Loading...
HomeMy WebLinkAbout8 Glenshire Drive Well Hydrogeologic Consulting Alll III* Memorandum To: Board of Directors From: Ed Taylor, Water Utility Manager Date: 6/3/2002 Subject: Consideration of an addition to the scope of services from Aqua Hydrogeologic Consulting to provide testing and remediation services for the Glenshire Drive Well. BACKGROUND: The District drilled the Glenshire Drive Well in 1996. The well was not developed to the full capacity. The well produces water that has an arsenic level which met the requirements at the time it was put into service (50ppb) but does not meet the new standard (10ppb). The District needs the increased supply from this well to meet the needs of the east service area (Glenshire). Staff is proposing to rehabilitate the well with the guidance of David Carlson of Aqua Hydrogeologic Consulting. At the February 6, 2002 Board Meeting, the Board approved a contract in the amount not to exceed of$35,277 with Aqua Hydrogeologic Consulting for hydrogeologic services for the further development and arsenic problem in the Glenshire Drive Well. Staff is now recommending an addition to the scope of services of Aqua Hydrogeologic Consulting in an additional amount not to exceed$30,000 to provide testing and remediation services for the Glenshire Drive Well. RECOMMENDATION: i recommend that the Board approve an addition to the scope of services of Aqua Hydrogeologic Consulting in an additional amount not to exceed$30,000 to provide testing and remediation services for the Glenshire Drive Well and authorize the execution of an agreement for the proposed services. Attached:Aqua Hydrogeologic Consulting Proposal 0 Page 1 FROM : CARLSON FAX NO. : 8410946 May. 31 2002 09:59AM P1 Menw To: Ed Taylor Frorre David Carlson CCa Mark Thomas Date: May 31,2002 Re: Glenshire Drive Well Rehabilitation ED: The following is a request for a change order to my Task Services Agreement for the rehabilitation of Glemhire Drive Production Well. This change order request is to include the proposed work plan and cost estimate as provided by Carson Pump for completing the actual rehabilitation work. Because my existing contract is for supervision and data collection of the work to be completed at the Glenshire Drive Well it is natural that the work plan and cost estimate as provided by Carson Pump be combined with my Task Services Agreement. If you have any questions regarding this request for a change order, please contact me at (775)250-9700. Sincerely, 7Q David Carlson C SON + Turbine and Submergible Sales & Service • Complate Well Rehabilitations 7W#T • Aquifer Testing - Turbine or Submersible P.O. BOX 20159 CARSON CITY, NV 89721 (775) 888.9926 FAX (775) 888.9928 David Carlson Aqua Hydrogeologic Consulting P.O. Box 18793 Reno, NV. 89511 Dear David, Following is a cost estimate to complete the scope of work that you outlined for me on the Glenshire Well. Please note, that item#2, is to install an elbow on the pump discharge, install a flometer, valve and discharge line out the door if required. I am also only pricing the removal of the turbine pump that is currently in the well. If it is to be reinstalled, the cost will be $6.501 per foot. I also am intending to use a 500 gpm, 60 hp pump for the swabbing. This increases the price some, but I recommend pumping the zones at the higher rate to get acurate samples. The spinner test, I priced at a depth of 150' for the pump and 160'for the 3" access pipe. When the test pump is installed, I priced the hourly rate for the pumping, using the electrical power avaliable at the well building. If I have to supply a'generator, the cost per hour will have to be increased for the cost of the generator and fuel. The horsepower for the pump is approximately 150 bhp. If possible I would rather use our diesel power unit, but since the well is in a building, this may not be possible. The mobilization and demobilization is a little higher than normal, but we have quite a bit of equipment to move to the job site. Look this over and if you have any questions, please call me. Sincerely, Dan Trampe . .-____-__ rHa CMG Y 4 • Turbine and Submersible Sales & Service CARSON •Complete Well Rehabilitations • Aquifer Testing - Turbine or Submersible P.O. BOX 20159 CARSON CITY, NV 89721 (775) 888-9926 FAX (775) 888.9928 Coast Estimate for Sampling of Glenaltire Well 1. Mobilization and Demobilization $3,500.00 2. Install discharge line on current pump and pump well for 12 his. $500.00 3. Remove 380'of 81'x1-1/4"water-lubricated Ingersoll-Rand turbine pump @$6.50/ft. $2,470.00 4. Brush 14"well for 6 hrs. (0 $150/hr. $900.00 S. Double swab and pump well to collect water samples, est. 20 hrs. @$200/hr. $4,000.00 6. Double swab and pump screen sections to redevelope well, est- 20 hm. 0$200/hr. $4,000.00 7. Bail debris from well, est 4 hrs. @$150/hr. $600.00 8. Install and remove 150' of 4"drop pipe with 180' of 3"drop pipe and 500 gpm pump $1,800.00 9. Conduct 8 hr. spinner test @$125/hr. $1,000.00 10. Install and remove 200' of 8' turbine test pump @$12/ft, $2,400.00 11. Conduct 8 hr. pump developernent @$180/hr. $1,440.00 12. Conduct 2 hr. step drawdown test @$180/hr. $360.00 13. Conduct 24 hr. Constant drawdown best @$180/hr. 3$4. 20.00 Total:$27,390.00