Loading...
HomeMy WebLinkAbout10 Electric Master Plan CEQA SAVERS ENGINEERING 650 26S 6SS4 06/26/02 09:41am P. dm2 i p Sauers Engineering, Inc. JJJ Civil & Environmental Engineers Memorandum June 27, 2002 TO: Board of Directors FROM: Keith Knibb, Consulting Engineer SUBJECT: Electric System Master Plan Update - CEQA As of June 19,2002, the California Environmental Quality Act (CEQA)review period is closed for the Electric System Master Plan Update negative declaration. I contacted the State Clearinghouse and no comments were received from the agencies on their distribution list. The Board of Directors is held a Public Hearing on.Tune 5, 2002. The final CEQA documents included with this report are: ► Comments and Responses ► Final Negative Declaration ► Notice of Determination ► Department of Fish and Game Certificate of Fee Exemption RECOMMENDATIONS I recommend the Board of Directors take the following actions: ► Adopt the Final Negative Declaration. ► Approve the project for purposes of CEQA. ► Authorize the filing of the Notice of Determination with the Office of the Nevada County Clerk, the office of the Placer County Clerk, and the Governor's Office of Planning and Research. ► Adopt the De Minimis Impact Finding and authorize the filing of the Certificate of Fee Exemption with the Nevada County Clerk. ► Adopt a finding that the draft documents as circulated and the negative declaration reflect the District's independent judgement. SAVERS ENGINEERING 630 ZSS 6834 06l28J02 09:41am P. 009 Truckee Donner Public Utility District i Electric System Master Plan Update COMMENTS AND RESPONSES On June 5,2002,the Board of.Directors of the Truckee Donner Public Utility District held a Public Hearing to receive comments on the adoption of a negative declaration for the Electric System Master Plan t 7pdate. Comments were received from two members of the public. Charlie White, Donner Lake Resident Comment: Does the District plan on undcrgrounding power lines around the Donner Lake area. Response: District Electrical Engineer Joe Horvath responded that the District is planning to underground power lines in other parts of the system,but not necessarily around Donner Lake. Some new construction will involve underground power lines around the Donner Lake area including lines in and out of substations and new commercial construction. Don McCormick, Truckee Resident Comment: Are the District's plans for a fiber optic system an element of the electric system master plan. Is control of the electric system using fiber optics part of the master plan. Response: District General Manager Peter Holzmeister stated that the District currently has two SCADA systems, one for the control of the water system and one for the control of the electrical system. Assistant General Manager Steve Hollabaugh stated that the SCADDA system is not included in the electric system master plan. SAUERS ENGINEERING S90 ZEE SSS4 06i26/02 09:41am P. 004 NEGATIVE DECLARATION ( ) Proposed (X ) Final NAME OF PROJECT: Truckee Electric System Master Plan Update LOCATION: Truckee, California Entity or Person Undertaking Project: (XX) Truckee Donner Public Utility District 11570 Donner Pass Road P.O. Box 309 Truckee, CA 95959 Other ( ) Name: Address: Phone: PROJECT DESCRIPTION: Adoption of an update to the District's electric system master plan. Finding: It is hereby found that the above named project will not have a significant effect upon the environment. Initial An initial study of this project was undertaken and prepared in accordance with Article V Study: of the District's local environmental guidelines and Section 15063 of the EIR Guidelines for the California Environmental Quality Act for the purpose of ascertaining whether this proj ect might have a significant effect upon the environment. A copy of such initial study is attached hereto and incorporated herein by reference. Such initial study documents reasons to support the above finding. Mitigation The following mitigation measures have been included in the project to avoid potentially Measures: significant effects: None. Date: By Peter L. Holzmeister, General Manager SAUERS ENGINEERING S30 2SS 6334 06/2e/02 09:41am P. 00S NOTICE OF DETERMINATION To: X Office of Planning and Research From: Truckee Donner PUD 1400 Tenth Street,Room 121 P.O. Box 309 Sacramento,CA 95814 Truckee. CA 96160-0309 County Clerk County of Nevada 201 Church Street Nevada City,CA 95959 Subject: Filing of Notice of Determination in compliance with Section 21108 or 21152 of the Public Resources Code. Electric System Master Plan Update Project Title 2002052094 Peter L. Holzmeister (530)587-3896 State Clearinghouse Number Responsible Agency Area Code/Telephone Contact Person Truckee Nevada County and Placer County Project Location(include county) Project Description: Construction of two new water storage tanks, access road, and underground utilities including pipelines, electrical conduits and communication conduits. This is to advise that the Truckee Donner Public Utility District has approved the described project on July 3,2002 and 9 Lead Agency ❑ Responsible Agency Date has made the following determinations regarding the above described project: 1. The project[❑will ®will not]have a significant effect on the environment. 2. ❑ An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA. 0 A Negative Declaration was prepared for this project pursuant to the provisions of CEQA. 3. Mitigation measures[❑ were 0 were not]made a condition of the approval of the project. 4. A statement of Overriding Considerations[ ❑ was N was not] adopted for this project. 5. Findings ['S were❑were not] made pursuant to the provisions of CEQA. This is to certify that the Negative Declaration with comments and responses and record of project approval is available to the General Public at: Truckee Donner Public Utility Dist., P.O. Box 309 11570 Donner Pass Road Truckee CA 96160-0309 Peter L.Holzmeister,General Manager Date DFG Fee $ 0.00 Date received for filing at OPR: SAUERS ENGINEERING 590 266 66S4 06/2e/02 09:41am P. 006 CALIFORNIA DEPARTMENT OF FISH AND GAME CERTIFICATE OF FEE EXEMPTION De Minimis Impact Finding Project Title/Location, Name and Address of Project Proponent (including county): Electric System Master Plan Update, Truckee,Nevada County and Placer County. Truckee Donner Public Utility District P.O. Box 309 Truckee, Nevada County, CA 96160-0309 Project Description: Adoption of an update to the District's electric system master plan. Findings of Exemption: An initial study has been conducted by the Truckee Donner Public Utility District so as to evaluate the potential for adverse environmental impact. When considering the record as a whole there is no evidence before the Truckee Dormer Public Utility District that the proposed project will have potential for an adverse effect on wildlife resources or the habitat upon which the wildlife depends. The Truckee Donner Public Utility District has, on the basis of substantial evidence, rebutted the presumption of adverse effect contained in Section 753.5 (d) of Title 14, Code of California Regulations. Certification: I hereby certify that the Truckee Donner Public Utility District has made the above findings of fact and that based upon the initial study and hearing record the project will not individually or cumulatively have an adverse effect on wildlife resources, as defined in Section 711.2 of the Fish and Game Code. Peter L. Holzmeister Title: General Manager Lead Agency: Truckee Donner PUD Date: