HomeMy WebLinkAboutRES 1985-35 - Board RESOLUTION NO. 8535
OF THE
TRUCKER DONNER PUBLIC UTILITY DISTRICT
APPROVING SPECIFICATIONS AND CALLING FOR
PROPOSALS ON THE 1985 PIPELINE REPLACEMENT CONTRACT
WHEREAS, it is the desire of the District to go forward with the
1985 pipeline replacement contract for Skislope Way , South River
Street East , and Ponderosa Drive ;
NOW, THEREFORE , BE IT RESOLVED by the Board of Directors of the
Truckee Donner Public Utility District as follows :
1 . That the specifica ,s and contract documents for
labor, materials and pment for the 1985 pipeline
replacement contract prepared by Keith Sauers , District
Engineer , and attached hereto are hereby approved.
2 . That the President of the Board of Directors is
hereby directed to issue a call for proposals based on
the attached specifications .
3 . That the date and time established for the bid
opening is 2 :00 P.M. on Thursday , September 26 , 1985.
PASSED AND ADOPTED by the Board of Directors of the Truckee
Donner Public Utility District at a regular meeting thereof duly
called and held in the District on the 4th day of September,
1985 , by the following roll call vote:
AYES: Cooley , Corbett , Hamilton and Maass.
NOES : None .
ABSENT: Duffy.
TRUCK DONNER UBLIC UTILITY DISTRICT
By
ATTEST:
Susan Ford , Deputy District Clerk