HomeMy WebLinkAbout8 Surveying Glenshire Area • se Braw Memorandum To: Board of Directors From: Neil Kaufman, Water Systems Engineer Date: September 10, 2002 Subject: PROPOSAL TO PERFORM SURVEYING IN GLENSHIRE AREA BACKGROUND: As part of the acquisition of the Glenshire Water System, there are a few planned improvements. • Construction of a pipeline along Donnington Lane from The Strand to Royal Way and then 200 feet along Royal Way. • Construction of a pump station on the portion of APN 49-240-31 south of The Strand along with inlet and discharge piping in the Strand. • Construction of a pipeline along Sherwood Drive and Kent Drive from Somerset Drive to APN 49-240-26. The District has a proposal from Andregg Inc. to perform survey work related to these three projects. The location of these projects is shown the attached figure. The Donnington Lane pipeline route and the pump station site are covered by the aerial photography and base map work previously performed by Andregg for the Truckee River Trail project. This is the same base map work that the District utilized for the surveying for the Glenshire Transmission Pipeline project. There is not any base mapping for Sherwood Drive and this will require a complete survey. RECOMMENDATION: Accept the proposal from Andregg Inc. to perform survey work along in the Glenshire area amount of$19,550.00 as described in the attached proposal. RUG-31-2002 08:20 FROM RNDREGG INC. TO 5871189 P.01i01 ° ANDIZEGG, INC. . . MIAMI August 30, 2002 Truckee Donner Public Utilities District P.O. Box 309 Phone 530-582-3969 Truckee, CA 96160 Fax 530-587-1189 Attention: Neil Kaufman Re: Glenshire Pump Station&Pipeline Truckee,Nevada County,CA As requested in your letter of July 15,herewith is our proposal for surveying and mapping in the 3 areas indicated in your letter and identified below.The horizontal datum shall be NAD83 (1991.35)California State Plane Coordinate System,Zone 2 and the vertical datum shall be NGVD29 matching the mapping previously done for the proposed Truckee River Bike Trail. Area 1 —Donnington Lane Donnington Lane from The Strand to Royal Way and 200 feet along Royal Way,t 1700 feet. Area 2—Pump Station Site Portion of APN 49-240-31. on Donnington Lane south of The Strand, t 300 feet and about 2 acres. Area 3—Sherwood Drive Along Sherwood Drive and Kent Drive from Somerset Drive to APN 49-240-26,+ 1100 feet. Task i —Utility Location Surveys Survey the position of all visible utilities, culvert crossings and inverts and USA pre-marks for underground utilities along the routes. No manholes to be opened or inverts to be measured. Utility positions and descriptions shall be plotted in AutoCAD drawing file suitable to overlay onto the Truckee River Bike Trail mapping. Task 2—Boundary Surveys Field and office work to determine Right-of-Way boundary lines for roadways in the above areas. Prepare AutoCAD map with boundary lines and utility survey points. Task 3—Aerial Manning Area 3 Field and office work to obtain photogrammetric mapping of Area 3 and overlay with utility and boundary survey information. Mapping shall be at a scale of 1-=40' with 1 foot countours. Total Estimated Fees ... Tasks 1,2&3 ............................$19,5M.00 The above estimated fees shall not be exceeded without prior authorization from client and shall remain valid for 30 days, Our current schedule would enable us to begin work within 10 days of your notice to proceed, weather permitting, and be completed within 30 days thereafter. Thank you for this opportunity_ If you have any questions or need additional information,please call. Sincerely, ANDREGG,INC_ Ile Mark J. Bardakiian, PLS ' UPDC\sysTR0P0SAL\Wf3\G1cnxhirc PS&Pirzlinc.duc andregg®andregg.com i.AT 306 54' 131° N I LAND 1210 04'89-W