Loading...
HomeMy WebLinkAboutAgenda Packet 2026-10-07 Board of Directors T R U C K E E D O N N E R General Manager Jeff Bender PUBLIC UTILITY DISTRICT Brian C. Wright Christa Finn r4 Executive Leadership Tony Laliotis Chad J. Reed Courtney Murrell REGULAR BOARD MEETING Mike Swanson Steve Randall 11570 DONNER PASS ROAD, TRUCKEE, Michael Salmon CA 96161 Steven Poncelet 6:00 PM, Wednesday, October 7, 2026 Scott Crow AGENDA Jillian Steward Martina Rochefort 1. Call to Order 2. Roll Call 3. Pledge of Allegiance 4. Changes to the agenda 5. Public Comment— This is time set aside for the public to address the Board on any matter not on the agenda. Testimony related to any agendized matter should be addressed at the time that that item is considered. (The public may comment on any subject that is not on the agenda. Each speaker will be limited to three minutes, but speaker time may be reduced at the discretion of the Board President if there are a large number of speakers on any given subject.) DIRECTOR UPDATE 6. This item provides time for Directors to comment on any item within the purview of the District. DEPARTMENT UPDATES 7. This item provides time for each Department to update the Board of Directors. PUBLIC HEARING 8. District's Workforce Vacancies, Recruitment, and Retention Efforts a.) Conduct a Public Hearing regarding the District's Workforce Vacancies, Recruitment, and Retention Efforts in compliance with AB 2561; and b.) Provide feedback to staff CONSENT CALENDAR a .®. MIKUL A LEADERSHIP SPECIAL RISIRICTFOR.i..... NDRIION 11570 Donner Pass Road,Truckee,CA 96161 Phone-530-587-3896-www.tdpud.or Page 1 of 119 These items are generally interpreted as routine in nature or the subject matter has been previously presented to the Board for discussion. They are intended to be acted upon by the Board without additional discussion. Any Board Member may request an item to be removed from the Consent Calendar for discussion prior to voting on the Consent Calendar. 9. Treasurer's Report, October 2026 Approve the Treasurer's Report for October 2026 which includes: a. Fund Balances for the Month of July 2026 b. Disbursements for the Month of August 2026 10. Consideration for the Board to Reschedule the Electric System Master Plan CEQA Public Hearing to November 4, 2026 Reschedule the Electric System Master Plan CEQA Public Hearing from October 7, 2026, to November 4, 2026, at 6:00pm, or as soon thereafter, to receive public comment on the Proposed Negative Declaration. 11. Board Meeting Minutes Consider approval of the September 2, 2026 Regular Meeting and September 8, 2026 Special Meeting Minutes. 12. Consideration of a Recruiting Services Contract for Electrical Engineering Manager Authorize the General Manager to execute a professional services contract for executive recruitment services with Alliance Resource Consulting, Inc. in the amount of $38,000, plus a 10% change order authorization, for a total not to exceed $41,800. ACTION ITEMS 13. Adopt Resolution 2026-16 approving the submission and attesting to the veracity of the 2025 Power Source Disclosure (PSD) Report and Power Content Label (PCL) Adopt Resolution 2026-16 approving the submission and attesting to the veracity of the 2025 Power Source Disclosure (PSD) Report and Power Content Label (PCL). 14. Consideration of Adoption of Resolution No. 2026-17 Approving the 2026 Physical Security Plan Page 2 of 119 Adopt Resolution No. 2026-17 approving the 2026 Physical Security Plan and authorize the General Manager or designee to provide the required notice of adoption and program review documentation to the California Public Utilities Commission Safety and Enforcement Division. 15. Consideration for Designation of Labor Negotiators for the General Manager's Employment Contract Appoint two members of the District's Board of Directors to serve as negotiators for the General Manager's Employment Contract WORKSHOP 16. Martis Valley Groundwater Management Plan Water Year 2024 and 2025 Annual Reports Receive this report and provide input and direction to staff. CLOSED SESSION 17. Closed session pursuant to Government Code Section 54957(a): Consultation with General Manager to Review Critical Infrastructure Information ADJOURNMENT The agenda is available for review at the TDPUD Administrative Office and the District's internet website. Posted on Thursday, October 1, 2026. Martina Rochefort, District Clerk A copy of the agenda packet is available for public review, during normal business hours, at the District Administrative Office located at 11570 Donner Pass Road. Public participation is encouraged. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the Districts public meetings. If particular accommodations for the disabled are needed (i.e. disability-related aids, or other services), please contact the District Clerk at (530) 582-3923 or martinar@tdpud.org, at least 24 hours in advance of the meeting. Any person with a disability may submit a request for reasonable modification or accommodation to the above-described means for accessing and offering comment at the meeting to Martina Rochefort, District Clerk, or email at martinar@tdpud.org, who will swiftly resolve such a request. Page 3 of 119 TRUCKEE DON N ER AGENDA ITEM #7 PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 TO: Board of Directors FROM: SUBJECT: This item provides time for each Department to update the Board of Directors. APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: BACKGROUND: ANALYSIS AND BODY: GOALS AND OBJECTIVES: District Code 1.05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1.05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: Page 1 of 2 Page 4 of 119 ATTACHMENTS: 1. Water - Department Update 2. Electric -Department Update 3. Administrative Services - Department Update 4. PIO & SA - Department Update 5. Human Resources & Risk Management - Department Update 6. District Clerk - Department Update Page 2 of 2 Page 5 of 119 TRUCKEE DON N ER PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 FROM: Chad J. Reed, Water Utility Director SUBJECT: Water Department Update Water Supply Water production for the month of August 2026 (shown in Figure 1) reflects our community's late-summer demand patterns. When compared to last August 2025, total water production, the volume of water that was pumped, disinfected, and distributed increased by 3%. When measured against the broader running three-year August average (2023-2025), production was also 3% higher. While we have seen fluctuations throughout the summer, the District continues to monitor these trends closely to ensure we are meeting our 1% reduction goals and operating the system efficiently. As noted in previous months, our "conservation as a way of life" initiative remains a priority, especially during these high-demand periods of late summer, year to date (January-August) is 3% below the 2025 production period. 250,000,000 Water Production (Gallons) o ,�o 200,000,000 — ti �b O 150,000,000 ^oiO 00�01 OPti ,Vto�y 3ti0 � 100,000,000 00%-14 M' M Y ti M 50,000,000 ti : 0 ,ate Quo tr �t� aJ woe J �'� oet oet oet oet Q O �o� Qeo ■ 2026 Production 2025 Production 3 Year Average Figure 1 Water production over the past two years compared to current production Page 1 of 4 Page 6 of 119 Water Conservation & Legislative Updates Nonfunctional Turf Mandate (AB 1572): Staff are actively preparing a draft resolution to address California's Nonfunctional Turf Bill (AB 1572). Under this statewide mandate, public water systems are prohibited from supplying potable (drinking) water to irrigate nonfunctional turf—defined as mowed ornamental grass located in areas like street rights-of-way, parking lot medians, and building borders that serve no active recreational purpose. Due to the inclement weather in Truckee most of the medians and commercial buildings do not have nonfunctional grass, However, all water districts will need to adopt a resolution confirming this by January 1, 2027. To ensure compliance ahead of the deadline, staff will present a resolution to the Board, which will establish local guidelines for distinguishing functional turf (e.g., parks and sports fields) from nonfunctional turf, the Water Department and Communications Department are working on public outreach efforts. System Maintenance & Operations The Water Department staff have been busy balancing active capital projects with essential safety training and proactive system maintenance: Confined Space Safety Training The entire Water Department recently completed comprehensive Confined Space Training, ensuring our team is fully certified and prepared to work safely within subterranean vaults, tanks, and enclosed utility structures. Thank you to the Truckee Sanitation District for generously allowing us to utilize their specialized facility for this critical hands-on training. UQ� „Al 4, Figure 2 Water Department Staff preparing to lower entrant into a test vault. Page 2 of 4 Page 7 of 119 Control Valve Maintenance & Winter Readiness As we move closer to the end of the summer season, the Water Department has been focused on the annual inspection and servicing of control valves throughout the District. The valves are critical for managing water pressure and isolating sections of the system during repairs. Many are located in areas that become difficult to access once snow is on the ground so completing this proactive maintenance now ensures winter operational readiness. Leak Detection & Repair Simultaneously, our Distribution Crew remains focused on responding to and repairing system leaks in a timely manner to minimize water loss and protect District infrastructure. r k, k tia t � +� Figure 3 Left Picture:Water Department Staff repairing identified leaks.Right Picture:Water Department Staff preparing to hot-tap the main. Well 20 Status The contractor warranty work on Well 20 has been completed and is now fully back operable. Well 20 will be put into use as soon as a bacteriological test is performed. Page 3 of 4 Page 8 of 119 2026 Construction Season Progress Our capital improvement projects are reaching significant milestones as we approach the fall: • Hirschdale Pipeline Construction Project: This project is in its final stages, with only a few weeks remaining before the new pipeline is ready to start moving water. This represents a major step forward for system reliability in that area. • Pipeline Rehabilitation (Slip-lining) Project: We are pleased to report that the slip-lining effort—a trenchless method of inserting a new liner into an existing pipe—will be fully complete and operable by the time of this Board Meeting. This successfully rehabilitates critical segments, including creek and highway crossings. k p$i 34 Figure 4 Left Picture:The Contractors were preparing the pipe to receive the slip-liner.Right Picture:Contractor is preparing to terminate the Slip-line • Donner Trails Tank Project: Progress on the Donner Trails tank has been excellent. Following the successful completion of the sandblasting phase, crews have moved into the cathodic protection phase. Cathodic protection uses electrical currents to prevent internal metal corrosion, significantly extending the operational lifespan of this storage asset. • 2026 Pipeline Replacement Project (Ski Bowl Condos): Work continues at the Ski Bowl Condominiums. As discussed last month, this project transitioned into a two-year project due to early-season environmental delays and equipment challenges. We are focused on completing as much of the complex as possible before the October winter soil-disturbance cutoff, with Hansen Brothers absorbing winterization and remobilization costs. Page 4 of 4 Page 9 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 FROM: Mike Swanson, Director of Electric Engineering & Operations SUBJECT: Electric Department Update Reliability August District outage impacts included approximately 675,000 customer outage minutes from planned outages, primarily associated with wildfire hardening work in the Sierra Meadows and Tahoe Donner neighborhoods. Unplanned District outages accounted for approximately 353,000 customer outage minutes and were caused by animals, equipment failures, third-party incidents, and a motor vehicle incident. In August, the Hawk Fire resulted in transmission provider outages that impacted most District customers and accounted for approximately 82% of total customer outage minutes during the month. Transmission provider outages are tracked separately from District system reliability. Martis Valley Substation Modernization The contractor is nearly complete with conduit and ground grid installation inside the substation. Work continues on the primary conduit installation south of the fence for the feeder getaways and on ground grid installation around the perimeter. Ground rod installation is underway but has progressed slowly due to equipment issues. Paving is scheduled for mid-October. The project schedule remains compressed but is still on track for completion. Vegetation Vegetation crews have completed 7.5 miles of trimming year-to-date, with vegetation work nearly complete for the 2026 construction projects. In addition, 117 hazard trees have been removed year-to-date. Project Updates The District crew continues to make progress on the Ski Slope System Hardening Project, with more than 50% of the poles installed and full pole installation targeted by October 31. A planned outage was scheduled for September 25 to complete the final wire pull on SRIP 6, bringing the project substantially to completion. HW Power has started construction on the Northwoods South project and has installed more than 20 poles. 2027-2028 Projects Planning and design are underway for approximately 12 miles of 2027 and 2028 system hardening projects. Prosser Lakeview (Truckee 5) is advancing through staking and material development, while the Tahoe Donner SRIP 7/8 projects are in design. Due to long lead times, poles for these projects are also in the process of being ordered. Page 1 of 1 Page 10 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 FROM: Michael Salmon, Chief Financial Officer SUBJECT: Administrative Services Department Update Customer Service - Billing Information — 2026 YTD August 2026 Account Billing Totals $ in thousands Electric Water Jan $ 3,720 $ 1,592 Feb 41365 11618 Mar 3,494 1,585 Apr 31,111 1,580 May 31P283 1,619 Jun 21770 11747 Jul 2,824 1,876 Aug 31,330 1,980 YTD $ 26,897 $ 13,597 Accounts(ytd avg) 14,917 131-797 change to PY ytd avg. 0.4% 0.5% - Billing Volumes, All Customer Types — 2026 YTD August • Electricity YTD Avg Billed 2022 2023 2024 2025 2026 KWH/Account/ 978 1,037 980 960 926 Month -5.3% -10.7% -5.5% -3.5% <chg to 2026 Page 1 of 7 Page 11 of 119 kWh-per billing day average by month 2026 and 3yr Average(2023-2025) December is the most frequent Peak Demand(KW)Month ■3yr Average ■2026 600,000 — 500,000 400,000 300,000 200,000 100,000 H R11 H Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Average billed kWh per account per month 1,300 • 1,200 1,100 • 1,000 900 800 • _ ! 700 J Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 12026 2025 2024 • 2023 12022 • YTD Electric kWh average per account per month of 926 is down 3.5% to last year (LY) and down 6.7to 3-year average (3YA) o YTD August Truckee average temperature of 50.0° is T 1 .20 or 2% to last year (LY) and T2.5° or 5% to 5-year average (5YA). ■ Q1 2026 avg. of 38.30 was warmer 15% to LY & warmer 21% to 5YA ■ Q2 2026 avg. of 50.30 was cooler 7% to LY & cooler 0% to 5YA ■ July 2026 avg. of 65.50 was warmer 3% to LY & cooler 3% to 5YA ■ August 2026 avg. of 67.60 was warmer 6% to LY & warmer 5% to 5YA o YTD August Heating Degree Days of 3,825 are 15% to LY and t14% to 5YA ■ Q1 HDD of 2,403 were down 16% to LY and down 20% to 5YA ■ Q2 HDD of 1 ,361 were up 32% to LY and up 1% to 5YA ■ July HDD of 29 were down 61% to LY and down 8% to 5YA ■ August HDD of 32 were down 60% to LY and down 56% to 5YA • YTD August water potable gallons billed average per account per month of 5,804 are down 3.8% to last year and up 0.9% to 3YA. Potable gallons per month per account comparative is provided below. Page 2 of 7 Page 12 of 119 Average Billed Potable Water Gallons per Account by Month 14,000 • • 12,000 • L j • • 10,000 8,000 i 6,00 4,000 a ` j a � 2,000 Jan Mar Apr May Jun Jul Aug Sep Oct Nov Dec •2026 • 2025 • 2024 9 2023 9 2022 • 2021 • 2020 Customer Service Satisfaction Scores — September 2026 Overall, hovr satisfied were you with the experience with our customer suppo... -. Answered:24 Skipped:0 60% SD% 40% 3D% 20% 1D% D4'n Extremely Very satisfied Somewhat Not so satisfied Not at all satisfi ed satisfied satisfied Page 3 of 7 Page 13 of 119 7-1 Haw much time did it take us to address your questions and concerns? LJ Answered,24 Skipped:U 60% 50% 40% 30% 20% 10% 0% Much shorter Shorter than About what I Longerthan Much Langer than expected expected expected expected than expected PLease categorized the reasons) for your service cat LJ Answered:17 Skipped:7 60% 50% 40% 30% 20% 10% 0 Billing Payment New Service Power outage Water leak New question question or Stop Commercial Service to Service existing home Page 4 of 7 Page 14 of 119 General Services • Fleet- Mileage Totals Q1 Jan 18,477 Feb 18,488 Mar 19,177 Q2 Apr 22,564 May 21,752 Jun 22,448 Q3 Jul 25,753 Aug 23,406 Sep Q4 Oct Nov Dec • Facilities o Asphalt slurry's performed in August o Lobby Security upgrades scheduled for October 10-11 o Hazmat annual inspecitons completed o HVAC @ Tahoe Donner Subsation repair completed o Water tank painting Finance and Acccounting • Closed and reporting on August internal financials, Treasurer's Report completed. • U.S. Bureau of Labor Statistics, Consumer Price Index for All Urban Consumers (CPI-U), Inflation % Year over Year, August 2026 — 0 3.4% U.S. City Average 0 3.4% San Francisco-Oakland-Hayward • New Sales tax law taking effect 1/1/2027, information below. The impact on costs for the District is complicated, impacting both operating expenses and capital expenditures, and staff will estimate the impact over the coming months. At the current Truckee sales tax rate of 9.00%, for every $1 M in digital products the new tax equates to $90,000. o Components of current sales tax rate in Truckee is as follows: ■ 6.00% - California state sales tax ■ 0.25% - Nevada County sales tax ■ 1.50% - Truckee city tax ■ 1.25% - Special district tax (Truckee Tourism Business Improvement Page 5 of 7 Page 15 of 119 District) ■ 9.00% - Total sale tax rate Sages and Use Talc Applies to Digital Products Beginning January 1 , 2027 Beginning January 1, 2027, the definition of tangible personal property in the Sales and Use Tax Law will be expanded to include digital products and any copyright or patent interests associated with those digital products- As a result, retail sales of digital products in this state or the storage, use, or other consumption in this state of digital products purchased frorn any retailer mar be subject to sales and use tax- This change is the result of a new law and generally affects: Sellers of prewritten computer saftrr�are Prewritten Software-as-a-Service ( aaS) providers E.Isinesses that license or provide remote access to prewritten software Purchasers of digital products What is a digital product? A digital product is prewritten computer software transferred on tangible storage media, transferred electronically, or accessed remotely. Prewritten computer software is computer software that is held or exists for general or repeated sale or lease, even if it was initially developed on a custom basis or for in-Douse use, including the combination of two or more prewritten prog rams- • PENSION . The CalPERS Actuarial Valuation Report (AVR) for the District was released in September. Summary of Key Valuation Results Below is a brief surnnary of Trey valuation results along with page references where more detailed information can be found. R"LdFed funplayer Contributions—page 8 Fiscal Year Fiseal Year 2M-27 2027-213 Employer Normal Cos-Rates Rale Plan 52DO 1522% 15.68% Rate Plan 2760g ?M% 8.FJ% Unfunded Accrued LiaMity(UAL)Contribution Anrcurt $1,883,759 $1,f1f32,721 Paid either as Option 1)12 Mbrfthly Payments of V59,97!1.92 $1MM6.75 Option 2)Annual Prepayment in July $1,822difX3 51-9113,563 Me rnber Contri bution Rates—page 9 Fiscal Year Fiseal Year 2026-27 2027-M Rase�_an 5200 8.00% 8.00% Ra.e'lan 27DDO 7.75% 7.75% Page 6 of 7 Page 16 of 119 • Employer (District) contribution rates increase effective 7/1/2027 as indicated: • of Payroll - Classic (currently 18 active)to 15.68% up 40 BP or 2.6% % Payroll - Pepra (currenity 55 active) to 8.05% up 12 BP or 1.5% UAL Required Payment July 2027 of$1.98M, up $99k or 5.3% Overall, these increases are within FY27 budget expectations forpension costs. • Employee contribution rates increase effective 7/1/2027 as indicated: % of Payroll - Classic (currently 18 active)to 8.00%, no change % Payroll - Pepra (currenity 55 active) to 7.75%, no change • Funded Ratio improved this annual report cycle by 380 BP or 5.1% to 77.8%. Funded Slatus—Funding Policy Basis—page 11 June 30,2024 J une 30,2025 Entry Age Accrued Liability(AL) $75,985,848 S79.33d,783 Fair Value of Assets{Asset] 56,298,9N 01.731.429 Urhunded Accrued Uabfity(UAL)[AL—Assels] $19,746,849 S17.599,350 Funded Ratio[As5et5-AL] 74.4'.a 77.8% The UAL is driven primarily by under-funding of Classic pension benefits primarily in many past years; when majority of Classic benefit employees were actively employed. A UAL is common across virutally the entire CalPERS particiapting agencies pool (hence the Pepra reform in 2013). The Funded Ratio improvement was driven primarily by CalPERS investment performance of 11.6% for FYE 6/30/2025 favorable to the 6.8% valuation assumption. The FYE 6/30/2026 investement performance of 14.8% will benefit next year's AVR valuation report metrics, with that report issued in September 2027. A workshop is planned this fall to review the District's Pension and Other Post Employment Benefits (OPEB). Page 7 of 7 Page 17 of 119 e TRUCKEE DONNER 4o PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 FROM: Steven Poncelet, PIO & Strategic Affairs Department SUBJECT: Public Information & Strategic Affairs - Department Update Communications & Outreach Truckee Community Block Party • The second annual block party was held Thursday, September 171" from 5:00 — 7:OOPM in downtown. In addition to the District's typical outreach materials about customer rebates, PSOM, and TDPUD's scholarship programs, District communications staff created new outreach materials for this event that covered timely topics like explaining the different types of wildfire outages, introducing new water conservation rules and rebates, and how to better understand your utility bills. The TDPUD booth featured representatives from the electric utility, water utility, customer service, conservation, human resources and clerks departments. This was different than the staffing for a typical community event, and was expanded in this way to respond to the purpose of the event, which is for our local community to connect directly with the agencies that serve them. Customers could interact with the people behind-the-scenes that work at TDPUD. The event was very well attended. TDPUD Customer Survey Outreach • District staff have received the final customer survey documentation and are working on further public dissemination through a press release, the website, and announcement to customers in an e-mail newsletter. The results have also been shared internally within the District and will help inform future District activities. Wildfire Safety Power Outages — Customer Education • Staff has been working on new educational materials on wildfire safety power outages. In the past the District communicated primarily about PSOM outages and how to prepare, staff has identified the need to educate the community on emergency de-energization, or "encroachment," and how it differs from a PSOM. Staff has created a flyer on this topic, which was available to customers at the Truckee Community Block Party. Staff is also working on updating the wildfire safety webpage and will share this information in a social media post and future all-customer email newsletter. "Rates 101" — Customer Education • The communications department has been working on revamping its education materials on rates and reading your bill. The District's rates webpages were updated in Fall 2025 to include regional rate comparison graphics and in-depth Page 1 of 3 Page 18 of 119 definitions of the terms used in TDPUD bills, as part of the outreach around the proposed water rate increase. Staff has been building on that groundwork to create new tools to help educate customers, including a step-by-step bill breakdown graphic. Once completed, this educational component will be added to the website, shared on social media and included in a future all-customer email newsletter. Staff created a flyer on this topic that was available to customers at the Truckee Community Block Party. Joint TDPUD-TTSA-TSD Water Professionals Appreciation Week Press Release • District communications staff are again taking the lead, in collaboration with Tahoe Truckee Sanitation Agency (T-TSA) and Truckee Sanitary District (TSD), on the annual water professionals appreciation press release. California created Water Professionals Appreciation Week in 2017 to recognize the contributions of the state's water workforce. This year, the observance takes place October 3-11. The press release highlights the essential role water agencies, and their employees play in providing essential services, protecting natural resources, and supporting local communities, as well as how Truckee's water agencies work together to meet all of our community's water-related needs. Ongoing Communications & Outreach • 2026 water campaign and water conservation regulations o Garden photo contest • Wildfire mitigation, response, and power outages • Planned outage and construction communication • Your Money at Work: 2026 capital projects • Board recap press release Strategic Affairs NCPA Annual Meeting - September 23-25, 2026 • The District attended the Northern California Power Agency (NCPA) annual conference in Olympic Valley, CA on September 23-25. The event included leaders at the utility, State, and National level and addressed key topics including wildfire mitigation/liability, large loads/data centers, electric resources/transmission, and effective leadership through rapid change. NCPA Crisis Communications Training • The District is in the process of updating its Draft Crisis Communication Plan. The Northern California Power Agency (NCPA) has just completed a similar effort for their electric utility operations which included a full day training for NCPA staff. NCPA has shared their plan and training materials with their utility members and offered a full day training to member utilities on September 22. District staff were in attendance along with many of the NCPA member utilities. This plan and training will be invaluable in updating the launching of the District's plan. Page 2 of 3 Page 19 of 119 California Legislative Session Results • The District's joint action groups: California Municipal Utilities Association (CMUA), Northern California Power Agency (NCPA), Association of California Water Agencies (ACWA), and California Special Districts Association (CSDA) continue to monitory the progression of 2026 passed legislation across the Governor's desk for signature or veto. End of session result reports will follow. Page 3 of 3 Page 20 of 119 r TRUCKEE DONNER 4o PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 FROM: Jillian Steward, HR & Risk Director SUBJECT: Human Resources and Risk Department Update Staffing Open Positions: • Electric Engineering Manager—Accepting applications • Journeyman Lineman — Testing • Water Service Technician/Tech in Training — Job offer pending • Customer Service Representative — Interviews scheduled • Systems Operator 1/11 - Testing Culture • 9/30 — Wellness Labs & Flu Shot • 10/05 - 10/09 — Second Annual PUD Appreciation Week • 10/29 — Halloween Celebration Staff Development • 10/06 —All Staff Meeting Charging Futures Forward • 9/17 — Promoted our scholarship programs at the Community Block Party • 10/15 — Truckee Elementary Field Trip Charging Communities Forward • 10/07 — Charging Communities Forward fundraising event Safety and Risk • 9/22 — Confined Space Rescue Training @ TSD • 10/28 — EOC Mock Tabletop Exercise • 10/29 — Safety Committee Meeting Page 1 of 1 Page 21 of 119 e TRUCKEE DONNER 4o PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 FROM: Martina Rochefort, District Clerk/Executive Assistant SUBJECT: District Clerk's Office - Department Update Below is an overview of anticipated agenda items for the next two board meetings, as well as upcoming community and association events. The information below is intended to assist the Board in preparing for discussions and engagements throughout the remainder of 2026 and into early 2027. November 4, 2026 Board Meeting -Public Hearing to approve the Electric System Master Plan and Negative Declaration -Power Cost Adjustment -Closeout of District Pipeline Replacement — 2026 Construction Contract -Closeout of District Pipeline Installation — Hirschdale Pipeline Construction Contract December 2, 2026 Board Meeting -Annual Procurements 2027 -Set 2027 Board Calendar -Annual Election of Officers -Annual Review of Investment Policy -Financing Corp Meeting - Set Officers Upcoming Community Events October 17, 2026 — Big Truck Day Upcoming Association Events December 1-3, 2026 — ACWA Fall Conference (Anaheim, CA) March 31-April 1, 2027 — CSDA Legislative Day (Sacramento, CA) May 11-13, 2027 - ACWA Spring Conference (San Francisco, CA) Page 1 of 1 Page 22 of 119 TRUCKEE DON N ER AGENDA ITEM #8 PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 TO: Board of Directors FROM: Jillian Steward, Director of Human Resources & Risk Management SUBJECT: District's Workforce Vacancies, Recruitment, and Retention Efforts /) r APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: a.) Conduct a Public Hearing regarding the District's Workforce Vacancies, Recruitment, and Retention Efforts in compliance with AB 2561; and b.) Provide feedback to staff BACKGROUND: To address the widespread and significant problem job vacancies in the public sector pose to the State of California, Governor Newsom signed Assembly Bill 2561 (AB 2561) on September 22, 2024. AB 2561 creates new requirements for public agencies to report before the governing board on vacant positions as well as recruitment and retention efforts through a public hearing at least once per fiscal year. If the governing board will be adopting an annual or multiyear budget during the fiscal year, the presentation shall be made prior to the adoption of the final budget. As part of the hearing, public agencies, including the District, must identify any challenges and potential necessary changes to policies, procedures, and recruitment activities to overcome these challenges. This was last presented to the Board through a Public Hearing on October 1, 2025. If the number of budgeted job vacancies represented by a single bargaining unit meets or exceeds 20 percent of the total number of authorized full-time positions, the public agency shall, upon request of the recognized employee organization, include additional information during the public hearing. This information includes total number of job vacancies within a bargaining unit, total number of applicants, average number of days to complete the hiring process, and opportunities to improve compensation and other working conditions. The recognized employee organization for a bargaining unit shall be entitled to make a presentation at the public hearing. At the September 02, 2026, regularly scheduled Board Meeting, the Board approved the scheduling of a Public Hearing to be held on October 7, 2026, in accordance with AB 2561 to present the District's Workforce Vacancies, Recruitment and Retention efforts. Page 1 of 3 Page 23 of 119 ANALYSIS AND BODY: The District maintains a Memorandum of Understanding (MOU) with one labor bargaining unit, International Brotherhood of Electrical Workers 1245 (IBEW 1245), representing 52 budgeted positions with 4 vacancies, resulting in a 7.6% vacancy rate. This is below the 20% threshold of the AB 2561 requirements to provide additional information at the request of IBEW 1245. Below are the current vacancies: 2 - Journeyman Lineman 1 — Customer Service Representative 1 —Accounting Specialist During last year's Public Hearing on the District's Workforce Vacancies, Recruitment and Retention Efforts, it was presented to the Board that the District was re-evaluating the Electric Department organizational structure for the most effective use of positions. This was completed and resulted in the promotion of two staff members to Troubleman, which in turn created two vacant positions for journeyman lineman. This is an active recruitment. The Customer Service Representative is expected to be filled within the next few weeks. The Accounting Specialist position is not currently posted as an active recruitment while the job description is being reviewed and will be updated if needed. The District is confident in our current ability to hire for open positions through our competitive wages, benefit package, and work environment. The District regularly reviews policies, procedures, recruitment and retention efforts to remain competitive in the local and utility industry labor markets, and retain our current qualified staff. In 2024 the District underwent a compensation and organizational structure study to review current positions in the labor market and to use during negotiations of a new contract with IBEW 1245. A new contract was approved in March 2025 which included market wage adjustments as appropriate, cost of living adjustments, meal/expense benefit increases, and other work condition improvements. All of which positively impacted the District's ability to recruit and retain staff. The District will have another opportunity to review and partner with IBEW 1245 in 2027 during negotiations of a new contract for 2028. The District strives to provide a good work environment through staff development opportunities and regular feedback opportunities through our committees on culture and safety. Ongoing challenges to the District's ability to hire and retain employees include the high cost of living and limited housing inventory in Truckee, as well as the availability of qualified employees within the utility sector. These challenges become increasingly difficult as the District continues providing a competitive wage in the same job market as investor-owned utilities, while managing increasing operational costs. To address these current and future challenges, the District has embraced a "grow your own" local workforce approach through our relationships with students at all levels within our school district, seasonal job opportunities, internships, apprenticeships, and the District Page 2 of 3 Page 24 of 119 awarded its first TDPUD Workforce Scholarships earlier this year. This summer, the District also implemented our new job board and online application website through our new HRIS software, NEOGOV. NEOGOV provides more visibility and further reach to candidates who are looking for and are qualified for, public sector jobs. We will continue to monitor the impact of NEOGOV, and it's ability to increase our qualified applicant pool as more positions are hired through this new process. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: There is no direct fiscal impact with this item. ATTACHMENTS: None Page 3 of 3 Page 25 of 119 TRUCKEE DON N ER AGENDA ITEM #9 PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 TO: Board of Directors FROM: Melanie Rives, Finance & Accounting Manager SUBJECT: Treasurer's Report, October 2026 /) r APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Approve the Treasurer's Report for October 2026 which includes: a. Fund Balances for the Month of July 2026 b. Disbursements for the Month of August 2026 BACKGROUND: ANALYSIS AND BODY: GOALS AND OBJECTIVES: FISCAL IMPACT: ATTACHMENTS: 1. 2026-10 Treasurer's Report Page 1 of 1 Page 26 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT TREASURER'S REPORT October 7, 2026 Fund Balances for the Month July 31, 2026 And Disbursements for the Month August 31, 2026 (includes Government Code section 53065.5 items) Page 1 of 15 Page 27 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Summary report of fund balances for the month ending July 31, 2026 and disbursements for August 2026. 1) REQUEST FOR APPROVAL OF DISBURSEMENTS and Check Summary The attached listing of checks and ACH payments issued during August 2026 total $5,149,867.87 in disbursements. 2) EMPLOYEE REIMBURSEMENT FOR INDIVIDUAL CHARGES Per Government Code 53065.5: Each special district, as defined by subdivision (a) of Section 56036, shall, at least annually, disclose any reimbursement paid by the district within the immediately preceding fiscal year of at least one hundred dollars ($100) for each individual charge for services or product received. "Individual charge" includes, but is not limited to, one meal, lodging for one day, transportation, or a registration fee paid to any employee or member of the governing body of the district. The disclosure requirement shall be fulfilled by including the reimbursement information in a document published or printed at least annually by a date determined by that district and shall be made available for public inspection. The Disbursements listing referenced in 1) includes above subject reimbursements information, as applicable. 3) STATEMENT OF GENERAL FUND: As of July 31 , 2026 the balance in the General Fund was $18,410,284 (Electric $9,678,722 and Water $8,731,562). 4) FUNDS STATUS REPORT: The total of all funds held in cash and on deposit with US Bank, the Local Agency Investment Fund, Placer County Investment Fund, Utah Public Treasurers' Investment Fund, California CLASS, BNY and TVI Investments as of July 31, 2026 was $66,786,239 ($47,042,260 Electric and $19,743,980 Water). 5) INVESTMENT STATUS REPORT: The majority of the District's investments are in California's Local Agency Investment Fund (LAIF), Utah Public Treasurers' Investment Fund (UPTIF), California CLASS, and the Placer County Investment Fund (PCIF). The earnings rates for the last 13 months were: LAIF PCIF UPTIF 1 YR T-BILL TVI CLASS July 2025 4.26% 3.97% 4.47% 3.94% 0.55% 4.34% August 2025 4.25% 3.86% 4.47% 3.70% 0.55% 4.33% September 2025 4.21% 3.88% 4.38% 3.53% 0.55% 4.27% October 2025 4.15% 3.76% 4.27% 3.56% 0.55% 4.19% November 2025 4.10% 3.91% 4.13% 3.47% 0.55% 4.04% December 2025 4.03% 3.77% 4.01% 3.35% 0.55% 3.88% January 2026 3.93% 3.80% 3.86% 3.35% 0.55% 3.78% February 2026 3.87% 3.99% 3.86% 3.35% 0.55% 3.74% March 2026 3.83% 3.81% 3.86% 3.53% 0.55% 3.70% April 2026 3.81% 3.89% 3.86% 3.57% 0.55% 3.69% May 2026 3.81% 3.80% 3.86% 3.64% 0.55% 3.70% June 2026 3.82% 3.85% 3.89% 3.81% 0.55% 3.70% July 2026 3.84% 3.82% 3.89% 3.89% 0.55% 3.72% Page 2 of 15 Page 28 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Request for Approval of Disbursements The disbursements of the Truckee Donner Public Utility District for the month of August 2026 totaled $5,149,867.87. A listing of those disbursements is attached. DISBURSEMENTS METRICS (excludes Payroll): Accounts Payable (A/P) Metrics $ A/P Disbursements 10,000,000.00 8,000,000.00 — 6,000,000.00 4,000,000.00 F 2,000,000.00 -fill 1114 111111 it 0.00 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ■2022 ■2023 ■2024 ■2025 2026 # A/P Payments Issued 350 — 300 — — 250 200 150 100 50 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ■2022 ■2023 ■2024 ■2025 2026 # A/P I nvoices Vouchered 1,000 800 600 400 200 a 11114wil Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ■2022 ■2023 ■2024 ■2025 ■2026 Page 3 of 15 Page 29 of 119 Truckee Donner Public Utility District Check Register CA August 2026 Gov.Code 53065.5 Check/Tran Date Type Vendor Vendor Name Item Reference Amount 6679 8/1/2026 WIRE 10360 AFLAC EMPLOYEE PAID INSURANCE $ 1,848.48 6682 8/1/2026 WIRE 1359 CALIPERS OPEB-CERBT MONTHLY CONTRIBUTION 11,417.00 6696 8/1/2026 WIRE 10737 US BANK GOVERNMENT SERVICES CREDIT CARD CHARGES 25,611.76 6684 8/3/2026 WIRE 5151 NRECA HEALTH 125 ADMINISTRATIVE FEES 472.50 51025 8/6/2026 DD 1537 AMAZON CAPITAL SERVICES,INC MATERIALS&SERVICES 489.22 51026 8/6/2026 DD 134 ANIXTER INC. MATERIALS&SERVICES 8,941.28 51027 8/6/2026 DD 10367 CCMEDIA PUBLISHING,LLC. MARKETING 1,250.00 51028 8/6/2026 DD 1624 CLOUDFIRE INC PROFESSIONAL SERVICES:OTHER 3,000.00 51029 8/6/2026 DD 577 COOPERATIVE RESPONSE CENTER INC. ANSWERING SERVICE 3,829.47 51030 8/6/2026 DD 2263 EMPIRE SOUTHWEST,LLC. REPAIRS&MAINTENANCE 79.48 51031 8/6/2026 DD 1167 ERPR,LLC PROFESSIONAL SERVICES:MARKETING 3,500.00 51032 8/6/2026 DD 5840 FERGUSON ENTERPRISES INC INVENTORY 10,668.48 51033 8/6/2026 DD 1484 FUENTES CONSULTING LLC PROFESSIONAL SERVICES:OTHER 3,950.00 51034 8/6/2026 DD 2254 FULL HEART DESIGN PROFESSIONAL SERVICES:MARKETING 5,250.00 51035 8/6/2026 DD 3340 GENERAL PACIFIC INC INVENTORY 6,907.22 51036 8/6/2026 DD 3480 GRAINGER INC. MATERIALS&SERVICES 609.74 51037 8/6/2026 DD 1577 HUNT&SONS,LLC FUEL/OIL FOR VEHICLES 8,288.43 51038 8/6/2026 DD 1305 JW WELDING SUPPLIES&TOOLS MATERIALS&SERVICES 348.65 51039 8/6/2026 DD 9654 JESSE LEDESMA* EMPLOYEE DEVELOPMENT 152.26 51040 8/6/2026 DD 1149 LOOMIS BANKING CHARGES 1,087.37 51041 8/6/2026 DD 1161 MADER SUPPLY,LLC INVENTORY 266,303.90 51042 8/6/2026 DD 1099 MOANA NURSERY PROFESSIONAL SERVICES:OTHER 325.00 51043 8/6/2026 DD 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 51.42 51044 8/6/2026 DD 5130 NCPA MEMBERSHIP DUES 10,601.00 51045 8/6/2026 DD 1079 O'REILLY AUTO PARTS MISC PARTS&SUPPLIES 96.54 S1046 8/6/2026 DD 820 ONESOURCE SUPPLY SOLUTIONS INVENTORY 4,676.10 S1047 8/6/2026 DD 775 ONLINE INFORMATION SERVICES CREDIT CHECK SERVICES 270.95 S1048 8/6/2026 DD 5730 PORTER SIMON LEGAL SERVICES 7,739.40 S1049 8/6/2026 DD 9936 EMPLOYEE VISION REIMBURSEMENT 187.83 S1050 8/6/2026 DD 1606 SAAS E SOLUTIONS,LLC PROFESSIONAL SERVICES:PROGRAM DELIVERY 5,075.00 51051 8/6/2026 DD 6402 SIERRA PACIFIC POWER CO PURCHASED POWER-SPPC&NEVADA POWER 59,159.06 51052 8/6/2026 DD 1357 SWIFT COMMUNICATIONS OF CALIFORNIA GENERAL ADVERTISEMENT 714.00 51053 8/6/2026 DD 7313 TAHOE SUPPLY COMPANY FACILITY SUPPLIES 111.27 51054 8/6/2026 DD 26 THE BANK OF NEW YORK MELLON DEBT PAYMENTS MONTHLY FUNDINGS(3 COPS) 212,078.99 51055 8/6/2026 DD 448 TRUCKEE TAHOE RADIO LLC MARKETING 2,611.70 51056 8/6/2026 DD 1286 TYNDALE COMPANY INC EMPLOYEE UNIFORM 1,505.24 51057 8/6/2026 DD 10584 UAMPS PURCHASED POWER-LAMPS 875,775.45 51058 8/6/2026 DD 10380 ULINE MATERIALS&SERVICES 250.17 51059 8/6/2026 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 306.48 51060 8/6/2026 DD 1538 USA FLEET SOLUTIONS MISC PARTS&SUPPLIES 1,461.00 51061 8/6/2026 DD 1649 VIP POWERLINE,CORP NORTHWOODS REBUILD-SNOWPEAKTO A59 12,335.00 51062 8/6/2026 DD 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 675.00 137302 8/6/2026 CHK 99999 JONALEE ADRIANO CUSTOMER REFUND-CLOSED ACCOUNT 351.74 137303 8/6/2026 CHK 657 AT&T COMMUNICATIONS 284.87 137304 8/6/2026 CHK 240 AUDIO ON-HOLD ON-HOLD PHONE SYSTEM 79.00 137305 8/6/2026 CHK 99999 JAMES BARBREE CUSTOMER REFUND-CLOSED ACCOUNT 893.43 137306 8/6/2026 CHK 1072 CONSOLIDATED ELECTRICAL DIST MATERIALS&SERVICES 127.09 137307 8/6/2026 CHK 99999 RICHARD DE JONG CUSTOMER REFUND-CLOSED ACCOUNT 451.62 137308 8/6/2026 CHK 99999 BRENDA DELGADILLO CUSTOMER REFUND-CLOSED ACCOUNT 230.64 137309 8/6/2026 CHK 99999 PETER FLEMING CUSTOMER REFUND-CLOSED ACCOUNT 570.10 137310 8/6/2026 CHK 99999 PAUL GRAHAM CUSTOMER REFUND-CLOSED ACCOUNT 65.81 137311 8/6/2026 CHK 1242 GRATEFUL GARDENS BUILDING MAINTENANCE 1,350.00 137312 8/6/2026 CHK 99999 MR MICHAEL DJACOBSON CUSTOMER REFUND-CLOSED ACCOUNT 240.00 137313 8/6/2026 CHK 99999 YOUNG A KIM CUSTOMER REFUND-CLOSED ACCOUNT 13.68 137314 8/6/2026 CHK 99999 MR CLYDE A KLADT III CUSTOMER REFUND-CLOSED ACCOUNT 28.26 137315 8/6/2026 CHK 6401 LIBERTY UTILITIES ELECTRIC FOR PUMP STATION 1,068.53 137316 8/6/2026 CHK 5151 NRECA AUGUST 2O26 INSURANCE 15,921.58 137317 8/6/2026 CHK 5150 NRECA GROUP BENEFITS TRUST AUGUST 2O26 INSURANCE 240,657.30 137318 8/6/2026 CHK 5222 ODP BUSINESS SOLUTIONS LLC FACILITY SUPPLIES 114.46 137319 8/6/2026 CHK 1398 SCHINDLER ELEVATOR CORP BUILDING MAINTENANCE 571.61 137320 8/6/2026 CHK 9928 KOLBY SILKWOOD* EMPLOYEE DEVELOPMENT 260.00 137321 8/6/2026 CHK 10761 SOUTHWEST GAS CORP. UTILITIES:NATURAL GAS 187.36 137322 8/6/2026 CHK 6940 TAHOE TRUCKEE SANITATION AGENCY VILLAGE AT GRAY'S-SCOUT HOTEL 50.00 137323 8/6/2026 CHK 6920 TAHOE TRUCKEE SIERRA DISPOSAL LANDFILL CHARGES 3,919.76 137324 8/6/2026 CHK 7040 TEICHERT&SON INC CREDIT DE MATERIALS&SERVICES 943.87 137325 8/6/2026 CHK 99999 THE GOOD WOLF BREWING COMPANY CUSTOMER REFUND-CLOSED ACCOUNT 771.01 137326 8/6/2026 CHK 10206 TRUCKEE CHAMBER OF COMMERCE MEMBERSHIP DUES 925.00 137327 8/6/2026 CHK 11041 TRUCKEE PAINT MART INC. MATERIALS&SERVICES 1,899.56 137328 8/6/2026 CHK 7320 TRUCKEE TAHOE LUMBER CO MATERIALS&SERVICES 35.36 137329 8/6/2026 CHK 526 WESTERN INDUSTRIAL PARTS INC. MISC PARTS&SUPPLIES 361.96 137330 8/6/2026 CHK 99999 SEMAJA WILLIAMS CUSTOMER REFUND-CLOSED ACCOUNT 425.29 6683 8/7/2026 WIRE 3824 MISSIONSQUARE 457/401A CONTRIBUTIONS 9642 FINAL 463.86 6685 8/7/2026 WIRE 540 CALIPERS 457 DEFERRED COMP PRGM CALIPERS 457 CONTRIBUTIONS 9642 FINAL 300.00 6686 8/7/2026 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING 9642 FINAL 2,375.03 6687 8/7/2026 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING 9642 FINAL 626.01 137331 8/7/2026 CHK PL PAYROLL PAYROLL FINAL CHECK 4,410.77 6689 8/11/2026 WIRE 6731 CALIFORNIA DEPARTMENT OF TAXAND FEE USE TAX PAYABLE 842.00 6681 8/13/2026 PL PL PAYROLL PAYROLL DIRECT DEPOSIT 275,841.78 6688 8/13/2026 WIRE 3824 MISSIONSQUARE 457/401A CONTRIBUTIONS PPE O8/07/2026 41,440.32 6690 8/13/2026 WIRE 11233 CALIPERS PENSION 76,348.95 6691 8/13/2026 WIRE 540 CALIPERS 457 DEFERRED COMP PRGM CALIPERS 457 CONTRIBUTIONS PPE 08/07/2026 23,805.95 6692 8/13/2026 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING PPE 08/07/2026 139,746.24 6693 8/13/2026 WIRE 905 HEALTHEQUITY INC. EMPLOYEE HSA CONTRIBUTIONS PPE 08/07/26 1,267.81 6694 8/13/2026 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING PPE O8/07/2026 32,490.03 51135 8/13/2026 DD 5440 ALTEC INDUSTRIES INC REPAIRS&MAINTENANCE 425.36 51136 8/13/2026 DD 1537 AMAZON CAPITAL SERVICES,INC OFFICE SUPPLIES 843.40 Page l of Page 4 of 15 Page 30 of 119 Truckee Donner Public Utility District Check Register CA August 2026 Gov.Code 53065.5 CheckJTran Date Type Vendor Vendor Name Item Reference Amount 51137 8/13/2026 DD 134 ANIXTER INC. INVENTORY 272.61 51138 8/13/2026 DD 1636 BRADY GENERAL ENGINEERING,INC. HIRSCHDALE CONN PIPELINE&PRV STATION 76,215.08 51139 8/13/2026 DD 1627 EDC BUILDERS,INC. TOOLS 20,376.18 51140 8/13/2026 DD 1472 EMERALD TRANSFORMER LA LLC PURCHASE TRANSFORMERS 709.34 51141 8/13/2026 DD 2263 EMPIRE SOUTHWEST,LLC. REPAIRS&MAINTENANCE 142.10 51142 8/13/2026 DD 848 FASTENAL SRIP6 GLENSHIRE DR&WILDFIRE HARDENING 1,253.37 51143 8/13/2026 DD 5840 FERGUSON ENTERPRISES INC MATERIALS&SERVICES 2,798.12 51144 8/13/2026 DD 3349 GLOBALRENTALCOINC RENTAL VEHICLE 7,549.46 51145 8/13/2026 DD 3480 GRAINGER INC. MATERIALS&SERVICES 774.96 51146 8/13/2026 DD 3S3S GRAYBAR ELECTRIC CO INC MARTIS VALLEY SUBSTATION MODERNIZATION 124.98 51147 8/13/2026 DD 3820 I BEW LOCAL 1245 UNION DUES-AUGUST-EE CONTRIBUTIONS 7,072.54 51148 8/13/2026 DD 1665 MOUNTAIN EAP EMPLOYEE RELATIONS&WELLNESS PROGRAM 225.00 51149 8/13/2026 DD 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 482.88 51150 8/13/2026 DD 1419 MUNICIPAL MAINTENANCE EQUIPMENT REPAIRS&MAINTENANCE 702.96 51151 8/13/2026 DD 289 NISC JULY 2026 MISC 22,693.73 51152 8/13/2026 DD 970 NORTHERN CALIFORNIA JOINT POLE ASSN MEMBERSHIP DUES 21.03 51153 8/13/2026 DD 494 NV5,INC. VARIOUS PROJECTS 264,028.00 51154 8/13/2026 DD 1079 O'REILLY AUTO PARTS REPAIRS&MAINTENANCE 491.65 511SS 8/13/2026 DD 1461 PROBOLSKY RESEARCH,LLC PROFESSIONAL SERVICES:CUSTOMER SURVEYS 29,750.00 51156 8/13/2026 DD 1556 PURCELL TIRE COMPANY REPAIRS&MAINTENANCE 4,002.98 51157 8/13/2026 DD 1638 ROAD SAFETY INC. NORTHWOODS REBUILD-SNOWPEAK TO A59 20,871.50 51158 8/13/2026 DD 1371 RUPPERT,INC. SRIP-FIBER 227,626.66 51159 8/13/2026 DD 10438 STB ELECTRICAL TEST EQUIP INC SAFETY SUPPLIES 1,514.25 51160 8/13/2026 DD 6655 SUNRISE ENVIRONMENTAL SCIENTIFIC FACILITY SUPPLIES 896.88 51161 8/13/2026 DD 6880 TAHOE INSTANT PRESS PROMOTIONAL HANDOUT/MATERIALS 320.53 51162 8/13/2026 DD 1157 TAIT NORTH AMERICA,INC DMR RADIO INFRASTRUCTURE&IMPROVEMENT 28,454.14 51163 8/13/2026 DD 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 1,273.00 51164 8/13/2026 DD 7380 UNITED PARCEL SERVICE UPS CHARGES 264.11 51165 8/13/2026 DD 1649 VIP POWERLINE,CORP NORTHWOODS REBUILD-SNOWPEAKTOA59 49,760.00 51166 8/13/2026 DD 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 675.00 51167 8/13/2026 DD 7820 WESTERN NEVADA SUPPLY CO MATERIALS&SERVICES 248.18 51168 8/13/2026 DD 667 WESTERN RENEWABLE ENERGY GENERATION ENVIRONMENTAL COMPLIANCE FEES 372.07 137332 8/13/2026 CHK 657 AT&T COMMUNICATIONS 6,273.77 137333 8/13/2026 CHK 1670 BLACKTOP PAVING CONTRACT SVCS:PAVING/SLURRY 6,231.59 137334 8/13/2026 CHK 999 MARK BOVENZI REFUNDTPP 874.00 137335 8/13/2026 CHK 99999 MRS MELISSA BRADSHAW CUSTOMER REFUND-CLOSED ACCOUNT 24.05 137336 8/13/2026 CHK 381 CAL-NEVADA TOWING REPAIRS&MAINTENANCE 290.00 137337 8/13/2026 CHK 99999 MICHELLE CAMICIA CUSTOMER REFUND-CLOSED ACCOUNT 985.00 137338 8/13/2026 CHK 1073 CLEAN MACHINE REPAIRS&MAINTENANCE 650.00 137339 8/13/2026 CHK 10489 CORELOGIC INFORMATION SOLUTIONS INC LICENSING,MAINTENANCE&SUPPORT 604.68 137340 8/13/2026 CHK 193 EASTERN REGIONAL LANDFILL LANDFILL CHARGES 164.10 137341 8/13/2026 CHK 348 EDGES ELECTRICAL GROUP MATERIALS&SERVICES 318.36 137342 8/13/2026 CHK 999 FENLEY FAMILY FORESTRY HYDRANT METER RENTAL REFUND 2,500.00 137343 8/13/2026 CHK 99999 TAYLOR HALSEY CUSTOMER REFUND-CLOSED ACCOUNT 1,050.00 137344 8/13/2026 CHK 341 HANSEN BROS.ENTERPRISES 2026 PIPELINE REPLACEMENT 295,659.88 137345 8/13/2026 CHK 1210 IMPACT EQUIPMENT COMPANY MATERIALS&SERVICES 123.01 137346 8/13/2026 CHK 10932 J&L FOOD MART&CARWASH REPAIRS&MAINTENANCE 130.00 137347 8/13/2026 CHK 99999 RONALD KINGSFORD CUSTOMER REFUND-CLOSED ACCOUNT 230.00 137348 8/13/2026 CHK 1067 LAKESIDE PAVING&SEALING CONTRACT SVCS:PAVING/SLURRY 705.00 137349 8/13/2026 CHK 6401 LIBERTY UTILITIES ELECTRIC FOR PUMP STATION 315.70 137350 8/13/2026 CHK 99999 ALAN MINSK CUSTOMER REFUND-CLOSED ACCOUNT 181.94 137351 8/13/2026 CHK 999 SIERRA LAND IMPROVEMENT INC HYDRANT METER RENTAL DEPOSIT REFUND 2,500.00 137352 8/13/2026 CHK 548 THE AUTO&TIRE DOCTOR INC. REPAIRS&MAINTENANCE 27.18 137353 8/13/2026 CHK 7175 TRANSWORLD SYSTEMS INC COLLECTION SERVICES 123.70 137354 8/13/2026 CHK 11041 TRUCKEE PAINT MART INC. MATERIALS&SERVICES 512.42 137355 8/13/2026 CHK 10175 WHITE CAP,L.P. MATERIALS&SERVICES 72.50 51169 8/20/2026 DD 5440 ALTEC INDUSTRIES INC REPAIRS&MAINTENANCE 703.74 51170 8/20/2026 DD 1537 AMAZON CAPITAL SERVICES,INC SAFETY SUPPLIES 1,753.79 51171 8/20/2026 DD 134 ANIXTER INC. INVENTORY 24,824.75 51172 8/20/2026 DD 1102 BROOKS BROTHERS TRAILERS REPAIRS&MAINTENANCE 56.03 51173 8/20/2026 DD 1251 CONSTRUCTION MATERIALS ENGINEERS,INC. 2026 CONSTRUCTION INSPECTION SERVICES 80,165.00 51174 8/20/2026 DD 10376 CORWIN FORD RENO REPAIRS&MAINTENANCE 2,734.57 51175 8/20/2026 DD 10650 EUROFINS EATON ANALYTICAL INC. WATER SAMPLE ANALYSIS 714.00 51176 8/20/2026 DD 5840 FERGUSON ENTERPRISES INC MATERIALS&SERVICES 24,712.19 51177 8/20/2026 DD 10645 GEI CONSULTANTS INC PROFESSIONAL SERVICES:OTHER 15,535.98 51178 8/20/2026 DD 1652 GENERIKAL DESIGN PROFESSIONAL SERVICES:MARKETING 2,000.00 51179 8/20/2026 DD 3349 GLOBALRENTALCOINC RENTAL VEHICLE 6,222.14 51180 8/20/2026 DD 3480 GRAINGER INC. FIELD SUPPLIES 2,375.01 51181 8/20/2026 DD 3515 GRAYBAR ELECTRIC CO INC MARTIS VALLEY SUBSTATION MODERNIZATION 712.59 51182 8/20/2026 DD 277 HACH COMPANY MATERIALS&SERVICES 1,586.12 51183 8/20/2026 DD 1577 HUNT&SONS,LLC FUEL/OIL FOR VEHICLES 8,243.06 51184 8/20/2026 DD 115 KIMBALL-MIDWEST MATERIALS&SERVICES 93.74 51185 8/20/2026 DD 924 KWA SAFETY&HAZMAT CONSULTANTS INC SAFETY MEETING 1,619.74 51186 8/20/2026 DD 10008 MOTION&FLOW CONTROL PRODUCTS,INC. MISC PARTS&SUPPLIES 397.44 51187 8/20/2026 DD 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 121.07 51188 8/20/2026 DD 490 VISA SAFETY SALES LLC MATERIALS&SERVICES 1,593.58 51189 8/20/2026 DD 1419 MUNICIPAL MAINTENANCE EQUIPMENT REPAIRS&MAINTENANCE 33.83 51190 8/20/2026 DD 494 NV5,INC. VARIOUS PROJECTS 120,531.55 51191 8/20/2026 DD 820 ONESOURCE SUPPLYSOLUTIONS MATERIALS&SERVICES 16,987.66 51192 8/20/2026 DD 1623 RINCON CONSULTANTS,INC ENVIRONMENTAL COMPLIANCE FEES 20,000.00 51193 8/20/2026 DD 552 RK CONTRACTORS INC. POLE CHANGE OUTS 12,892.29 51194 8/20/2026 DD 1638 ROAD SAFETY INC. NORTHWOODS REBUILD-SNOWPEAKTOA59 21,426.50 51195 8/20/2026 DD 6155 SAFETY-KLEEN CORPORATION HAZARDOUS MATERIAL COMPLIANCE 232.75 51196 8/20/2026 DD 7313 TAHOE SUPPLY COMPANY FACILITY SUPPLIES 546.94 51197 8/20/2026 DD 155 THE BANK OF NEW YORK MELLON ANNUAL ADMIN COSTS 4,620.00 51198 8/20/2026 DD 7300 TRUCKEE RENTS INC MATERIALS&SERVICES 18.52 Paget of Page 5 of 15 Page 31 of 119 Truckee Danner Public Utility District Check Register CA August 2026 Gov.Code 53065.5 Check/Tran Date Type Vendor Vendor Name Item Reference Amount 51199 8/20/2026 DD 10380 ULINE FIELD SUPPLIES 315.15 51200 8/20/2026 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 391.41 51201 8/20/2026 DD 643 UNITED SITE SERVICES OF NEVADA MATERIALS&SERVICES 1,302.92 51202 8/20/2026 DD 320 W&TGRAPHIX SCREEN PRINTING& EMPLOYEE UNIFORMS 46.33 51203 8/20/2026 DD 1546 WATERS CHIROPRACTIC DMV PHYSICAL 150.00 51204 8/20/2026 DD 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 615.00 51205 8/20/2026 DD 60 XEROX BUSINESS SOLUTIONS XEROX COPIER LEASE 11.45 137356 8/20/2026 CHK 1084 ALL STAR RENTS MATERIALS&SERVICES 4,542.90 137357 8/20/2026 CHK 1527 AT&T MOBILITY CELL PHONE CHARGES 2,180.68 137358 8/20/2026 CHK 348 EDGES ELECTRICAL GROUP MATERIALS&SERVICES 4,637.76 137359 8/20/2026 CHK 78 FEDERAL EXPRESS CORPORATION FEDERAL EXPRESS CHARGES 53.33 137360 8/20/2026 CHK 99999 HUMBLE BEGINNINGS CUSTOM HOMES CUSTOMER REFUND-CLOSED ACCOUNT 225.59 137361 8/20/2026 CHK 1067 LAKESIDE PAVING&SEALING CONTRACT SVCS:PAVING/SLURRY 44,125.00 137362 8/20/2026 CHK 7220 NAPA SIERRA MATERIALS&SERVICES 9.15 137363 8/20/2026 CHK 5222 ODP BUSINESS SOLUTIONS LLC OFFICE SUPPLIES 1,350.94 137364 8/20/2026 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 183,559.03 137365 8/20/2026 CHK 10101 PITNEY BOWES OFFICE SUPPLIES 211.32 137366 8/20/2026 CHK 322 POLLARDWATER MATERIALS&SERVICES 843.61 137367 8/20/2026 CHK 10573 PURCHASE POWER PREPAID POSTAGE 1,046.99 137368 8/20/2026 CHK 419 QCS LLC BUILDING MAINTENANCE 5,312.00 137369 8/20/2026 CHK 6273 SAUERS ENGINEERING INC SITZMARK PUMP STATION REPLACEMENT 29,911.00 137370 8/20/2026 CHK 675 SHERWIN-WILLIAMS MATERIALS&SERVICES 204.92 137371 8/20/2026 CHK 548 THEAUTO&TIRE DOCTOR INC. REPAIRS&MAINTENANCE 378.50 137372 8/20/2026 CHK 1669 THE ESTATE OF CHARLES GAZ50 GAZSO FINAL CHECK 9,300.06 6698 8/27/2026 PL PL PAYROLL PAYROLL DIRECT DEPOSIT 279,152.31 6699 8/27/2026 WIRE 3824 MISSIONSQUARE 457/401A CONTRIBUTIONS PPE 08/21/2026 41,546.26 6700 8/27/2026 WIRE 11233 CALPERS PENSION 74,660.48 6701 8/27/2026 WIRE 540 CALPERS 457 DEFERRED COMP PRGM CALPERS 457 CONTRIBUTIONS PPE 08/21/2026 24,331.11 6702 8/27/2026 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING PPE 08/21/2026 139,912.59 6703 8/27/2026 WIRE 905 HEALTHEQUITY INC. EMPLOYEE HSA CONTRIBUTIONS PPE 08/21/26 1,267.81 6704 8/27/2026 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING PPE 08/21/2026 33,670.04 51283 8/27/2026 DD 856 ACLARA TECHNOLOGIES LLC DATA COLLECTION UNITS 18,078.24 51284 8/27/2026 DD 1537 AMAZON CAPITAL SERVICES,INC OFFICE SUPPLIES 939.02 51285 8/27/2026 DD 134 ANIXTER INC. INVENTORY 6,228.53 51286 8/27/2026 DD 11443 AUTOGLASS/MOTORSPORTS EXPRESS-TRUCKEE REPAIRS&MAINTENANCE 594.97 51287 8/27/2026 DD 2257 BAKER TILLY US,LLP PROFESSIONAL SERVICES:AUDIT 3,198.49 51288 8/27/2026 DD 515 BRAGG CRANE SERVICE CONTRACT SERVICES:ROW TREE CLEARING 2,145.00 51289 8/27/2026 DD 893 DEBBIE MADERA CLEANING SERVICE BUILDING CLEANING 7,004.00 51290 8/27/2026 DD 361 FIRST CHOICE SERVICES FACILITY SUPPLIES 870.62 51291 8/27/2026 DD 3349 GLOBALRENTALCOINC RENTAL VEHICLE 4,245.65 51292 8/27/2026 DD 3480 GRAINGER INC. FIELD SUPPLIES 236.38 51293 8/27/2026 DD 1116 HUNT&SONS,INC FUEL/OIL FOR VEHICLES 2,073.23 51294 8/27/2026 DD 115 KIMBALL-MIDWEST MATERIALS&SERVICES 93.74 51295 8/27/2026 DD 1161 MADER SUPPLY,LLC INVENTORY 21,872.41 51296 8/27/2026 DD 9710 JENNIFER MASON 53065.5 CHARGING COMMUNITIES FORWARD 202.80 51297 8/27/2026 DD 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 368.52 51298 8/27/2026 DD 1079 O'REILLY AUTO PARTS MATERIALS&SERVICES 508.15 51299 8/27/2026 DD 820 ONESOURCE SUPPLY SOLUTIONS INVENTORY 6,417.38 51300 8/27/2026 DD 1638 ROAD SAFETY INC. NW REBUILD/HARDENING-TD3 SKISLOPE 11,314.00 51301 8/27/2026 DD 9912 MARTINA ROCHEFORT 53065.5 CHARGING COMMUNITIES FORWARD 159.08 51302 8/27/2026 DD 6155 SAFETY-KLEEN CORPORATION HAZARDOUS MATERIAL COMPLIANCE 871.50 51303 8/27/2026 DD 1030 EMPLOYEE VISION REIMBURSEMENT 662.40 51304 8/27/2026 DD 7313 TAHOE SUPPLY COMPANY FACILITY SUPPLIES 312.46 51305 8/27/2026 DD 6360 THATCHER COMPANY OF NEVADA,INC WATER QUALITY:TREATMENT 9,533.70 51306 8/27/2026 DD 26 THE BANK OF NEW YORK MELLON MELLO ROOS TAXES COLLECTED 8,969.52 51307 8/27/2026 DD 712 TRUCKEE DONNER PUD PURCHASED POWER-STAMPEDE HYDRO GEN 31,782.63 51308 8/27/2026 DD 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 215.00 51309 8/27/2026 DD 1286 TYNDALE COMPANY INC EMPLOYEE UNIFORMS 150.38 51310 8/27/2026 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 391.41 51311 8/27/2026 DD 1528 UNISYS CORPORATION LICENSING,MAINTENANCE&SUPPORT 1,640.08 51312 8/27/2026 DD 1649 VIP POWERLINE,CORP NW REBUILD/HARDENING-TD3 SKISLOPE 123,650.00 51313 8/27/2026 DD 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 705.30 137373 8/27/2026 CHK 99999 MR NUMA BESTEIRO CUSTOMER REFUND-CLOSED ACCOUNT 106.62 137374 8/27/2026 CHK 1073 CLEAN MACHINE REPAIRS&MAINTENANCE 700.00 137375 8/27/2026 CHK 78 FEDERAL EXPRESS CORPORATION FEDERAL EXPRESS CHARGES 34.37 137376 8/27/2026 CHK 999 JOHN HRYNKIEWICZ REFUNDTPP 844.00 137377 8/27/2026 CHK 1067 LAKESIDE PAVING&SEALING CONTRACT SVCS:PAVING/SLURRY 13,200.00 137378 8/27/2026 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 80,014.79 137379 8/27/2026 CHK 675 SHERWIN-WILLIAMS MATERIALS&SERVICES 64.79 137380 8/27/2026 CHK 669 STATE WATER RESOURCES CONTROL BOARD EMPLOYEE DEVELOPMENT 100.00 137381 8/27/2026 CHK 61 TECH PRODUCTS INC. MATERIALS&SERVICES 1,214.50 137382 8/27/2026 CHK 999 ALEJANDRO URREAGA REFUNDTPP 844.00 137383 8/27/2026 CHK 682 VERIZON WIRELESS CELL PHONE CHARGES 2,041.58 245 $ 5,149,867.87 *Denotes employee reimbursement containing multiple items with no Individual Item charge of$100 or greater. Page 3of3 Page 6 of 15 Page 32 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT STATEMENT OF GENERAL FUND Activity for the Month Ended 7/31/2026 Page 1 of 2 Electric Dept Water Dept Total Balance in General Fund 6/30/2026 $12,134,013 $9,491,487 $21,625,500 Receipts: Revenue received 3,449,142.34 $2,011,100 $5,460,242 Retired employees medical insurance 26,922 - 26,922 Record interest earned 57,791 74,525 132,316 Transfer from Vehicle Reserve 11,447 - 11,447 FF Funding&DL Surcharge Reimbursement for 2006 COP - 38,250 38,250 Cash clearing accounts(timing-prior month reversal) (183,960) - (183,960) Cash clearing accounts(timing-current month) 86,875 - 86,875 Total Receipts $3,448,218 $2,123,876 $5,572,093 Disbursements: Accounts payable/payroll disbursements $5,824,724 $2,804,978 $8,629,702 Voided checks (9,773) - (9,773) Distribute UPTIF interest 19,692 9,594 29,286 Transfer to Vehicle Reserve - 8,550 8,550 Restrict facilities fees 18,010 51,367 69,377 Restrict Donner Lake surcharge - 9,312 9,312 Section 125 benefit disbursement 35,846 - 35,846 Bank charges 15,009 - 15,009 Total Disbursements $5,903,508 $2,883,801 $8,787,310 Balance in General Fund 7/31/2026 $9,678,722 $8,731,562 $18,410,284 9/1/2026 11:33 AM I:\Treasurers Repo rt\Statement of General Fund\2026\2026-07 GF Page 7 of 15 Page 33 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Funds Status Report Activity for the Month Ended 7/31/2026 Page 2 of 2 Electric Dept Water Dept Total Distribution of Operating Funds At Month-End: Customer Services Operating Funds $2,400 $0 $2,400 Operating clearing accounts 86,875 - 86,875 U.S. Bank-General Fund 797,769 - 797,769 LAIF, UPTIF, PCIF, CLASS&TVI-General Fund 8,791,678 8,731,562 17,523,239 Total Operating Funds $9,678,722 $8,731,562 $18,410,284 Distribution of Designated&Restricted Funds at Month-End: LAIF, UPTIF, PCIF,TVI &CLASS $37,134,487 $9,833,660 $46,968,146 UPTIF-Donner Lake Assessment District - 93,254 93,254 2015 COP Water Bonds, Principal Payment Fund - 655,139 655,139 2022 COP Issuance/Payment Fund 181,931 358,719 540,649 U S Bank-Donner Lake Assessment District 00-1 - 43,171 43,171 Total Designated&Restricted Funds $37,316,417 $10,983,942 $48,300,359 Total Market Adjustments 47,120 28,477 75,597 Total Funds Available $47,042,260 $19,743,980 $66,786,239 9/1/2026 11:33 AM I:\Treasurers Repo rt\Statement of General Fund\2026\2026-07 GF Page 8 of 15 Page 34 of 119 INVESTMENT STATUS REPORT Activity for the Month Ended 7/31/26 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2025 6/30/2026 Activity 7/31/2026 ELECTRIC FUNDS LOCAL AGENCY INVESTMENT FUND(LAIF)-3.84%(3.82%) General Fund 1..136.1 $ 1,097,556 $ 4,583,835 $ (162,254) $ 4,421,581 Consolidate cash 793,878 Book transfer between funds (1,000,000) Quarterly investment income payment received 43,867 Capital Replacement Fund 1..136.41 9,659,626 9,237,452 88,369 9,325,821 Quarterly investment income payment received 88,369 Electric Rate Reserve Fund 1..136.35 510,640 520,371 1,504,982 2,025,352 Quarterly investment income payment received 4,982 Book transfer between funds 1,500,000 AB 32 Cap&Trade Fund 1..136.58 341,584 123,090 1,177 124,267 Quarterly investment income payment received 1,177 Deferred Liabilites Reserve 1..136.42 2,369,514 2,414,691 23,096 2,437,787 Quarterly investment income payment received 23,096 LCFS Credits 1..136.59 117,132 1,016,408 9,721 1,026,129 Quarterly investment income payment received 9,721 Total LAIF Electric Investments 14,096,052 17,895,848 1,465,091 19,360,939 UTAH PUBLIC TREASURERS'INVESTMENT FUND(UPTIF)- 3.89%(3.89%) General Fund 1..136.12 1,146,456 8,308 976,978 985,286 Distribute UPTIF interest (19,692) Restrict facility fees (18,010) Record monthly interest 3,233 Book transfer between funds 1,000,000 Reimbursement from VR for vehicle rentals 11,447 Facilities Fees 1..136.9 388,734 492,777 19,590 512,366 Restrict facilites fees 18,010 Record monthly interest 1,580 Electric Rate Reserve Fund 1..136.45 2,007,961 2,209,863 (1,492,915) 716,948 Record monthly interest 7,085 Book transfer between funds (1,500,000) Capital Replacement Fund 1..136.46 532,775 560,979 1,798 562,777 Record monthly interest 1,798 Electric Vehicle Reserve 1..136.13 1,843,672 2,701,489 (2,786) 2,698,702 Record monthly interest 8,661 Reserve transfer to GF for vehicle rentals (11,447) Total UPTIF Electric Investments 5,919,597 5,973,416 (497,336) 5,476,080 PLACER COUNTY INVESTMENT FUND(PCIF)- 3.82%(3.85%) Electric General Fund PC 1..136.49 507,597 517,400 1,648 519,048 Record monthly interest 1,648 Electric Rate Reserve Fund 1..136.47 1,596,394 1,627,211 5,182 1,632,394 Record monthly interest 5,182 Capital Replacement Fund 1..136.48 1,387,992 1,414,791 4,506 1,419,298 Record monthly interest 4,506 Total PCIF County Electric Investments 3,491,983 3,559,403 11,337 3,570,739 TVI INVESTMENTS- 0.55%(0.55%) Capital Replacement Fund 1..136.43 1,366,550 580,065 - 580,065 Electric Rate Reserve Fund 1..136.44 700,000 306,757 - 306,757 Total TVI Electric Investments 2,066,550 886,822 886,822 9/1/2026 u:so AM Investments Status Report Page 9 of 15 r tmen \7r....-,Report\invest stain,Report,\2o26\2o26-m ain 1-t-nts sts Report Page 1 of 4 Page 35 of 119 INVESTMENT STATUS REPORT Activity for the Month Ended 7/31/26 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2025 6/30/2026 Activity 7/31/2026 CLASS INVESTMENTS- 3.72%(3.70%) General Fund 1..136.16 4,266,101 2,856,720 9,042 2,865,763 Record monthly interest 9,042 Electric Rate Reserve Fund 1..136.22 2,392,046 2,831,078 8,961 2,840,039 Record monthly interest 8,961 Vehicle Reserve Fund 1..136.23 525,608 535,406 1,695 537,101 Record monthly interest 1,695 Capital Reserve Fund 1..136.24 9,391,939 10,355,903 32,780 10,388,682 Record monthly interest 32,780 Total CLASS Electric Investments 16,575,693 16,579,107 52,478 16,631,585 Total Electric Investments $ 42,149,874 $ 44,894,595 $ 1,031,570 $ 45,926,165 9/1/2026 u:so AM Investments Status Report Page 10 of 15 1:\7r....—,Report\inves tment stain,Report,\2o26\2o26-m ain 1—t—nts sts Report Page 2 of 4 Page 36 of 119 INVESTMENT STATUS REPORT Activity for the Month Ended 7/31/26 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2025 6/30/2026 Activity 7/31/2026 WATER FUNDS LOCAL AGENCY INVESTMENT FUND(LAIF)-3.84%(3.82%) General Fund 2..136.1 4,512,859 7,745,493 (771,157) 6,974,336 Consolidate cash (793,878) Quarterly investment income payment received 74,088 Restrict facility fees (51,367) Facilities Fees 2..136.90 1,407,058 1,698,019 (432,390) 1,265,629 Restrict facility fees 51,367 Book transfer between funds (500,000) Quarterly investment income payment received 16,243 Capital Replacement Fund 2..136.41 4,155,814 4,218,277 40,365 4,258,642 Quarterly investment income payment received 40,365 Reserve funding @ budget Total LAIF Water Investments 10,075,732 13,661,789 (1,163,182) 12,498,607 UTAH PUBLIC TREASURERS'INVESTMENT FUND(UPTIF)- 3.89%(3.89%) General Fund 2..136.12 1,485,549 1,136,309 11,232 1,147,540 Transfer to DLAD surcharge (9,312) Distribute UPTIF interest (9,594) DL Surcharge Reimbursement for 2006 COP 8,333 FF Funding portion of 2006 COP 29,917 Transfer to VR for vehicle sales (8,550) Record monthly interest 437 Facilities Fees 2..136.25 197,734 20,680 470,150 490,830 Record monthly interest 66 Transfer to GF for FF Funding portion of 2006 COP (29,917) Transfer between funds 500,000 West River St.Assessment District 2..136.31 45,074 45,963 147 46,111 Record monthly interest 147 Prepaid Connection Fees 2..136.7 39,312 37,825 121 37,947 Record monthly interest 121 Transfer to GF-MW PR connections - Donner Lake Assessment District Fund 2..136.84 91,158 92,956 298 93,254 Record monthly interest 298 Donner Lake Assessment District Surcharge Fund 2..136.61 247,713 258,589 1,807 260,396 DLAD surcharge collections 9,312 DL Surcharge reimbursement to GF for 2006 COP (8,333) Record monthly interest 829 TSA SAD II Improvement Fund 2..136.85 21,745 22,174 71 22,245 Record monthly interest 71 Water Vehicle Reserve 2..136.13 503,750 1,018,393 11,815 1,030,207 Record monthly interest 3,265 Transfer fron GF for vehicle sales 8,550 Deferred Liabilites Reserve 2..136.42 125,787 128,269 411 128,680 Record monthly interest 411 Capital Replacement Fund 2..136.46 141,318 144,106 462 144,568 Record monthly interest 462 Total UPTIF Water Investments 2,899,140 2,905,264 496,514 3,401,778 PLACER COUNTY INVESTMENT FUND(PCIF)- 3.82%(3.85%) Total PCIF Water Investments TVI INVESTMENTS- 0.55%(0.55%) Water General Fund TVI 2..136.15 1,396,171 609,686 - 609,686 Total TVI Water Investments 1,396,171 609,686 609,686 CLASS INVESTMENTS- 3.72%(3.70%) Water Vehicle Reserve 2..136.24 2,102,432 2,141,626 6,779 2,148,404 Record monthly interest 6,779 Total CLASS Water Investments 2,102,432 2,141,626 6,779 2,148,404 Total Water Investments $ 16,473,474 $ 19,318,364 $ (659,889) $ 18,658,475 9/1/2026 u:so AM Investments Status Report Page 11 of 15 1:\7reasor,,,Report\inves tment stain:Report,\2o2a\202a-m i-tme„is stains Report Page 3 of 4 Page 37 of 119 INVESTMENT STATUS REPORT Activity for the Month Ended 7/31/26 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2025 6/30/2026 Activity 7/31/2026 ELECTRIC&WATER INVESTMENTS,COMBINED TOTALS Pre-Market Adjustments Total LAIF Investments 49% 24,171,783 31,557,637 301,909 31,859,546 Total UPTIF Investments 14% 8,818,737 8,878,680 (822) 8,877,857 Total PCIF Investments 6% 3,491,983 3,559,403 11,337 3,570,739 Total TVlInvestments 2% 3,462,722 1,496,508 - 1,496,508 Total CLASS Investments 29% 18,678,124 18,720,732 59,257 18,779,989 Total Investments 100% Month End Bal.Mix $ 58,623,349 $ 64,212,960 $ 371,680 $ 64,584,639 Market Adjustments Total LAIF Investments 52,730 52,730 - 52,730 Total UPTIF Investments 20,180 20,180 20,180 Total PCIF Investments 17,355 17,355 - 17,355 Total TVI Investments (17,366) (17,627) (53) (17,680) Total CLASS Investments 3,011 3,011 3,011 Total Investments $ 75,910 $ 75,648 $ (53) $ 75,596 Post-Market Adjustments Total LAIF Investments 49% 24,224,514 31,610,367 301,909 31,912,276 Total UPTIF Investments 14% 8,838,916 8,898,859 (822) 8,898,037 Total PCIF Investments 6% 3,509,338 3,576,758 11,337 3,588,095 Total TVlInvestments 2% 3,445,356 1,478,880 (53) 1,478,827 Total CLASS Investments 29% 18,681,135 18,723,743 59,257 18,783,000 Total Investments 100% Month End Bal.Mix $ 58,699,258 $ 64,288,607 $ 371,628 $ 64,660,235 9/1/202611:50 AM Investments Status Report Page 12 of 15 I:\Treasurers Report\Investment Status Reports\2026\2026-07 Investments Status Report Page 4 of 4 Page 38 of 119 TRUCKEE DONNER PUD INVESTMENT BALANCES as of July 31,2026 Placer County Utah Public California TVI Fidelity Mmkt Morgan Stanley Dreyfus BNY US Bank Cash/ LAIF Invest Fund Invest Fund CLASS Investments Govt 57 Treas Sec Port Treas Security Treas Cash Res Checking Cash Clearings Total 131.1 ELECTRIC FUNDS General Fund $ 4,421,581 $ 519,048 $ 985,286 $ 2,865,763 $ $ $ $ $ $ 797,769 $ 89,275 $ 9,678,722 Facilities Fees - - 512,366 - - - 512,366 Rate Reserve Fund 2,025,352 1,632,394 716,948 2,840,039 306,757 7,521,490 Capital Reserve Fund 9,325,821 1,419,298 562,777 10,388,682 580,065 22,276,643 Deferred Liabilites Reserve/POB Fund 2,437,787 - - - - 2,437,787 Electric Vehicle Reserve Fund - 2,698,702 537,101 3,235,803 AB 32 Fund 124,267 - - 124,267 LCFS Credits 1,026,129 1,026,129 COP Issuance/Payment Fund - - - 181,931 181,931 Market Adjustments 30,741 17,355 13,546 2,692 17,214 47,120 Total Electric Investments 19,391,680 3,588,095 5,489,625 16,634,277 869,608 181,931 797,769 89,275 47,042,260 WATER FUNDS General Fund $ 6,974,336 $ - $ 1,147,540 $ $ 609,686 $ $ $ $ $ $ 8,731,562 Facilities Fees 1,265,629 490,830 - 1,756,459 Capital Reserve Fund 4,258,642 144,568 2,148,404 6,551,615 2015 COP Funds - - - 655,139 655,139 West River St.Assessment District 46,111 - 46,111 Deferred Liabilites Reserve 128,680 128,680 Prepaid Connection Fees 37,947 37,947 DLAD Fund 93,254 43,171 136,425 DLAD Surcharge 260,396 - 260,396 TSA SAD II Improvement Fund 22,245 22,245 Water Vehicle Reserve 1,030,207 1,030,207 COP Issuance/Payment Fund - - - - 358,719 358,719 Market Adjustments 21,989 6,634 318 465 28,477 Total Water Investments 12,520,596 3,408,412 2,148,723 609,221 655,139 358,719 43,171 19,743,980 Electric and Water,subtotal 31,912,276 3,588,095 8,898,037 18,783,000 1,478,828 655,139 540,649 840,940 89,275 66,786,239 MELLO ROOS-OLD GREENWOOD - - - - - - 235,772 783,311 - - - 1,019,083 Total Mello Roos-Old Greenwood 235,772 783,311 1,019,083 MELLO ROOS-GRAY'S CROSSING 1,867,076 - - 2,123,234 3,990,310 Total Mello Roos-Gray's Crossing 1,867,076 2,123,234 3,990,310 Total Investments $ 33,779,352 $ 3,588,095 $ 8,898,037 $ 18,783,000 $ 1,478,828 $ 655,139 $ 235,772 $ 783,311 $ 2,663,884 $ 840,940 $ 89,275 $ 71,795,633 202606 Last Month End Balances 33,477,443 3,576,758 8,898,859 18,723,743 1,478,880 562,394 235,096 765,882 2,475,860 4,024,560 186,360 74,405,834 Change from last month 301,909 11,337 (822) 59,257 (52) 92,745 677 17,429 188,024 (3,183,620) (97,084) (2,610,201) 202507 PY Month End Balances 28,366,591 3,419,305 8,898,777 15,378,938 5,219,822 625,278 265,902 718,566 2,444,366 1,054,269 72,179 66,463,992 Change from PY Month 5,412,761 168,790 (740) 3,404,062 (3,740,993) 29,860 (30,129) 64,745 219,518 (213,329) 17,097 5,331,641 2025 12 PYE Balances 26,054,126 3,509,338 8,838,916 18,681,135 3,445,356 157,539 230,979 86 269,360 2,116,400 184,397 63,487,630 Change from PYE 7,725,226 78,757 59,121 101,865 (1,966,527) 497,600 4,794 783,226 2,394,524 (1,275,460) (95,121) 8,308,003 I:\Treasurers Report\2026\2026-10 Treasurer's ReportWll Imertm-202607 ZS Page 13 of 15 Page 39 of 119 Ai&I., TRUCKEE DONNER July 2026 Public Utility District Electric Utility - Key Reserve Balances $ thousands $24,000 $22,277 $19,000 $14,000 ■ ■ $9,000 ■ ■ $9,679 ■ ■ ■ ■ ■$7,521 ■ $4,000 r$0 ■ -$1,000 YE 2021 YE 2022 YE 2023 YE 2024 YE 2025 PY Same Last Current YE YE GOAL Month Month Month FORECAST ■ Operating Reserve ■ Rate Reserve ■ Capital Reserve 2022 COP Project Funds 9/1/2026 11:40AM Page 14 of 15 0 FR Report Pack 2026 07 MFS Sec A(3.4) Page 40 of 119 TRUCKEE DONNER July 2026 Public Utility District Water Utility - Key Reserve Balances $ thousands $14,000 $12,000 $10,000 ■ ■ k $8,732 $8,000 ■ ■ ■ ■ ■ $6,552 ■ $6,000 ■ ■ ■ ■ $4,000 ■ $2,000 • • • • • • $1,756 • ■ ■ ■ ■ $1,030 $0 $0 YE 2021 YE 2022 YE 2023 YE 2024 YE 2025 PY Same Last Current YE YE GOAL Month Month Month FORECAST ■ Operating Reserve ■ Vehicle Reserve ■ Capital Reserve 2022 COP Project Funds ° • Facility Fees ° 9/1/2026 11:40AM Page 15 of 15 0 FR Report Pack 2026 07 MFS Sec A(3.4) Page 41 of 119 TRUCKEE DONNER AGENDA ITEM #10 PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 TO: Board of Directors FROM: Mike Swanson, Director of Electric Engineering & Operations SUBJECT: Consideration for the Board to Reschedule the Electric System Master Plan CEQA Public Hearing to November 4, 2026 APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Reschedule the Electric System Master Plan CEQA Public Hearing from October 7, 2026, to November 4, 2026, at 6:OOpm, or as soon thereafter, to receive public comment on the Proposed Negative Declaration. BACKGROUND: The Electric System Master Plan is the District's comprehensive long-range planning document for the electric utility and establishes the strategic framework for maintaining safe, reliable, resilient, and financially sustainable electric service. At the August 5, 2026, Board meeting, District staff and NV5 presented an overview of the Draft Electric System Master Plan during a Board workshop. The Board received the presentation and provided feedback prior to initiation of the California Environmental Quality Act (CEQA) review and adoption process. Following the workshop, NV5 completed the CEQA Initial Study for the Electric System Master Plan. The Initial Study determined that adoption of the Master Plan would not result in significant environmental impacts and supports a Proposed Negative Declaration. At the September 2, 2026, Board meeting, the Board approved the Electric System Master Plan CEQA Initial Study, authorized circulation of the Proposed Negative Declaration for public review, and scheduled a Public Hearing for October 7, 2026, at 6:OOpm, or as soon thereafter, to receive public comment on the Proposed Negative Declaration. ANALYSIS AND BODY: Page 1 of 3 Page 42 of 119 Following the September 2 Board action, staff and NV5 began coordinating the required CEQA public review and notice process for the Proposed Negative Declaration. The required 30-day public review and noticing period will not be completed in advance of the October 7 Public Hearing. As a result, additional time is necessary to complete the CEQA process before the Board considers adoption of the Negative Declaration and Electric System Master Plan. Staff recommends rescheduling the Public Hearing from the previous published date of October 7, 2026, to November 4, 2026. This will allow completion of the required public review period, provide time to receive and evaluate comments, and ensure the complete environmental record is available for Board consideration. The proposed change does not modify the Electric System Master Plan, CEQA Initial Study, or Proposed Negative Declaration. This action only reschedules the Public Hearing date previously established by the Board. Following the November 4, 2026 Public Hearing and consideration of the CEQA record, the Board will consider adoption of the Negative Declaration and formal adoption of the Electric System Master Plan. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: There is no direct fiscal impact associated with this action. Page 2 of 3 Page 43 of 119 ATTACHMENTS: None Page 3 of 3 Page 44 of 119 TRUCKEE DON N ER AGENDA ITEM #11 PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 TO: Board of Directors FROM: Martina Rochefort, District Clerk/Executive Assistant SUBJECT: Board Meeting Minutes /) r APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Consider approval of the September 2, 2026 Regular Meeting and September 8, 2026 Special Meeting Minutes. BACKGROUND: Draft meeting minutes are attached for review. ANALYSIS AND BODY: GOALS AND OBJECTIVES: District Code 1.05.020 Objectives: 1. Responsibly serve the public. 6. Manage the District in an effective, efficient and fiscally responsible manner. FISCAL IMPACT: There is no fiscal impact associated with this item. ATTACHMENTS: 1. Minutes 2026-09-02 DRAFT 2. Minutes 2026-09-08 DRAFT Page 1 of 1 Page 45 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, SEPTEMBER 2, 2026 1. Call to Order Meeting was called to order at 6:00 p.m. 2. Roll Call Directors Present: Steve Randall, Christa Finn, Board President Tony Laliotis Staff in attendance: Brian Wright, General Manager; Scott Crow, Assistant General Manager/Chief Information Officer; Mike Salmon, Chief Financial Officer; Mike Swanson, Director of Electric Operations and Engineering; Chad Reed, Water Utility Director; Steven Poncelet, Public Information & Strategic Affairs Director; Jillian Steward, Director of Human Resources & Risk Manager; Trey Griffin, Senior Network & Systems Administrator; Alex Spychalsky, Communications Program Manager; Martina Rochefort, District Clerk/Executive Assistant Other: Steve Gross, General Counsel Absent: Director Jeff Bender, Vice President Courtney Murrell 3. Pledge of Allegiance Director Finn led the Pledge of Allegiance. 4. Changes to the agenda No changes were made to the agenda. 5. Public Comment No oral public comment was received. Written public comment was received from Eric Sutton. DIRECTOR UPDATE 6. Director Finn and President Laliotis attended the Wildfire Safety Advisory Board (WSAB) Meeting on Tuesday. WSAB was very appreciative and impressed with the job the District is doing. President Laliotis thanked the crews for their work out in Sierra Meadows and staff for their communications during the Hawk Fire. DEPARTMENT UPDATES 7. Department updates were received from Mike Swanson, Director of Electric Operations and Engineering; Chad Reed, Water Utility Director; Mike Salmon, Chief Financial Officer; Alex Spychalsky, Communications Program Manager; Jillian Steward, Director of Human Resources and Risk Management; and Martina Rochefort, District Clerk/Executive Assistant. CONSENT CALENDAR 8. Consideration of Adopting Resolution 2026-15 Authorizing Staff and Special Counsel to Proceed with the Foreclosure Process on all Parcels with Delinquent 1 Page 46 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, SEPTEMBER 2, 2026 Assessments within the CFDs as Required by Bond Covenant. a. Adopt foreclosure Resolution 2026-15 authorizing staff and special counsel to proceed with the foreclosure process on all parcels with delinquent assessments within the CFDs as required by Bond covenant; and b. Authorize the General Manager to execute a contract for legal services with Stradling, Yocca, Carlson, & Rauth for their work relating to the foreclosure on delinquent parcels. 9. Treasurer's Report, September 2026 Approve the Treasurer's Report for September 2026 which includes: a. Fund Balances for the Month of June 2026 b. Disbursements for the Month of July 2026 c. Delinquent accounts receivable write-offs in accordance with District Code section 3.12.020 d. Semi-annual financial statements in accordance with District Code section 3.16.030.7 (F) 10. Board Meeting Minutes Consider approval of the August 5, 2026 Regular Meeting Minutes 11. Consideration to Schedule a Public Hearing on the District's Workforce Vacancies, Recruitment and Retention Efforts Schedule a Public Hearing for October 7, 2026 at 6.00pm or as soon thereafter, to provide information to the public regarding the District's workforce vacancies, recruitment, and retention efforts, receive and consider public input and provide direction to staff. No public comment was received. ACTION: Motion made by Director Finn to approve the Consent Calendar as presented, seconded by Director Randall. AYES: Randall, Finn, Laliotis NAYS: none ABSTAIN: none ABSENT: Bender, Murrell Motion passed. ACTION ITEMS 12. Public request for Board of Directors to revise to District Code, Title 7 Receive and review public request for consideration of revisions or waiver to District Code Title 7 and provide direction to staff. 2 Page 47 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, SEPTEMBER 2, 2026 Brian Wright, General Manager, presented the item. Mike Nethersole of MD Construction and Ciro and Katie Mancuso of Pioneer East Development provided comment. Discussion was held. No additional public comment was received. ACTION: Motion made by Director Randall to deny the request by the applicant to change District Code — Title 7 Electric Service, seconded by Director Finn. AYES: Randall, Finn, Laliotis NAYS: none ABSTAIN: none ABSENT: Bender, Murrell Motion passed. 13. Consideration of Approval of the 2026 Wildfire Mitigation Plan Approve the Truckee Donner Public Utility District 2026 Wildfire Mitigation Plan in substantially the same form presented, and direct staff to submit the Plan to the Wildfire Safety Advisory Board by October 2, 2026. Laura Manz of LJ Manz Consulting, Inc., Independent Evaluator,joined the meeting via zoom. Director of Electric Operations & Engineering presented the item. No public comment was received. Discussion was held. ACTION: Motion made by Director Finn to approve the Truckee Donner Public Utility District 2026 Wildfire Mitigation Plan in substantially the same form presented, and direct staff to submit the Plan to the Wildfire Safety Advisory Board by October 2, 2026, seconded by Director Randall. AYES: Randall, Finn, Laliotis NAYS: none ABSTAIN: none ABSENT: Bender, Murrell Motion passed. 14. 2026 Mid-Year Financial Update Accept and direct staff to file the 2026 mid-year financial update. CFO presented the item. No public comment was received. Discussion was held. ACTION: Motion made by Director Randall to accept report as presented, seconded by Director Finn. AYES: Randall, Finn, Laliotis NAYS: none ABSTAIN: none 3 Page 48 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, SEPTEMBER 2, 2026 ABSENT: Bender, Murrell Motion passed. 15. Consideration of the Donner Trails Tank Rehabilitation and Interior Coating Contract Authorize the General Manager to execute a construction services contract and associated documents with Olympus and Associates, Inc. for the Donner Trails Tank No. 2 Interior Coating Rehabilitation project in an amount of $202,250, plus a ten percent change order allowance of$20,225, for a total authorization not to exceed $222,475. Neil Kaufman, Water System Engineer, presented the item. No public comment was received. Discussion was held. ACTION: Motion made by Director Finn to authorize the General Manager to execute a construction services contract and associated documents with Olympus and Associates, Inc. for the Donner Trails Tank No. 2 Interior Coating Rehabilitation project in an amount of $202,250, plus a ten percent change order allowance of $20,225, for a total authorization not to exceed $222,475, seconded by Director Randall. AYES: Randall, Finn, Laliotis NAYS: none ABSTAIN: none ABSENT: Bender, Murrell Motion passed. 16. Consideration of the Martis Woods Hydropneumatic Pump Station Construction Contract Authorize the General Manager to execute a construction services contract and associated document for the Martiswoods Hydropneumatic Pump Station to M3 Construction in an amount of $2,835,900, plus a ten percent change order allowance of$283,590, for a total authorization not to exceed $3,119,490. Water System Engineer presented the item. No public comment was received. Discussion was held. ACTION: Motion made by Director Finn to authorize the General Manager to execute a construction services contract and associated documents for the Martiswoods Hydropneumatic Pump Station to M3 Construction in an amount of 4 Page 49 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, SEPTEMBER 2, 2026 $2,835,900, plus a ten percent change order allowance of $283,590, for a total authorization not to exceed $3,119,490, seconded by Director Randall. AYES: Randall, Finn, Laliotis NAYS: none ABSTAIN: none ABSENT: Bender, Murrell Motion passed. 17. Consideration of the Sitzmark Hydropneumatic Pump Station Construction Contract Authorize the General Manager to execute a construction services contract and associated documents with Ruppert Inc. for the Sitzmark Hydropneumatic Pump Station Replacement project in an amount of $1,332,466, plus a ten percent change order allowance of$133,247, for a total authorization not to exceed $1,465,713. Water System Engineer presented the item. No public comment was received. Discussion was held. ACTION: Motion made by Director Randall to authorize the General Manager to execute a construction services contract and associated documents with Ruppert Inc. for the Sitzmark Hydropneumatic Pump Station Replacement project in an amount of $1,332,466, plus a ten percent change order allowance of $133,247, for a total authorization not to exceed $1,465,713, seconded by Director Finn. AYES: Randall, Finn, Laliotis NAYS: none ABSTAIN: none ABSENT: Bender, Murrell Motion passed. 18. Consideration for the Board to Approve the CEQA Initial Study and Authorize Circulation of the Proposed Negative Declaration for the Electric System Master Plan Staff recommends the following actions: A. Approve the Electric System Master Plan CEQA Initial Study B. Authorize circulation of the Proposed Negative Declaration for public review C. Schedule a Public Hearing for October 7, 2026 at 6:OOpm, or as soon thereafter, to receive public comment on the Proposed Negative Declaration Director of Electric Operations & Engineering presented the item. No public comment 5 Page 50 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, SEPTEMBER 2, 2026 was received. Discussion was held. ACTION: Motion made by Director Randall to approve the Electric System Master Plan CEQA Initial Study, authorize circulation of the Proposed Negative Declaration for public review and schedule a public hearing for October 7, 2026 at 6:00 p.m. or as soon thereafter, to receive public comment on the Proposed Negative Declaration, seconded by Director Finn. AYES: Randall, Finn, Laliotis NAYS: none ABSTAIN: none ABSENT: Bender, Murrell Motion passed. 19. Consideration of Approval of the 2026 First Option Year for Material Purchase and Services Agreement with Gridware Line Sensors Authorize the General Manager to execute a Material Purchase and Service Agreement and associated documents with Gridware for electric utility distribution system line sensors and associated services in an amount not-to- exceed $950,000, plus applicable taxes and shipping Director of Electric Operations & Engineering presented the item. No public comment was received. Discussion was held. ACTION: Motion made by Director Finn to authorize the General Manager to execute a Material Purchase and Service Agreement and associated documents with Gridware for electric utility distribution system line sensors and associated services in an amount not-to-exceed $950,000, plus applicable taxes and shipping, seconded by Director Randall. AYES: Randall, Finn, Laliotis NAYS: none ABSTAIN: none ABSENT: Bender, Murrell Motion passed. Meeting recessed at 9:03 p.m. Meeting reconvened at 9:12 p.m. 20. Consideration of Increase to VIP Powerline Corp. Electric Utility Construction Services Contract Authorize the General Manager to increase the total not-to-exceed amount for the Electric Utility Construction Services contract with VIP Powerline Corp. in 6 Page 51 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, SEPTEMBER 2, 2026 the amount of$200,000, increasing the new total not-to-exceed amount to $1,300,000. Director of Electric Operations & Engineering presented the item. No public comment was received. Discussion was held. ACTION: Motion made by Director Finn to authorize the General Manager to increase the total not-to-exceed amount for the Electric Utility Construction Services contract with VIP Powerline Corp. in the amount of $200,000, increasing the new total not-to-exceed amount to $1,300,000, seconded by Director Randall. AYES: Randall, Finn, Laliotis NAYS: none ABSTAIN: none ABSENT: Bender, Murrell Motion passed. WORKSHOP 21. Truckee Donner PUD Customer Survey Results Receive this report and provide input and direction to staff. Josh Emeneger of Probolsky Research presented the item. No public comment was received. Discussion was held. Open Session recessed at 9:58 p.m. CLOSED SESSION 22. Closed Session Pursuant to Government Code Section 54956.9(d)(1), Conference with Legal Counsel, Existing Litigation, Sanchez v. TDPUD, et al, Superior Court of the State of California, County of Nevada, Case No. C00001910 Open Session reconvened at 11:37 p.m. No reportable action was taken in Closed Session. ADJOURNMENT Meeting adjourned at 11:37 p.m. TRUCKEE DONNER PUBLIC UTILITY DISTRICT Tony Laliotis, President 7 Page 52 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, SEPTEMBER 2, 2026 Respectfully Submitted, Martina Rochefort, District Clerk 8 Page 53 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT SPECIAL BOARD MEETING MINUTES 11570 DONNER PASS ROAD, TRUCKEE, CA 1:00 PM, TUESDAY, SEPTEMBER 8, 2026 1. Call to Order Meeting was called to order at 1:00 p.m. 2. Roll Call Directors Present: Steve Randall, Christa Finn, Board President Tony Laliotis Staff in attendance: Brian Wright, General Manager Other: Steve Gross, General Counsel Absent: Director Jeff Bender, Vice President Courtney Murrell 3. Changes to the agenda No changes were made to the agenda. Open Session recessed at 1:01 p.m. CLOSED SESSION 4. Closed Session Pursuant to Government Code Section 54956.9(d)(1), Conference with Legal Counsel, Existing Litigation, Sanchez v. TDPUD, et al, Superior Court of the State of California, County of Nevada, Case No. C00001910 Open Session reconvened at 2:02 p.m. There was no reportable action taken in Closed Session. ADJOURNMENT Meeting adjourned at 2:02 p.m. Page 54 of 119 TRUCKEE DON N ER AGENDA ITEM #12 PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 TO: Board of Directors FROM: Jillian Steward, Director of Human Resources & Risk Management SUBJECT: Consideration of a Recruiting Services Contract for Electrical Engineering Manager APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Authorize the General Manager to execute a professional services contract for executive recruitment services with Alliance Resource Consulting, Inc. in the amount of $38,000, plus a 10% change order authorization, for a total not to exceed $41,800. BACKGROUND: In the spring of 2026, the District's Electrical Engineering Manager announced his anticipated resignation in the summer of 2026 to pursue personal opportunities. During this transition, the Electrical Engineering Manager partnered with District Leadership to outline the status of critical projects and departmental priorities, essential job responsibilities, as well as the key technical and leadership skills for someone to be successful in the role. Successful recruitment for managerial or leadership positions takes significant time, resources, and industry contacts. Rapidly evolving energy landscapes, significant increase in capital project development, particularly around data center and energy generation projects, and highly competitive labor markets have presented additional challenges for the recruitment of electrical engineering and executive leadership across the industry. To ensure the District has the opportunity to evaluate prospective candidates from a robust recruitment pool, Staff is recommending the procurement of executive recruitment services with demonstrated experience and success within the electric utility industry. ANALYSIS AND BODY: On September 11, 2026, the District advertised a request for proposals (RFP) for executive search firm services for the recruitment and placement of the Electrical Engineering Manager. On September 28, 2026, the District received four proposals. One of the proposals did not meet all the requirements and was omitted from scoring. An internal committee reviewed each of the proposals received based upon the following criteria: Page 1 of 3 Page 55 of 119 • Recruitment Methodologies and strategies • Experience of the firm and key personnel • Proposed timeline and schedule • References • Cost The firms below were considered: Firm Location Cost BCP, Inc. Roseville, CA $29,900 Alliance Resources Consultants La Palma, CA $38,000 J Powers Recruiting, INC Sacramento, CA $39,500 Following a review of each of the proposals, staff has determined that Alliance Resource Consulting, Inc. would be the most beneficial for the District. Alliance's proposal included the services of a consulting team with over 20 years of executive recruiting experience, extensive experience in recruiting executives for government agencies and special districts, a proactive and client-centered recruiting strategy, 12-week project timeline recruitments and an impressive portfolio of references and successful recruitments. Alliance's cost proposal is also within the District's expected range for services, as the District's last four recruiting services contracts from 2021-2024 ranged from $27,000 to $35,000 for engineering and director- level positions. With Board authorization, staff would initiate a professional services agreement with Alliance Resource Consulting, Inc. immediately, with the expectation of candidate selection and interviews in January 2027. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: Page 2 of 3 Page 56 of 119 The recommended professional services agreement includes a cost proposal of $38,000 for the Electrical Engineering Manager recruitment. Staff is recommending a 10% change order authorization be included, for a total not to exceed amount of $41,800. ATTACHMENTS: None Page 3 of 3 Page 57 of 119 TRUCKEE DON N ER AGENDA ITEM #13 PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 TO: Board of Directors FROM: Steven Keates, Utility Resource Strategies Manager Brian Wright, General Manager SUBJECT: Adopt Resolution 2026-16 approving the submission and attesting to the veracity of the 2025 Power Source Disclosure (PSD) Report and Power Content Label (PCL) APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Adopt Resolution 2026-16 approving the submission and attesting to the veracity of the 2025 Power Source Disclosure (PSD) Report and Power Content Label (PCL). BACKGROUND: In 1997, Senate Bill (SB) 1305 established California's Power Source Disclosure Program (codified in Public Utilities Code sections 398.1 to 398.5), directing retail electricity suppliers to disclose energy source mix and environmental impact to consumers. California Energy Commission (CEC) regulations require retail suppliers to submit annual Power Source Disclosure reports and make the Power Content Label available to retail customers. While CEC regulations mandate an annual third-party Certified Public Accountant (CPA) audit to verify energy purchases, Publicly Owned Utilities (POUs) are exempt if their governing board formally approves the submission and attests to the veracity of the data. Adopting the proposed resolution satisfies state mandates while saving the District the expense of an external CPA audit. The District's Board has historically adopted resolutions to satisfy this State mandate. ANALYSIS AND BODY: District staff compiled procurement data for calendar year 2025 from verified supplier records provided by Utah Associated Municipal Power Systems (UAMPS) and Western Area Power Administration (WAPA). In addition, the board approved retaining Rincon in July 2026 to provide independent third party verification of the District's electricity transactions for annual reporting to the California Air Resources Board (CARB) under state Greenhouse Gas (GHG) reporting rules. Staff has verified the accuracy of these submissions. References to the Power Content Label will be abbreviated using "PCL". Regulatory& Format Updates (AB 242 & SB 1158 Compliance) The 2025 PCL introduces structural modifications mandated by recent CEC rulemakings implementing Assembly Bill (AB) 242 and Senate Bill (SB) 1158: Page 1 of 3 Page 58 of 119 • Dual-Column Loss-Adjusted Display: For the first time, the PCL presents two side-by-side metrics: Retail Sales alongside Total Loss-Adjusted Load (which accounts for retail sales, municipal end uses, and transmission/distribution losses). • Fuel Mix Grouping: Electricity sources are now explicitly grouped into two categories - "Renewables and Zero-Carbon Resources" and "Fossil Fuels and Unspecified Powe►'. • Unspecified Power Footnote & Updated GHG Methodology: The CEC updated its calculation methodology for unspecified power, deriving GHG emissions from uncommitted in-state gas generation, unspecified market imports, and net oversupply. The 2025 label explicitly discloses that 92% of unspecified power was derived from fossil fuels and 8% from zero-carbon/renewable sources. Multi-Year Portfolio & Results Comparison The table below summarizes TDPUD's power mix and carbon intensity metrics from 2022 through 2025 alongside the CEC reported 2025 California Utility Averages: CategoryFuel / Metric RPS Eligible 45.5% 47.3% 55% 50% 46% Renewables — Biomass & Biogas 15.9% 12.0% 16% 8% 2% — Geothermal 0.0% 0.0% 0% 0% 5% — Eligible Hydroelectric 2.6% 4.3% 4% 8% 1% — Solar 0.0% 8.0% 9% 9% 25% — Wind 27.0% 23.0% 27% 25% 14% Large Hydroelectric 0.0% 10.5% 0% 0% 10% Nuclear 0.0% 0.0% 0% 0% 10% Natural Gas 9.7% 12.5% 15% 16% 11% Other Resources 11.1% 5.5% 5% 1% 0% Unspecified Power 33.7% 24.2% 24% 33% 21% Total Mix 100% 100% 100% 100% 100% Retired Unbundled 14.4% 12.8% 25% 14% N/A RECs (% Sales) GHG Intensity 417 355 386 496 384 (lbs CO2e/MWh) Key Operational Drivers & PCL vs. RPS Compliance Context While the Power Content Label provides an annual snapshot of the fuel mix and greenhouse gas (GHG) intensity delivered to serve retail customer sales, it operates alongside broader operational drivers and regulatory frameworks. PCL Eligible Renewables (50% Retail) reflect physical energy delivered to serve retail sales from California acknowledged renewable generation sources. The District also retires unbundled Renewable Energy Credits (RECs) to cover generation from sources that are not registered with the state of California but which the District still considers renewable. These unbundled RECs cover carbon-free or hydro resources (such as Landfill Natural Gas from City of Murray and Veyo Heat Recovery)that deliver physical power but lack bundled REC attributes. Combining physical PCL renewables (50%) and retired unbundled RECs brings TDPUD's total RPS compliance achievement to 64%for 2025. Note that this methodology is consistent with previous years. Page 2 of 3 Page 59 of 119 The Districts 2025 Power Content Label is provided as Attachment 1. The District Resolution 2026- 16 PCL Attestation is provided as Attachment 2. GOALS AND OBJECTIVES: District Code 1.05.020 Objectives: 1. Responsibly serve the public. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1.05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. FISCAL IMPACT: There is no direct fiscal impact associated with adopting Resolution 2026-16, submitting the 2025 Power Source Disclosure Report and Power Content Label, or attesting to the veracity of the data. District Board attestation maintains compliance with state law while avoiding the cost of a third-party CPA audit. ATTACHMENTS: 1. TDPUD Power Content Label (Exhibit A) 2. Resolution 2026-16 PCL Attestation Page 3 of 3 Page 60 of 119 Truckee Donner Public Utility District 2025 Power Content Label CA Utility TDPUD Total Average D' • Other Emissions, Power Sources, Mix End Uses, & End Uses, & Unbundled RECs (Retail Sales) Losses) Losses) Greenhouse Gas Emissions Intensity 496 524 384 (Ibs of COZe emitted per megawatt hour) Renewables and Zero-Carbon Resources 53% 50% 67% Fossil Fuels • Z few 8% 7% 2% -• - 0% 0% 5% • • - • •- - 8% 8% 1% • . 9% 9% 25% • 25% 23% 14% • • - ' - - - • - • • 50% 47% 46% • - • - - 0% 0% 10% 0% 0% 10% • • - • • • - 0% 0% 0% • 1% 1% 0% 16% 15% 11% • • ' - • - 0% 0% 2% • - - • ' • - ' , 33% 1 37% 21 Retail sales covered by retired unbundled RECs 14% N/A N/A ■ This label does not reflect compliance with the Renewables Portfolio Standard (RIPS), which measures the use of tracking instruments called Renewable Energy Credits (RECs) over the course of multi-year compliance periods. RECs that are purchased separately from the renewable energy ("Unbundled RECs") can be used for RPS compliance, but they do not factor into the power mixes or GHG emissions intensities above. ■ GHG intensity figures exclude biogenic CO2 and emissions from geothermal sources and grandfathered imports of firmed-and-shaped energy. For detailed information about all GHG emissions from California's retail electricity suppliers, visit the CEC webpage at the link below. ■ Unspecified power is electricity purchased from a genericized pool on the open market. In 2025, 92% of unspecified power came from fossil fuels (natural gas, coal, and petroleum) and 8% came from renewables and zero-carbon resources (RPS-eligible and other renewables, large hydroelectric, and nuclear). Truckee Donner Public Utility District California Energy Commission - Power Source Disclosure www.tdpud.org https://www.energy.ca.gov/programs-and-topics/programs/ power-source-disclosure-program/power-content-label Page 61 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Resolution No. 2026 - 16 APPROVING SUBMISSION AND ATTESTING TO THE VERACITY OF THE 2025 POWER SOURCE DISCLOSURE REPORT AND 2025 POWER CONTENT LABEL WHEREAS, the Truckee Donner Public Utility District (District) is a public agency of the State of California, and owns and operates an Electric System for the provision of electric service at retail to the general public within its service area; and WHEREAS, Senate Bill 1305 (SB 1305), adopted in 1997 and codified in Public Utilities Code sections 398.1 to 398.5, established a Power Source Disclosure Program that directs all California retail suppliers of electricity to disclose to consumers the sources of energy used to provide the electric service in an accurate and easy to understand manner; and WHEREAS, the California Energy Commission (CEC) regulation implementing SB 1305 requires publicly owned electric utilities, like the District, to have the Board attest to the veracity of the Power Source Disclosure (PSD) Report and Power Content Label (PCL) in lieu of an audit by a third-party certified public accountant; and WHEREAS, District staff accurately prepared the 2025 PSD Report and 2025 PCL for submission to the CEC and District customers based on information provided and verified by our electric suppliers including Utah Associated Municipal Power Systems (UAMPS), Western Area Power Administration (WAPA), Western Electricity Coordinating Council (WECC), and a third-party verifier who prepares a report for all electricity transactions and submits this report annually to the California Air Resources Board for Greenhouse Gas Emissions reporting requirements; and WHEREAS the District generally submits a PSD Report to the CEC by June 1st of each year, and the PCL is made available to our customers by October 1st of each year in accordance with CEC requirements and deadlines. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: The Board of Directors approves the submission of the 2025 Power Content Label (Exhibit A) to the California Energy Commission and hereby provides attestation of the veracity of the reports submitted by staff Resolution No. 2026—XX Page 62 of 119 PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting held within said District on October 7, 2026 by the following vote: AYES: NOES: ABSTAIN: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Tony Laliotis, President of the Board ATTEST: Martina Rochefort, District Clerk Resolution No. 2026—XX Page 63 of 119 TRUCKEE DON N ER AGENDA ITEM #14 PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 TO: Board of Directors FROM: Mike Swanson, Director of Electric Engineering & Operations SUBJECT: Consideration of Adoption of Resolution No. 2026-17 Approving the 2026 Physical Security Plan APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Adopt Resolution No. 2026-17 approving the 2026 Physical Security Plan and authorize the General Manager or designee to provide the required notice of adoption and program review documentation to the California Public Utilities Commission Safety and Enforcement Division. BACKGROUND: California Public Utilities Commission (CPUC) Decision 19-01-018 establishes physical security requirements for California electric utilities, including publicly owned utilities (POUs). The Decision requires utilities to identify electric distribution facilities that may merit special protection, evaluate physical security risks, develop appropriate mitigation measures, and obtain an independent third-party review of the resulting Physical Security Plan (Plan). The District's previous Physical Security Plan was completed in 2021. CPUC Decision 19-01-018 requires POUs to conduct a program review of their Security Plan and associated physical security program every five years following initial approval by their governing body. Following Board adoption, notice of the Plan adoption must be provided to the CPUC Safety and Enforcement Division within 30 days. CPUC Decision 19-01-018 provides that a POU's notice of final Plan adoption may consist of a copy of a signed resolution, ordinance, or letter by a responsible elected or appointed official or utility director. Staff recommends adoption by resolution to provide a clear and formal record of the Board's adoption of the Plan for transmittal to the CPUC. Consistent with the five-year review cycle, the District has completed its 2026 review and update of the Physical Security Plan. The updated Plan evaluates seven District facilities against the CPUC criteria and identifies the Truckee Substation and Martis Valley Substation as Covered Distribution Facilities. The Primary Control Center is also included because it will provide supervisory and operational control of the Covered Page 1 of 5 Page 64 of 119 Distribution Facilities. Tahoe Donner Substation, Donner Lake Substation, the Glenshire circuit, and Corporation Yard were evaluated but did not meet the criteria for classification as Covered Distribution Facilities. As part of the required independent review process, the District contracted with AESI- US, Inc. (Acumen) to perform an unaffiliated third-party evaluation of the updated Plan. Acumen's scope included evaluating the Plan against CPUC Decision 19-01-018, identifying deficiencies and recommended changes, and issuing a final independent review report. The contract was for a fixed fee of $9,500. ANALYSIS AND BODY: The 2026 Physical Security Plan evaluates potential threats and vulnerabilities to the District's Covered Distribution Facilities and identifies mitigation measures intended to reduce those risks. The Plan uses a risk-based approach that considers likelihood, potential impact, baseline risk, proposed mitigation measures, and residual risk following implementation of those measures. The CPUC criteria focus on the regional significance and function of a facility rather than simply the number of customers served. The District evaluated each substation against seven criteria established in CPUC Decision 19-01-018, including whether the facility supports regional electric restoration, military installations, regional drinking water or wastewater services, regional public safety facilities, major transportation facilities, a Level 1 Trauma Center, or more than 60,000 meters. Truckee Substation qualifies because it supplies regional public safety loads, including the Nevada County Sheriff, California Highway Patrol, and CAL FIRE. Martis Valley Substation qualifies because it serves a regional wastewater treatment facility. Tahoe Donner Substation and Donner Lake Substation were evaluated against the same criteria but were not identified as Covered Distribution Facilities. Tahoe Donner serves approximately 3,969 meters and Donner Lake approximately 3,557 meters, but neither serves a regional critical load identified by the CPUC criteria. Both substations serve local facilities, including satellite wastewater, local water distribution, and local fire services. These facilities are important to the community, but the Plan distinguishes them from the regional facilities contemplated by the CPUC standard. The Plan also notes that the District's satellite water and wastewater facilities are relatively small and are not considered regional facilities under the CPUC criteria. Likewise, local fire and police services do not meet the criterion for a regional public safety establishment unless they serve the broader regional functions identified in the standard. In addition, no District substation serves more than 60,000 meters, functions as a required crank path or black-start facility, serves a qualifying military installation, or serves a Level 1 Trauma Center or major transportation facility as defined by the CPUC criteria. Page 2 of 5 Page 65 of 119 Although Tahoe Donner and Donner Lake are not classified as Covered Distribution Facilities, they are not excluded from the District's broader physical security considerations. The Plan includes a separate assessment of non-covered facilities and identifies observations and recommended security improvements for those locations. The assessment also considered system resiliency. The District's four substations are independently supplied from NV Energy, and the Plan states that if one substation is lost, the remaining substations can carry the District's load. This redundancy reduces the potential systemwide consequence of losing an individual substation and is an important component of the District's overall physical security and resiliency strategy. Key areas identified through the assessment include: • Perimeter security and potential unauthorized access • Physical access controls and key management • Intrusion detection, surveillance, and facility monitoring • Protection of critical substation equipment • Physical security governance, procedures, and assigned responsibilities • Employee and contractor physical security awareness and access management The assessment identified vulnerabilities associated with perimeter protection, keyed access, monitoring of Covered Distribution Facilities, protection of critical equipment, and the need for more formalized physical security standards and responsibilities. While the likelihood of individual physical security events varies, the potential consequences of a successful event can be significant. The Risk Assessment Worksheet supporting the Plan generally considers the impact of a successful compromise of a Covered Distribution Facility to be High because of the potential for outages affecting critical loads served by those facilities. Acumen completed the required unaffiliated third-party review of the Plan. The review evaluated how the Plan characterized physical threats, vulnerabilities, existing safeguards, and risk. Acumen recommended refinement of several findings to better distinguish a credible physical threat event from a vulnerability, environmental condition, existing security measure, or program and governance gap. The review also recommended that assessment categories be tied to realistic physical threat scenarios and then evaluated in terms of site vulnerability, existing protections, response and recovery capability, and potential consequences. The third-party review also identified areas where the Plan should more clearly separate physical security threats from broader cybersecurity, supply chain, training, access management, and governance issues unless those issues directly support or enable a credible physical security event. The District incorporated the third-party review into the final Plan by refining the risk characterization and documenting mitigation decisions. The final Plan includes Page 3 of 5 Page 66 of 119 recommended security upgrades and identifies whether those recommendations are accepted, rejected, or addressed through an alternative. This approach is consistent with CPUC Decision 19-01-018, which provides that the independent third-party opinion and recommendations, the utility's response, the threat and risk assessment, and the mitigation measures together constitute the final plan report. The Physical Security Plan and supporting risk assessment contain confidential and security-sensitive information regarding District facilities, vulnerabilities, protective measures, and mitigation strategies. Accordingly, detailed facility-specific vulnerabilities and security measures are not reproduced in this staff report. Adoption of the proposed Resolution will formally approve the 2026 Physical Security Plan and complete the local governing-body adoption portion of the current review cycle. Following adoption, the signed Resolution will provide formal documentation of the Board's action for notification to the CPUC Safety and Enforcement Division. The District will also provide the required program review documentation to the CPUC following completion of the review process. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: The District contracted with Acumen to conduct the required unaffiliated third-party evaluation of the Physical Security Plan for a fixed fee of $9,500. Adoption of the Physical Security Plan does not, by itself, authorize additional expenditures associated with implementation of recommended mitigation measures. Page 4 of 5 Page 67 of 119 Future expenditures associated with implementation will be incorporated into the District's established budgeting, procurement, and approval processes, as applicable. ATTACHMENTS: 1. Resolution_2026_Physical Security Plan Page 5 of 5 Page 68 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Resolution No. 2026 - 17 Adopting the 2026 Physical Security Plan WHEREAS, California Public Utilities Commission Decision 19-01-018 establishes physical security requirements applicable to publicly owned electric utilities; and WHEREAS, CPUC Decision 19-01-018 requires publicly owned electric utilities to identify distribution facilities that may merit special protection, assess physical security risks, develop appropriate mitigation measures, and obtain an independent third-party review of the utility's Physical Security Plan; and WHEREAS, the Truckee Donner Public Utility District completed its previous Physical Security Plan in 2021 and is required to review its Physical Security Plan and associated physical security program on a five-year cycle; and WHEREAS, the District has completed its 2026 review and update of the Physical Security Plan, including evaluation of District facilities against the applicable CPUC criteria; and WHEREAS, the 2026 Physical Security Plan identifies the Truckee Substation and Martis Valley Substation as Covered Distribution Facilities and includes the Primary Control Center due to its supervisory and operational control of Covered Distribution Facilities; and WHEREAS, the District obtained the required unaffiliated third-party review of the 2026 Physical Security Plan and considered the resulting recommendations in preparation of the final Plan; and WHEREAS, CPUC Decision 19-01-018 provides that notice of final Plan adoption by a publicly owned utility may consist of a copy of a signed resolution, ordinance, or letter by a responsible elected or appointed official or utility director; NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. That the recitals set forth above are adopted as findings of the Board of Directors 2. That the Board of Directors hereby adopts the Truckee Donner Public Utility District 2026 Physical Security Plan 3. That the General Manager or designee is authorized to provide the required notice of adoption and program review documentation to the California Public Utilities Commission Safety and Enforcement Division Resolution No. 2026—XX Page 69 of 119 PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting held within said District on {Date} by the following vote: AYES: NOES: ABSTAIN: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Tony Laliotis, President of the Board ATTEST: Martina Rochefort, District Clerk Resolution No. 2026—XX Page 70 of 119 TRUCKEE DON N ER AGENDA ITEM #15 PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 TO: Board of Directors FROM: Jillian Steward, Director of Human Resources & Risk Management SUBJECT: Consideration for Designation of Labor Negotiators for the General Manager's Employment Contract APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Appoint two members of the District's Board of Directors to serve as negotiators for the General Manager's Employment Contract BACKGROUND: The general manager's role and responsibilities are outlined in District Code, Title 2- Administration. The general manager reports directly to the Board of Directors under the terms of an employment contract requiring review in FY2026. ANALYSIS AND BODY: Government Code Section 5497.6(a) outlines that prior to meeting on matters regarding employment/labor agreements, the Board must identify and designate its negotiators. In July, 2025 the District renewed and updated the general manager's employment contract. Within the terms of the updated employment contract are provisions for the evaluation and consideration by the Board of performance goals and incentives. In preparation for meetings with the Board and negotiation of updated terms associated with the general manager's employment agreement, Staff is recommending the Board designate its labor negotiators. Historically, the Board has designated its President and Vice President to serve as labor negotiators for the general manager's employment agreements. GOALS AND OBJECTIVES: District Code 1.05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. Page 1 of 2 Page 71 of 119 District Code 1.05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: There is no direct fiscal impact associated with this item. ATTACHMENTS: None Page 2 of 2 Page 72 of 119 TRUCKEE DONNER AGENDA ITEM #16 PUBLIC UTILITY DISTRICT MEETING DATE: October 7, 2026 TO: Board of Directors FROM: Steven Poncelet, Public Information Officer/Strategic Affairs Director SUBJECT: Martis Valley Groundwater Management Plan Water Year 2024 and 2025 Annual Reports r APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Receive this report and provide input and direction to staff. BACKGROUND: The District has a long history of stewardship and collaboration in managing water resources. A major tenant of local water resource management has been to use the best available science to inform the decision-making process. This has resulted in decades of monitoring and scientific study, including the Desert Research Institute's Martis Valley groundwater model/report as part of the Federal Truckee River Basin Study. This effort was supported by the District, Northstar Community Services District - NCSD, and Placer County Water Agency - PCWA (Local Water Agencies) and was a key component of the collaboratively adopted 2013 Martis Valley Groundwater Management Plan (GMP). This effort was temporarily halted when the Martis Valley Groundwater Basin was initially included in the Sustainable Groundwater Management Act (SGMA) in 2014 as a Medium Priority Basin, and then removed in 2019 when reclassified as Very Low Priority. The three Local Water Agencies worked with our local partners to develop a plan to go back to the GMP framework in 2019. This included updating the Stakeholder Working Group list to reflect the local agencies or groups with a direct interest in Martis Valley groundwater resources. In general, the stakeholders fall into three categories: local public agencies; major water users/pumpers; and local non-profits/interest groups. A GMP Stakeholder Working Group kick-off meeting was held in October 2019, where the three Local Water Agencies reviewed the 2013 Martis Valley GMP and the key meetings and actions that would occur going forward. This includes an annual report tracking the performance and long-term sustainability of the groundwater basin, along with an update to the GMP to occur during 2024. It was agreed that the start of the GMP would now be in 2019. It was also agreed that the first GMP annual report would cover the past two water years (October - September 2017/2018 and 2018/2019) which would provide continuity from the last SGMA annual report. This GMP annual report was conducted over the winter months with the annual Stakeholder Working Group Page 1 of 3 Page 73 of 119 meeting in the spring to review the results. The Local Water Agencies continued to monitor and evaluate the health of the basin with annual reports covering water years 2019/2020, 2020/2021, and 2021/2022. In 2024, the Local Water Agencies worked collaboratively to create a Request for Proposal (RFP) to conduct the Water Year 2022/2023 annual report and a five-year Martis Valley GMP update. It also included one stakeholder working group meeting and one public meeting to share the study with key stakeholders and the community. The District Board awarded a contract to GEI Consultants who completed the GMP update and annual report during 2024 and into 2025. This included a series of Public Hearings on the intent to update a GMP and for the intent to adopt an updated GMP. This was done by all three Local Water Agencies and the costs were split equally between the GMP partners. Since the adoption of the updated GMP, the Local Water Agencies continue to implement the plan including preparation of annual reports. The next Annual Report was for the Water Year 2023/2024 but, given the extended process that the Local Water Agencies chose to follow for the GMP update into 2025, it was decided to wait for the end of the Water Year 2024/2025 and do one contract for the two Water Years. The District, as has been done in the past, was the contracting agency for this contract and then would seek reimbursement from the Local Water Agencies. The Local Water Agencies met and decided to approach GEI Consultants to continue their work in the Martis Valley and conduct the Water Year 2023/2024 and 2024/2025 Annual Reports. The nature of the District's scope of work in the Martis Valley and the unique value that GEI Consultants provided, given their intimate knowledge of the Martis Valley Groundwater Basin and experience working with the Local Water Agencies, qualified as a Special Service. GEI Consultants was eager to work with the District again and was capable of serving the Local Water Agencies' needs in a professional, timely, and efficient manner. They provided a proposal for $26,000 to conduct the scope of work and the District's Board took action to award a contract at the May 6th Board meeting. ANALYSIS AND BODY: GEI Consultants has completed the water years 2023/2024 and 2024/2025 report, which is provided as Attachment 1. In general, the basin is healthy and operating well within its sustainable yield. The Local Water Agencies have shared the report with the Martis Valley GMP Stakeholder Working Group and are planning a meeting in early October to present the results. This meeting will include a presentation by GEI Consultants and the Stakeholder Working Group will have the opportunity to directly engage and ask questions. GOALS AND OBJECTIVES: Page 2 of 3 Page 74 of 119 District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. FISCAL IMPACT: There is not direct fiscal impact associated with this workshop item. However, the District was the lead agency on this procurement, and the costs will be shared equally between the District, Northstar Community Services District, and Placer County Water Agency. The District's portion of $9,533.33 was included in the approved FY26 and FY27 budgets under GL 1/2.2.923.00.753 for $8,000 each year. Sufficient funds exist in the FY26 budget for the small overage for this year's annual report, which does cover two water years. ATTACHMENTS: 1. MVGB Water Years 2024-25 Groundwater Conditions TM Page 3 of 3 Page 75 of 119 Attachment 1 ?7) kConsultants GLI Consulting Engineers and Scientists Martis Valley Groundwater Basin - Groundwater Conditions Technical Memorandum Water Years 2024 and 2025 September 10, 2026 TRUCKEE DONNER PUBLIC UTILITY DISTRICT 0 P CWA g 1 _ :� . Page 76 of 119 Martis Valley Groundwater Basin - Groundwater Conditions Technical Memorandum Water Years 2024 and 2025 Prepared for: Truckee Donner Public Utility District On behalf of Truckee Donner Public Utility District, Northstar Community Service District, and Placer County Water Agency collectively referred to as the MVGB Agencies Prepared by: GEI Consultants 11010 White Rock Road, Suite 200 Sacramento, CA 95670 September 10, 2026 Page 77 of 119 TRUCKEE DONNER PUBLIC UTILITY DISTRICT MARTIS VALLEY GROUNDWATER BASIN—GROUNDWATER CONDITIONS WATER YEARS 2024 and 2025 Certifications and Seals This report and analysis was prepared by the following GEI Consultants Inc.professional geologists. Report sections contained herein based on available data and were prepared by: Date: September 10, 2026 Sean Storey Geologist-In-Training No. 812 W. MfDF#0 CAL�F�4 Date: September 10, 2026 Richard W. Shatz Principal Hydrogeologist California Certified Hydrogeologist C.H.G. No. 84 Martis Valley Groundwater Basin Annual Report GEI Consultants, Inc. Water Years 2024&2025 i Page 78 of 119 Table of Contents ExecutiveSummary..............................................................................................................................1 1. Introduction ............................................................................................................. 1-1 1.1 Martis Valley Groundwater Basin................................................................. 1-1 1.2 Climatic Conditions ...................................................................................... 1-1 1.3 Surface Water Conditions............................................................................ 1-1 2. Groundwater Conditions........................................................................................2-1 2.1 Groundwater Levels..................................................................................... 2-1 2.2 Groundwater Flow........................................................................................ 2-5 3. Groundwater Extraction......................................................................................... 3-1 4. Surface Water Diversions ......................................................................................4-1 5. Groundwater Recharge.......................................................................................... 5-1 6. Total Water Use....................................................................................................... 6-1 7. Change in Groundwater Storage........................................................................... 7-1 8. Conclusions............................................................................................................. 8-1 9. References...............................................................................................................9-1 Martis Valley Groundwater Basin Annual Report GEI Consultants, Inc. Water Years 2024&2025 i Page 79 of 119 Appendices Attachment A. Monitoring Well Hydrographs List of Figures Figure 1-1. Martis Valley Groundwater Basin Location......................................................................1-2 Figure 1-2. Annual Precipitation Deviation from Mean: Truckee Ranger Station No. 049343 for 1988 to2025.............................................................................................................................1-3 Figure 2-1. Martis Valley Groundwater Basin Monitoring Well Locations..........................................2-3 Figure 2-2. Martis Valley Groundwater Basin Historical Groundwater Level Elevations, Water Years 2017-2025........................................................................................................................2-4 Figure 3-1. Martis Valley Groundwater Basin Locations of Groundwater Extractions .......................3-2 Figure 3-2. Martis Valley Groundwater Basin Community Water System Monthly Pumping Totals..3-3 Figure 7-1. Martis Valley Groundwater Basin Change in Groundwater Elevation, Spring 2023-Spring 2024 .................................................................................................................................7-2 Figure 7-2. Estimated Change in Storage and Groundwater Use......................................................7-4 List of Tables Table 6-1. Total Water Use for Water Years 2023, 2024, and 2025 (values in AF).........................6-1 Table 7-1. Estimated Change in Storage..........................................................................................7-1 Martis Valley Groundwater Basin Annual Report GEI Consultants, Inc. Water Years 2024&2025 ii Page 80 of 119 Abbreviations and Acronyms msl mean sea level AF acre-feet AFY acre-feet per year Basin Martis Valley Groundwater Basin CASGEM California Statewide Groundwater Elevation Monitoring DWR California Department of Water Resources ft feet GMP Groundwater Management Plan MVGB Martis Valley Groundwater Basin MVGB Agencies TDPUD,NSCD and PCWA NCSD Northstar Community Services District PCWA Placer County Water Agency SGMA Sustainable Groundwater Management Act T-TSA Tahoe-Truckee Sanitation Agency TDPUD Truckee Donner Public Utility District TRBWG Truckee River Basin Working Group TROA Truckee River Operating Agreement TSD Truckee Sanitary District WY water year Martis Valley Groundwater Basin Annual Report GEI Consultants, Inc. Water Years 2024&2025 iii Page 81 of 119 Executive Summary This report provides annual monitoring data and an assessment of groundwater conditions in the Martis Valley Groundwater Basin(MVGB or Basin) for water years 2024 and 2025. A water year (WY) is defined as October 1, through September 30 of any calendar year. The MVGB does not have to comply with the Sustainable Groundwater Management Act (SGMA), as the Basin was re-classified in 2018 as a very low-priority Basin. However,the MVGB Agencies (Truckee Donner Public Utilities District, Northstar Community Services District, and Placer County Water Agency) recognize the importance of groundwater management and are continuing to implement the Martis Valley Groundwater Management Plan guidelines. Groundwater levels, groundwater extractions, surface water conditions, groundwater recharge from locally derived and imported wastewater, measured and estimated total water use, and groundwater storage change estimates were compiled and analyzed. Climatic conditions were also evaluated as to their effects on groundwater levels. Groundwater is measured in 13 monitoring wells on a monthly basis,and in some cases daily. This data was analyzed and summarized in this report for two full water years,2024 and 2025. Historic groundwater lows are shown, but only represent measurements taken before monthly and daily monitoring was instituted, this increased frequency showed that in the summer months groundwater levels drop below the historic low. WY 2024 received about 23 inches of rainfall, while WY 2025 received about 21 inches. Both years received between 6 and 8 inches below average rainfall and are considered below normal precipitation years. Groundwater levels throughout the Basin decreased by the end of WY2025 primarily due to precipitation, which is the dominant control factor of the Basin's groundwater, and a slight increase in groundwater pumping. Total groundwater pumping in the Basin in WY 2024 was 6,923 acre-feet(AF), and WY 2025 was 6,900 AF, an increase of about 300 AF from WY 2023. Change in groundwater storage for WY 2023 to 2024 increased by about 900 AF, while WY 2024 to 2025 storage decreased by about 6,100 AF. Overall, the amount of water pumped from the MVGB accounts for less than 1% of total storage capacity, where precipitation is the predominant control measure for sustainability of the Basin. Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 ES-1 Page 82 of 119 1 . Introduction For the full history of the groundwater management of the basin, please see the Martis Valley Groundwater Management Plan 2025 10-year Update. 1 .1 Martis Valley Groundwater Basin The MVGB, Basin No. 6-67, as defined by DWR in Bulletin 118 Final 2018 Basin Boundary Modifications (2019), is a 35,600-acre(57-square-mile)intermontane, fault-bounded basin east of the Sierra Nevada crest. Figure 1-1 shows the location of the MVGB and pertinent geographic features. Groundwater recharge is primarily dominated by precipitation through rain and snow. Treated water is recharged into the groundwater system via two leach fields operated by Tahoe- Truckee Sanitation Agency (T-TSA) (Figure 1-1), increasing the groundwater contribution to downstream Truckee River flows. 1 .2 Climatic Conditions Water year types were developed for the MVGB using local precipitation data from Truckee Ranger Station No. 049043. Its location is shown on Figure 1-1. WYs 2024 and 2025 are considered to be below normal years. The deviation of annual water year precipitation from the mean is shown on Figure 1-2. 1 .3 Surface Water Conditions The Truckee River is the dominant hydrologic feature in the MVGB. It conveys hundreds of thousands of acre-feet(AF) of surface water through the Basin and flows along the lowest portions of the Basin. The measured outflow of the Truckee River at the edge of the Basin was about 500,000 acre-feet per year(AFY) in WYs 2024 and 2025. Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 1-1 Page 83 of 119 Figure 1-1. Martis Valley Groundwater Basin Location - - _11F O T-TSA Plant Creeks and Rivers _ Truckee-Donner Public Utility District(TOPUD) Northstar Community Service District(NCSD) +� ' =City of Truckee Boundary J I. Seapnpede. County Boundary Reserwrir - } Martis Valley Groundwater Basin SIERRA COUNTY r 4 NEVADACOLINTYW. r - r - - - - -- - -- - -- J t S J f r� 1ff 4 —. .. L� =rC` TrarrkrrRirrr I'. [ _ y )101 lM+,rrE'r lake ! �•—• .t '/fc -. fVEVAPA COUNTY x- - PLACER COUNTY 0 ..------ -- -'-•� -- -✓-- --- ------------- ��+u�,.,.ir,•rr - w• a _1lLfi L� r� Northstar Resort N 1. C i1 d IY 0 2.5 5 14 l r fuh h o ry Mil®s Source:aerial,baseadata,etc. Mattis Vatley Annual Report Martis Valley Groundwater Basin Water years 2024&2025 Groundwater Management Plan Area Nevada and Placer Counties.California Truckee-Donner Public Utility District GE JULY 2026 FIGURE 1-1 Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 1-2 Page 84 of 119 Figure 1-2. Annual Precipitation Deviation from Mean: Truckee Ranger Station No. 049343 for 1988 to 2025 35 O 30 .Z; M a-J .CL 25 �V 4.J L 20 - 15 Wet Ln 0 10 One Standard Deviati ---------------------- --------------------------- --------------------------- ------------ V -------------------------------- O V Above Mean s bove Normal00 - � � oo Ol Q n [N m Ln �n In oo Q1 o r-I N m -1 in �D In oo M o .-1 rV m � Ln ta n oo m Q ,� N m � v) 00 M t'n Zn a) m 6-1 in0 o 6 0 6 6 o O o r -i e-I e-I g p e-I r-I r-I g N N N N N Cl rn dl rn of M d1 0 0 0 0 0 0 0 0 0 0 0 0 0 O C] Q O O p O C O O o O ai rl rl a-I rl rl rl N N N N N N N N N N N N N N " N N N N N N N N CV N IC .O Below Normal �, -10 one-Standard Deviation - ------ fl---------------------- --- ---- fu Below Mean D � ry Q -15 -20 Water Year Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 1-3 Page 85 of 119 2. Groundwater Conditions Wells used for groundwater level monitoring(labeled as CASGEM wells historically,now merged with SGMA) in the MVGB are shown on Figure 2-1. Data from the wells were used to generate hydrographs to show groundwater levels over time. Groundwater levels range from within a few feet of ground surface to as much as 200 feet below ground surface. Monthly groundwater measurements show groundwater pumping temporarily lowers groundwater levels below the historic low fall measurements,but are not depleting reserves. Climatic conditions cause the groundwater levels to vary from year to year but typically recover during above normal or wet water years. The MVGB monitoring network has good regional distribution (covering over 70 percent of the Basin, the remaining 30% is remote and has no pumping) and is monitoring groundwater levels near areas of pumping, and groundwater inflow and outflow areas. 2.1 Groundwater Levels Long-term hydrographs, from WY 2018 through WY 2025 for 13 monitoring wells, are presented on Figure 2-2 along with the water year types. Historically the groundwater level measurements were made twice per year, in spring and fall. The frequency of the measurements were increased by TDPUD and NCSD to monthly in WY 2017 to improve the assessment of groundwater conditions. DWR also installed transducers into 9 monitoring wells in late 2023 which provide daily measurements. Hydrographs for each individual monitoring well are presented in Appendix A. Water levels in all wells remained within historic ranges in WYs 2024 and 2025, except at two monitoring wells, 17N16E11FOO1M and 18N17E33LO01M. These wells reflect opposite conditions, well 17N16E11FOOIM is under artesian pressure, and rose about 120 feet to ground surface (artesian flowing) in winter WY2024 and has remained at this level since that time but with some periods of lower levels due to pumping. Proximity to agency production wells should correlate to when groundwater extractions occur, however the drawdown curves observed do not correlate with agency well frequency, and could be tracking pumping from a private well use in the fracture zone which feeds this monitoring well. Monitoring well 18N17E33LO01M tracks groundwater levels in the fractured volcanic rocks that create the ridge on the east side of the valley known as Juniper Flats. Historically there has only been up to 15 feet of water in the well and the levels fluctuate dependent upon the water year type. Groundwater levels in 8N17E33LOOIM started to slowly decline in 2019 and decreased by about 15 feet, until WY 2024 when it was reported to be dry. The well remained dry during WY2025, up to February when DWR discontinued monitoring. This is not the only time that declines like Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Year 2024 &2025 2-1 Page 86 of 119 this have occurred, once between 2001 and 2003 and again between 2011 and 2015, but in both cases the declines stopped about 1 foot before the well went dry. The nearest municipal supply well is TDPUD's Well#20, which has reduced production each year since 2020. Groundwater levels in nested monitoring wells 17N16E13KOO1M-Deep and 17N16E13KO03M- Shallow prior to 2011 had similar groundwater levels (see Appendix A). In 2011, groundwater levels in the deeper well rose by over 50 feet while the shallow monitoring well's groundwater levels remained the same levels until 2023 when they returned to pre-2011 conditions, with both wells at a similar elevation and trending in a similar pattern. DWR has installed transducers into these wells in April 2022 and is taking daily measurements to assist in the interpretation of the conditions at these wells. Spring groundwater levels increased slightly from WY 2023 (wet year)to WY 2024(below normal year), while groundwater levels declined from WY 2024 to WY 2025 (below normal year) likely a delayed response from the Wet conditions prior. This delayed response suggests Wet year recharge in some areas cannot raise groundwater levels further as the aquifers in these local areas are already full, unlike central valley aquifers with much higher capacity. Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Year 2024 &2025 2-2 Page 87 of 119 Figure 2-1. Martis Valley Groundwater Basin Monitoring Well Locations I 'a rJrc'rr r. o Y ' r i TDPUD Municipal Well • 9 Northstar(NCSD)Municipal Well i'#k CASGEM/SGMA Well Bat Natural Spring 4� 8N16E22H001 M - ) Creeks and Rivers ,•'\-7.. Fault Zone .. .---- Uncertain Location • 1irvnir 1 y / Good Certainty in Location 01 F Hirs hdale ,�•'' �^ � Martis Valley Groundwater Basin f 1$1NI17E33LU 1 M r i County Boundary TH-Prosser L---�a r Presser Aknnsx VI l lags •• Old Greer,wao 17N17E05�! �"�` grosser H- 'I Mom- i 0 TFibreb-and i NEVADA ♦ + �i � • Q lleigh[s ' Wedl#26 I Glc. 17N1'6E11 F00 ❑ v� zee • Sanders� � �`I • 17N'17E07P001M u 1, k Northside ru I Q outhslde 17N17E1$C001 M i --" 17N16E171002M ,L,..= lifflNY�.!'�r!Il - � Donner Lake - � TH-Martis Valley ! ,, l:+ �w iJEVAdACDUTJT-Y � 17'1V16E13K001 M ._� - :�_...---__---- ---- --�- --- ----------'-- Donner-reek C ` -17N16E13K0031M11 - c '( ' `--PLpCERCDUN7YAIf 24,—--- } N- ,yr o ,.tilt s 71 N17E29 Q01 M f Weld 3 ► f ell t I 'HiY -- ✓ Well I �c e r;� C'n1e1 Cr k rk C�re .+ � \ 17N17E296001 M ,s y TH 2 -`..TH.=Test Hole Prosser Villager Martis Valley, and Fibreboard monitori ng wells have as iate nic I wells nearb T PUD 2 0 2 Martis Valley Annual Report MARTIS VALLEY GROUNDWATER BASIN 91 Water Years o &2025 N �' L Nevada and Placer Counties, ties, California MONITORING LOCATIONS o MilesEl s Truckee-Danner Public Utility District Consultants JULY 202E FIGURE 2-1 Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 2-3 Page 88 of 119 Figure 2-2. Martis Valley Groundwater Basin Historical Groundwater Level Elevations, Water Years 2017-2025 6,000 23 WY 2024 WY 2025 171\116E17F002N1 —17N17E2913001M 5,950 18N16E22H001M 17N16E11F001M 5,900 — — 171\117E07P001N1 LA —17N17E1 BCD 01M 5,850 18N17E33L001M 0 —17N16E13KO01M S,800 — - TH-Fibreboard w TH-ProsserVil lage i 5,750 TH-Martis Valley —17N16E13K003M 5,700 00, 17N17E05DOO1M ■ Wet 5,650 ■ Ahove Normal I ■ Below Normal 5,600 I I ■ Dry ■ ■ A Water Year Start/End 5,550 r— n 00 oo v0 an a, Cn rn o o Q o � � ,� � rV rV rw rn m m m t a cr Ln Ln Ln � Data collected _1 ry N rw ry rw � ry rw N ry rw rw r 4 rN rq ry N ry ry rN rti sv ry f ra m S G M A Data 1-+ C L I A Y I I L Y A I 1 L i JI - i i ¢ O ¢ O d C7 U O a O Viewer online web application Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 2-4 Page 89 of 119 2.2 Groundwater Flow Seasonal groundwater level elevation contours for spring and fall 2024 and 2025 are shown on Figures 2-3 through 2-6. These contours reflect pumping, recharge, geologic conditions, and surface water directional flow. Groundwater contours were developed using monitoring well groundwater levels, surface water in the Truckee River and creeks and natural springs. Groundwater levels at 17N16E11FOOIM were included to develop the contours. As expected, spring groundwater contours show higher elevations than fall contours. The fall contours exhibit lower groundwater level elevations in the central portions of the Basin, relative to spring conditions, due to increased pumping, less natural recharge, and groundwater discharges to the Truckee River. The groundwater flow patterns remained similar compared to previous water years,with flow from the perimeter of the MVGB towards the Truckee River and then eastward. The groundwater contours show pumping has changed this regional pattern near the airport, but this is not a new development as the historical contours have also reflected this pumping depression. The pumping depression appears to be caused by the Martis Valley municipal well as the highest producing well in the valley. The extent and depth of this depression decreased due to the wetter conditions in WY 2023 and partially refills during the winter months before decreasing during the summer months. The depression refilled to about the same elevations in spring in both water years. Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 2-5 Page 90 of 119 Figure 2-3. Martis Valley Groundwater Basin Spring 2024 Groundwater Elevation Contours s, cr,rr ,• � ;� elf .01 yak ,tiC f +• L • 16E22H 1 J esertinrr � ■ + f ■ mss• '' �. + f •rvnir, i r F` Groundwater i « # + 0 Elevation(ft ■ ■ s msl) 5750 • 18N17E33L0 1 Dry + ■ lei 5900 Tii�r seer Ila ■ 17 17EOSD001.M ! ■ ■ ■ ! 5850 + ■r 5 .7 . 5.9 c,P�k 4 ' ;t 5654 5800 D ,NTH-Fi6r hoard 5750 � 17N 16 E 11 F001 M ;0 5772:0 � {� A 5756 V` . 5S4 .8 •■ 570t] MARTIS � 0v 5700 ..•.. ` < 5700 M 17Ni'IF-18CGOtM VALLEY 575U 5729. BASIN ■ ■ ■ f 5650 1 � V' 7N17EP001;M 17N16E1 jF60420%*** f�t 5728.5 - - �.� ir ' �� TH-Martisjf"Valle TQPUQ Municipal �; k ♦� ` Well DnnrirrLude ♦ 5707.7 s ♦1#71hlle&iK003M ■f-^-s -_---►yEVA�ACOUfvTY_ _ ______________—_ -------------- Northstar(NCSQ} ------------- ---- ---- — ------ - - -- -- 0 L Municipal Well ♦ - i;- 'i# �-- 4 PLACER GDUN7Y — i --------- - ■•59Q0, ##� 6$0% +i i- Golf Course � i � 5 # 17 7E2SBUOIM•+..,. ;E.;..�. lsei .��t r , "tar ■■■ ■■+r 5;$7 CASGEM Well i f 90� 4 585@, {. ■�?i■ Natural Spring f 9Q4+:ri - 1' Creeks and E '� 0 L � #t � � � � , Rivers n Fault Zone r eoreC "k a Uncertain a G �tti.t Location Good Certainty in Location r +AK Martis Valley N _ 4d i ••: � Groundwater a a � Basin Or C _ i County Boundary Martis Valley Annual Report MARTIS VALLEY GROUNDWATER BASIN 91 2 1 0 2 H Water Years 2024&2025 GROUNDWATER ELEVATION CONTOURS u' Nevada and Placer Counties, California SPRING 224 o Miles 'GEI Truckee Donner Public Utility District Consultants JULY 2026 FIGURE 2-3 Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 2-6 Page 91 of 119 Figure 2-4. Martis Valley Groundwater Basin Fall 2024 Groundwater Elevation Contours r •,fit � ,f _ I .R � 4 •• , Bnc7a y ,� 1 5850-.16W$E22H 1 rsrnnrr � � � Y�. 5800 4 _• � iYISS - J �y - - MIR 1 f 01 $ Groundwater � i • ` ■ Elevation{ft C-, .. ' 5750 ■o msl) 0• 1BN17E33L0 + 5700 ■■ ■i 5900 5 f] ■,� f``� � Dry -Pf%�ser lage r 17N17E05�41,M ■ ■ ■ 5850 • � vo 5 86.3 �650 .8 ■ ■ ■ 1 5800 * A* �r , TH-FiEr lboard 70Q 5750 17N16E11F001M ■* 5748-0 ''k q 5750 59y4f2 MARTIS �yc" 5700 + t S7O017N1,T' E18C001M VALLEY 5719. 0Q•' } 17N17 7ROfl1M BASIN ■ ■ ■i 5650 Q ;1 17N16E1 jFjP02�il1� ■*■ 5750 wfl0 5720.1 4 TDPUD Municipal r 21.8 ■ Tti•M1Aartis Vail r,: 5 * a� 46695.3 Well + Po„ner Grr$a S�EIQ w 17N'I E13K003`Mrr COUN_TY ___ _ _ ----__- ------` Northstar(NCSD) f ---1----------------• ---------- �--•--- - -- -------- - ------ #40 +�; ®��`5750 J �['f $ -• PLACER COUNTY i _ �\ Municipal Well --- ---- - 4644844 ++# ;i f * ��*. fsr Golf Course �q- • 17 7E29B tM � Lt 4* # $.$71 CASGEM Well N r ` 4V?* Natural Spring p � Creeks and ry y Rivers t £ LL � Fault Zone y C'r❑IJC+'rk Uncertain Cek yr Location oil Cie Good Certainty in 4PP Location •� Maros Valley �,� ••t Groundwater ! Basin t I County Boundary C L-- ` Mantis ValieyAnnual Report MARTIS VALLEY GROUNDWATER BASIN N ° 2 Water Years 2024&2025 GROUNDWATER ELEVATION CONTOURS "' - 1 Nevada and Placer Counties, California FALL 202 Miles - Truckee Donner Public Utility District GE Consultants JULY 2026 FIGURE 2-4 N Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 2-7 Page 92 of 119 Figure 2-5. Martis Valley Groundwater Basin Spring 2025 Groundwater Elevation Contours •�f1•c'11 L'f! � — Saw t . } 1 �11$I,J 6E22H 1 . excnbir r' 5921d r 5 , _ rf ' Groundwater #♦ Elevation(ft t 00 5750 `■ � rnsl) ** 1 57t * a N17E33L0 1 L 6 ■■ ■15900 '' � Ti�jpr user Ila ■ 17N17E05D00.1M ■ ■ ■ 15850 5800 � �: 5700 r f ■ ■ ■ ■ TH-Fihr hoard I - 5750 17N16E11F001M �` 573ff.9 r �,.• 5750 59 8.4(Ground Surface) #4 ♦♦ MARTtS �" 17N'17E18C 01M VALLEY �- 5700 _ 5700 BASIN 59D8 0 * 17N17 $P a1;M ! ■ ■ ■ 1 5fi50 17N16E17F4VVV i*■* 5750 575245 i� I TDPUD Municipal i!r •r L � ti 4�■a 5700 TH•Martis'Valley # Well r 58 0 Z t 5708.2" 5 50 �f]fl Rrr Lude { # *17{N41•B�E13K06 , * ---�— __-- NEVADACOUNTY ___ ---- ---�_---_ ------------ � Narthstar(NCSD) ` ---- -- ---_---__---- - - ------ -- - ------- -- # V . 5750— Cr L c PLACER COUNTY Municipal Well ------ — -- ------- ----___----- — _ #t: #t## #+;+��l�80 4 ■ {/.� Golf Course �' ' 17N17E290001M � � }'f ■�� �$50���� 5$7 D � CASGEM Well 'y i y ti •i?� Natural Spring N �■ _ r i Greeks and ti I 4 D Rivers o 2 x Fault Zone N f f - C''rf ld i'+'e4 • is v" Uncertain a Location e-• Good Certainty in Location t Martis Valley „ f •••� Groundwater Basin County Boundary Martis Valley Annual Report MARTIS VALLEY GROUNDWATER BASIN 2 1 0 2Water Years 2024&2025 GROUNDWATER ELEVATION CONTOURS N Nevada and Placer Counties, California SPRING 2025 s Miles - Truckee Danner Public Utility District Consultanu JULY 2026 FIGURE 2-5 N Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 2-8 Page 93 of 119 Figure 2-6. Martis Valley Groundwater Basin Fall 2025 Groundwater Elevation Contours .Su.cy en - 2•vr .r ref w L Horn 'k6))VE22 1 escrrnn• ,- • Pva,r,, r' * O'NJO ■ +� t * ruse jr .r � ` ■ rinir - 4 i * ■ ■ i • �' Groundwater +1 58�5U= Elevation(ft ■ 5750 ■ ) #� 18N17E33L11 &700 1 ■ ■1 5900 5 0 �0 ;• ! y Dry r 4* see flag • 17N17E05D00.1M d ■ si 5850 sk* 5 .w 8 5U 8 a ■ ■ 5800 0 r 5700 ON ■R TH i r hoard 5750 y 17N16E11F001M ■a 5749.3 5750 f 59 3.7(Ground Su!f4 e) - MARTCS 7E . 01MVALLEY �" ■ ■e 5700 8 ■5TD 571 13ASIN 1 5650\5700 17N17 7RQ01M 17N 16E17■ 92LP■** 5750 5720.2 0 a j TRPUR Municipal „• c;�=� 1.4.* � � T 5695.8 H•Martis Vail Well 4 Dun Lale ` . 5 ♦ $ 4 �f ■----------- - --'-- - 1T�N' iEE13�t�016 �` 0=0 NPEVOA COUNTY Northsta r(NCS R) 5 ------- LACER GDUNTY Municipal Well ---- ------------- ------ - ■+*#all, +�# ■�■ + �(] Golf Course ■ F.asf c, �y,,,, „at ■4�� ■' � 17 7E2904 1M `•"k ■ ■1■ 5.$7 !1 CASGEM Well p �'58 . . ; o N . r►?j■ O Natural Spring N le,4, Creeks and 4 �!� b Rivers Fault Zone Croc ..... Uncertain k L % Location Good Certainty in Location '~ Martis Valley s' 00 , •••t L���..1 Groundwater of = r! • Basin ---i ! County Boundary g L — — Mantis Valley Annual Report MARTIS VALLEY GROUNDWATER BASIN 2 1 0 2 Water Years 2024&2025 GROUNDWATER ELEVATION CONTOURS Nevada and Placer Counties,California FALL 2025 Miles 'GE Truckee Donner Public Utility District Consultants JULY 2026 FIGURE 2-6 Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 2-9 Page 94 of 119 3. Groundwater Extraction Groundwater extractions for various water use sectors are present in the MVGB. The total water use is based on both metered and estimates of pumping. The general locations of the community water service areas and non-community water purveyors, along with the location of golf courses, are shown on Figure 3-1. Total groundwater extraction in the MVGB was about 6,650 AF for WY 2023, 6,923 AF in WY 2024, and 6,900 AF in WY 2025, all below the sustainable yield estimate of 24,000 AFY. Metered municipal groundwater extractions made by TDPUD and NCSD account for about 82 percent of the total extractions; therefore, total groundwater extraction is well quantified. Groundwater extraction estimates for non-community uses and golf course irrigation were developed by others and are reported annually to the DWR, State Water Resources Control Board, and the Truckee River Operating Agreement(TROA)program. These estimates are developed on a calendar-year basis,not by water years. The calendar-year extraction data is approximately equal to water year estimates due to the annual cycle of climatic conditions, including freezing temperatures and significant amounts of snow and other precipitation, which typically limits the need to pump groundwater in the winter, spring, and fall months of each year. Groundwater use is summarized in Table 6-1. This public information is available from the `Annual Inventory of Water Use, Lake Tahoe, and Truckee River Basins' reports from online DWR sources annually. The largest volume of water extracted at any location in the MVGB is from the Martis Valley municipal well, located near the airport, and has altered the regional groundwater flow direction. Three other wells (Old Greenwood, Prosser Village and Fibreboard) north of the Truckee River and east of the town of Truckee are the next largest producers in the valley. Total groundwater pumping increased by about 300 AF in WYs 2024 and 2025 (below normal water years)compared to WY 2023 (a wet year). Figure 3-1 is also useful for comparison with the groundwater contours (presented in Section 2) and corresponds with the pumping data. Graphical representations of monthly and annual pumping for TDPUD and NCSD wells are presented on Figure 3-2. Seasonally, groundwater demand peaks in the summer and declines to approximately one-third to one-quarter of that amount during the winter and spring. This distribution suggests that calendar and water year pumping estimates are typically similar in magnitude for this Basin. Figure 3-2 also shows that the overall pumping volume fluctuates from year to year but overall remains consistent unless dry conditions persist, varying by about 1,000 AF. Groundwater use is typically higher in below normal years compared to wet years. Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 3-1 Page 95 of 119 Figure 3-1. Martis Valley Groundwater Basin Locations of Groundwater Extractions �r aM f • center vncn l` L � r •troy enro NEVADA to TI)PUE)Municipal well P itla oe Northstar(NCSB) Pro ser Annex _ Well -j iI, Municipal Well Tel Boener $ s �{ I qh•Golf CIsL' ', Prosser Gralye c e Old Greenw ad I (General Well O i Heights old ere d --'Well'M20 ,ar-e Location) ...... Ag/ T Golf cTun P('.) i Fibreboard Ag $ Non-C ommun liy, I) an d$s gregate s Well �� Martis { • (General Well a �� coyole Moon GI—hire Valley 5 �< Location) c'• +, r Norl side _ Scale of Extraction Q =`� Erry t.rxckr` .R MarYis.-s Magnitude naer a a•, Valiey Well Po - _ o nonnarl.nAe Soutride ~ I Wells Extracting r Hoer Cr k 7 Airport IaevAoncouNT_r___-- '-- -- -----= >2000 AF per Water 1 I — —('r.x ——PACER COUNTY l Year --------- ,I Wells Extracting ��---�-- i s¢haffers� in. ._f"-" _wT yea,AF per Water 113 THt - i Year a �. II 1 I� star's Q Wells m _ \ Well r �If nurse, T 2 I � �400 AFF per per Water `r- m3n3s luh _� 4 Year Care-4 Laha a a� Cl GolI n Big Spring: �c0 O Natural Spring II 5 Id r t Creeks and Rivers a I Fault Zone ••Uncertain *q° uca Nokths�r I .. �r Res rt I Good Certainty n •'y ; Marais Valley YY a Groundwater Basin County Boundary g 2 1 0 2 Martis Valley Annual Report MARTIS VALLEY GROUNDWATER BASIN w Water Yeas 2024&2025 LOCATIONS OF GROUNDWATER EXTRACTIONS Nevada and Placer Counties,California Miles rr Truckee-Donner Public Utility District L I con:wcams JULY 2026 FIGURE 3-1 Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 3-2 Page 96 of 119 Figure 3-2. Martis Valley Groundwater Basin Community Water System Monthly Pumping Totals 900 +TDPUD Groundwater Production —NSCSD Groundwater Production 800 700 600 - 500 v LL 400 WY 2023 WY 2024 WY 2025 4827 AF 5025 AF 4988 AF a 300 — 200 100 WY 2023 WY 2024 WY 2025 565 AF 664 AF 679 AF 0 � ti� ti3 ti3 �°` ti°` ti& tip � by tih tih ti� �a� Per �Jti Qc�` far PQc �4� Qcw �aC Pis ��� pc'� ,ate Note: Monthly pumping totals shown at end of each month. Month-Year Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 3-3 Page 97 of 119 4. Surface Water Diversions Although the Truckee River and multiple tributaries course throughout the MVGB, surface water constitutes less than 15 percent of municipal and industrial water supply. The total surface water diverted for use was about 973 AF in WY 2023, 1,035 AF in WY 2024, and 1,065 AF in WY 2025. NCSD has water rights to use water from Big Springs, which is located outside the Basin but within the watershed as shown on Figure 3-1. Northstar Resort uses water from the spring, primarily for snowmaking. A portion of this water supplies recharge to the Basin's aquifers by storing water as snow, which later melts, becomes runoff, and infiltrates into the Basin. Water from the spring is also used in the Basin,at the Northstar Golf Course,along with other commercial and domestic uses. The amount of groundwater recharge attributable to surface water from Big Springs cannot be quantified at this time but may be an important source of late season low flow support in downstream creeks and wetlands, like all springs throughout the Basin. A second surface water source, from within the MVGB, is used for irrigation at the Ponderosa Golf Course,but its diversion point is unidentified. Some deep percolation from turf irrigation also provides groundwater recharge within the MVGB. Surface water use data is summarized on Table 6-1. Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 4-1 Page 98 of 119 5. Groundwater Recharge Wastewater is exported from the North Lake Tahoe area and from within the MVGB and is sent to the T-TSA wastewater treatment plant. The treated water from the T-TSA is recharged into the MVGB groundwater system through subsurface leach fields (pipes with holes surrounded by gravel) under permit with the Lahontan Regional Water Quality Control Board. The locations of the leach fields are shown on Figure 1-1. Groundwater recharge data for WYs 2024 and 2025 are summarized in Table 6-1. About 3,740 AF of treated water was recharged into the MVGB in WY 2024 and 3,670 AF in WY 2025. About 1,860 AF of wastewater was imported into the MVGB in WY 2024, and 1,820 AF imported in WY 2025. Wastewater from TSD is partially derived from groundwater pumping within the MVGB and partially offset impacts of local pumping near the Truckee River. Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 5-1 Page 99 of 119 6. Total Water Use The total estimated groundwater and surface water use in the MVGB by sector is summarized in Table 6-1. About 87 percent of the water use was provided from groundwater, with a total water use of 7,628 AF in 2023, 7,958 AF in 2024, and 7,966 in 2025. About 53 percent of all water used was returned to the Basin after being treated by T-TSA. Table 6-1. Total Water Use for Water Years 2023, 2024, and 2025 (values in AF) Water Use Sector 2023(Wet) 2024(Below Normal) 2025(Below Normal) Municipal and Industrial (M&I) 6,219 6,527 6,535 Groundwater Metered 5,392 5,689 5,666 Groundwater Estimated 55 4 4 Surface Water Metered 368 430 460 Surface Water Estimated 404 404 404 Golf Courses 1,409 1,431 1,431 Groundwater Estimated 1,208 1,230 1,230 Surface Water Estimated 201 201 201 Subtotal Groundwater 6,655 6,923 6,900 Subtotal Surface Water 973 1,035 1,065 Total Water Use 7,628 7,958 7,966 T-TSA Groundwater Recharge 3,788 3,741 3,669 Total 3,840 4,217 4,297 Note:Only includes water sources in MVGB,does not include evapotranspiration from native vegetation. Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 6-1 Page 100 of 119 7. Change in Groundwater Storage Change in groundwater levels drives the overall change in groundwater storage, Figure 7-1 spatially shows the estimated groundwater elevation changes (current year elevations subtracted from previous year elevations).Portions of the Basin(northwest, southwest,and southeast corners) with no significant pumping or groundwater level monitoring wells were not included in the estimates. The results and input values of groundwater level change and storage are presented in Table 7-1. Groundwater in storage in the MVGB slightly increased in WY 2024 as runoff from 2023 kept aquifers near full, and decreased in WY 2025, after two years of below normal precipitation. Groundwater pumping only increased by about 300 AF, with the greatest increase being located south of the Truckee River. As shown on Figure 7-1, a positive change (a 123-foot rise in groundwater levels in WY 2024) in storage occurred near well 17N16E11FOOIM that appears to be a result increasing the confined pressure of water found in the fractures of the volcanic rock monitored by this well. This historic high groundwater level could affect change in storage estimates significantly in WY 2024 and was excluded from the calculation due to the likely small volume of water that is contained in the joints and fractures. Similarly well 18N17E33LO01M was not included in the estimates because the depth to groundwater could not be measured due to the well being dry(greater than 187 feet below ground surface). Table 7-1. Estimated Change in Storage Basin Area Used Average Estimated Time Periods for in Analysis 1 Groundwater Average Storage Change in Groundwater Level Level Change Coefficients Storage Elevation Comparisons (ears$} (feet) (AF) Spring 2023-Spring 20242 24,5W 1.50 0.075 2,756 Spring 2024-Spring 2025 24,5QQ -4.79 0.075 -S,BC2: Total Cumulative Change 2024 and 2025 WYs -6,C.4� 1 Basin Area limited to extent of MVGBwith groundwaterelevation data to limit interpolation error Well under artesian pressure did not fully contribute it's increase to average change in groundwater levels Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 7-1 Page 101 of 119 Figure 7-1. Martis Valley Groundwater Basin Change in Groundwater Elevation, Spring 2023-Spring 2024 A Boca i/• erentiir r M ` r TON16E22H 1 r 7 ru.,.r`r i Prw kr TDPIJD Municipal Well " y •••• y +� Q�- Northstar(NCSD) TH-Prosser 18N17E3 LU01M Municipal Well R Village 1. Dry-- l Monitoring Well &25.7 � 17N17EOSI3001M - f. -13 1 L) ' b Natural Spring f �p TH-Fi•breboard Creeks and Rivers 17N16E11 F001 M22 9 !� r. 1 — —- ! 123.5* $ MARTIS F Fault Zone 171�17E07P001 M VALLEY ,�. .... - -12 BASIN Uncertain Location .o TH-Marti-s Valley Goad Certainty in �' h!.. I �a !'__ _. •• -9.3� 17 N 17 18C,01.M Location 17N16E17F002M �t L� j ;, -8.4- Martis Valley • 9 4.6 `� �4 1 N16E13K003M� �1. _ _ _ _ + � c , _ — NEVAaA CDUNTY __--_- ----___--- ------------ Groundwater Basin - -------- ------ - ---- ----�-- — --9 6 ------------_1 pLAGER COUNTY l -- -' -- ------------------ — ----- ---= County Boundary --- ,ylh ! �_ :`�,• 1�- 17E29-130�01 Change in 2.3 Groundwater /l ► Level (feet) :'I F.... 20 to 25 e 15to20 N _ C}jfrf C'.ek I I 10 t0 75 5 to 10 OW - }�'c ' A,• .,Lre• --- ---',ir '-'L 0 to 5 li -5 to 0 e r •'R 4 Note '`t ell 17N16E11 001 M is under artesian ressure iucaa e 6f 123.5 is anomalvu an a dad from calcula ans and chap a in rvundwater levels. 15 to-10 e " Martis Valley Annual Report MARTIS VALLEY GROUNDWATER BASIN 2 1 0 2 Water Years 2024& 2025 CHANGE IN GROUNDWATER ELEVATION - - Nevada and Placer Counties, California SPRING 2023 TO SPRING 2024 ` � I Miles o 'k Truckee Donner Public Utility District L Consultants JULY 202B FIGURE 7-1 Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 7-2 Page 102 of 119 Figure 7-2. Martis Valley Groundwater Basin Change in Groundwater Elevation, Spring 2024-Spring 2025 Ilk •� r IF { 4 � +}} T }}1 �`sen vrr " ! Lam" I 18N16E22H 1- _4. 2 2026 CiS23 25 3.... W. Events — — TaPUa Municipal ` Well Northstar(NCSD) 'r ( • Municipal Well r f TH-Prosser 8N17E3 L�01N1 + Monitoring WeEI Village Dry r �►' (b Natural Spring �. -01-17.5 �)�,_17N17E050001M Creeks and Rivers 3.6 i q TH-Fi !e 6 �` Fault Zone y 17N16E11 F001 M "* — � � -41.1 d. ' �, •• Uncertain Location _ 'j �, 5.4* -0 MARTIS 17 17E07P001 M VALLEY Good Certainty in TH-Mart,i'S Valley 11.2 BASIN Location 0.5 17N17+I 18Cr M M Valley Martis -1.2 Groundwater Basin 715Mtet E002M _ ti 1 1 N16E13K003M* H +. NEVRI]ACOUM1ITY -�------------- ,— -- ----- County Boundary -"7 CERcOUNTY -^ Change in -- --- --- — — ��- g - -- --- --� l % 1. 17E29.P001 M. � _ Groundwater Level (feet) Y � o to b + 411 -5to0 E , 10to-5 N - -20 to-15 N M1 � '• -25 to-20 -30 to-25 - .. •••� F z� -35to-30 jr AO to-35 Martis Valley Annual Report MARTIS VALLEY GROUNDWATER BASIN 2 1 0 2 Water Years 2024& 2025 CHANGE IN GROUNDWATER ELEVATION w' - L Nevada and Placer Counties, California SPRING 2024 TO SPRING 2025 Miles ''G Truckee Donner Public Utility District C❑nsuttants JULY 2026 FIGURE 7-2 Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 7-3 Page 103 of 119 Historical trends in the estimated annual and cumulative change of groundwater in storage, along with water year type and annual groundwater use, are shown on Figure 7-2. The annual change in storage was based on groundwater elevation change and specific yield as described above. Over the last two water years, groundwater in storage increased by about 2,800 AF in 2024, and then decreased by about 8,800 AF as a result of below normal conditions in WY 2024 and 2025, with decreased recharge and slightly more groundwater pumping. Groundwater in storage in the MVGB decreased over the two years by about 6,000 AF. For perspective, the Basin has approximately 484,000 AF in storage, so the overall change in WYs 2024 and 2025 is relatively small (less than 1 percent decrease) in comparison to the total water stored in the Basin. Figure 7-2. Estimated Change in Storage and Groundwater Use 60o,00D ■ wet 13,500 550,000 ■ Above Normal ■ Below Normal ■ Dry 500,000 f Estimated Cumulative Storage 12,000 Estimated Annual Storage Change ~Estimated Groundwater Use 450,000 10,500 0 40D,000 a C 3 3 t 350,000 9,000 y A W � � O 300,000 `o = v 7,500 W 250,000 F 3 m 0 200,000 6,000 c7 0 w 150,000 M v E storage change and groundwater 4,500 100,000 use estimates prior to WY 2016 r. 50,000 3,000 o 1,saa -50,000 ■ -100,000 m n m o '-1 •-I N O O O O N N N N Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 7-4 Page 104 of 119 8. Conclusions Groundwater levels increased slightly in WY 2024 in response to the lingering wet conditions of WY 2023, while levels dropped in WY 2025 after two years of below normal precipitation. Groundwater levels remained within their respective normal ranges when compared to historical spring and fall levels. Only one well was below its historic low levels in the summer months, due to lower recharge and slightly higher pumping. Groundwater pumping in WY 2023 was about 6,550 AF. Groundwater pumping increased in WY 2024 and WY 2025 by about 300 AF, about 5 percent in comparison to WY 2023. In response to the below normal precipitation and increased groundwater use during WY 2024 and 2025, the pumping depression that formed south of the Truckee River has reduced in size due to the wet conditions of WY 2023, but has fluctuated between WYs 2024 and 2025, a normal behavior for a healthy groundwater aquifer. With the below normal precipitation conditions of WYs 2024 and 2025 an overall decrease in groundwater storage of about 6,000 AF occurred, however, this number is reflective of two years of groundwater use and reflects less than 1%of total storage in the MVGB. This estimate does not include the 120-foot increase in one well and decrease of over 2 feet in another well which was reported to be dry. Overall this would not significantly change the estimated change in storage. As a management action, discuss with DWR resuming monitoring at 18N17E33LOOIM. Use the daily groundwater level measurements at well 17N16E11FOO1M to assess which local well is affecting groundwater levels while artesian conditions are present. Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 8-1 Page 105 of 119 9. References Brown and Caldwell. 2013. Martis Valley Groundwater Management Plan (GMP). California Department of Water Resources (DWR). 2020. California's Groundwater. Bulletin I I8-Final 2018 Basin Boundary Modification 2020. 2025, 2024. Annual Inventory of Water Use, Lake Tahoe and Truckee River Basins, Calendar Year 2026, 2025. 2026. California Groundwater Live. Accessed May 2026. https:Hsgma.water.ca.gov/CaIGWLive/#wells GEI Consultants, Inc. (GE). 2018. Annual Report for the Martis Valley Groundwater Basin, Sustainable Groundwater Management Act Alternative Submittal, Water Years 2016 and 2017. March 2018. 2022. Annual Report for the Martis Valley Groundwater Basin, Water Years 2020 and 2021. June 2022. 2023. Annual Report for the Martis Valley Groundwater Basin, Water Year 2022. June 2023. GEI Consultants and Balance Hydrologics. 2025. Martis Valley Groundwater Management Plan 5-year Update,Nevada and Placer Counties, California. Martis Valley Groundwater Basin Groundwater Conditions Technical Memorandum GEI Consultants, Inc. Water Years 2024&2025 9-1 Page 106 of 119 Appendix A. Monitoring Well Hydrographs Page 107 of 119 17N16E11FOO1M 5,950 5,900 N E 5,850 fB 5,800 O fB > N 5,750 - Lu L 5,700 0 5,650 GS Elevation 5,600 WSE Historic Low WSE 5,550 CT) O r1 N M -td- Ln lD r� 00 a) O r1 N M -:t Ln lD r, 00 a) O r1 fV M lzt U) lD I- 00 M O r1 N M �t U) 00 M M M M M al al al al al O O O O O O O O O O ri ri ri ri ri c1 c1 c1 c1 r H N N N N N N m al al a) al al al al a) al al O O O O O O O O O O O O O O O O O O O O O O O O O O c-I r-I r-I r-I r-I r-I r-I r-I r-I r1 r1 N fV fV N N N N N N N N N N N N N N N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O c-I c-I c-I c-I c-I c-I c-I c-I c-I ri ri ri ri ri ri ri ri r1 ri ri r1 ri ri c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I Water Year Page 108 of 119 17N16E13K001M & 003M - Deep vs Shallow 5,950 5,900 — N E 5,850 fB i 5,800 O N 5,750 W L 5,700 � I I O 5,650 L GS Elevation 5,600 —WSE - 001M Deep WSE - 003M Shallow 5,5 M O c-I N M Ln lD I- 00 M O c-I N M lzt U) l0 I- 00 M O c-1 f V M U) 110 I- 00 M O r-I f V M lzt U) 00 a) a) a) m m m m m m m O O O O O O O O O O ri ri ri -1 c-I ri ri ri ri ri N N N N N N m m m m m m m m m m m O O O O O O O O O O O O O O O O O O O O O O O O O O c-I r-I r-I r-I r-I r-I r-I r-I r-I r-I r-I N N N N N N N N N f V f V N N N N N N N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I r-I ri ri -q -q r-I r-I r-I r-I r-I r-I r-I r-I r-I r-I r-I r-I r-I r-I Water Year Page 109 of 119 17N16E17F002M 5,950 1% 5,900 N E 5,850 ca C: 5,800 O ca N 5,750 Lu N 5,700 I O 5,650 i (D GS Elevation 5,600 WSE Historic Low WSE 5,550 M O N m -zt Ln 1,D r, 00 rn O -1 N m Ln 1,0 r- 00 M O -1 N m :I- Ln QO r- 00 M O -1 N Cn �t Ln 00 a) a) Ql Ql Ql Ql Ql Ql Ql Ql O O O O O O O O O O ­1 ­1 ­1 ­1 ­1 r-I _q _q _q _q N N N N N N m m m m m m m m m m m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ci c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I N N N N N N N N N N N N N N N N N N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I Water Year Page 110 of 119 17N17EO5D001M 5,950 5,900 N E 5,850 ro i r_- 5,800 O ro GS Elevation dJ 5,750 WSE Lu i N Historic Low WSE rO 5,700 O 5,650 L (D I 5,600 — 5,550 M O -1 N M Tt Ln W I, 00 M O -1 N M Tt Ln W r� 00 M O -i N M Ln W I- 00 O1 O r-I N M -:4- Ln 00 m Ol Ol m m m m m m m O O O O O O O O O O -1 -1 -1 c-I c-I c-I c-I c-I c-I c-I N N N N N N Ql Ql Ql Ql Ql Ql Ql Ql Ql Ql Ql O O O O O O O O O O O O O O O O O O O O O O O O O O N N N N N N N N N fV N N N N N N N N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I -1 c-I rI ri _q c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I Water Year Page 111 of 119 17N17E07P001M 5,950 5,900 - cn E 5,850 - ro C: 5,800 - O ca _N 5,750 - Lu L v rO 5,700 — O 5,650 fLn V GS Elevation 5,600 Note: Ground Surface Elevation at this well site was historically recorded as 5794 ft msl, DWR's most recent WSE elevation was measured at 5767 ft msl. Historic Data has been corrected to reflect this change. Historic Low WSE 5,550 Ol O ri fV M -zt Ln l0 I, 00 Ql O .-I N CO -zl- Ln W I, 00 M O -1 N M -zt Ln l0 I, 00 a) O .-I N M -zl- Ln 00 Ol Ol Ol 0) 0) 0) M M M M O O O O O O O O O O r-I r-I r-I r-I r-I r-I r-I r-I r-I r-I N N N N N N M M M M M M M M M M 01 O O O O O O O O O O O O O O O O O O O O O O O O O O r-I r-I r-I r-I ri ri ri ri ri ri ri N N N N N N N N N N N N N N N N N N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O r-I r-I r-I r-I r-I r-I r-I r-I r-I r-I c-I c-I c-I c-I c-I ri ri ri ri ri r-I r-I r-I r-I r-I r-I r-I r-I ri r-I r-I r-I r-I r-I Water Year Page 112 of 119 17N17E18C001M 5,950 5,900 N E 5,850 ro C: 5,800 O ca > _N 5,750 L L v rO 5,700 O 5,650 fLn V Note: Ground Surface Elevation at this well site was GS Elevation 5,600 historically at 5794 ft msl, DWR's most recent elevation of 5773 ft msl. Historic Data has been corrected to WSE reflect this change. Historic Low WSE 5,550 Ol O ri rV M -zt Ln l0 I, 00 a) O r-I N CO -zl- Ln W I, 00 01 O -1 N M -zt Ln l0 I, 00 a) O r-I N M Ln 00 Ol Ol Ol 0) 0) 0) M M M M O O O O O O O O O O r-I r-I r-I r-I r-I r-I r-I r-I r-I r-I N N N N N N M M M M M M M M M M 01 O O O O O O O O O O O O O O O O O O O O O O O O O O r-I r-I r-I r-I r-I r-I r-I r-I r-I -1 ri N N N N N N N N N N N N N N N N N N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O r-I r-I r-I r-I r-I r-I r-I r-I r-I r-I c-I c-I c-I c-I c-I ri ri ri ri r-I r-I r-I r-I r-I r-I r-I r-I r-I ri r-I r-I r-I r-I r-I Water Year Page 113 of 119 17N17E296001M 5,950 5,900 N E 5,850 --' f6 i 5,800 O N 5,750 W L 5,700 O 5,650 L GS Elevation 5,600 -- WSE Historic Low WSE 5,550 Ol O r-1 N M -ti- Ln W r� 00 Ql O r-I N M RZI- Ln lfl r� 00 Ql O r-1 N M -:I- Ln lfl r� 00 Ql O r-I N M RZI- Ln 00 Ol Ol Ol Ol Ol Ol m m m m O O O O O O O O O O ri ri ri ri ri ri ri ri ri ri N N N N N N Ql Ql Ql Ql Ql Ql Ql Ql Ql m m O O O O O O O O O O O O O O O O O O O O O O O O O O c-I r-I r-I r-I r-I r-I r-I r-I r-I r-I r-I N N N N N f V f V f V N N N N N N N N N f V f V f V f V N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I ri r-I r-I ri ri ri ri ri ri ri ri ri r-I r-I r-I c-I c-I c-I c-I c-I c-I Water Year Page 114 of 119 18N16E22H001M 5,950 5,900 N E 5,850 ro 5,800 O ro 4J 5,750 LU L N M 5,700 O 5,650 i GS Elevation 5,600 WSE Historic Low WSE 5,550 M O r-I N M R* Ln lD I� 00 0) O r-I N M 4:4' Ln lD I%� 00 Q1 O r i N M li* Ln l CD �0 I� 00 M i N M R* Ln 00 el el el m m m m m m m O O O O O O O O O O ri ri ri ri ri ri ri ri ri ri N N N N N N Ql Ql Ql Ql Ql Ql Ql Ql Ql Ql Ql O O O O O O O O O O O O O O O O O O O O O O O O O O r-I r-I r-I r-I r-I r-I r-I r-I r-I r-I r-I N N N N N N N N N N N fV fV fV fV fV fV fV fV fV N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O r-I r-I r-I r-I r-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I r-I Page 115 of 119 18N17E33L001M 5,950 5,924 5,900 E 5,850 ca 5,800 O ca > 4J 5,750 W 5,738 N M 5,700 Z3 O 5,650 i —GS Elevation 5,600 Dry conditions reported as early as 2/19/2022, DWR reference point appears to be offset from WSE original public data sources between June and July 2022.Total depth of well is 190 feet deep according to well completion report, lowest recorded measurement is 187.1 feet on Historic Low WSE 10/15/2024 NM: Dry well. DWR Discontinued monitoring at this well on 2/19/2025 5,550 M O r-I N M 4:4' Ln lZ r� 00 M O r-I N M 4:4' Ln lZ I� 00 M O r-I N MR* Ln lZ r� 00 Q1 O r-I N M R* M 00 M M M M M M M M M M O O O O O O O O O O r-I r-I r-I r-I r-I r-I r-I r-I r-I r-I N N N N N N M M M M M M M M M M Ql O O O O O O O O O O O O O O O O O O O O O O O O O O c-I r-I r-I r-I r-I r-I r-I r-I r-I r-I r-I N N N N N N N N N N N N N N N N N N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O r-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I r-I r-I r-I r-I Water Year Page 116 of 119 Fibreboard (TH) 5,950 5,900 N E 5,850 ca 5,800 O ca N 5,750 Lu L � I 5,700 O 5,650 rLn V GS Elevation 5,600 WSE Historic Low WSE Cr) O ri (14 M T U) lD 1- 00 M O r-I fV M T U) lD 1� 00 Cr) O c-I fV M � U) lD 1, 00 Ol O ri N M 111 00 Ql Ql Ql Ql Ql Ql Ql Ql Ql Ql O O O O O O O O O O ri ri ri ri ri ri ri ri ri ri CV CV CV CV CV N M M M M M M M M M M M O O O O O O O O O O O O O O O O O O O O O O O O O O c-I r-I r-I r-I r-I r-I r-I r-I r 1 r-I r-I f V N N N N N N N N N N N f V f V f V f V f V f V N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O c-I c-I c-I c-I c-I c-I r-I c-I c-I r-I r-I r-I r-I r-I c-I c-I ri ri ri ri ri r 1 r 1 r-I Water Year Page 117 of 119 Martis Valley (TH) 5,950 5,900 cN E 5,850 co C 5,800 O > N 5,750 W L 5,700 IA A O 5,650 — L GS Elevation 5,600 WSE Historic Low WSE 5,550 M O r-I N M Ln l0 I- W Ol O r-I N M RT Ln l0 r� W Ol O ri N M RT Ln l0 r� W M O r-I N M Tt Ln 00 dl Ol Ol Ol Ol Ol Ql Ql Ql Ql O O O O O O O O O O cI cI cI cI cI cI cI cI cI cI N N N N N N 01 Ol Ol Ol 01 01 01 01 41 41 41 O O O O O O O O O O O O O O O O O O O O O O O O O O ri r-I c-I c-I r-I r-I r-I r-I ri ri ri CV CV CV N N N N N N N N N N N N N N N N N N CV CV (V fV N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O ri ri c-I c-I c-I c-I c-I c-I ri ri ri ri ri ri c-I c-I c-I c-I c-I ri ri ri ri ri ri c-I c-I c-I c-I c-I c-I ri ri ri ri ri c-I Water Year Page 118 of 119 Prosser Village (TH) 5,950 5,900 N E 5,850 ro 5,800 O ru 5,750 Lu N M 5,700 ------- v� Cvr O 5,650 ------- — i GS Elevation 5,600 ------ WSE Historic Low WSE 5,550 - M O -i N M Ln lD r� 00 M O -i N M Ln lD I, 00 M O r-I N M Tt Ln lD r� 00 01 O r-I ('4 M Tt Ln 00 0) 0) m m m m m m m m O O O O O O O O O O -4 -4 c 1 c 1 c 1 c 1 c 1 c 1 c 1 c 1 N N N N N N Ql Ql Ql Ql Ql Ql Ql Ql Ql Ql Ql O O O O O O O O O O O O O O O O O O O O O O O O O O -I r1 c-I c-I r-I r-I r-I r-I r-I r-I _q N N N N N N N N f V f V N N N N N N N N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I rl ri rl ri c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I Water Year Page 119 of 119