in the amount of$300 to each District employee with no lost-time accident(s) in FY25. 9. Consideration of Snowplow Upgrades on Two Water Department Service Trucks Authorize the General Manager to execute a contract with Jordan's Truck and Trailer Equipment Sales and Service for the procurement and installation of two Western Products MVP Plus snow plows for a cost of $24,308, plus a 10% contingency of $2,431, for a total authorization not to exceed $26,739. 10. Approval of Board Meeting Minutes Consider approval of December 3, 2025 Board Meeting Minutes 11. Consider Approval of the Treasurer's Report, January 2026 Approve the Treasurer's Report for January 2026 which includes: a. Fund Balances for the Month of October 2025 b. Disbursements for the Month of November 2025 12. Consideration of Closeout of the Martis Valley Substation Civil Construction - 2025 Contract Adopt Resolution 2026-01 accepting the Martis Valley Substation Civil Construction - 2025 project as complete and authorize the filing of the Notice of Completion. 13. Dispense with Competitive Bidding and Negotiate Directly with Vendors for the FY26 Procurement of Bulk Sodium Hypochlorite a. Make a finding to dispense with competitive bidding for the 2026 procurement of sodium hypochlorite. b. Authorize the General Manager to negotiate directly with qualified vendors for the purchase and delivery of sodium hypochlorite for calendar year 2026, in an amount not to exceed $60,000. ACTION ITEMS 14. Resolution 2026-02 Commending Dan Wilkins Adopt Resolution 2026-02 in recognition of Dan Wilkins for his many years of service, leadership and collaboration as the Town of Truckee's Public Works Director Page 2 of 63 15. Consideration of Approval for a Electric Utility Construction Services Contract Authorize the General Manager to execute a contract with VIP Powerline Corp for Electric Utility Construction Services to provide dock crew and storm response services, in an amount not to exceed $1,000,000, plus a contingency allowance of 10 percent ($100,000), inclusive of applicable taxes and fees, for a total contract amount not to exceed $1,100,000. 16. Consideration of a Contract with Generikal Design for Photographer-Videographer Services Authorize the General Manager to execute a contract with Generikal Design for 2026 Photographer-Videographer Services in an amount not to exceed $30,000, plus a ten percent change order authorization of $3,000, for a total contract amount not to exceed $33,000. WORKSHOP 17. Consideration of Monthly Reliability Metrics Reporting Receive an informational Workshop presentation on electric system reliability metrics—System Average Interruption Frequency Index (SAIFI), System Average Interruption Duration Index (SAIDI), and Customer Average Interruption Duration Index (CAIDI) and provide feedback and direction to staff. ADJOURNMENT The agenda is available for review at the TDPUD Administrative Office and the District's internet website. Posted on Friday, January 16, 2026. Martina Rochefort, District Clerk A copy of the agenda packet is available for public review, during normal business hours, at the District Administrative Office located at 11570 Donner Pass Road. Public participation is encouraged. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the Districts public meetings. If particular accommodations for the disabled are needed (i.e. disability-related aids, or other services), please contact the District Clerk at (530) 582-3923 or martinar@tdpud.org, at least 24 hours in advance of the meeting. Any person with a disability may submit a request for reasonable modification or accommodation to the above-described means for accessing and offering comment at the meeting to Martina Rochefort, District Clerk, or email at martinar@tdpud.org, who will swiftly resolve such a request. Page 3 of 63 AGENDA ITEM #7 Public Utility District m MEETING DATE: January 21, 2026 TO: Board of Directors FROM: SUBJECT: Department Updates APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: BACKGROUND: Department updates are attached to the staff report. ANALYSIS AND BODY: GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. 5. Developing an inclusive culture drives organizational integration and success. Page 1 of 2 Page 4 of 63 FISCAL IMPACT: There is no fiscal impact associated with this item. ATTACHMENTS: 1. Water Department Update - January 2026 2. Electric Department Update - January 2026 3. CFO Department Update - January 2026 4. PIO and Strategic Affairs Department Update - January 2026 5. Human Resources & Risk Management Department Update - January 2026 Page 2 of 2 Page 5 of 63 Public MEETING DATE: January21, 2026 FROM: Chad J. Reed, Water Utility Director SUBJECT: Water Department Update Water Supply Figure 1 illustrates water production for the month of November and reflects continued seasonal reductions. Water production during November 2025 continued to trend downward as expected with cooler temperatures. Compared to November 2024, total pumping decreased by 4%, reflecting both seasonal conditions and ongoing customer conservation efforts.When compared to the average of the past three Novembers, production was 11% lower, demonstrating a consistent pattern of declining late-season demand. Year-to-date (January—November)totals remain relatively stable. Overall pumping for 2025 is 4% lower than the same period in 2024, indicating systemwide efficiency and a continued transition into winter operations Ovate.P-d.ai.r(GJ j o,. f m r ,a ,. Aia„ iwr we,i swemee, a.�. rrmamee, ... •]025 ProEu¢ion •2QiG Protluction n3Year Average Page 1 of 3 Page 6 of 63 System Updates As the District moves further into the winter season, a primary operational focus for the Water Department is snow removal at Water Department facilities and, when needed, support at Electric Department assets. Currently, four of the District's ten potable wells are in service, with the remaining wells offline for the winter season. Two major well projects previously reported to the Board include Well 20 and the Hirschdale Well rehabilitation. Well 20 is complete and fully operational. Rehabilitation work at the Hirschdale Well is substantially complete; however, due to the nature of the improvements, additional flushing is ongoing to ensure that only optimal water quality is delivered to customers. Field crews continue to respond promptly to system leaks to minimize water loss and maintain reliability. Most recently, the Distribution Crew responded to and repaired a mainline leak along North Woods Drive. ;k4 z k i. b Y :j id A l a{'. k Figure 1 Photos of recent leak response 11235 North Woods Drive in the Tahoe Donner Community. Crews continue to repair leaks quickly to reduce water losses and maintain service reliability. 2026 Construction Season Preparation The Water Department is actively preparing for the 2026 construction season and is advancing several capital projects for Board consideration, bidding, and award. Page 2of3 Page 7 of 63 Hirschdale Pipeline Construction Project The project was awarded at the November Board Meeting and is scheduled to proceed in May 2026. Martis Woods Pump Station Project Staff has brought an item to the January 21 regular Board meeting recommending approval to update the engineering design for the Martis Woods Pump Station. This work is necessary to prepare the project for the 2026 construction schedule and to ensure long- term system reliability. Pipeline Rehabilitation Project Staff plans to bring this item to the February Board meeting. The project involves slip-lining several pipeline segments within the District where traditional excavation methods are not feasible. Two of the proposed segments include creek crossings and a crossing beneath Highway 89. 2026 Pipeline Replacement Project This project will also be presented to the Board in February. The scope includes replacement of the remaining pipeline segments serving the Ski Bowl Condominiums. Portions of this system were previously replaced concurrently with the Ski Lodge facility improvements, and this project completes the remaining work. Page 3 of 3 Page 8 of 63 TRUCKEE DONNER Public Utility District MEETING DATE: January 21, 2026 FROM: Mike Swanson, Director of Electric Operations & Engineering SUBJECT: Electric Department Update Electric Engineering & Operations The District experienced a significant winter storm event on Christmas Eve and Christmas Day, resulting in multiple outages across the electric system ranging from brief service interruptions to longer duration outages requiring line crew response. The bulk of the outages occurred in the Tahoe Donner and Donner Lake areas, where heavy snow loading and winter conditions impacted overhead lines. Two crews were staffed and actively responding throughout the event. Most customers who experienced outages were restored within a few hours of the initial outage start time, with intermittent outages continuing through December 28 as storm conditions persisted. Between December 24 and December 28, the District experienced approximately 40 sustained multiple-customer outages and 60 single-customer outages. Of the sustained outages: • Transmission lines experienced five sustained outages, impacting approximately 12,000 customers. • Distribution lines experienced 35 sustained multiple-customer outages, impacting approximately 8,000 customers. • The longest outage durations occurred in the Wolfgang/Pinnacle Loop area of Tahoe Donner, with an outage lasting 18 hours and 37 minutes, and in the Ski Slope area, where outages lasted approximately 13 hours. Engineering Engineering staff continue to work with the District's consultant on development of the Electric Master Plan, which will guide long-term system planning, capital investment priorities, system hardening efforts, and overall reliability improvements across the electric system. Engineering is also advancing work on the Martis Valley Substation project contract, with the current schedule targeting issuance of the construction package for bid in March 2026. Operations Operations staff remain focused on winter storm preparedness and response, including Page 1 of 2 Page 9 of 63 vehicle readiness, material staging, and development of storm-specific work plans to support safe and efficient restoration efforts. Looking ahead, crews are developing plans to reframe existing poles in targeted locations to mitigate snow-related outages, particularly in the Donner Lake and Tahoe Donner areas. Operations are also preparing for installation of the District's Gridware "Gridscope" line- monitoring devices, which will improve system visibility and support faster outage identification and response. Vegetation Management The Vegetation Management team has received LiDAR data from the District's consultant. This information will be used to refine vegetation risk assessments and will directly inform development of the 2026 vegetation work plan, as well as longer-term vegetation management strategies in future years. Page 2 of 2 Page 10 of 63 TRUCKEE DONNER Public Utility District MEETING DATE: January 21, 2026 FROM: Michael Salmon, CFO SUBJECT: CFO Department Update Customer Service - Electric Time of Use Residential, account enrollment as of Dec.2025 (Dec.2024): o Primary 38 (32) +0 from November o Secondary 22 (17) +0 from November - 907 YTD December kWh billed per account per month average o Down 2.8% to last year o Down 4.4% to three-year average - 7,595 YTD December gallons billed per account per month average o Down 1.1% to last year o Up 3.5% to three-year average - $2.02 Million YTD December 2025 Power Cost Adjustment (PCA) credits billed - $0.2402 YTD December 2025 per kWh retail, post-PCA o Up 8.7% to prior year - YTD December Billing Information: Page 1 of 4 Page 11 of 63 2025 Account Billing Totals $in thousands Electric Water Jan $ 3,720 $ 1,592 Feb 4,365 1,618 Mar 3,494 1,585 Apr 3,111 1,580 May 3,283 1,619 Jun 2,770 1,747 Jul 2,824 1,876 Aug 3,330 1,980 Sep 2,831 1,842 Oct 2,632 1,749 Nov 3,196 1,650 Dec 2,990 1,571 YTD $ 38,547 $ 20,410 Accounts 14,881 13,768 change topy 0.3% 0.4% - Customer Service Satisfaction Scores, December 2025 Overall, how satisfied were you with the experience w... ❑ 4 Answered:25 Wpped:0 100% 90% 80% 70% GO% 50% 40% 30% 20% ■10% 0% Extremely Very Somewhat Not so Not at all satisfied satisfied satisfied satisfied satisfied How much time did it take us to address your questio... EL Q Arswered:25 Skipped:0 10CIA 90% 30% 7CIA Go% 50% 40% 30% 20% 10% Much Shorter Aboutwhat Larger Much shorter than lexpected than longer than than expected expected expected expected Page 2 of 4 Page 12 of 63 Please categorized the reason(s)for your service call LJ Answered:IS Skipped:7 100% 80% 60% 40% 20% ■ 0% Billing Payment New Power Water leak New question question Service or outage Commercial Stop Service Service... • Customer Payment Kiosk o The new customer payment kiosk went live in early November. Activity primarily during regular business hours by those chosing self-serve. The District recently added an account number bar code to statements to aid in kiosk utilizaiton and in coming months will be promoting kiosk as a payment option. Activity for the two months of November and December: Kosk Totals-Nov/Dec 2025 Type Count Total AvgTran Max Tran Cash 14 $ 3,751 $ 268 $ 1,425 Qed i t 15 $ 1,176 $ 78 $ 250 o Total 29 $ 4,927 $ 170 $ 1,425 Finance and Acccounting • UAMPS provided power sources combined cost per MWh continues to be favorable Year to Date (YTD) November Page 3 of 4 Page 13 of 63 $100 • $74.41 • $72.86 $75 � 5fi9.38 - $50 YTD 51MWH Change $0 YTD Nov 242 2 YTD Nov 2023 YTD Nov 2424 YTD Nov 2025 • f M1H • UAMPS YTD November MW hours purchased of 156,650 are 0.2% greater than last year and 0.5% less than the 3 year average ('22-24). • Closed and reported on November financials, Treasurer's Report completed. • Year-End December close and January board meeting preparations • Year rolling of reporting systems and new budget system updates • Annual 2025 tax (W-2, 1099) and other annual reporting preparations General Services • District Fleet - 21,717 miles in December 2025 and 300,115 miles for 2025 • SMOG and weekly BIT inspections completed • Fire alarms, sprinklers, and exit lights testing/inspections • Building security enhancements evaluation and planning • Water VacCon truck back in service as of 1/12/2025! • Snowquip blower transported to Sacramento for repair Page 4 of 4 Page 14 of 63 TRUCKEE DONNER Public Utility District MEETING DATE: January 21, 2026 FROM: Steven Poncelet, Public Information & Strategic Affairs Director SUBJECT: PIO and Strategic Affairs Department Update Communications and Outreach The District ended 2025 with a significant amount of "winter preparedness and safety" communications, along with timely outage communications during the peaks of our winter storms. In addition, staff spent significant time compiling recaps of the District's 2025 accomplishments, which were shared across all communications channels, including the website, social media, radio interview, digital advertising, lobby screens and a press release that was picked up by local media. Timed with the spirit of the holidays, staff also created advertising and a social media post to share the District's gratitude for the community that we serve and the Board and staff that make the District excel. At the February 4t" Board Meeting, there will be a workshop covering the District's communications during 2025. Strategic Affairs Staff continue to work with our joint-action groups in Sacramento (California Municipal Utilities Association (CMUA), Northern California Power Agency (NCPA), Association of California WaterAgencies (ACWA), and California Special Districts Association (CSDA))on tracking the implementation of new and existing laws along with preparing for the 2026 legislative session. The 2026 legislative session began on January 5, 2026, with the last day to introduce new bills being February 20, 2026, and the last day to approve bills being August 31 , 2026. The Governor also submitted the next fiscal year budget on January 10, 2026 which is also being reviewed and analyzed for the impacts on public power and water. Two key upcoming events that support the above efforts are NCPA's Strategic Issues Conference January 20-22nd and CMUA/NCPA's Capitol Day on January 261". Both meetings provide the opportunity to hear from industry and political leaders on key trends, along with continuing to build strong and productive relationships with legislators, regulators, political leaders, and industry colleagues. During Capitol Day, District staff and our joint-action groups will be meeting with the District's elected State representatives (Senator Marie Alvarado-Gill and Assemblymember Heather Hadwick) along with key regulatory agencies including the California Air Resources Board (GARB), California Energy Commission (CEC), Wildfire Safety Advisory Board (WSAB), State Water Resources Control Board (SWRCB), and Department of Water Resources (DWR). Page 1 of 1 Page 15 of 63 TRUCKEE DONNER Public Utility District MEETING DATE: January 21, 2026 FROM: Jillian Steward, HR & Risk Director SUBJECT: Human Resources and Risk Department Update Staffing • Vehicle Maintenance Foreman - Accepting applications internally from 1/12/26 to 1/14/26, skills testing to be scheduled before the end of January Culture • 1/21 — Meditation & Mocktails Safety and Risk • Overall workplace incidents reduced by 20% from FY24 Page 1 of 1 Page 16 of 63 AGENDA ITEM #8 Public Utility District m MEETING DATE: January 21, 2026 TO: Board of Directors FROM: Jillian Steward, Director of Human Resources & Risk Management SUBJECT: Consideration of Approving the Safety Incentive Award for FY25 APPROVED BY. Brian C. Wright, General Manager RECOMMENDATION: Approve the FY26 Safety Incentive Award in the amount of $300 to each District employee with no lost-time accident(s) in FY25. BACKGROUND: To promote the District's Core Value of Safety and organizational culture, the Board has historically awarded a safety incentive to employees. From 2014-2017, the District awarded those employees who did not have a lost-time accident an incentive of$250 each year. Since 2020, the District has awarded those employees who did not have a lost-time accident in the previous FY an incentive of $300. The District's commitment to safety as our number one Core Value is highly dependent on our employees living the safety culture and diligent application of safe practices. Regular trainings facilitated by staff and industry experts, safety tailgate meetings, equipment inspection and testing, the establishment of a Safety Committee and regular peer review of "near misses" and incident reports are all part of the program to keep safe work practices a priority during the work day. ANALYSIS AND BODY: The District's goal and incentive program of no lost-time injuries has been effective for many years. in 2023 and 2024 the District achieved the goal of zero lost-time injuries. In 2025 the District experienced one lost-time injury. However, with the challenging work environments inherent to the utility industry and the more than 146,000 work hours recorded (average of 76 employees, working an average of 1920 hours FY25), having only 1 lost-time injury is still a commendable record for 2025. Acknowledging safe behavior and practices is an effective way to promote and maintain our successful safety culture. Staff is proposing to continue with the goal of no lost-time injuries or accidents, and award employees who did reach this goal. With the help of the District's Safety Page 1 of 2 Page 17 of 63 Committee, the District proposes that each employee reaching this goal receives a $300 incentive for FY25. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: The cost of the FY25 Safety Incentive Award will not exceed $21,500. 72 employees were eligible for the entire $300 safety incentive, 3 employees were eligible for a prorated safety incentives based on their 2025 hire date, and 1 employee was ineligible due to a lost-time injury. This is a budgeted expense in the FY26 Board approved budget for each department under GL Code: 925.00.333 ATTACHMENTS: None Page 2 of 2 Page 18 of 63 AGENDA ITEM #9 Public Utility District m MEETING DATE: January 21, 2026 TO: Board of Directors FROM: Brian Yohn, General Services Manager Michael Salmon, Chief Financial Officer SUBJECT: Consideration of Snowplow Upgrades on Two Water Department Service Trucks APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Authorize the General Manager to execute a contract with Jordan's Truck and Trailer Equipment Sales and Service for the procurement and installation of two Western Products MVP Plus snow plows for a cost of $24,308, plus a 10% contingency of $2,431, for a total authorization not to exceed $26,739. BACKGROUND: The Water Department has a need to upgrade two 2025 Chevrolet Silverado 2500HD service trucks with a Western Plow MVP Plus with Ultramount 2 to improve snow removal operations during winter. The snowplow upgrades would benefit the District as follows: - Reduce wear and tear on the District's large equipment during and after snowstorms due to not "roading" heavy equipment from one side of town to the other. - Improve operating efficiency: Water staff visit pump stations and well sites daily and, with trucks equipped with plow blades, can perform snow removal at lower elevation locations with lower snow volumes. This reduces the need to send water distribution operators to do snow removal at sites like Glenshire system, Sierra Meadows system, Prosser system, and the Hirschdale System. This can help provide the larger snow removal equipment the opportunity to prioritize the Tahoe Donner and Donner Lake system locations, where snow volumes are typically higher. This strategy will increase efficiency for snow removal operations for the District while reducing unnecessary wear and tear on the larger heavy equipment. - The upgrades may also qualify the two 2025 Chevrolet Silverado 2500HD service trucks for the California Air Resouces Board (GARB) Advanced Clean Fleet (ACF) "Intermittent Snow Removal Vehicle Exemption," which may be helpful for current Page 1 of 3 Page 19 of 63 CARB ACF reporting requirements and provide for future compliance at vehicle replacement. ANALYSIS AND BODY: Staff solicited a Sourcewell estimate from Jordan's Truck and Trailer Equipment Sales and Service, from Reno, NV, for the procurement and installation cost for two Western 8 ft. 6 in. MVP Plus Ultramount 2 snowplows with a cost of$24,308. Sourcewell, formerly National Joint Purchasing Alliance, has identified Western Products (Sourcewell Contract # 062222-DDY) as a competitive bidder through an RFP process for snow and ice equipment. Section 3.08.060 of the District Code (Joint Purchasing with the State of California and other public agencies) permits the District to take advantage of other agencies' competitive procurement processes. Jordan's Truck and Trailer Equipment Sales and Service is a qualified Sourcewell vendor for Western Products with a quote consistent with District Code requirements. Further, Jordan's location in Reno, NV is advantageous for any future service needs. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 4. Modernize the utility and add value to our communities through collaboration and innovation. FISCAL IMPACT: The fiscal impact of the procurement and installation of the two Western Plows is $24,308, plus a 10% contingency of $2,431, for a total authorization not to exceed $26,739. This agenda item was not specifically budgeted for in water's vehicle reserve expenditures for FY26 or FY27. However, the Water Vehicle Reserve Fund has adequate funds available to support the Western Products procurement and installation on the two 2025 Chevrolet 250OHD Service trucks. Water Vehicle Reserve information is as follows: Water Vehicle Actual Forecast Budget Reserve 2025 2026 2026 Beginning Balance $ 728,607 $ 498,800 $ 475,000 Funding 327,000 484,000 484,000 Expenditures (614,057) (628,700) (602,000) Investment Income 47,750 11,000 11,000 Asset Sale Proceeds 9,500 60,000 60,000 Ending Balance $ 498,800 $ 425,100 $ 428,000 Page 2 of 3 Page 20 of 63 Staff estimates there is sufficient contingency in the water vehicle reserves expenditure budget for 2026 to accommodate this $26,739 expenditure. Further, with the close-out of FY25 actuals in March 2026, should operating results favorably exceed forecast, an additional transfer to water vehicle reserve from operating will be recommended to replenish the estimated $2,900 forecast 2026 variance to the Budget. ATTACHMENTS: None Page 3 of 3 Page 21 of 63 AGENDA ITEM #10 Public Utility District m MEETING DATE: January 21, 2026 TO: Board of Directors FROM: Martina Rochefort, District Clerk/Executive Assistant SUBJECT: Approval of Board Meeting Minutes APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Consider approval of December 3, 2025 Board Meeting Minutes BACKGROUND: ANALYSIS AND BODY: Draft December 3, 2025 minutes are attached. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 6. Manage the District in an effective, efficient and fiscally responsible manner. FISCAL IMPACT: There is no fiscal impact associated with this item. ATTACHMENTS: 1. Minutes 2025-12-03 DRAFT Page 1 of 1 Page 22 of 63 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, DECEMBER 3, 2025 1. Call to Order Meeting was called to order at 6:00 p.m. 2. Roll Call Directors Present: Courtney Murrell, Steve Randall, Jeff Bender, Vice President Tony Laliotis and President Christa Finn Staff in attendance: Brian Wright, General Manager; Scott Crow, Chief Information Officer/IT Director/Assistant General Manager; Mike Salmon, Chief Financial Officer; Jillian Steward, Director of Human Resources & Risk Management; TJ Dwyer, Water Operations Manager; Trey Griffin, Senior Network & Systems Administrator; Alex Spychalsky, Communications Project Manager; Nina Krommenhoek, Contracts Administrator; Martina Rochefort, District Clerk/Executive Assistant Other Steve Gross, General Counsel 3. Pledge of Allegiance Director Bender led the Pledge of Allegiance. 4. Changes to the agenda No changes were made to the agenda. 5. Public Comment No public comment was received. DIRECTOR UPDATE 6. Director Bender reminded fellow board members and public of the "Speak Your Peace" civility project. Director Murrell engaged with members of the public after the water rate meeting. President Finn reflected on the last year. DEPARTMENT UPDATES 7. Department updates were received from Mike Swanson, Director of Electric Operations & Engineering; Alex Spychalsky, Communications Program Manager; Jillian Steward, Director of Human Resources & Risk Management; and Scott Crow, IT Director/Chief Information Officer/Assistant General Manager. CONSENT CALENDAR 8. Consider Approval of the Treasurer's Report, December 2025 Approve the Treasurer's Report for December 2025 which includes: a. Fund Balances for the Month of September 2025 1 Page 23 of 63 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, DECEMBER 3, 2025 b. Disbursements for the Month of October 2025 9. Approval of Board Meeting Minutes Consider approval of November 19, 2025 Board Meeting Minutes 10. Consideration of a Second Contract Amendment for Hirschdale Well Rehabilitation Authorize the General Manager to execute a second contract amendment with Eaton PumpsCo., LLC in the amount of $24,444.00 for the Rehabilitation of the Hirschdale Well project, resulting in a revised total not-to-exceed contract amount of $121,280.51 No public comment was received. ACTION: Motion made by Director Laliotis to approve the Consent Calendar as presented, seconded by Director Bender. AYES: Murrell, Randall, Bender, Laliotis and Finn NAYS: none ABSTAIN: none ABSENT: none Motion passed. ACTION ITEMS 11. Consideration of FY26 Annual Contracts and Procurements a) Authorize FY26 routine annual procurements totaling $16,464,050 from the vendors listed in Attachment 1 b) Authorize the General Manager to execute the required documents necessary to procure the products and services listed in Attachment 1 Michael Salmon, Chief Financial Officer, presented the item. No public comment was received. Discussion was held. ACTION: Motion made by Director Laliotis to authorize FY26 routine annual procurements totaling $16,404,050 from the vendors listed in Attachment 1 and authorize the General Manager to execute the required documents necessary to procure the products and services list in Attachment 1 and as revised to exclude Western Nevada Supply (sodium hydrochorite) $60,000 from Schedule 1.F. as presented, seconded by Director Bender. AYES: Murrell, Randall, Bender, Laliotis and Finn NAYS: none ABSTAIN: none 2 Page 24 of 63 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, DECEMBER 3, 2025 ABSENT: none Motion passed. 12. Electric 2022 Debt Proceeds Expenditures Authorization Authorize $7,202,596 in recent electric capital expenditures to be funded from Electric's 2022 debt issuance proceeds and transfer $7,202,596 to the electric capital reserve fund. CFO presented the item. No public comment was received. Discussion was held. ACTION: Motion made by Director Bender to authorize $7,202,596 in recent electric capital expenditures to be funded from Electric's 2022 debt issuance proceeds and transfer $7,202,596 to the electric capital reserve fund as presented, seconded by Director Finn. AYES: Murrell, Randall, Bender, Laliotis and Finn NAYS: none ABSTAIN: none ABSENT: none Motion passed. 13. Consideration of Review of the District's Investment Policy as described in District Code Title 3, Chapter 3.20.012.9 a) Review the District's Investment Policy as described in District Code Title 3, Chapter 3.20.012.9 and affirm no changes or provide direction as needed; and b) Delegate authority to Michael Salmon, Treasurer, to invest District funds according to the District's Investment Policy CFO presented the item. No public comment was received. Discussion was held. ACTION: Motion made by Director Finn to review the District's Investment Policy as described in District Code Title 3, Chapter 3.20.012.9 and affirm no changes and delegate authority to Michael Salmon, Treasurer, to invest District funds according to the District's Investment Policy as presented, seconded by Director Bender. AYES: Murrell, Randall, Bender, Laliotis and Finn NAYS: none ABSTAIN: none ABSENT: none Motion passed. 14. Annual Election of Board Officers 3 Page 25 of 63 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, DECEMBER 3, 2025 The Board of Directors will nominate and elect the Board President and Board Vice President for the next twelve months. ACTION: Motion made by Director Finn to nominate Director Laliotis as Board President, seconded by Director Murrell. AYES: Murrell, Randall, Bender, Laliotis and Finn NAYS: none ABSTAIN: none ABSENT: none Motion passed. ACTION: Motion made by Director Finn to nominate Director Murrell as Board Vice President, seconded by Director Randall. AYES: Murrell, Randall, Bender, Laliotis and Finn NAYS: none ABSTAIN: none ABSENT: none Motion passed. 15. 2026 Board Calendar Consider approval of the 2026 Board Meeting calendar No public comment was received. Discussion was held. ACTION: Motion made by Director Randall to approve the proposed 2026 Board Meeting Calendar as presented, seconded by Director Murrell. AYES: Murrell, Randall, Bender, Laliotis and Finn NAYS: none ABSTAIN: none ABSENT: none Motion passed. Open Session recessed at 7:16 p.m. CLOSED SESSION 16. Closed Session Pursuant to Government Code Section 54957 Public General Manager's Performance Plan Review Open Session reconvened at 9:42 p.m. There was no reportable action taken in Closed Session. 4 Page 26 of 63 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, DECEMBER 3, 2025 ADJOURNMENT Meeting adjourned at 9:42 p.m. TRUCKEE DONNER PUBLIC UTILITY DISTRICT Tony Laliotis, President Respectfully Submitted, Martina Rochefort, District Clerk 5 Page 27 of 63 AGENDA ITEM #11 Public Utility District m MEETING DATE: January 21, 2026 TO: Board of Directors FROM: Melanie Rives, Finance & Accounting Manager Michael Salmon, Chief Financial Officer SUBJECT: Consider Approval of the Treasurer's Report, January 2026 APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Approve the Treasurer's Report for January 2026 which includes: a. Fund Balances for the Month of October 2025 b. Disbursements for the Month of November 2025 BACKGROUND: ANALYSIS AND BODY: GOALS AND OBJECTIVES: FISCAL IMPACT: ATTACHMENTS: 1. 2026-01 Treasurers Report Page 1 of 1 Page 28 of 63 TRUCKEE DONNER PUBLIC UTILITY DISTRICT TREASURER'S REPORT January 21 , 2026 Fund Balances for the Month October 31, 2025 And Disbursements for the Month November 30, 2025 (includes Government Code section 53065.5 items) Page 1 of 15 Page 29 of 63 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Summary report of fund balances for the month ending October 31, 2025 and disbursements for November 2025. 1) REQUEST FOR APPROVAL OF DISBURSEMENTS and Check Summary The attached listing of checks and ACH payments issued during November 2025 total $5,958,136.91 in disbursements. 2) EMPLOYEE REIMBURSEMENT FOR INDIVIDUAL CHARGES Per Government Code 53065.5: Each special district, as defined by subdivision (a) of Section 56036, shall, at least annually, disclose any reimbursement paid by the district within the immediately preceding fiscal year of at least one hundred dollars ($100) for each individual charge for services or product received. "Individual charge" includes, but is not limited to, one meal, lodging for one day, transportation, or a registration fee paid to any employee or member of the governing body of the district. The disclosure requirement shall be fulfilled by including the reimbursement information in a document published or printed at least annually by a date determined by that district and shall be made available for public inspection. The Disbursements listing referenced in 1) includes above subject reimbursements information, as applicable. 3) STATEMENT OF GENERAL FUND: As of October 31, 2025 the balance in the General Fund was $19,450,192 (Electric $11,050,478 and Water $8,399,714). 4) FUNDS STATUS REPORT: The total of all funds held in cash and on deposit with US Bank, the Local Agency Investment Fund, Placer County Investment Fund, Utah Public Treasurers' Investment Fund, California CLASS, BNY and TVI Investments as of October 31, 2025 was $63,193,004 ($45,138,520 Electric and $18,054,483 Water). 5) INVESTMENT STATUS REPORT: The majority of the District's investments are in California's Local Agency Investment Fund (LAIF), Utah Public Treasurers' Investment Fund (UPTIF), California CLASS, and the Placer County Investment Fund (PCIF). The earnings rates for the last 13 months were: LAIF PCIF UPTIF 1 YR T-BILL TVI CLASS October 2024 4.52% 3.66% 5.04% 4.08% 0.55% 5.00% November 2024 4.48% 3.79% 4.87% 4.11% 0.55% 4.83% December 2024 4.43% 3.73% 4.74% 4.11% 0.55% 4.64% January 2025 4.37% 3.83% 4.55% 3.99% 0.55% 4.42% February 2025 4.33% 4.10% 4.53% 3.91% 0.55% 4.41% March 2025 4.31% 3.86% 4.49% 3.87% 0.55% 4.40% April 2025 4.28% 4.00% 4.49% 3.71% 0.55% 4.39% May 2025 4.27% 3.88% 4.47% 3.95% 0.55% 4.35% June 2025 4.27% 3.90% 4.48% 3.95% 0.55% 4.34% July 2025 4.26% 3.97% 4.47% 3.94% 0.55% 4.34% August 2025 4.25% 3.86% 4.47% 3.70% 0.55% 4.33% September 2025 4.21% 3.88% 4.38% 3.53% 0.55% 4.27% October 2025 4.15% 3.76% 4.27% 3.56% 0.55% 4.19% Page 2 of 15 Page 30 of 63 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Request for Approval of Disbursements The disbursements of the Truckee Donner Public Utility District for the month of November 2025 totaled $5,958,136.91. A listing of those disbursements is attached. DISBURSEMENTS METRICS (excludes Payroll): Accounts Payable (A/P) Metrics $ A/P Disbursements 8,000,000.00 7,000,000.00 6,000,000.00 5,000,000.00 4,000,000.00 3,000,000.00 2,000,000.00 1,000,000.00 0.00 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ■2021 ■2022 ■2023 ■2024 2025 # A/P Payments Issued 400 350 300 250 200 150 100 50 I� _ Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ■2021 ■2022 ■2023 ■2024 r 2025 # A/P I nvoices Vouchered 1,200 1,000 800 600 400 — 200 �� I Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ■2021 ■2022 ■2023 ■2024 ■2025 Page 3 of 15 Page 31 of 63 Truckee Donner Public Utility District Check Register CA November 2025 Gov.Code 53605.5 Check/Tran Date Type Vendor Vendor Name Item Reference Amount 6430 11/1/2025 WIRE 6731 CALIFORNIA DEPARTMENT OF TAXAND FEE ELECTRICAL ENERGY SURCHARGE $ 10,770.00 6431 11/1/2025 WIRE 540 CALIPERS 457 DEFERRED COMP PRGM CALIPERS 457 CONTRIBUTIONS 9985 FINAL 1,173.08 6433 11/1/2025 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING 9985 FINAL 895.36 6436 11/1/2025 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING 9985 FINAL 3,676.62 6443 11/1/2025 WIRE 10737 US BANK GOVERNMENT SERVICES CREDIT CARD CHARGES 32,987.82 6429 11/5/2025 WIRE 1359 CALIPERS OPEB-CERBT MONTHLY CONTRIBUTION 10,417.00 6428 11/6/2025 PL PL PAYROLL PAYROLL DIRECT DEPOSIT 300,680.97 6432 11/6/2025 WIRE 540 CALIPERS 457 DEFERRED COMP PRGM CALIPERS 457 CONTRIBUTIONS PPE 10/31/2025 20,922.43 6434 11/6/2025 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING PPE 10/31/2025 35,147.18 6435 11/6/2025 WIRE 905 HEALTHEQUITY INC. EMPLOYEE HSA CONTRIBUTIONS PPE 10/31/25 1,218.00 6437 11/6/2025 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING PPE 10/31/2025 127,209.45 6438 11/6/2025 WIRE 3824 MISSIONSQUARE 457/401A CONTRIBUTIONS PPE 10/31/2025 47,934.55 6439 11/6/2025 WIRE 10360 AFLAC EMPLOYEE PAID INSURANCE 1,232.32 6440 11/6/2025 WIRE 11233 CALIPERS CALIPERS CONTRIBUTIONS PPE 10/31/2025 72,148.12 48200 11/6/2025 DD 1414 ALPINE SMITH,INC. MULTIHOG MXC130 W/SNOWBLOWER 625.00 48201 11/6/2025 DD 1537 AMAZON CAPITAL SERVICES,INC FACILITY SUPPLIES 1,074.14 48202 11/6/2025 DD 9086 EMPLOYEE VISION REIMBURSEMENT 523.92 48203 11/6/2025 DD 515 BRAGG CRANE SERVICE CONTRACT SERVICES:ROW TREE CLEARING 9,152.00 48204 11/6/2025 DD 10367 CCMEDIA PUBLISHING,LLC. MARKETING 2,175.00 48205 11/6/2025 DD 577 COOPERATIVE RESPONSE CENTER INC. ANSWERING SERVICE 3,416.47 48206 11/6/2025 DD 1555 CTOS RENTALS,LLC RENTAL VEHICLE 14,858.88 48207 11/6/2025 DD 1587 DILLARD ENVIRONMENTAL SERVICES ENVIRONMENTAL COMPLIANCE FEES 450.00 48208 11/6/2025 DD 1167 ERPR,LLC PROFESSIONAL SERVICES:MARKETING 1,000.00 48209 11/6/2025 DD 736 FACTORY MOTOR PARTS MISC PARTS&SUPPLIES 678.05 48210 11/6/2025 DD 9347 EMPLOYEE VISION REIMBURSEMENT 482.00 48211 11/6/2025 DD 361 FIRST CHOICE SERVICES FACILITY SUPPLIES 185.00 48212 11/6/2025 DD 1530 FORTRA,LLC LICENSING,MAINTENANCE&SUPPORT 1,881.34 48213 11/6/2025 DD 2254 FULL HEART DESIGN PROFESSIONAL SERVICES:MARKETING 937.50 48214 11/6/2025 DD 277 HACH COMPANY MATERIALS&SERVICES 365.21 48215 11/6/2025 DD 74 HEAVY EQUIP INC. 2025 PIPELINE REPLACEMENT 32,300.00 48216 11/6/2025 DD 1577 HUNT&SONS,LLC FUEL/OIL FOR VEHICLES 6,892.45 48217 11/6/2025 DD 3820 I BEW LOCAL 1245 UNION DUES-NOVEMBER-EE CONTRIBUTIONS 7,256.06 48218 11/6/2025 DD 1305 JW WELDING SUPPLIES&TOOLS MATERIALS&SERVICES 643.01 48219 11/6/2025 DD 9654 JESSE LEDESMA* EMPLOYEE DEVELOPMENT 952.00 48220 11/6/2025 DD 1149 LOOMIS BANKING CHARGES 941.97 48221 11/6/2025 DD 617 MOUNTAIN EAP EMPLOYEE RELATIONS&WELLNESS PROGRAM 225.00 48222 11/6/2025 DD 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 128.47 48223 11/6/2025 DD 5130 NCPA MEMBERSHIP DUES 9,159.00 48224 11/6/2025 DD 1588 NORCAL CONTAINERS MISC PARTS&SUPPLIES 6,800.00 48225 11/6/2025 DD 1079 O'REILLY AUTO PARTS MISC PARTS&SUPPLIES 251.31 48226 11/6/2025 DD 820 ONESOURCE SUPPLY SOLUTIONS INVENTORY 1,574.70 48227 11/6/2025 DD 775 ONLINE INFORMATION SERVICES CREDIT CHECK SERVICES 270.20 48228 11/6/2025 DD 5730 PORTER SIMON LEGAL SERVICES 8,939.00 48229 11/6/2025 DD 846 REAL GRAPHIC MARKETING 662.18 48230 11/6/2025 DD 552 RK CONTRACTORS INC. NORTHWOODS REBUILD 243,675.00 48231 11/6/2025 DD 1606 SAAS E SOLUTIONS,LLC PROFESSIONAL SERVICES:PROGRAM DELIVERY 5,000.00 48232 11/6/2025 DD 837 SIERRA OFFICE SOLUTIONS XEROX COPIER LEASE 150.16 48233 11/6/2025 DD 10414 SNAP-ON INDUSTRIAL MISC PARTS&SUPPLIES - 48234 11/6/2025 DD 6604 SPIEGEL&MC DIARMID PROFESSIONAL SERVICES:FERC ISSUES 4,202.50 48235 11/6/2025 DD 3826 STONE'S COUNTRYTIRE TIRES 322.14 48236 11/6/2025 DD 1357 SWIFT COMMUNICATIONS OF CALIFORNIA GENERAL ADVERTISEMENT 1,666.00 48237 11/6/2025 DD 7313 TAHOE SUPPLY COMPANY FACILITY SUPPLIES 428.00 48238 11/6/2025 DD 26 THE BANK OF NEW YORK MELLON DEBT PAYMENTS MONTHLY FUNDINGS(3 COPS) 146,448.58 48239 11/6/2025 DD 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 710.00 48240 11/6/2025 DD 448 TRUCKEE TAHOE RADIO LLC MARKETING 2,595.20 48241 11/6/2025 DD 10584 UAMPS PURCHASED POWER-LAMPS 993,826.41 48242 11/6/2025 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 222.99 48243 11/6/2025 DD 1528 UNISYS CORPORATION LICENSING,MAINTENANCE&SUPPORT 1,616.32 48244 11/6/2025 DD 643 UNITED SITE SERVICES OF NEVADA VARIOUS PROJECTS 1,409.66 48245 11/6/2025 DD 1538 USA FLEET SOLUTIONS MISC PARTS&SUPPLIES 1,420.00 48246 11/6/2025 DD 320 W&TGRAPHIX SCREEN PRINTING& EMPLOYEE UNIFORMS 5,152.98 48247 11/6/2025 DD 1546 WATERS CHIROPRACTIC DMV PHYSICAL 420.00 48248 11/6/2025 DD 9961 MATTHEW WELLISE 53605.5 AIRFARE,MEETING EXPENSES 1,132.56 136485 11/6/2025 CHK 999 ALPENSWING 25631302,METER SET REFUND 407.07 136486 11/6/2025 CHK 134 ANIXTER INC. INVENTORY 16,203.13 136487 11/6/2025 CHK 657 AT&T COMMUNICATIONS 686.79 136488 11/6/2025 CHK 240 AUDIO ON-HOLD ON-HOLD PHONE SYSTEM 79.00 136489 11/6/2025 CHK 99999 MONICAD BEAVERS CUSTOMER REFUND-CLOSED ACCOUNT 126.65 136490 11/6/2025 CHK 99999 AMANDA BOUTWELL CUSTOMER REFUND-CLOSED ACCOUNT 270.20 136491 11/6/2025 CHK 1006 CALIFORNIA STATE DISBURSEMENT UNIT CHILD SUPPORT PPE 10/31/2025 115.38 136492 11/6/2025 CHK 99999 ALLEN CHARLTON CUSTOMER REFUND-CLOSED ACCOUNT 105.36 136493 11/6/2025 CHK 1415 CRISIS INTERVENTION SERVICES PROFESSIONAL SERVICES:PROGRAM DELIVERY 2,825.00 136494 11/6/2025 CHK 1601 CROWN TECHNICAL SYSTEMS,LLC MARTS VALLEY SUBSTATION MODERNIZATION 1,068,345.32 136495 11/6/2025 CHK 999 EDC BUILDERS,INC REFUND EF FEES 649.00 136496 11/6/2025 CHK 3096 EMPLOYMENT DEVELOMENT DEPT. UNEMPLOYMENT INSURANCE 3,878.00 136497 11/6/2025 CHK 99999 MR SEVERO GONZALEZ CUSTOMER REFUND-CLOSED ACCOUNT 149.80 136498 11/6/2025 CHK 99999 PABLO HEIT CUSTOMER REFUND-CLOSED ACCOUNT 8.17 136499 11/6/2025 CHK 99999 STEVEN JORDAN CUSTOMER REFUND-CLOSED ACCOUNT 1.44 136500 11/6/2025 CHK 6401 LIBERTY UTILITIES ELECTRIC FOR PUMP STATION 475.63 136501 11/6/2025 CHK 5151 NRECA INSURANCE NOVEMBER 2025 16,793.22 136502 11/6/2025 CHK 5150 NRECA GROUP BENEFITS TRUST INSURANCE NOVEMBER 2025 237,664.02 136503 11/6/2025 CHK 999 RICHARD PAGEY REFUNDTPP 844.00 136504 11/6/2025 CHK 1398 SCHINDLER ELEVATOR CORP BUILDING MAINTENANCE 549.36 136505 11/6/2025 CHK 9928 KOLBY SILKWOOD 53605.5 EMPLOYEE DEVELOPMENT,AIRFARE 1,224.00 136506 11/6/2025 CHK 99999 SHINING SUN CUSTOMER REFUND-CLOSED ACCOUNT 302.44 136507 11/6/2025 CHK 6920 TAHOE TRUCKEE SIERRA DISPOSAL LANDFILL CHARGES 2,336.62 Page l of Page 4 of 15 Page 32 of 63 Truckee Donner Public Utility District Check Register CA November 2025 Gov.Code 53605.5 Check/Tran Date Type Vendor Vendor Name Item Reference Amount 136508 11/6/2025 CHK 7040 TEICHERT&SON INC CREDIT DE MATERIALS&SERVICES 9,766.46 136509 11/6/2025 CHK 7320 TRUCKEE TAHOE LUMBER CO MATERIALS&SERVICES 243.65 136510 11/6/2025 CHK 526 WESTERN INDUSTRIAL PARTS INC. MISC PARTS&SUPPLIES 496.28 6445 11/10/2025 WIRE 905 HEALTHEQUITY INC. HSA EMPLOYER DEPOSIT 402.25 48249 11/13/2025 DD 1537 AMAZON CAPITAL SERVICES,INC TOOLS 2,551.63 48250 11/13/2025 DD 1624 CLOUDFIRE INC PROFESSIONAL SERVICES:OTHER 30,500.00 48251 11/13/2025 DD 9224 EMPLOYEE VISION REIMBURSEMENT 739.02 48252 11/13/2025 DD 1432 DOWL,LLC 2025 CAPITAL IMPROVEMENT PLAN 205.00 48253 11/13/2025 DD 10650 EUROFINS EATON ANALYTICAL INC. WATER SAMPLE ANALYSIS 70.00 48254 11/13/2025 DD 3340 GENERAL PACIFIC INC EMPLOYEE UNIFORM 616.72 48255 11/13/2025 DD 3480 GRAINGER INC. MATERIALS&SERVICES 642.13 48256 11/13/2025 DD 74 HEAVY EQUIP INC. 2025 PIPELINE REPLACEMENT 211,115.37 48257 11/13/2025 DD 11227 INLAND ECOSYSTEMS 2025 PIPELINE REPLACEMENT 750.00 48258 11/13/2025 DD 1305 JW WELDING SUPPLIES&TOOLS MATERIALS&SERVICES 327.25 48259 11/13/2025 DD 1099 MOANA NURSERY PROFESSIONAL SERVICES:OTHER 315.00 48260 11/13/2025 DD 11025 MOONSHINE INK MARKETING 428.00 48261 11/13/2025 DD 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 450.38 48262 11/13/2025 DD 289 NISC OCTOBER 2025 PRINT SERVICES 21,827.81 48263 11/13/2025 DD 970 NORTHERN CALIFORNIA JOINT POLE ASSN MEMBERSHIP DUES 12.41 48264 11/13/2025 DD 1079 O'REILLY AUTO PARTS MATERIALS&SERVICES 19.61 48265 11/13/2025 DD 1410 OAK HARBOR FRIEGHT LINES,INC. MISC PARTS&SUPPLIES 631.17 48266 11/13/2025 DD 820 ONESOURCE SUPPLY SOLUTIONS INVENTORY 14,807.43 48267 11/13/2025 DD 9504397 PACE SUPPLY INVENTORY 244.34 48268 11/13/2025 DD 1371 RUPPERT,INC. MARTIS VALLEY SUBSTATION MODERNIZATION 60,945.15 48269 11/13/2025 DD 1532 SLATE ROCK FIR EMPLOYEE UNIFORMS 362.80 48270 11/13/2025 DD 1328 TRAFFIC MANAGEMENT,INC. NORTHWOODS REBUILD-A44 TO SNOWPEAK 19,400.70 48271 11/13/2025 DD 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 482.00 48272 11/13/2025 DD 7300 TRUCKEE RENTS INC MATERIALS&SERVICES 62.85 48273 11/13/2025 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 242.45 48274 11/13/2025 DD 7380 UNITED PARCEL SERVICE UPS CHARGES 178.16 48275 11/13/2025 DD 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 1,334.10 48276 11/13/2025 DD 7820 WESTERN NEVADA SUPPLY CO MATERIALS&SERVICES 56.90 136511 11/13/2025 CHK 134 ANIXTER INC. INVENTORY 13,200.39 136512 11/13/2025 CHK 657 AT&T COMMUNICATIONS 3,217.78 136513 11/13/2025 CHK 99999 MR RAFAEL CAPETILLO CUSTOMER REFUND-CLOSED ACCOUNT 45.71 136514 11/13/2025 CHK 1073 CLEAN MACHINE REPAIRS&MAINTENANCE 540.00 136515 11/13/2025 CHK 1518 COLUMN SOFTWARE PBC GENERAL ADVERTISEMENT 1,765.39 136516 11/13/2025 CHK 10489 CORELOGIC INFORMATION SOLUTIONS INC LICENSING,MAINTENANCE&SUPPORT 553.44 136517 11/13/2025 CHK 193 EASTERN REGIONAL LANDFILL LANDFILL CHARGES 477.92 136518 11/13/2025 CHK 348 EDGES ELECTRICAL GROUP TOOLS 161.85 136519 11/13/2025 CHK 905 HEALTHEQUITY INC. HSA ADMINISTRATIVE FEES 83.85 136520 11/13/2025 CHK 10932 J&L FOOD MART&CARWASH REPAIRS&MAINTENANCE 120.00 136521 11/13/2025 CHK 99999 BRUCE JOHNSON CUSTOMER REFUND-CLOSED ACCOUNT 127.42 136522 11/13/2025 CHK 1592 JR CONSTRUCTION CUSTOMER PAYMENT KIOSK 8,906.00 136523 11/13/2025 CHK 9600 EMPLOYEE VISION REIMBURSEMENT 401.51 136524 11/13/2025 CHK 44444 DENISE M KOWAL INCENTIVES-EV CHARGERS,EFFICIENT WIND 2,197.05 136525 11/13/2025 CHK 6401 LIBERTY UTILITIES ELECTRIC FOR PUMP STATION 237.10 136526 11/13/2025 CHK 44444 STEVEN MCDONALD INCENTIVES-DUCTLESS MINI SPLIT HEATPMP 875.00 136527 11/13/2025 CHK 5222 ODP BUSINESS SOLUTIONS LLC OFFICE SUPPLIES 480.23 136528 11/13/2025 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 45,610.84 136529 11/13/2025 CHK 322 POLLARDWATER MATERIALS&SERVICES 170.33 136530 11/13/2025 CHK 44444 BRIAN RENEHAN INCENTIVES-EFFICIENT WINDOWS 951.65 136531 11/13/2025 CHK 5912 RESOURCE DEVELOPMENT COMPANY MULTIHOG MXC330 W/SNOWBLOWER 2,000.00 136532 11/13/2025 CHK 99999 RICHARD AND LYNNEHILDEBRAND R CUSTOMER REFUND-CLOSED ACCOUNT 384.67 136533 11/13/2025 CHK 675 SHERWIN-WILLIAMS MATERIALS&SERVICES 148.23 136534 11/13/2025 CHK 999 SIERRA COMMUNITY HOUSE CHARGING COMMUNITIES FORWARD 1,000.00 136535 11/13/2025 CHK 6940 TAHOE TRUCKEE SANITATION AGENCY 2025 PIPELINE REPLACEMENT 25.00 136536 11/13/2025 CHK 6920 TAHOE TRUCKEE SIERRA DISPOSAL LANDFILL CHARGES 1,553.81 136537 11/13/2025 CHK 7175 TRANSWORLD SYSTEMS INC COLLECTION SERVICES 98.96 136538 11/13/2025 CHK 10284 UNITED RENTALS MATERIALS&SERVICES 483.35 136539 11/13/2025 CHK 44444 GARY WALKER INCENTIVES-ENERGY STAR HT PMP WRT HTR 1,000.00 136540 11/13/2025 CHK 99999 JENNIFER WINN CUSTOMER REFUND-CLOSED ACCOUNT 269.70 136541 11/13/2025 CHK 5643 ZORO TOOLS,INC TOOLS 53.94 6446 11/17/2025 WIRE 6731 CALIFORNIA DEPARTMENT OF TAX AND FEE USE TAX PAYABLE 1,115.00 6444 11/20/2025 PL PL PAYROLL PAYROLL DIRECT DEPOSIT 286,901.62 6447 11/20/2025 WIRE 11233 CALPERS CALPERS CONTRIBUTIONS PPE 11/14/2025 66,853.43 6448 11/20/2025 WIRE 540 CALPERS 457 DEFERRED COMP PRGM CALPERS 457 CONTRIBUTIONS PPE 11/14/2025 21,547.77 6449 11/20/2025 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING PPE 11/14/2025 31,946.83 6450 11/20/2025 WIRE 905 HEALTHEQUITY INC. EMPLOYEE HSA CONTRIBUTIONS PPE 11/14/25 1,213.36 6451 11/20/2025 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING PPE 11/14/2025 116,533.55 6452 11/20/2025 WIRE 3824 MISSIONSQUARE 457/401A CONTRIBUTIONS PPE 11/14/2025 47,009.65 48357 11/20/2025 DD 1393 ACWAIPIA AUTO&GENERAL LIABILITY INSURANCE 484,095.06 48358 11/20/2025 DD 1537 AMAZON CAPITAL SERVICES,INC FACILITY SUPPLIES 2,226.51 48359 11/20/2025 DD 1489 CAROLLO ENGINEERS 6170A TANK INTERIOR REHAB 3,988.75 48360 11/20/2025 DD 9503810 CDW GOVERNMENT INC. LICENSING,MAINTENANCE&SUPPORT 75,804.84 48361 11/20/2025 DD 1251 CONSTRUCTION MATERIALS ENGINEERS,INC. VARIOUS PROJECTS 41,962.50 48362 11/20/2025 DD 893 DEBBIE MADERA CLEANING SERVICE BUILDING CLEANING 7,004.00 48363 11/20/2025 DD 1614 DUNCAN WEINBERG GENZER&PEMBROKE,P.C. PROFESSIONAL SERVICES:FERC ISSUES 270.00 48364 11/20/2025 DD 992 E&M ELECTRIC&MACHINERY INC LICENSING,MAINTENANCE&SUPPORT 12,850.00 48365 11/20/2025 DD 2263 EMPIRE SOUTHWEST,LLC. REPAIRS&MAINTENANCE 79.78 48366 11/20/2025 DD 949 FERGUSON ENTERPRISES INC 1423 MATERIALS&SERVICES 97.00 48367 11/20/2025 DD 1484 FUENTES CONSULTING LLC SAFETY MEETING 3,546.59 48368 11/20/2025 DD 3340 GENERAL PACIFIC INC EMPLOYEE UNIFORM 933.09 48369 11/20/2025 DD 3480 GRAINGER INC. TOOLS 168.62 48370 11/20/2025 DD 9467 EMPLOYEE VISION REIMBURSEMENT 120.00 48371 11/20/2025 DD 1577 HUNT&SONS,LLC FUEL/OIL FOR VEHICLES 5,008.51 Paget of Page 5 of 15 Page 33 of 63 Truckee Donner Public Utility District Check Register CA November 2025 Gov.Code 53605.5 Check/Tran Date Type Vendor Vendor Name Item Reference Amount 48372 11/20/2025 DD 115 KIMBALL-MIDWEST MISC PARTS&SUPPLIES 543.39 48373 11/20/2025 DD 9733 EMPLOYEE VISION REIMBURSEMENT 227.96 48374 11/20/2025 DD 9737 EMPLOYEE VISION REIMBURSEMENT 897.47 48375 11/20/2025 DD 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 262.25 48376 11/20/2025 DD 494 NVS,INC. VARIOUS PROJECTS 71,876.50 48377 11/20/2025 DD 820 ONESOURCE SUPPLYSOLUTIONS INVENTORY 24,268.08 48378 11/20/2025 DD 9504397 PACE SUPPLY INVENTORY 5,341.89 48379 11/20/2025 DD 5070 PLATT MATERIALS&SERVICES 2,428.87 48380 11/20/2025 DD 890 QUALUS,LLC MARTIS VALLEY SUBSTATION MODERNIZATION 9,948.00 48381 11/20/2025 DD 1611 RITZ INSTRUMENT TRANSFORMERS,INC PURCHASE TRANSFORMERS 11,715.48 48382 11/20/2025 DD 2245 SI SUPPLY TOOLS 181.45 48383 11/20/2025 DD 1532 SLATE ROCK FIR EMPLOYEE UNIFORM 462.16 48384 11/20/2025 DD 10414 SNAP-ON INDUSTRIAL PERSONALCHARGE-F.HESTON 922.59 48385 11/20/2025 DD 3826 STONE'S COUNTRYTIRE TIRES 1,526.54 48386 11/20/2025 DD 6880 TAHOE INSTANT PRESS OFFICE SUPPLIES 83.93 48387 11/20/2025 DD 7313 TAHOE SUPPLY COMPANY FACILITY SUPPLIES 40.53 48388 11/20/2025 DD 1157 TAIT NORTH AMERICA,INC MISC PARTS&SUPPLIES 752.41 48389 11/20/2025 DD 1328 TRAFFIC MANAGEMENT,LLC. NORTHWOODS REBUILD-A44 TO SNOWPEAK 2,666.20 48390 11/20/2025 DD 712 TRUCKEE DONNER PUD PURCHASED POWER-STAMPEDE HYDRO GEN 5,087.10 48391 11/20/2025 DD 10380 ULINE MATERIALS&SERVICES 413.31 48392 11/20/2025 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 260.87 48393 11/20/2025 DD 1528 UNISYS CORPORATION LICENSING,MAINTENANCE&SUPPORT 1,612.58 48394 11/20/2025 DD 320 W&TGRAPHIX SCREEN PRINTING& EMPLOYEE UNIFORM 133.53 48395 11/20/2025 DD 934 WEST COAST PAVING INC CONTRACT SVCS:PAVING/SLURRY 7,200.00 48396 11/20/2025 DD 10678 WILLDAN FINANCIAL SERVICES GC ARBITRAGE REBATE SERVICES 2,500.00 48397 11/20/2025 DD 9948 EMPLOYEE VISION REIMBURSEMENT 189.00 48398 11/20/2025 DD 1561 ZOHO CORPORATION LICENSING,MAINTENANCE&SUPPORT 1,635.00 136542 11/20/2025 CHK 1507 ALESHIRE&WYNDER LLP PROFESSIONAL SERVICES:OTHER 75.00 136543 11/20/2025 CHK 6 ALPINE LOCK AND KEY MARTIS VALLEY SUBSTATION MODERNIZATION 19.95 136544 11/20/2025 CHK 134 ANIXTER INC. MATERIALS&SERVICES 2,509.57 136545 11/20/2025 CHK 1527 AT&T MOBILITY CELL PHONE CHARGES 3,213.30 136546 11/20/2025 CHK 99999 HAYES BATTEN CUSTOMER REFUND-CLOSED ACCOUNT 10.95 136547 11/20/2025 CHK 99999 ETHIOPIA BEKELE CUSTOMER REFUND-CLOSED ACCOUNT 4.47 136548 11/20/2025 CHK 6730 CALIFORNIA DEPARTMENT OF TAX AND FEE ENVIRONMENTAL COMPLIANCE FEES 2,141.04 136549 11/20/2025 CHK 1006 CALIFORNIA STATE DISBURSEMENT UNIT CHILD SUPPORT PPE 11/14/2025 115.38 136550 11/20/2025 CHK 193 EASTERN REGIONAL LANDFILL LANDFILL CHARGES 381.20 136551 11/20/2025 CHK 341 HANSEN BROS.ENTERPRISES VARIOUS PROJECTS 173,554.62 136552 11/20/2025 CHK 1622 HOWARD INDUSTRIES,INC CUSTOMER PAYMENT KIOSK 19,445.99 136553 11/20/2025 CHK 10225 MCMASTER-CARR SUPPLY COMPANY MATERIALS&SERVICES 92.38 136554 11/20/2025 CHK 1599 MEIDEN AMERICA SWITCHGEAR,INC. MARTIS VALLEY SUBSTATION MODERNIZATION 305,950.22 136555 11/20/2025 CHK 99999 SAMANTHA MEYERS CUSTOMER REFUND-CLOSED ACCOUNT 229.52 136556 11/20/2025 CHK 10138 NEVADA COUNTY CDA HAZARDOUS MATERIAL COMPLIANCE 5,223.90 136557 11/20/2025 CHK 5222 ODP BUSINESS SOLUTIONS LLC OFFICE SUPPLIES 41.86 136558 11/20/2025 CHK 1276 ON THE HOOF VARIOUS VEHICLES 1,085.00 136559 11/20/2025 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 58,175.63 136560 11/20/2025 CHK 10101 PITNEY BOWES OFFICE SUPPLIES 88.29 136561 11/20/2025 CHK 6273 SAUERS ENGINEERING INC INNSBRUCK TANK DESIGN/REBUILD 7,275.00 136562 11/20/2025 CHK 10720 SNOQUIP REPAIRS&MAINTENANCE 326.23 136563 11/20/2025 CHK 7040 TEICHERT&SON INC CREDIT DE MATERIALS&SERVICES 377.23 136564 11/20/2025 CHK 682 VERIZON WIRELESS CELL PHONE CHARGES 175.14 136565 11/20/2025 CHK 5643 ZORO TOOLS,INC TOOLS 152.49 223 $ 5,958,136.91 *Denotes employee reimbursement containing multiple Items with no individual item charge of$100 or greater. Page 3of3 Page 6 of 15 Page 34 of 63 TRUCKEE DONNER PUBLIC UTILITY DISTRICT STATEMENT OF GENERAL FUND Activity for the Month Ended 10/31/2025 Page 1 of 2 Electric Dept Water Dept Total Balance in General Fund 9/30/2025 $11,016,742 $8,844,464 $19,861,206 Receipts: Revenue received $3,274,249 $1,865,517 $5,139,766 Retired employees medical insurance 21,840 - 21,840 Record interest earned 42,114 79,419 121,532 FF Funding&DL Surcharge Reimbursement for 2006 COP - 38,234 38,234 Cash clearing accounts(timing-prior month reversal) (396,378) - (396,378) Cash clearing accounts(timing-current month) 52,186 - 52,186 Total Receipts $2,994,010 $1,983,170 $4,977,180 Disbursements: Accounts payable/payroll disbursements $2,875,757 $2,375,697 $5,251,453 Distribute UPTIF interest 22,394 11,544 33,938 Restrict facilities fees 11,397 31,370 42,766 Restrict Donner Lake surcharge - 9,309 9,309 Section 125 benefit disbursement 37,831 - 37,831 Bank charges 12,896 - 12,896 Total Disbursements $2,960,274 $2,427,919 $5,388,194 Balance in General Fund 10/31/2025 $11,050,478 $8,399,714 $19,450,192 11/17/2025 5:08 PM I:\Treasurers Repo rt\Statement of General Fund\2025\2025-10 GF Page 7 of 15 Page 35 of 63 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Funds Status Report Activity for the Month Ended 10/31/2025 Page 2 of 2 Electric Dept Water Dept Total Distribution of Operating Funds At Month-End: Customer Services Operating Funds $2,400 $0 $2,400 Operating clearing accounts 52,186 - 52,186 U.S. Bank-General Fund 2,003,367 - 2,003,367 LAIF, UPTIF, PCIF, &TVI -General Fund 8,992,525 8,399,714 17,392,239 Total Operating Funds $11,050,478 $8,399,714 $19,450,192 Distribution of Designated&Restricted Funds at Month-End: LAIF, UPTIF, PCIF,TVI &CLASS $33,994,460 $8,063,046 $42,057,506 UPTIF-Donner Lake Assessment District - 90,504 90,504 2015 COP Water Bonds, Principal Payment Fund - 905,259 905,259 2022 COP Issuance/Payment Fund 293,466 605,125 898,591 U S Bank-Donner Lake Assessment District 00-1 - 43,171 43,171 Total Designated&Restricted Funds $34,287,926 $9,707,105 $43,995,031 Total Market Adjustments (199,884) (52,336) (252,219) Total Funds Available $45,138,520 $18,054,483 $63,193,004 11/17/2025 5:08 PM I:\Treasurers Repo rt\Statement of General Fund\2025\2025-10 GF Page 8 of 15 Page 36 of 63 INVESTMENT STATUS REPORT Activity for the Month Ended 10/31/2025 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2024 9/30/2025 Activity 10/31/2025 ELECTRIC FUNDS LOCAL AGENCY INVESTMENT FUND(LAIF)-4.15%(4.21%) General Fund 1..136.1 $ 6,294,941 $ 1,558,995 $ 528,084 $ 2,087,079 Consolidate cash 510,180 Quarterly investment income payment received 17,904 Capital Replacement Fund 1..136.41 2,181,606 2,277,706 26,170 2,303,876 Quarterly investment income payment received 26,170 Electric Rate Reserve Fund 1..136.35 - 500,000 - 500,000 AB 32 Cap&Trade Fund 1..136.58 481,113 272,279 3,138 275,417 Reimbursement from GF for Horse Butte Power 3,138 Deferred Liabilites Reserve 1..136.42 2,267,444 2,343,593 26,926 2,370,520 Quarterly investment income payment received 26,926 LCFS Credits 1..136.59 112,056 115,841 1,317 117,158 Funds transfer to/from GF 1,317 2022 COP Project Fund 1..132.95 7,039,834 7,276,275 83,581 7,359,855 Quarterly investment income payment received 83,581 Total LAIF Electric Investments 16,195,388 14,344,689 669,216 15,013,905 UTAH PUBLIC TREASURERS'INVESTMENT FUND(UPTIF)- 4.27%(4.38%) General Fund 1..136.12 521,095 468,672 (32,134) 436,538 Distribute UPTIF interest (22,394) Restrict facility fees (11,397) Record monthly interest 1,656 Facilities Fees 1..136.9 653,845 831,317 14,335 845,651 Restrict facilites fees 11,397 Record monthly interest 2,938 Electric Rate Reserve Fund 1..136.45 1,868,991 1,985,804 7,019 1,992,822 Record monthly interest 7,019 Capital Replacement Fund 1..136.46 495,353 525,609 1,858 527,466 Record monthly interest 1,858 Electric Vehicle Reserve 1..136.13 1,428,687 2,160,063 7,634 2,167,697 Record monthly interest 7,634 Total UPTIF Electric Investments 4,967,970 5,971,464 (1,289) 5,970,175 PLACER COUNTY INVESTMENT FUND(PCIF)- 3.76%(3.88%) Electric General Fund PC 1..136.49 908,374 738,390 2,352 740,743 Record monthly interest 2,352 Electric Rate Reserve Fund 1..136.47 1,115,617 1,345,545 4,286 1,349,831 Record monthly interest 4,286 Capital Replacement Fund 1..136.48 1,335,212 1,374,760 4,380 1,379,140 Record monthly interest 4,380 Total PCIF County Electric Investments 3,359,204 3,458,696 11,019 3,469,714 TVI INVESTMENTS- 0.55%(0.55%) Capital Replacement Fund 1..136.43 2,966,550 1,366,550 - 1,366,550 Electric Rate Reserve Fund 1..136.44 1,500,000 700,000 - 700,000 Total TVI Electric Investments 4,466,550 2,066,550 2,066,550 11/19/20259:39 AM Investments Status Report Page 9 of 15 r tmen \7r....-,Report\invest stain,Report,\202s\m „� ain 2s-10 i ,-�t,sts Report Page 1 of 4 Page 37 of 63 INVESTMENT STATUS REPORT Activity for the Month Ended 10/31/2025 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2024 9/30/2025 Activity 10/31/2025 CLASS INVESTMENTS- 4.19%(4.27%) General Fund 1..136.16 503,934 2,707,965 3,020,201 5,728,165 Record monthly interest 20,201 Transfer from US Bank 3,000,000 Electric Rate Reserve Fund 1..136.22 1,511,598 2,367,928 8,380 2,376,308 Record monthly interest 8,380 Vehicle Reserve Fund 1..136.23 503,934 520,309 1,841 522,150 Record monthly interest 1,841 Capital Reserve Fund 1..136.24 4,031,201 7,812,369 27,648 7,840,017 Record monthly interest 27,648 Total CLASS Electric Investments 6,550,668 13,408,570 3,058,071 16,466,641 Total Electric Investments $ 35,539,781 $ 25,841,399 $ 678,945 $ 26,520,345 11/19/20259:39 AM Investments Status Report Page 10 of 15 1:\7r....—,Report\inves tment stain,Report,\2025\2025-10 i ns ain,—�t,sts Report Page 2 of 4 Page 38 of 63 INVESTMENT STATUS REPORT Activity for the Month Ended 10/31/2025 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2024 9/30/2025 Activity 10/31/2025 WATER FUNDS LOCAL AGENCY INVESTMENT FUND(LAIF)-4.15%(4.21%) General Fund 2..136.1 3,090,636 6,675,675 (464,861) 6,210,814 Consolidate cash (510,180) Quarterly investment income payment received 76,688 Restrict facility fees (31,370) Facilities Fees 2..136.90 1,411,527 1,343,382 46,808 1,390,190 Restrict facility fees 31,370 Quarterly investment income payment received 15,438 Capital Replacement Fund 2..136.41 1,210,177 2,527,847 29,028 2,556,875 Quarterly investment income payment received 29,028 Reserve funding @ budget - Total LAIF Water Investments 5,712,340 10,546,904 (389,026) 10,157,878 UTAH PUBLIC TREASURERS'INVESTMENT FUND(UPTIF)- 4.27%(4.38%) General Fund 2..136.12 908,092 772,617 20,112 792,729 Transfer to DLAD surcharge (9,309) Distribute UPTIF interest (11,544) DL Surcharge Reimbursement for 2006 COP 8,160 FF Funding portion of 2006 COP 30,074 Record monthly interest 2,731 Facilities Fees 2..136.25 495,007 285,200 (29,066) 256,134 Record monthly interest 1,008 Transfer to GF for FF Funding portion of 2006 COP (30,074) West River St.Assessment District 2..136.31 43,090 44,593 158 44,751 Record monthly interest 158 Prepaid Connection Fees 2..136.7 88,057 91,131 322 91,453 Record monthly interest 322 Donner Lake Assessment District Fund 2..136.84 87,144 90,185 319 90,504 Record monthly interest 319 Donner Lake Assessment District Surcharge Fund 2..136.61 223,320 241,655 2,002 243,658 DLAD surcharge collections 9,309 DL Surcharge reimbursement to GF for 2006 COP (8,160) Record monthly interest 854 TSA SAD II Improvement Fund 2..136.85 20,787 21,513 76 21,589 Record monthly interest 76 Water Vehicle Reserve 2..136.13 728,607 1,100,716 3,890 1,104,606 Record monthly interest 3,890 Deferred Liabilites Reserve 2..136.42 120,249 124,446 440 124,885 Record monthly interest 440 Capital Replacement Fund 2..136.46 1,131,023 139,811 494 140,305 Record monthly interest 494 Total UPTIF Water Investments 3,845,376 2,911,867 (1,253) 2,910,615 PLACER COUNTY INVESTMENT FUND(PCIF)- 3.76%(3.88%) Total PCIF Water Investments TVI INVESTMENTS- 0.55%(0.55%) Water General Fund TVI 2..136.15 2,996,171 1,396,171 - 1,396,171 Total TVI Water Investments 2,996,171 1,396,171 1,396,171 CLASS INVESTMENTS- 4.19%(4.27%) Water Vehicle Reserve 2..136.24 2,015,738 2,081,234 7,366 2,088,600 Record monthly interest 7,366 Total CLASS Water Investments 2,015,738 2,081,234 7,366 2,088,600 Total Water Investments $ 14,569,625 $ 16,936,177 $ (382,913) $ 16,553,264 11/19/20259:39 AM Investments Status Report Page 11 of 15 1:\7r....-,Report\inves tment stain,Report,\2025\2025-10 I....t-t,stains Report Page 3 of 4 Page 39 of 63 INVESTMENT STATUS REPORT Activity for the Month Ended 1013112025 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2024 9/30/2025 Activity 10/31/2025 ELECTRIC&WATER INVESTMENTS,COMBINED TOTALS Pre-Market Adjustments Total LAIF Investments 42% 21,907,728 24,891,593 280,190 25,171,783 Total UPTIF Investments 15% 8,813,347 8,883,332 (2,542) 8,880,790 Total PCIF Investments 6% 3,359,204 3,458,696 11,019 3,469,714 Total TVlInvestments 6% 7,462,722 3,462,722 - 3,462,722 Total CLASS Investments 31% 8,566,405 15,489,804 3,065,436 18,555,240 Total Investments 100% Month End Bal.Mix $ 50,109,405 $ 56,186,147 $ 3,354,102 $ 59,540,249 Market Adjustments Total LAIF Investments (9,106) (9,106) - (9,106) Total UPTIF Investments 16,492 16,492 16,492 Total PCIF Investments (16,653) (16,653) - (16,653) Total TVI Investments (243,495) (242,745) (43) (242,789) Total CLASS Investments (165) (165) (165) Total Investments $ (252,761) $ (252,177) $ (43) $ (252,220) Post-Market Adjustments Total LAIF Investments 43% 21,898,622 24,882,487 280,190 25,162,677 Total UPTIF Investments 15% 8,829,839 8,899,824 (2,542) 8,897,282 Total PCIF Investments 6% 3,342,552 3,442,043 11,019 3,453,062 Total TVlInvestments 5% 7,219,227 3,219,977 (43) 3,219,933 Total CLASS Investments 31% 8,566,240 15,489,639 3,065,436 18,555,075 Total Investments 100% Month End Bal.Mix $ 49,856,479 $ 55,933,969 $ 3,354,060 $ 59,288,029 11/19/2025 9:39AM Investments Status Report Page 12 of 15 e ain \Treasurers Report\Investment status Reports\2025\2025-10 Investments Sts Report Page 4 of 4 Page 40 of 63 TRUCKEE DONNER PUD INVESTMENT BALANCES as of October 31,2025 Placer County Utah Public California TVI Fidelity Mmkt Morgan Stanley Dreyfus BNY US Bank Cash/ LAIF Invest Fund Invest Fund CLASS Investments Govt 57 Treas Sec Port Treas Security Treas Cash Res Checking Cash Clearings Total 131.1 ELECTRIC FUNDS General Fund $ 2,087,079 $ 740,743 $ 436,538 $ 5,728,165 $ $ $ $ $ $ 2,003,367 $ 54,586 $ 11,050,478 Facilities Fees - - 845,651 - - - 845,651 Rate Reserve Fund 500,000 1,349,831 1,992,822 2,376,308 700,000 6,918,962 Capital Reserve Fund 2,303,876 1,379,140 527,466 7,840,017 1,366,550 13,417,050 Deferred Liabilites Reserve/POB Fund 2,370,520 - - - - 2,370,520 Electric Vehicle Reserve Fund - 2,167,697 522,150 2,689,847 AB 32 Fund 275,417 - - 275,417 LCFS Credits 117,158 117,158 COP Project Fund 7,359,855 7,359,855 COP Issuance/Payment Fund - - - 293,466 293,466 Market Adjustments 6,947 16,653 9,297 127 185,454 199,884 Total Electric Investments 15,006,958 3,453,062 5,979,472 16,466,514 1,881,096 293,466 2,003,367 54,586 45,138,520 WATER FUNDS General Fund $ 6,210,814 $ - $ 792,729 $ $ 1,396,171 $ $ $ $ $ $ 8,399,714 Facilities Fees 1,390,190 256,134 - 1,646,324 Capital Reserve Fund 2,556,875 140,305 2,088,600 4,785,780 2015 COP Funds - - - 905,259 905,259 West River St.Assessment District 44,751 - 44,751 Deferred Liabilites Reserve 124,885 124,885 Prepaid Connection Fees 91,453 91,453 DLAD Fund 90,504 43,171 133,675 DLAD Surcharge 243,658 - 243,658 TSA SAD II Improvement Fund 21,589 21,589 Water Vehicle Reserve 1,104,606 1,104,606 COP Issuance/Payment Fund - - 605,125 605,125 Market Adjustments 2,159 7,196 39 57,333 52,336 Total Water Investments 10,155,719 2,917,810 2,088,561 1,338,838 905,259 605,125 43,171 18,054,483 Electric and Water,subtotal 25,162,677 3,453,062 8,897,282 18,555,075 3,219,934 905,259 898,591 2,046,537 54,586 63,193,004 MELLO ROOS-OLD GREENWOOD - - - - - - 269,730 85 - - - 269,815 Total Mello Roos-Old Greenwood 269,730 85 269,815 MELLO ROOS-GRAY'S CROSSING 1,829,612 - 232,487 2,062,099 Total Mello Roos-Gray's Crossing 1,829,612 232,487 2,062,099 Total Investments $ 26,992,289 $ 3,453,062 $ 8,897,282 $ 18,555,075 $ 3,219,934 $ 905,259 $ 269,730 $ 85 $ 1,131,078 $ 2,046,537 $ 54,586 $ 65,524,917 202509 Last Month End Balances 26,866,591 3,442,043 8,891,634 15,489,639 3,219,977 811,679 268,843 - 833,638 5,187,113 398,778 57,159,757 Change from last month 125,698 11,019 5,648 3,065,436 (42) 93,580 887 85 297,440 (3,140,575) (344,192) 8,365,161 202410 PY Month End Balances 24,355,510 6,768,260 8,888,647 5,000,000 6,877,020 875,492 317,502 304 1,067,446 3,597,082 62,371 57,809,636 Change from PY Month 2,636,779 (3,315,199) 8,635 13,555,075 (3,657,086) 29,767 (47,772) (219) 63,631 (1,550,545) (7,785) 7,715,282 2024 12 PYE Balances 25,999,121 3,342,552 8,891,634 8,566,240 7,219,227 142,863 259,524 306 313,210 2,266,449 220,427 57,159,757 Change from PYE 993,168 110,510 5,648 9,988,835 (3,999,293) 762,396 10,206 (221) 817,867 (219,911) (165,840) 8,365,161 I:\Treasurers Report\2026\2026-01 Treasurer'',ReportWll lmertm-202510555 Page 13 of 15 Page 41 of 63 Ai&I., TRUCKEE DONNER October 2025 Public Utility District Electric Utility - Key Reserve Balances $ thousands $17,000 $15,000 $13,000 $13,417 $11,000 ■ ■ ■ ■ ■ r $11,050 ■ $9,000 ■ ■ ■ $7,360 $7,000 y y $6,919 ■ ■ $5,000 $3,000 $1,000 ■ -$1,000 YE 2020 YE 2021 YE 2022 YE 2023 YE 2024 PY Same Last Current YE YE GOAL Month Month Month FORECAST ■ Operating Reserve ■ Rate Reserve ■ Capital Reserve 2022 COP Project Funds 11/17/2025 5:13 PM Page 14 of 15 0 FR Report Pack 202510 MFS Sec A(3.4) Page 4 of 63 TRUCKEE DONNER October 2025 Public Utility District Water Utility - Key Reserve Balances $ thousands $14,000 $12,000 $10,000 ■ $8,000 ■ ■ $8,400 $6,000 ■ ■ ■ r $4,786 $4,000 ■ ■ $2,000 • • • • • • • $1,646 • ■ ■ ■ ■ ■ ■ $1,105 ■ $0 ^ ■ ■ $0 ■ YE 2020 YE 2021 YE 2022 YE 2023 YE 2024 PY Same Last Current YE YE GOAL Month Month Month FORECAST ■ Operating Reserve ■ Vehicle Reserve ■ Capital Reserve 2022 COP Project Funds ° • Facility Fees ° 11/17/2025 5:13 PM Page 15 of 15 0 FR Report Pack 202510 MFS Sec A(3.4) Page 43 of 63 AGENDA ITEM #12 Public Utility District m MEETING DATE: January 21, 2026 TO: Board of Directors FROM: Josh Campbell, Senior Electric Engineer Mike Swanson, Director of Electric Engineering & Operations SUBJECT: Consideration of Closeout of the Martis Valley Substation Civil Construction - 2025 Contract APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Adopt Resolution 2026-01 accepting the Martis Valley Substation Civil Construction - 2025 project as complete and authorize the filing of the Notice of Completion. BACKGROUND: In June 2025, the Board awarded a construction contract for the Martis Valley Substation Civil Construction—2025 project to Ruppert, Inc. of Truckee, California. The scope of the project included the following items: • Site work improvements including trenching, excavation and backfill; • Installation of conduits, pre-fabricated vault and boxes; • Installation of ground grid improvements; • Removal, installation and repair or resurfacing of asphalt pavement; and • Concrete foundation installation for switchgear and control enclosure (SCE). The bid price was $547,443. The Board also established a ten percent change order allowance of $54,744, for a total authorization not to exceed $602,187. Ruppert, Inc. began work on the project in June 2025 and reached substantial completion in October 2025. District staff performed a final walkthrough in November 2025. ANALYSIS AND BODY: The work performed is complete and staff recommends acceptance by the District. Attached is Resolution 2026-01 and the Notice of Completion (Attachment 1) accepting the project and directing that the Notice of Completion be filed. During the course of the project, three change order requests were submitted and reviewed by staff. After review and discussion, the District and Ruppert, Inc. agreed on a total of $18,161.05 for all change orders. The change orders were required to accomplish the following work: Page 1 of 3 Page 44 of 63 • Grounding clamps for conduit sweeps in the switchgear; • Thermal concrete testing; • Concrete slurry design change; In addition to the three change order requests, there were two items that resulted in credits to the District in the amount of $5,948.75. The first credit was for TDPUD staff labor for assisting in the installation of the two light poles, and the second credit was for labor and materials for items which were originally bid but deemed unnecessary during construction. The total change order amount for the project totaled $12,212.30. Although most of the items in the contract were lump-sum, the asphalt paving was on a unit price basis. The estimated paving amount in the bid slightly exceeded the actual amount, resulting in a reduction to the contract amount. There was also no rock work required during the project, so the rock work portion of the contract amount was not paid out. These two items resulted in an additional credit to the District of $19,156.80. A summary of the change orders and credits can be found in the Table below: Item Amount Change Order 1: Rigid Conduit Grounding $1936.31 Clamps Change Order 2: Thermal Resistivity $3,827.92 Testing for Slurry Mix Change Order 3: Trench Slurry Mix Design $12,396.82 Change Credit 1: Labor for Light Pole Installation ($2,000.00) Credit 2: Labor and Materials for ($3,948.75) Miscellaneous Grounding and Conduit work Credit 3: AC Paving Reduction ($2116.80) Credit 4: Rock Work Not Required ($17,040.00) Total ($6,944.50) The final contract price, including the Change Orders and Credits, is $540,498.50. The original bid price approved by the Board of Directors was $547,443. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 6. Manage the District in an effective, efficient and fiscally responsible manner. Page 2 of 3 Page 45 of 63 District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 4. Modernize the utility and add value to our communities through collaboration and innovation. FISCAL IMPACT: There is no direct fiscal impact associated with this item. The overall financial details of the project are provided below. The final contract price is $540,498.50, which is below the Board's authorized not to exceed amount of$602,187. A summary of the final contract price can be found in the Table below: Item Amount Original bid price $547,443.00 Approved change order requests$18,161.05 Credit from Contractor ($25,105.55) Total $540,498.50 In June 2025, the Board approved the contract award, including any change orders, for a total not to exceed $602,187. Therefore, the contract close-out total is $61,688.50 less than the approved amount. The District's FY24 & FY25 Budget (and related 10-year CIP plan) allocated the following amounts for the Martis Valley Substation project: Budget - Martis Valley Substation Rebuild Project 2024 2025 2026 3-Yr Total Capital $2,000,000 $2,500,000 $3,000,000 $7,500,000 Reserves Facility Fees - $500,000 - $500,000 Total Budget $2,000,000 $3,000,000 $3,000,000 $8,000,000 Actuals through $217,117 $3,522,454 - $3,743,206 the end of 2025 Due to milestone invoicing delays for long-lead time equipment purchases, the approved equipment expenditures for 2024 occurred in 2025. The approved FY26-27 Electric Capital Budget includes $3M allocated in FY26 for the next (and final) phase of the project. Staff intends to present to the Board an item for consideration later this spring for the 2026 scope of work for the project. ATTACHMENTS: 1. Item 12 Attachment 1, Resolution 2026-01 Page 3 of 3 Page 46 of 63 PublicDistrict Resolution No. 2026-01 AUTHORIZING THE ACCEPTANCE OF THE MARTIS VALLEY SUBSTATION CIVIL CONSTRUCTION — 2025 PROJECT AND DIRECTING FILING OF THE NOTICE OF COMPLETION WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to undertake the Martis Valley Substation Civil Construction— 2025 project; and WHEREAS, Ruppert, Inc. was selected by the District to perform the work; and WHEREAS, Ruppert, Inc. has completed all of the Work included in the Project; and NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows: 1. That the District hereby accepts the Martis Valley Substation Civil Construction — 2025 project as complete. 2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a copy of which is attached hereto. 3. That 35 days following the filing of the Notice of Completion, the monies retained from the contractor payments be released to the contractor if no claims have been made to the District by material suppliers or laborers. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 21 St day of January 2026, by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Tony Laliotis, President of the Board ATTEST: Martina Rochefort, District Clerk Page 47 of 63 RECORDING REQUESTED BY: Truckee Donner Public Utility District WHEN RECORDED, RETURN TO: TRUCKEE DONNER PUBLIC UTILITY DISTRICT Martina Rochefort, District Clerk 11570 Donner Pass Road Truckee, CA 96161-4947 THE UNDERSIGNED DECLARES DOCUMENTARY TRANSFER TAX- NONE NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN: 1. That the name and address of the public entity for whom the improvement project was done, as owner thereof, is the Truckee Donner Public Utility District, 11570 Donner Pass Road, Truckee, CA 96161. 2. Nature of interest or estate of owner: beneficial interest of a public utility of electric and water facilities. 3. That on January 21, 2026 the hereinafter described improvements were accepted as complete pursuant to Resolution 2026-02 of the Truckee Donner Public Utility District, the awarding authority. 4. That the subject improvements of the notice are generally described and identified as follows: Martis Valley Substation Civil Construction —2025 project. 5. That the name and address of the contractor for such project was: Ruppert, Inc., 11168 W River St, Truckee, CA 96161 1 certify under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Dated: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Brian Wright, General Manager MAIL TAX STATEMENTS TO: SAME AS ABOVE Legal References: CC-3093,CCP-2003 (oath), 2015.5 (unsworn statement) Page 48 of 63 AGENDA ITEM #13 Public Utility District m MEETING DATE: January 21, 2026 TO: Board of Directors FROM: Chad Reed, Water Utility Director SUBJECT: Dispense with Competitive Bidding and Negotiate Directly with Vendors for the FY26 Procurement of Bulk Sodium Hypochlorite Z-- APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: a. Make a finding to dispense with competitive bidding for the 2026 procurement of sodium hypochlorite. b. Authorize the General Manager to negotiate directly with qualified vendors for the purchase and delivery of sodium hypochlorite for calendar year 2026, in an amount not to exceed $60,000. BACKGROUND: The District utilizes sodium hypochlorite as a critical water disinfectant chemical to ensure compliance with state and federal drinking water regulations and to maintain safe, reliable drinking water service. Continuous and timely procurement of this chemical is essential to daily water system operations and regulatory compliance. Historically, sodium hypochlorite has been procured through the District's annual procurement process. It was originally anticipated that the 2026 sodium hypochlorite purchase would be included in the annual procurement cycle; however, no bids were received under that solicitation. To ensure uninterrupted water treatment operations and continued regulatory compliance, the Water Department re-issued the solicitation as a standalone bid. Despite this second advertising effort, on January 8th no responsive bids were received. Bid documents were prepared and publicly advertised in accordance with District procurement requirements on two separate occasions, including specifications for unit pricing, delivery of 12.5% sodium hypochlorite in both 55-gallon drums and bulk deliveries, and compliance with all safety, regulatory, and insurance requirements. Both Page 1 of 2 Page 49 of 63 requests for bids were advertised in the Sierra Sun, and neither solicitation resulted in any responsive bids. ANALYSIS AND BODY: One option available to the District would be to re-advertise the bid for a third time. However, based on the lack of response from two separate and properly advertised solicitations, staff believes it is unlikely that further re-advertisement would result in a different outcome. Similar to other routine and operationally critical procurement, the pool of qualified vendors capable of meeting the District's technical, regulatory, and delivery requirements is limited and the District's realativily small size may impact bid responses. Sodium hypochlorite procurement is routine and recurring in nature, and any delay in securing a reliable supply poses operational and regulatory risks to the District's water system. Dispensing with competitive bidding will allow staff to work directly with qualified vendors to secure pricing and delivery terms that meet operational needs while maintaining fiscal responsibility. Staff therefore recommends that the Board make a finding to dispense with competitive bidding for the 2026 procurement of sodium hypochlorite and authorize the General Manager to negotiate directly with qualified vendors. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency FISCAL IMPACT: The 2026 sodium hypochlorite purchase is included in the FY 2026-27 Water Department Operating Budget in the amount of$60,000 (GL 2.7.681 .843). The contract is structured as a unit-price agreement, and expenditures will occur only as material is ordered and delivered. ATTACHMENTS: None Page 2 of 2 Page 50 of 63 AGENDA ITEM #14 Public Utility District m MEETING DATE: January 21, 2026 TO: Board of Directors FROM: Brian Wright, General Manager SUBJECT: Resolution 2026-02 Commending Dan Wilkins APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Adopt Resolution 2026-02 in recognition of Dan Wilkins for his many years of service, leadership and collaboration as the Town of Truckee's Public Works Director BACKGROUND: Dan Wilkins has announced his retirement at the end of 2025 following a 27 year career with the Town of Truckee Public Works. Dan is leaving behind a remarkable legacy of dedication, innovation, and infrastructure that has defined Truckee's evolution. First hired in 1988 as an Associate Engineer, he quickly rose through the ranks to become the Public Works Director and Town Engineer by 2001. In that role, Dan led transformational projects that have become hallmarks of Truckee's landscape and identity. Through his work as Public Works Director, Dan embraced the philosophy of strong partnerships and collaboration with all the community stakeholders, including the Truckee Donner Public Utility District and the many public agencies within the Truckee community. The legacy of Dan's leadership, collaboration and partnership are found in the Town of Truckee improvement projects, including the Envision Donner Pass Rd corridor project, Brickelltown Streetscape Improvement Project, the West River Streetscape Improvement Project, the Downtown Railroad Loop Project, the Reimagine Bridge Street Project, in addition to the many roadway, drainage and street scape projects, just to name a few. In each of these projects, Dan's leadership set the tone for diligent strategic planning and collaboration with the District and the many other stakeholders to ensure utility infrastructure improvements and development strategies were incorporated into these often challenging public works projects. Most recently, Dan and his team worked closely with District engineers to ensure the West River Streetscape Project accounted for and addressed the design, operation and maintenance needs of local utility infrastructure. Timely completion of this project required communication across multiple stakeholders and public agencies, including utilities, telecommunications, public works, railroad and local property owners and Page 1 of 3 Page 51 of 63 businesses. Most notably, Dan's efforts always maintained the goal of identifying win/wins and pathways to success through communication and partnership across multiple agencies. Dan's leadership and service to the community wasn't limited to his employment with the Town of Truckee. Dan is also a local Rotarian, a member of the Board of Directors for Tahoe City Public Utility District and the Tahoe-Truckee Sanitation Agency, where he has played an integral role in the development and support of critical infrastructure planning strategies that impact the residents and businesses of the Truckee Tahoe Basin. ANALYSIS AND BODY: Dan Wilkins' tenure as the Town of Truckee's Director of Public Works has come to a conclusion with the announcement of his retirement as he and his family embrace the next phase of life. The legacy Dan leaves behind is one of commitment to excellence and the continuous improvement in the quality of life afforded by the Truckee community. Upon his retirement, Dan's passion for strategic planning and infrastructure improvement, always through the lens of sustainability, safety and value to the community he serves, will be carried forward by the highly skilled and motivated team he leaves behind. With his retirement, Truckee Donner Public Uitlity District wishes to recognize the tremendous partnership and community service accomplished through his leadership and collaboration with the adoption of Resolution No. 2026-02 commending his service to the community of Truckee. The District wishes Dan and his family a healthy and enjoyable retirement. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: Page 2 of 3 Page 52 of 63 There is no fiscal impact associated with this item. ATTACHMENTS: 1. Resolution No 2026-02 Page 3 of 3 Page 53 of 63 TRUCKEE DONNER Public Utility Districtr Resolution No. 2026-02 Commending Dan Wilkins for His Years of Service WHEREAS, Dan Wilkins has been employed with the Town of Truckee Public Works Department since 1988; and WHEREAS, during his tenure of employment with the Town of Truckee he has served as Public Works Director since 2001; and WHEREAS, over the course of the 27 years with the Town of Truckee, Dan's leadership, innovation, collaboration and work ethic have led to the successful completion of many critical infrastructure improvement projects throughout the Truckee Community: and WHEREAS, Dan has been an extremely valuable partner in his collaboration and support with the Truckee Donner Public Utility District WHEREAS, Dan has earned the respect and admiration of his team, peers and the community he serves for his commitment to enhancing the quality of life in Truckee; and WHEREAS, Dan has announced his intent to retire from his position as Public Works Director for the Town of Truckee at the end of 2025. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: • Dan Wilkins be commended for his exemplary contributions and exceptional service to the Town of Truckee; and • Thank Dan for his valuable partnership and collaboration with the District. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting held within said District on January 21, 2026 by the following vote: AYES: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Tony Laliotis, President of the Board Page 1 of 2 Page 54 of 63 ATTEST: Martina Rochefort, District Clerk Page 2 of 2 Page 55 of 63 AGENDA ITEM #15 Public Utility District m MEETING DATE: January 21, 2026 TO: Board of Directors FROM: Mike Swanson, Director of Electric Engineering & Operations SUBJECT: Consideration of Approval for a Electric Utility Construction Services Contract APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Authorize the General Manager to execute a contract with VIP Powerline Corp for Electric Utility Construction Services to provide dock crew and storm response services, in an amount not to exceed $1,000,000, plus a contingency allowance of 10 percent ($100,000), inclusive of applicable taxes and fees, for a total contract amount not to exceed $1,100,000. BACKGROUND: The District intends to use electric utility construction contractors to support construction, maintenance, and emergency response activities related to the District's 12.47kV and 14.4kV electric distribution systems, often referred to as a "Dock Crew". The District has also utilized contractors, as well as mutual aid support during storm conditions, to ensure timely system restoration and maintain reliability during major weather events. These contracted services are an important component of maintaining system reliability, public and employee safety, and supporting restoration efforts during adverse weather. To ensure operational demands are met, and capital project schedules remain on track, contract crews are used only as needed to supplement the internal workforce. The Dock Crew serves as a flexible contingency resource that: • Provides additional labor capacity during high workload periods; • Assists with New Business construction; • Supports system hardening and reliability efforts; • Provides coverage during vacations or unexpected absences; and • Works in parallel with District crews to maintain project progress. The Dock Crew is a key component of the District's contingency plan, ensuring that the electric capital plan can be executed even during periods of increased workload or Page 1 of 3 Page 56 of 63 staffing limitations. During major outages or severe weather, contractor personnel may also be used as a Storm Response Crew, enabling rapid restoration of electric service. On October 28, 2025, the District publicly opened bids for Electric Utility Construction Services — 2026. The Request for Bids (RFB) was issued in accordance with District policy and the California Public Contract Code, and required bidders to meet minimum qualification standards, including appropriate contractor licensing, safety compliance, insurance, and bonding capacity. The contract was bid as a Time and Equipment Contract, with bidders providing hourly labor rates, daily equipment rates, mobilization/demobilization charges (if any), and an optional rate escalation percentage for the contract's renewal years. ANALYSIS AND BODY: The District received four (4) bids by the submission deadline. To determine the lowest responsive and responsible bidder, staff calculated a standardized total evaluated cost for each proposer. The evaluation was based on the aggregate of the following bid components, applied consistently across all bids: 1) hourly labor rates for Crew Foreman, Lineman, Apprentice Lineman, and Groundman classifications; 2) daily rates for electric construction-related equipment; 3) mobilization and demobilization charges; and 4) the rate escalation percentage proposed by each bidder for optional renewal years. This standardized evaluation methodology allowed staff to equitably compare total anticipated costs and identify the lowest overall bid. Company Cost (Base plus Option Years) VIP Powerline Corp $13,260.00 Diversified Utility Services $25,727.56 Wilson Construction $120,887.03 Mountain G. Enterprises $165,701 .54 Based on the evaluation methodology above, VIP Powerline Corp was determined to be the lowest responsive bidder. Although VIP Powerline Corp submitted higher hourly labor rates than several competitors, their overall pricing was significantly more competitive because: • Substantially lower equipment rates • No mobilization or demobilization charges • No percentage increase for the option years, resulting in stable pricing The contract provides Time and Equipment pricing for as-needed Dock Crew and Storm Response services, ensuring the District can supplement internal resources only when necessary to complete planned work, support reliability improvements, and execute the capital plan. Page 2 of 3 Page 57 of 63 GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 4. Modernize the utility and add value to our communities through collaboration and innovation. FISCAL IMPACT: The total authorization for Electric Utility Construction Services (Dock Crew and Storm Response) with VIP Powerline Corp is $1,100,000, which includes a 10% contingency. Funding for this work is included in the approved FY 2026 Electric Utility's operating expense and capital expenditure budgets, as applicable. The vast majority of the $1.1 million is anticipated to be charged to capital projects, with Electric's capital expenditure budget for FY26 of $13,760,000, excluding land & building related items, approximately double the annual average. ATTACHMENTS: None Page 3 of 3 Page 58 of 63 AGENDA ITEM #16 Public Utility District m MEETING DATE: January 21, 2026 TO: Board of Directors FROM: Alex Spychalsky, Communications Program Manager Steven Poncelet, Public Information Officer/Strategic Affairs Director SUBJECT: Consideration of a Contract with Generikal Design for Photographer- Videographer Services APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Authorize the General Manager to execute a contract with Generikal Design for 2026 Photographer-Videographer Services in an amount not to exceed $30,000, plus a ten percent change order authorization of $3,000, for a total contract amount not to exceed $33,000. BACKGROUND: The District uses photos and/or videos to promote the mission, values, employees, and programs that serve our community. The need for the District to produce and disseminate compelling digital content has become increasingly important as social media and digital channels have exploded over the last decade. The District issued a Request for Proposals (RFP) seeking a professional photo and video consultant to work with the District's General Manager Department to produce professional-grade photos and videos to support District programs, communications, and other efforts. Included in the scope of work was on-call photo/video and production services to be billed on an hourly basis with rates to be provided for taking photos and/or videos, plus post-production services. The services required include but are not limited to the following tasks: • Professional-grade photo and video execution and post-production; • On-call availability with established lead-time notice from the District; • Ability to shoot photos and video of utility work in active work zones in cross- country terrain; • Event coverage; and • Post-production services; and electronic delivery of final photos and/or videos in a format acceptable to the District. Page 1 of 3 Page 59 of 63 Additional services requested but not required included: • Social media video content creation, at the direction of District Staff and/or a consultant; • Filming sit-down and in-the-field interviews with District Board, Staff and others; and • Editing video packages to support major educational/marketing campaigns. The District issued the RFP on November 20, 2025, advertised in the Sierra Sun as required, and proposals were due on December 18, 2025. The annual budgeted cost for a Photography-Videography Services Consultant for 2026 is not to exceed $30,000. ANALYSIS AND BODY: The District received seven responses to the RFP. In the past, this contract has primarily been focused on professional photography needs with some requests for video as well. This year, the scope of the contract was expanded to focus more heavily on videography as well as video production, as these are growing needs the District has identified. Of the seven companies that responded to the RFP, three companies were based in Southern California, two were based in Reno/Sparks, one was based in Incline Village and one was based in Truckee. A cross-departmental scoring committee was created which reviewed all the RFPs. The scoring committee selected Generikal Design as having provided the proposal most advantageous to the District. While many of the proposals provided high-quality photography, videography and production/editing samples, they were also evaluated on the quality and relevance of their proposal, their experience working with local Truckee- Tahoe businesses and agencies, their cost proposal, and their references. Weighing all of these factors, Truckee-based Generikal Design's proposal was found to be most advantageous to the District. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and Page 2 of 3 Page 60 of 63 innovation. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: The contract with Generikal Design for 2026 Photographer-Videographer Services is for an amount not to exceed $30,000, plus a ten percent change order authorization of $3,000, for a total contract amount not to exceed $33,000. The $33,000 total is included in the approved District FY26 budget under GL Codes 1/2.2.930.10.753 (Professional Services Marketing) and 1/2.2.930.10.655 (Digital Marketing). ATTACHMENTS: None Page 3 of 3 Page 61 of 63 AGENDA ITEM #17 Public Utility District m MEETING DATE: January 21, 2026 TO: Board of Directors FROM: Mike Swanson, Director of Electric Engineering & Operations SUBJECT: Consideration of Monthly Reliability Metrics Reporting APPROVED BY. Brian C. Wright, General Manager RECOMMENDATION: Receive an informational Workshop presentation on electric system reliability metrics— System Average Interruption Frequency Index (SAIFI), System Average Interruption Duration Index (SAIDI), and Customer Average Interruption Duration Index (CAIDI) and provide feedback and direction to staff. BACKGROUND: Electric utilities nationwide rely on standardized reliability indicators established by the Institute of Electrical and Electronics Engineers (IEEE). These metrics include SAIFI, SAIDI, and CAIDI to measure outage frequency, systemwide outage duration, and restoration performance, respectively. • System Average Interruption Frequency Index (SAIFI) • System Average Interruption Duration Index (SAIDI) • Customer Average Interruption Duration Index (CAIDI) All three metrics include planned outages, consistent with IEEE reporting requirements, enabling uniform benchmarking across utilities. ANALYSIS AND BODY: Electric reliability for the District is measured using three standardized IEEE metrics: • SAIFI — Measures how often customers experience outages • SAIDI — Measures the average outage duration across all customers, regardless of whether they lost power • CAIDI — Measures how long affected customers were out of power Page 1 of 2 Page 62 of 63 To improve transparency and align with industry best practices, staff prepared a Workshop presentation introducing these metrics and outlining the District's approach to ongoing tracking and reporting. These metrics represent the predominant performance indicators used across public power, cooperatives, and investor-owned utilities and include planned outages to maintain consistency with national reliability benchmarks. Using these indicators allows the District to: • Monitor overall electric system performance; • Track trends over time related to operational and capital improvement efforts; • Communicate reliability clearly to the Board and the public; and • Compare performance to regional peers. To increase transparency and support ongoing oversight, SAIFI, SAIDI, and CAIDI are planned to be incorporated into the monthly Engineering & Operations Department Update beginning next month. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 5 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: There is no direct fiscal impact associated with this Workshop presentation or the initiation of monthly reliability reporting. ATTACHMENTS: None Page 2 of 2 Page 63 of 63