HomeMy WebLinkAboutRES 1988-21 - Board RESOLUTION NO. 8821
OF THE
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
APPROVING SPECIFICATIONS AND CALLING FOR
BIDS TO UPGRADE APPROXIMATELY 1,700 FEET OF POWER LINE
WHEREAS, the failure of a transformer at the Truckee Substation has created
a substantial risk so that any similar failures would cause the downtown
Truckee area to be without power for a substantial period of time; and
WHEREAS , a new replacement transformer, which would alleviate the risk,
cannot be acquired and installed for many months; and
WHEREAS , the electrical load could be transferred from the Truckee
Substation to the Martis Valley Substation, but such a transfer would
require an upgrade of approximately 1 ,700 feet of wire and would involve an
expense in the area of $20 ,000; and
WHEREAS, Public Contract Code Section 20205.1 requires that the District
engage in competitive bidding on any expenditure in excess of $10,000;
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee
Donner Public Utility District as follows:
1. To authorize the President to issue a call for bids
based on the plans and specifications on file in the
Engineering Department for upgrading approximately
1 ,700 feet of power line in order to transfer the
electrical load from the Truckee Substation to the
Martis Valley Substation.
2. The date and time established for the bid opening is
11:00 A.M. on Tuesday, August 30, 1988.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public
Utility District at a regular meeting thereof duly called and held in the
District on the 5th day of July 1988 by the following roll call vote:
AYES: Aguera, Maass, Sutton and Corbett.
NOES: None.
ABSENT: White.