HomeMy WebLinkAbout10 Electric Master Plan CEQA SAVERS ENGINEERING 650 26S 6SS4 06/26/02 09:41am P. dm2 i
p
Sauers Engineering, Inc. JJJ
Civil & Environmental Engineers
Memorandum
June 27, 2002
TO: Board of Directors
FROM: Keith Knibb, Consulting Engineer
SUBJECT: Electric System Master Plan Update - CEQA
As of June 19,2002, the California Environmental Quality Act (CEQA)review period is closed
for the Electric System Master Plan Update negative declaration. I contacted the State
Clearinghouse and no comments were received from the agencies on their distribution list. The
Board of Directors is held a Public Hearing on.Tune 5, 2002.
The final CEQA documents included with this report are:
► Comments and Responses
► Final Negative Declaration
► Notice of Determination
► Department of Fish and Game Certificate of Fee Exemption
RECOMMENDATIONS
I recommend the Board of Directors take the following actions:
► Adopt the Final Negative Declaration.
► Approve the project for purposes of CEQA.
► Authorize the filing of the Notice of Determination with the Office of the Nevada County
Clerk, the office of the Placer County Clerk, and the Governor's Office of Planning and
Research.
► Adopt the De Minimis Impact Finding and authorize the filing of the Certificate of Fee
Exemption with the Nevada County Clerk.
► Adopt a finding that the draft documents as circulated and the negative declaration reflect
the District's independent judgement.
SAVERS ENGINEERING 630 ZSS 6834 06l28J02 09:41am P. 009
Truckee Donner Public Utility District
i Electric System Master Plan Update
COMMENTS AND RESPONSES
On June 5,2002,the Board of.Directors of the Truckee Donner Public Utility District held a
Public Hearing to receive comments on the adoption of a negative declaration for the Electric
System Master Plan t 7pdate. Comments were received from two members of the public.
Charlie White, Donner Lake Resident
Comment: Does the District plan on undcrgrounding power lines around the Donner Lake area.
Response: District Electrical Engineer Joe Horvath responded that the District is planning to
underground power lines in other parts of the system,but not necessarily around Donner Lake.
Some new construction will involve underground power lines around the Donner Lake area
including lines in and out of substations and new commercial construction.
Don McCormick, Truckee Resident
Comment: Are the District's plans for a fiber optic system an element of the electric system
master plan. Is control of the electric system using fiber optics part of the master plan.
Response: District General Manager Peter Holzmeister stated that the District currently has two
SCADA systems, one for the control of the water system and one for the control of the electrical
system. Assistant General Manager Steve Hollabaugh stated that the SCADDA system is not
included in the electric system master plan.
SAUERS ENGINEERING S90 ZEE SSS4 06i26/02 09:41am P. 004
NEGATIVE DECLARATION
( ) Proposed
(X ) Final
NAME OF PROJECT: Truckee Electric System Master Plan Update
LOCATION: Truckee, California
Entity or Person Undertaking Project:
(XX) Truckee Donner Public Utility District
11570 Donner Pass Road
P.O. Box 309
Truckee, CA 95959
Other ( ) Name:
Address:
Phone:
PROJECT DESCRIPTION:
Adoption of an update to the District's electric system master plan.
Finding: It is hereby found that the above named project will not have a significant effect upon the
environment.
Initial An initial study of this project was undertaken and prepared in accordance with Article V
Study: of the District's local environmental guidelines and Section 15063 of the EIR Guidelines
for the California Environmental Quality Act for the purpose of ascertaining whether this
proj ect might have a significant effect upon the environment. A copy of such initial study
is attached hereto and incorporated herein by reference. Such initial study documents
reasons to support the above finding.
Mitigation The following mitigation measures have been included in the project to avoid potentially
Measures: significant effects:
None.
Date: By
Peter L. Holzmeister, General Manager
SAUERS ENGINEERING S30 2SS 6334 06/2e/02 09:41am P. 00S
NOTICE OF DETERMINATION
To: X Office of Planning and Research From: Truckee Donner PUD
1400 Tenth Street,Room 121 P.O. Box 309
Sacramento,CA 95814 Truckee. CA 96160-0309
County Clerk
County of Nevada
201 Church Street
Nevada City,CA 95959
Subject:
Filing of Notice of Determination in compliance with Section 21108 or 21152 of the Public Resources Code.
Electric System Master Plan Update
Project Title
2002052094 Peter L. Holzmeister (530)587-3896
State Clearinghouse Number Responsible Agency Area Code/Telephone
Contact Person
Truckee Nevada County and Placer County
Project Location(include county)
Project Description:
Construction of two new water storage tanks, access road, and underground utilities including pipelines,
electrical conduits and communication conduits.
This is to advise that the Truckee Donner Public Utility District has approved the described project on July 3,2002 and
9 Lead Agency ❑ Responsible Agency Date
has made the following determinations regarding the above described project:
1. The project[❑will ®will not]have a significant effect on the environment.
2. ❑ An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA.
0 A Negative Declaration was prepared for this project pursuant to the provisions of CEQA.
3. Mitigation measures[❑ were 0 were not]made a condition of the approval of the project.
4. A statement of Overriding Considerations[ ❑ was N was not] adopted for this project.
5. Findings ['S were❑were not] made pursuant to the provisions of CEQA.
This is to certify that the Negative Declaration with comments and responses and record of project approval is available to the General
Public at:
Truckee Donner Public Utility Dist., P.O. Box 309 11570 Donner Pass Road Truckee CA 96160-0309
Peter L.Holzmeister,General Manager Date
DFG Fee $ 0.00
Date received for filing at OPR:
SAUERS ENGINEERING 590 266 66S4 06/2e/02 09:41am P. 006
CALIFORNIA DEPARTMENT OF FISH AND GAME
CERTIFICATE OF FEE EXEMPTION
De Minimis Impact Finding
Project Title/Location, Name and Address of Project Proponent (including county):
Electric System Master Plan Update, Truckee,Nevada County and Placer County.
Truckee Donner Public Utility District
P.O. Box 309
Truckee, Nevada County, CA 96160-0309
Project Description:
Adoption of an update to the District's electric system master plan.
Findings of Exemption:
An initial study has been conducted by the Truckee Donner Public Utility District so as
to evaluate the potential for adverse environmental impact.
When considering the record as a whole there is no evidence before the Truckee Dormer
Public Utility District that the proposed project will have potential for an adverse effect
on wildlife resources or the habitat upon which the wildlife depends.
The Truckee Donner Public Utility District has, on the basis of substantial evidence,
rebutted the presumption of adverse effect contained in Section 753.5 (d) of Title 14,
Code of California Regulations.
Certification:
I hereby certify that the Truckee Donner Public Utility District has made the above
findings of fact and that based upon the initial study and hearing record the project will
not individually or cumulatively have an adverse effect on wildlife resources, as defined
in Section 711.2 of the Fish and Game Code.
Peter L. Holzmeister
Title: General Manager
Lead Agency: Truckee Donner PUD
Date: