Loading...
HomeMy WebLinkAboutORD 1988-02 - Board s ORDINANCE NO. 8802 OF THE TRUCRRE DONNER PUBLIC UTILITY DISTRICT REVISING ELECTRIC RULE NUMBER 25 — MISCELLANEOUS ELECTRIC SERVICE FEES — WHEREAS , the Board of Directors of the. Truckee Donner Public Utility District determined the need to clarify and amend Electric Rule Number 25 concerning miscellaneous electric service fees; NOW, THEREFORE, BE IT ENACTED that the Board of Directors of the District hereby approves the revised miscellaneous electric service fees, a copy of which is attached hereto, to become effective thirty days from the date of this ordinance. Further, the Clerk of the District is directed to publish this ordinance in accordance with the laws of the State of California. PASSED AND ADOPTED at a regular meeting of the Board duly called and held within the District on the 4th day of April, 1988, by the following roll call vote: AYES: Aguera, Maass, White and Corbett. NOES: None. ABSENT: Sutton. TRUCKEE DONNER PUBLIC UTILITY DISTRICT gy 1 l�� t � Jo i L. Corbett, President ATTEST,,: . Susan M. Craig, Deputy Dislyict Clerk smc/2a.79 d MISCELLANEOUS ELECTRIC SERVICE FEES 1 . Relocation of overhead or underground services with no Actual cost of the service benefit to the District. performed including material, equipment and overhead; in no instance less than $50.00 2. Temporary removal of electrical facilities for customers sole convenience. (Except for service removal and re- placement to remove trees.) 3. Relocation of security lights. if 4. Service reconnect following disconnect at the pole for non- payment of bill (due to meter tampering or unaccessable it meter). 5. Service disconnect or reconnect for the customer to work on their facilities: a) After normal working hours It b) During normal working hours N/C 6. Service disconnect or reconnect due to structural fire: a) District facilities undamaged N/C b) District facilities damaged Actual cost of materials Remove/reinstall service drops for removal of trees. N/C 8. Meter reconnection during office hours. $15.00 9. Meter disconnect/reconnect after office hours. $50.00 10. Resealing meter: a) Ring seal - first occurrence N/C b) Ring seal - second occurrence $25.00 c) Anytime where both the ring seal and the inner seal are cut or missing $25.00 11. Testing single phase meter due to either a broken or missing internal seal or any situation where the integrity of the meter is in question. $50.00 12. Testing polyphase meter due to either a broken or missing internal seal or any situation where the integrity of the Actual cost/not less meter is in question. than $50.00 13. Testing of meter at customer request, if the meter has been tested within 3 years: a) Single phase $50.00* b) Polyphase Actual cost/not less than $75.00* *Refunded if meter is more than 2% fast. REFERENCE: Miscellaneous Services (Customer requests) Electric Rule No. 25 (Ordinance No. 8802) See Page E-25