Loading...
HomeMy WebLinkAbout8 Alder Drive Well CEQA ?' Tic #1 �I1UI EE IliNNER A UtilityPublic District Memorandum To: Board of Directors From: Ed Taylor, Water Utility Manager Date: 6-14-2002 Subject: ENGINEERING SERVICES FOR ALDER DRIVE WELL ENVIRONMENTAL REVIEW (CEQA) BACKGROUND: The Board of Directors approved the development of a new water supply, the drilling of a new water well (Alder Drive Well). Staff has been working to identify locations for this well. A site has been identified. Staff is requesting the approval of a contract for services with Sauers Engineering for the Environmental Review and to make recommendations for compliance with California Environmental Quality Act (CEQA) for the Alder Drive Well Project. SCOPE OF ENGINEERING SERVICES Environmental Review $9,000 RECOMMENDA77ON That the Board approves the Engineering Services agreement with Sauers Engineering, Inc. for service Environmental Review for the Alder Drive Well Project as defined in the attached proposal dated May 30, 2002. 0 Page 1 SAUERS ENGINEERING S30 25S 6034 05/31J02 07:42am P. 001 s Sauers Engineering, Inc. Civil & Environmental Engineers May 30,2002 Mr. Ed Taylor, Water Superintendent Truckee Donner Public Utility District P.O. Box 309 Truckee,CA 96160-0309 SUBJECT: ALDER DRIVE WELL-ENVIRONMENTAL REVIEW Tear Ed: This letter is our proposal for professional services to provide environmental review in compliance with the California Environmental Quality Act(CEQA)for the proposed Alder Drive Well. The project would be conducted in three phases; fast, geologic test hole; second, construction of the production well,and third, construction of the well pump station. Based on my conversations with you and on our experience with similar District projects,we anticipate that the geologic test hale project will qualify for a categorical exemption and that a negative declaration will be the appropriate level of review for the subsequent phases the project. Scope of Services For the geologic test hole project,we will prepare a Preliminary Environmental Assessment and Notice of Exemption. We will rile these documents with the Office of the Nevada County Clerk. This would allow the District to proceed with the geologic test hole to determine whether the proposed site will be suitable for a productio n well. For the construction of the production well and pump station,we will prepare an environmental initial study and proposed negative declaration following CEQA Guidelines. We will distribute preliminary documents to the State Clearinghouse and responsible agencies. We will coordinate a public hearing,receive oral and written comments and prepare responses. We will prepare a final negative declaration and notice of determination and file appropriate final documents with the County Clerk and State Clearinghouse. Based on the location of the proposed project site,at:archaeological site survey and record search will be an appropriate component to the environmental review. We will include archaeological services as part of the environmental review. Previous environmental review work done for the property which includes the proposed well site may be useful in identifying potential environmental concerns. Previous environmental analysis will be considered during the preparation of the Initial Study. 440 Lower Grass Valley Road, Suite A,Nevada City.CA 95959 (530)265-9021 Fax (530)265-6834 ' SAUERS ENGINEERING S30 ZSS 5004 0S151102 07:4Zam P. 002 i Schedule of Services We anticipate needing approximately thirty days following the District's authorization to proceed to prepare the categorical exemption,the initial study,and the proposed negative declaration. Depending on the number and nature of comments,preparation of final documents for approval by the District should take an additional forty-five to sixty days including the public review period and public bearing. Engineer's Fee We propose to provide the above described services, except for archaeological review, for a fixed fee of$9,000. This will include the archaeological review services. These fees do not include filing fees with the Department of Fish and Game. Closure Thank you for the opportunity to provide this proposal for professional services for this very important project. I am available to discuss this proposal with you at your convenience and with the Board of Directors at the June 5,2002 board meeting. Yo s tra y, Keith Knibb