HomeMy WebLinkAbout7 Falcon Point Change Order TDPUD MEMORANDUM June 28, 2002 TO: Board of Directors FROM: Ed Taylor, Water Utility Manager SUBJECT: FALCON POINT CHANGE ORDER #1 AGENDA # 7 BACKGROUND: The Board of Directors at the May 1, 2002 meeting awarded the Falcon Point Booster Station Project contract to Longo Construction, Inc. We are requesting a change order to the contract. The design for the Falcon Point Booster Station was based off of the as built drawings provided by Dart. The as built drawings were for the construction of the Falcon Point Tank. The design was completed during the winter months when snow prevented the site from being surveyed to determine the tank location. The site was surveyed and the tank location was 3 feet different than the as built drawings had indicated. The redesigned pump station will require additional excavation and additional concrete wall construction. Staff and Longo Construction Inc. are reviewing the changes and will have the results completed Tuesday, July 2, 2002. RECOMMENDATION: I recommend that the Board approve Contract Change Order#1. Attachment-none at this time. Proposal to be distributed at meeting July 3, 2002.