HomeMy WebLinkAboutORD 1990-01 - Board ORDINANCE NO. 9001
OF THE
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
SETTING FORTH ELECTRIC CONNECTION AND FACILITIES FEES
AND RESCINDING PREVIOUS RESOLUTIONS AND ORDINANCES
WHEREAS, AB 1600, which took effect on January 1, 1989, requires
that, in charging facilities fees, the Truckee Donner Public
Utility District shall treat all classes of customer equally; and
WHEREAS, a review of the basis of the electrical facilities fees
has revealed a discrepancy in the rate charged to the District's
commercial/industrial customers and the residential customers; and
WHEREAS, it is the District's intent to treat all customers
equally;
NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the
Truckee Donner Public Utility District as follows:
1. As of the effective date of this ordinance,
Ordinance 8404 and any other prior resolutions
and ordinances pertaining to electric
connection and facilities fees are rescinded
and of no further force and effect.
2. The ELECTRIC CONNECTION AND FACILITIES FEES, a
copy of which is attached hereto, shall become
effective 30 days from the date this ordinance
is adopted.
3 . These fees shall be retroactive to January 1,
1989; the General Manager is hereby authorized
to take action necessary to implement the
terms of this ordinance.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner
Public Utility District at a regular meeting thereof duly called
and held within said District on the 4th day of September, 1990, by
the following roll call vote:
AYES: Aguera, Corbett, Curran and Maass.
NOES: Sutton.
ABSENT: None.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
J s A. Maass, President
ATTEST:
7:�Z
Susan-M. Craig, Deputy Dist ct Clerk
smc
CONNECTION AND FACILITIES FEES
ARRUcabi l itY
The charges hereunder are applicable to all applicants for service
at locations not previously served by the District or where the
serving capacity of an existing service is increased to greater
than that previously served by the District. The initial charge
for service to applicants under the District's electric tariff
shall consist of a connection fee and, if applicable, a facilities
fee as appears on the following page.
CONNECTION FACILITIES FEE
IFFEE
A) SINGLE PHASE, 120/140
SERVICE
THREE-WIRE OVERHEAD
1) Temporary Actual cost -0-
2) Permanent connection to
structure $450 Residential $200
Commercial $40/KW
3) Temporary connection to
customer owner power pole
and subsequent transfer to Residential $200
structure $575 Commercial $40/KW
B) SINGLE PHASE, 120/240
SERVICE
THREE-WIRE UNDERGROUND
1) Permanent connection to
structure $600 Residential $200
Commercial $40/KW
2) Temporary connection to
customer owned power pole;
removal of same and
installation of
underground permanent Residential $200
service to structure $775 Commercial $40/KW
C) THREE PHASE, 208, 240 OR
480 KV SERVICE
FOUR-WIRE OVERHEAD
1) Permanent connection to
structure Actual cost $40/KW
2) Temporary single phase
120/240 service for
construction purposes - to
become three-phase
permanent $175 -0-
D) THREE PHASE, 208, 240 OR
480 KV SERVICE
FOUR WIRE UNDERGROUND
1) Permanent connection to
structure Actual cost $40/KW
2) Temporary single phase
120/240 service for
�..., construction purposes - to
become three-phase
permanent $175 -0-
smc 8 31 90