Loading...
HomeMy WebLinkAbout1980-12-31 Min Ord - Board (4) THINGS TO DO December 15, 1980 Requested actionwW, Due Comments Mary Bills presented were approved for payment with the exception of the $28 Sierra Sun bill 4 Mary List the bill for the notice of public hearing to be ! held on 12/15 separately Mary Establish a prepaid bond redemption fund as a re- E stricted fund in the amount of $541.01 (assessments #7 and 8) Lyell Advise Sam Sperry to begin the procedure for calling the two bonds effective 7/81 at a fee of $25 per = thousand and not to exceed $3,000 (i �t Roberta Sign the letter of agreement with Mund, McLaurin # ` McDonough prepare an offer of dedication of a right of way to j the County of Nevada based on the proper property j description (re access - Senior Citizen Housing - Martis Valley Substation) Lyell Relating to grant deed from Aiello to the PUD, (for construction of substation) purchase title insurance McDonough Provide letter outlining downtown street light assess ment district formation procedure with a copy to the Truckee Downtown Merchasts Association - PQ1356, Truckee, Calif. 95734 Roberta 'Execute quitclaim deed to Confusion Corporation f McDonough, Begin development agreement process - Roth (Ponderosa Dan, Lyell Estates) and EIA process Dan Re private water line utilization (boot-leg subdivi- sion splitting from the south to Hwy 267) look into the problem and report back to the Board Lyell - Dan Make recommendations re Joerger's reqeust for abandon- ment and realignment of easement -1- Dan Check to see whether or not Toomey has connected to the water line for domestic purposes - report to the Board Susan Advertise that public hearing on West River Street j Line Extension has been continued to 1119/81 j Susan 1 Publish the Conflict of Interest Code Ordinance / 1111 - #8009 ✓ Susan Publish the Airport Water Transmission Main Ordin- ance - #8010 ✓ J Susan Publish Ordinance 8011 ordaining the acceptance of the water distribution system elements comprised of the Airport Transmission Main as constructed by Dart Lyell Advise staff that Collinson, Newbry, Cook, Draney, Libnosky, Fuller and Grady (Southside Area) may be connected after paying applicable fees i Dan Investigate Resolution No. 8006 - prepare amended i resolution after conferring with Martin McD and Lyell Lyell Advise staff to keep list of all persons applying for service in the Southside Subservice area t Lyell Check into fire hydrant problem at Dr. Kieth's home t Lyell - Dan Prior to the 1/5 meeting, provide input re the fire r McDonough hydrant agreement I Lyell Have the AwC extra regulators located at Donner Lake ; checked out by the GE representative Lyell - Mary Purchase three fans for the Truckee Sub - bill FHK ' i McDonough Draw up appropriate documents for abandonment of the Stueckler easement �-- Lyell Re Joerger property - check to see whether electrical! lines are strung from tree to tree to reach the Baucum residence - report to Board I -2- t i i Roberta Call special meeting upon receipt of certain data from the Manager and Engineer respecting Joerger's realignment of easement request. Roberta Sign letter to Sierra Pacific Power Company author- / izing waiver of Section 18 Susan File Notices of Determination - CSA#19 and Martis / Woods/Sierra Pines annexations ✓ Roberta iSign letter to California Energy Commission R i Lyell Re water service arrangements to W River St. ware- house built by Quintana, contact.new owner and ob- tain all pertinent information - report to.Board 1 Lyell iRe letter from Roen's attorney dated 12/15, send E 1Mr. Dillin a polite letter advising that final pay- ment has been scheduled for consideration at the i t1/5 meeting Lyell lRe Wes-Dan ARC Notice, call and write to County pro- testing the the lack of sufficient time to review the 1 environmental assessment of the project and request action be delayed r Lyell In accordance to newly established policy, object to Joseph Huljev's area variance application Lyell Investigate and determine the ownership of the ac- cess road off Beacon Hill (with respect to a logging operation) - report to the Board Roberta Contact Ken Merriman of R. W. Beck to see if another staff person can be assigned to the District - ex- press dissatisfaction with Mr. Reid 1 t Lyell Proceed with remodeling mobile unit and office Lyell Purchase generator to provide trailer with electri- city in the event of an emergency f i :. -3- # THINGS TO DO December 1, 1980 �-Action requested Due _ Comments Susan After execution, file minutes of 8/18/80 in minute / book ! ✓ Susan Prepare minutes of 9/3/80 in final form with correc- tion (pg. 6 - at end of Seymour vs. PUD, "Karl Kuttel left the meeting at this point. ") 112/10/80 Lyell Write to PERS asking them to justify bill for admin- istration of SS program costs 12/15/80 Mary On list of bills presented for approval, list Sierra Sun invoices separately so Board may identify which invoice is for the misprint Mary Bills presented for approval may be paid with the ex- I ception of $156 for Board Meeting attendance for an ; associate engineer from the Cook Associates' bill, her PERS bill and the Sierra Sun bill i Susan ublish and post Ordinance No. 8008 Dan Relating to the TranSierra Broadcasting tower site, repare an initial environmental assessment on Site "A" (TranSierra has agreed to pay costs in approximate tamount of $200) Susan and repare quitclaim deed relating to Hilltop property Martin McD bodying the corrections suggested .by Counsel and a Lsolution including Director Sutton's suggestions 12/10/80 Susan rovide two copies of proposed quitclaim deed re Hill- op to each of Kohler's addresses Susan ublish notice of public hearing - recreational cov- nants - Hilltop - 1/19/81, 7:30 P.M. Lyell dvise Sierra Pacific that Board has agreed to the ab- reviated. filing for a rate increase as long as the errand charge per kW does not exceed $4.79 -1- ' Susan Publish notice of public hearing - TSD line exten- VZ sion in Martis Valley - 1/19/81, 7:30 P.M. Dan Re TSD line extension, Martis Valley, notify all in- volved property owners that public hearing has been set for 1/19/81 at 7:30 P.M. Dan Rewrite the agreement between the TSD and PUD accord- ing to the facts and current status of the TSD water line extension 1/14/81 Susan Publish notice of public hearing - 12115/80, 8:00 PM, discussion of proposed ordinance determining District` policy regarding the Airport Water Transmission Main Susan Publish notice of public hearing - 12/15/80, 8:00 P.M I- discussion of draft ordinance ordaining the accept- ance of water distribution system elements comprised / of the Airport Transmission Main as constructed by ✓ art Susan Publish notice of public hearing - 12/15/80, 8:00 P.M. ( j Conflict of Interest Code ordinance ✓ Dan Pelating to Phil Newbry's request for a water hookup, write a letter stating the Board's position and ex- �laining that he will not receive water until there isi dditional water available in the critically deficient outhside t i Lyell Respecting the temporary mobil addition, obtain sev- K �ral quotes for rewiring and proceed with doing so Susan Irovide Lyell with copy of Dan's July report Lyell - Dan Make recommendations to the Board as to floor plans or the new mobil office and the old building 12/15/80 Lyell Publish the appropriate notice seeking District Coun- sel applicants and send the letter drafted by Martin cD to local attorneys Susan Relating to fire hydrant maintenance, provide Martin 1 cD with copies of all correspondence to date C ' Martin McD Re fire hydrant maintenance, research correspondence i received by the District to date - report to Board !12/15/80 i I I -2- 1 t f I � Lyell Relating to writing specifications for going to T" bid for insurance coverage, contact Mund McLaren of San Francisco re obtaining their assistance i Mary ! Transfer $200,000 into the restricted account for electrical capital improvements effective l/l/81 - reflect action in 1981 budget ; � s 1 � ` Mary Place recent -Sierra Pacific refund in General Fund Lyell Relating to service commitment policy, provide Board with copy of Dan's proposal 12/10/80! t Lyell Relating to District's electrical capacity, report re current situation and projected future needs s• and Beck's recommendations t I Lyell Prepare draft resolution addressing the handling of small claims 12/15/80 R ,�•-. 4 yell ! Advise Board in writing what would be necessary to acquire the additional 2 megawatts of power from SPPCo 12/15/80 : i i i Lyell Advise Fred Katz that three fans will be necessary Bob Prepare specifications for fans to be purchased by `• FHK 12/15/80f Mary R Relating to C. W. Roen progress pay estimate #3, s ( that payment be made in the amount of $5,442.12 's l Martin McD f Represent the District in PUD vs. Roen et al. i Lyell j Respecting a possible call of bonds - WRSAD - con- # tact Sam Sperry - determine best action - report to i the Board Mary Pay Suter's progress payment in the amount of i $3,344.99 i ! Dan File Martis Woods/Sierra Pines Annexation with Placer County LAFCo 3 -3- t ' j Susan File Notice of Completion with Nevada County Recorder (altitude valve installation at four 1 storage tanks - Tahoe Donner) Mary 35 days after Notice of Completion has been filed on the altitude valve installation at four storage tanks at Tahoe Donner, pay the 10% withhold in the amount of $2,893.30 to Suter provided no liens have been filed with the County Lyell Investigate Stueckler request for abandonment of public utility easement - make recommendation to the Board Dan Relating to Ponderosa Estates - write letters to Roth, Board of Supervisors, County Counsel, Planning Department and Planning Commission, and Department of Real Estate stating that the project may not be accepted until Roth meets the PUD's requirements I Lyell Advise Noltz (Alpine Deli) that the Board denied ! / his request for a variance having to do with the location of a propane tank 9 I Lyell Write follow-up letter to oil company re PUD's re- quest. for priority rating , Lyell ! Write a letter to the Union stating that, until such time as a new Memorandum of Understanding is adopted the Board will follow the rules and regulations in the MOU which expires 11/30/80 } i 1 1 � 3 I f r t -4- ( f THINGS TO DO November 17, 1980 r". ' Action requested - Due Comments Susan Type the minutes of August 18, 1980 in final form i11/26/80 / Mary Pay bills (including Suter Construction Co. ) t { Jim - Karl Select three dates for possible joint PUD-TFPD meet- Lyell ing to discuss fire hydrants and fee schedule Lyell - write letter asking Fire District to choose date for meeting Susan Forward copy of Resolution No. 8074 to Tudor Eng, Dan Provide Directors with a schematic of the temporary building ` i Roberta - Jim Work with R. W. Beck in developing an assessment of ?0""Lyell the current situation with respect to the Down Town Substation and projected future needs i Susan - Karl Prepare cover letter to FmHA for the revised loan ap-1 plication - Karl - sign letter and application Martin Mc Review and, if necessary, reword, proposed. ordinance determining District policy re the Airport Water Transmission Main - report to Board 12/1/80 Dan - Susan Notify property owners that public hearing re West River Street line extension has been continued to 12/15/80 - Susan - publish notice Dan Concerning facilities fees and replacement fees, pre- pare preliminary report which includes a definition 2/15/80 Dan - Martin Mc Relating to Prosser Woods Subdivision, begin work on developer agreement upon receipt of $500 deposit iary etersen/Yamaoka claim in the amount of $26.58 was pp roved for payment -1- 1 Dan Provide Board and Susan with revised TSD line ex- tension agreement Lyell Prepare draft policy addressing claims submitted to to the District Lyell 1Advise Tahoe Truckee Recycling that request for lwaiver was denied (for damaged meter) Karl - Jim Execute quitclaim deeds - Kuttel and Taylor t s Susan Release $280,000 performance bond issued to guaranteef the installation of the Donner Lake facilities upon I disability of the pipeline and removal of the treat- ment plant rii Susan iPrepare agenda for Special Meeting - 11/24, 7:30 , �P.M. - Executive Session to discuss Union negotia- . itions f Susan Record easements for water system facilities within a Stage VI of the Airport Transmission Pipeline along �. IHighway 267 k Martin Mc Prepare ad seeking District Counsel for placement in local and Reno newspapers --also letter to be sent to, local attorneys soliciting a proposal !II I Lyell ",Regarding failure of Prosser Well, notify affected ;,Par.ties to conserve water 9 Martin Mc Contact Grumer re PUD vs Roen, Gregg Brothers et al o ascertain status Lyell 4otify Sierra Sun that secret witness information mays e placed on PUD bills for one complete cycle Dan rovide Salty Gebhardt (P.O.Box 909, Truckee) and usan with material having to do with the West River < treet line extension /^ Susan onward,copy of Dendy report re groundwater quality n the vicinity of the proposed TTSA expansion to z Butterfield, the Airport.District and Don Strand -2- } THINGS TO DO November 3, 1980 Action requested_ Karl Sign minutes of August 4 and August 12, 1980 i t Mary Investigate into the Southern Pacific Transportation Company bill for longitudinal water line lease - re- port I Mary When overtime meal expenses are presented to the Board for payment, provide a more detailed explana- tion than in the past ; i Lyell Relating to Hyatt-Thermalito power, when information 4 is received, advise the Board if District involvements fis possible and practical Lyell Advise Mr. Wilson that District will not go into PG&E! territory without their written consent - if consent is obtained, District will provide a rough estimate i Lyell jWith assistance from Dan Cook and Neil Ried, prepare r a flow chart showing action required, sequence of t events and an estimated schedule relative to the Mar-;' tis Valley Substation M/17/80 Lyell iRelating to Project 79-1, request that Dan, Sam Sperry and perhaps a representative of Stone & Young- 1 Ferg appear and advise the Board with respect to award f the construction bids i11/12/80 i Mary +Prepare a complete and accurate accounting of the 'facilities fees account �11/12/80 j i Susan 1Prepare appropriate resolution authorizing execution of a quitclaim deed - easement on Ute Drive 1/12/80 1 Dan If possible, pay transportation costs for delivery ✓ of the mobil unit - bill the PUD t� Dan (Inspect mobil unit upon delivery to PUD to insure = 1condition is as good as when purchased � -1- Susan Copy Suter' s pay estimate to Board 1 ` Dan i Make recommendation re Suter's bill 11/17/80 R I Susan jWhen received, copy the Board with the Seymour - .-�--- PUD judgment F t r Lyell Inquire of McDonough re responsibility that might be s 'incurred by the PUD with respect to fire hydrant ! ymaintenance, fees means of obtaining funds for main- tenance F Lyell Write to Fire Chief Copeland and ask that they provide C Ithe District with three convenient dates for a joint tweeting of the two Boards to discuss the fire hydrant; agreement (after 5:30, not on a regular meeting date not on Thursday) Susan }Solicit response from Tudor Engineering with respect to REA letter of 10/27/80 - copy Board and Tudor !with Seymour's original letter _ , Lyell Re Custom Creative Homes - provide will serve letter ' which states that wiring and plumbing for each unit must be separate { i i Lyell Pe land division on Richards - provide will serve �etter - no problems anticipated as long as appro- priate fees are paid s i Lyell Object to variance - (Kerr - Reed Avenue, Donner Lake)j s ; t Lyell �repare draft policy whereby all requests for encroach i dents be automatically denied - thereafter, if investir- o cation warrants, negotiations may be initiated f i R ; > Lyell With respect to Kerr - Reed Avenue, Donner Lake, write , letter to the Planning Department objecting to the 1 violation of the PUD easement on the front property S lyine and requiring that separate services be made to t the new residence as well as the old residence ! t i l i Lyell R'ie Union Oil Company expansion - check out site to 1 �.� mike sure there is no encroachment i t Mary Serra Wood lProducts is not to receive electric ser- v ce until they have completed the County process -2- i j i ' I Lyell i Prepare draft policy for consideration by the O^ Board setting forth procedure to be followed by District personnel re connection of services only s upon completion of County process t Lyell ! Provide Mire Shea with map showing potential sites { for location of radio tower i Mary Pay bills with exception of Southern Pacific Trans-, portation Company bill and Western Coating bill. iInclude Western Coating bill on list for Board ap- proval at 11/17 meeting I Lyell Notify Steve Grumer that, as of November 3, 1980, his services are no longer required by the District' and his resignation would be appreciated 1 9, Lyell # Notify the person selected to fill the General Manager position - lacking acceptance from the Board's first choice, notify the second choice. ` i After acceptance, release new Manager'$ name to the press i 11/4/80 � s � Mary Upon new Manager's arrival, present him with a check in the amount of $1,500 to help defray moving:; expenses i f 1 Lyell s Contact Martin McDonough and request him to provide! interim services as District Counsel until a selec- 1 f tion procedure can be initiated i i 4 ' 1 1 , i i i t . i � t 5 � t t f 1 THINGS TO DO October 20., 1980 Action requested Due Comments Susan Type minutes of August 4 and 12, 1980, in final 1 form as drafted 10/29/80 l Mary Bills, including payment to Northstate Equipment in 1 the amount of $113.83, were approved for payment t Lyell Seek permission from PG&E to serve Norman Wilson - prepare preliminary cost estimate for the line ex- { tension - report back to Board Susan Publish Ordinance 8007 Dan Re Larry Fuller - prepare developer agreement ` i 1- Sign letter re Boca-Prosser project addressed to / U FERC •ASAP Steve Draw up resolution employing Tudor Engineering for th Boca Prosser project for the phase relative to the FERC application =10/29/80 Karl Sign various resolutions, agreements and ordinances ASAP ; Susan Forward copy of Gold Town - PUD agreement to Steve Mitchell Lyell gWrite cover letter for Mr. Aiello for FmHA 10/21/80 110/21/80 i ! Lyell Request that Sierra Pacific deliver the total work product on the Martis Valley Substation to the Dist. Susan File Negative Declarations on annexation proceedings with County Dan Write letter to Mr. Williamson of the State Clearing- house outlining the mitigation measures re water sys- tem improvements, Project 79-1 -1- Steve - Dan Prepare draft policy and resolution for developer agreements 10/29/80 Steve Prepare ordinance determining District policy re- garding the Airport Water Transmission Main 10/21/80 Susan . Publish and post notice of public hearing on ordin- ance determining District policy regarding the Air- port Water Transmission Main 11/17 - 8:00 P.M. 10/27/80• Steve Prepare legal opinion relating to the ordinance (Airport Water Transmission Main) 110/29/80 , a Mary Pay Roen $12,872.58 for reconstruction of Southside ? #2 3 Lyell - Steve ` Write letter to John Roth, developer of Ponderosa j ! Estates, demanding that he refrain in his advertise- ments from indicating that PUD water is available to; the lots at this time and advising that he should contact the Manager of the District to initiate a developer agreement for water and electric arrange- ments. Copy letter to Western Title Dan Obtain copy of Truckee River Bank plans - make , appropriate recommendations to the Board Lyell - Steve Prepare draft resolution setting forth District Dan i policy on the issuance of service commitments 110/29/80 , Dan ?Write to Roen Construction re monies withheld on jProject 77-1 Dan Re Falconi & Associates ;request, review and report back to the Board ' Susan (Forward Steve copy of quitclaim deed (request for easement - Ute Drive) i Lyell Investigate requested easement on Ute Drive - make 1 recommendation to Board 111/3/80 ,teve If appropriate, prepare resolution authorizing execu- tion of quitclaim deed - easement on Ute Drive �10/29/80 Jim Respond to Mrs. Manetta's letter having to do with District buildings i -2- _Dan Respond to Notice respecting Prosser Woods and �"" Custom Creative Homes Steve I Prepare letter for Karl's signature asking Insur- ance carrier status of claims referred to them by the District - copy Board i Steve I Advise the Board of settlement agreed upon in the Atkinson case i Lyell - Dan No further inspection or construction is to be done on the Duttweiler - McCoy project - submit a written report to the Board followed by a develop- er agreement C i R f 1{{ 1 �E rr1 � t 2 E f S i I 1 • f t i t 1 � I i } -3- r THINGS TO DO October 6, 1980 Board Meeting Action requested Due Comments Susan Minutes of June 2 and 16, 1980, were approved - file in minute book Susan Copy Board with draft minutes of August 4 and 12, / 1980 v Mary Bills presented were approved for payment Lyell Obtain factual information from Beck regarding the State Hyatt-Thermolito power facilities project (availability and cost) S Roberta Contact Truckee Fire Protection District re pos- sibility of evening meeting "'Vary August Sierra Pacific Power Co. bill is correct - pass on to customers i Bob i Write letter notifying Koepf and Lange that Board action will be taken if clean-up is not accomplish- ed by the end of the month s Lyell P Provide "cherry picker" line truck to elevate the photographer for Truckee High School student body 1:45 pictures ; 10/7 Steve and Dan Regarding Mira Shea's request for lease of District ! property for location of a radio tower, report as toi 10/20 the procedure the District should use is 4 f Mary Accept $250 deposit from Mira Shea (KTRT) for En- gineering and Attorney fees having to do with pos- sible lease of District land for location of radio 'f { tower � t I Susan 1 Schedule public hearing for consideration of ordi- i / nance amending Directors' compensation - advertise 10/20 i J S jE Steve Modify draft ordinance amending Ordinance No. 7401 f { clarifying Director compensation 10/20 i r Lyell Hire someone to establish the value of the Dis- trict office and warehouse for insurance purposes yell Invite a representative of Tudor Engineer to at- tend the October 20th meeting to discuss hydro- E / generation at Boca & Prosser 4 � f Susan Publish Ordinance #8005 and #8006 in small display h form, once in the Sierra Sun 4 Mary See copies of Ordinance #8005 and #8006 - add to t policy manual , i Steve Relating to Water System Improvements, Project 79-1, provide legal opinion re special use permit i requirements i f Dan Properly abandon Donner Creek Well #1 i r • I Dan Take water samples from the Southside Well No. 1, j Southside Well No. 2, Well A, Well B, and the Air- port Well immediately upon the operational capabil ity of each of the subject wells and have the sam- r"" pies analyzed for general mineral in organic chem- icals at a State Certified Laboratory of your dis- cretion and report the results to the Board and to the State Health Department at the earliest pos- sible opportunity f Dan Make an analysis of the water system in the eastern! end of the Town Subservice Area and specifically the water service as made available to the Louis- i iana Pacific Mill. Report the results' of the study j and analysis and the recommended solution to any problems associated with potential cross connec- tion conditions at the Mill to the Board and to { the Health Dept. on or before the regular meeting ' of 11/17. Should the analysis and recommended cor-! ; rection identify a serious potential or existing { health hazard, the corrective measures as authoriz-1 ed by the Board and approved by the Health Dept. shall be included by appropriate contract change E order in pending Project 79-1. i f Dan Coordinate the removal, inspection and, if appro- priate, repair of the existing pump facilities 1 located in Well A and Well B prior to 611181; work ' with the Health Dept. and Dart to achieve the long term use of Well A and Well B as an upper zone source of water to be used primarily during the summer high demand periods i t ' 1 -2- i Dan Communicate with the Health Dept. regarding those items on the deficiency list that are either con- tained in Project 77-1 and/or are an integral part of Project 79-1 with the purpose of obtaining the Health Department letter of approval for Project 79-1 Iso that the facilities can be corrected in accordance with the plans and specifications for the projects Dan JRegarding the 17 items of a minor nature on the de- ficiency record that Bob Slattery indicates as of 10/1 have been completed, review the work as conclud- ed, expand any deficiency list noted during the on- site inspections and communicate directly with the Health Department regarding the resolution of each deficiency item listed I Lyell {Hire someone to establish the value of the District I / ,office and warehouse for insurance purposes E.� I Steve raw up letter of agreement between Sierra Pacific r / nd the PUD and an appropriate resolution outlining information contained in Jerry Canning's letter � 10/15 Lyell �ontact R. W. Beck with respect to a final review of ! "the plans and specifications on the presently propos- ed site Lyell Notify Mr. Aiello that the agreement is acceptable to the Board and will be placed on the agenda for action Ls 11/3 - invite him to attend the meeting and expres Lis intent I Mary -Pay $11,861.80 to Joe Suter Construction Co. as recommended by the Engineer Susan Schedule public hearing for Z+4 P.M. on 11/3 re Rest River Street Line Extension Policy - place ad- ertisement in Sierra Sun Dan lelating to the West River Street line extension "icy, notify all the people affected by certified Letter of the public hearing (7:30 P.M. on 11/3) - E e prepared to explain and discuss "Exhibit D" 1 yell Notify Richard Blumenfeld of Arthur Andersen that t proposal to assist with budget system and methodology" is on a "back burner" Lyell Go forward with preparation of 1981 budget -3- � 1 Lyel1 Advise Lloyd that the Board has designated him to r ' negotiate the union contract r00" Steve Draw up an ordinance determining that the Airport Pipeline shall be used only as a transmission de- vice with only three connections allowed (Reynolds jWay, Southside Complex and So. River Street) plus i existing fire hydrants 10/15 Dan , Take some action with respect to Trumpp - Cuevas (?) i Lyell Check with insurance company to see whether it is E possible to use the line truck for placing poxy ! coat on District office and warehouse roofs Dan Have poxy coat applied to District office and ware- house roofs (grey) if insurance company gives OK r Lyell s Have copies of the July and August chemical analyses) r. ♦d��/�provided to the Board 5` 4 r ,,o—�,yell - Steve Place advertisement in Sierra Sun respecting the prohibition of and penalty for posting notices on power poles. Prepare a form letter to be sent to ! > appropriate persons when they are identified 'r Steve - Mary Prepare customer policy ordinance, delinquent ac- 10/15 counts receivable resolution, security light contract Steve Prepare resolution respecting financial relationship + among District officials 10/15 i Lyell Make inquiry of the Nevada County Board of Super- visors as to the status of the District's Conflict of Interest Code. E i 1 3 -4-