Loading...
HomeMy WebLinkAboutRES 1961-08 - Board RESOLUTION OF ACCEPTANCE # 10�8 BE IT RESOLVED: By the Board of Directors of Truckee Public Utility District, that that certain Bill of Sale from Truckee Heights, Inc. , dated September 21, 1961 conveying right and title to water mains, hydrants, etc . , to which this Resolution is attached, shall be and same is hereby accepted by the Board of Directors of said District, and the Clerk of said Board is hereby authorized and directed to place the same of record in the official records of the County of Nevada, State of California. PASSED AND ADOPTED THIS 110th day of October, 1961 TRUCME PUBLIC UTILITY DISTRICT President of the card of Directors Secretary TRUCKEE PUBLIC UTILITY DISTRICT Subject to approval of regulatory bodies having jurisdiction. Proposal Number I. Sierra Pacific Power Company will pay the Truckee Public Utility District $300, 000 for the electric facilities and equipment now owned by the District in the Electrical Department, The Power Company will then rehabilitate the distribution system and operate it as part of the Company's integrated ;electric system to give adequate -and dependable service to all customers. Pr opo sal Number II, Sierra Pacific Power Company will lease the electric facilities of TPUD and operate the distribution system as part of the Company's integrated system. The lease should be for ten (10) years. For this lease the Company will pay the ,District $100, 000 at the rate of $10, 000 per year. Over a period of three years the Company will rehabilitate the distribution system to give adequate and dependable service. At the end of the lease period the District will pay the Company a fair value for the improvements and additons the Company has made to the system, take over the system and oper- ate it; or the District will sell the equity it might have at that time in the system to the Company which would continue to operate the system, SIERRA PACIFIC POWER COMPANY Fred L. Fletcher, President September 8, 1961 TRU CKEE PU D S. P. P. CO. a w, Hr. Kw. Hr. Schedule 50 100 200 500 Schedule 50 100 200 500 Domestic Lighting L-7 $2. 60 $5. 10 $9. 60 $20. 10 D-4 $i2.20 $3. 70 $6.70 $13.20 Combination Domestic C-6 2. 50 4.25 fi 75 14.25 D-4 2.20 3. 70 6. 70 13.20 Lighting h Appliances Domestic Lighting & Cooking W o r Commercial HC-1 D-4 2.20 3. 70 6. 70 13.20 Heating or Cooking 3. 50 4.00 7. 00 13.00 C-4 2. 35 4.60 7.60 15. 60 Dom. 10 KW or more Min. Comm. 7. S KW or more Domestic Lighting, Soo 2000 500 2000 € Heating k Cooking Oor HC-2 Comm. Heating & Cooking 5. 00 5.00 10.00 32. 50 IS.60 45.60 Dom. 15 KW or more Min. Min, as� q.v a a�► s- Comm. 10 KW or more y'o o ,� 7 Soo 1000 Saco (K-1 Combination Comm. Ltng. (Load Factor 30% % Heating & Cooking s-6 20.00 30.00 110.00 ( 1000 KW Hr.25.90 22.05 20.40 } (Auto Camps, Trailer Parks) Min. ( 5000 KW HrJ25► 50 106.25 98.00 2S KW or more connected Soo 1000 500O General Power Service P-3 18.25 30. 75 110. 75 3-1 11. 50 21.50 101.50 Wholesale Power service K-2 Same as our K except � for discount allowances