Loading...
HomeMy WebLinkAboutORD 1989-01 - Board ORDINANCE NO. 8901 OF THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT AMENDING MISCELLANEOUS SERVICE FEE SCHEDULE WHEREAS, it has been determined by the Board of Directors of the Truckee Donner Public Utility District that the current charge for reconnecting, disconnecting or transferring electrical service does not cover the expense involved; NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee Donner Public Utility District that effective 30 days from the date of passage of this ordinance the District's miscellaneous service fee schedule shall be changed. A copy of that schedule is entitled Exhibit "A" and has been attached hereto. PASSED AND ADOPTED by the Board of Directors at a regular meeting duly called and held within the District on the 16th day of January, 1988 by the following roll call vote: �^ AYES: Aguera, Corbett, White and Maass. NOES: Sutton. ABSENT: None. TRUCKEE DONNER PUBLIC UTILITY DISTRICT qen=C',czrv�� es A. Maass, President ATTEST: Susan M. Craig, Deputy District Clerk smc j,... MISCELLANEOUS ELECTRIC SERVICE FEES 1. Relocation of overhead or underground services with no benefit to the District - Actual cost of the service performed including material, equipment and overhead; in no instance less than $50. 2 . Temporary removal of electrical facilities for customers sole convenience. (Except for service removal and replacement to remove trees. ) - Actual cost of the service performed including material, equipment and overhead; in no instance less than $50. 3 . Relocation of security lights - Actual cost of the service performed including material, equipment and overhead; in no instance less than $50. 4 . Service reconnect following disconnect at the pole for non- payment of bill (due to meter tampering or unaccessable meter) - Actual cost of the service performed including material, equipment and overhead; in no instance less than $50. 5. Service disconnect or reconnect for the customer to work on their facilities: a) After normal working hours - Actual cost of the service performed including material, equipment and overhead; in no instance less than $50 A^ b) During normal working hours - n/c. 6. Service disconnect or reconnect due to structural fire: a) District facilities undamaged - n/c b) District facilities damaged - actual cost of materials. 7. Remove/reinstall service drops for removal of trees - n/c 8. Meter reconnection, disconnection or transfer: a) During regular office hours - $40. b) When the District is required to pay the employee time and a half - $100. c) When the District is required to pay the employee double time - $130. d) Automatic transfers to the owner, $15. 9. Resealing meter: 1.►. a) Ring seal - first occurrence - n/c b) Ring seal - second occurrence - $25. f c) Anytime where both the ring seal and the inner seal are cut or missing - $25. 10. Testing single phase meter due to either a broken or missing internal seal or any situation where the integrity of the meter is in question - $50. 11. Testing polyphase meter due to either a broken or missing internal seal or any situation where the integrity of the meter is in question - Actual cost; not less than $50. 12. Testing of meter at customer request, if the meter has been tested within three years: a) Single phase - $50. b) Polyphase - Actual cost; not less than $75. (Cost refunded if meter is mor than 2% fast. REFERENCE: Miscellaneous Services (Customer requests) Electric Rule No. 25 Resolution 8405; Minute Order 85/83 ; Ordinance 8802 smc ram^