HomeMy WebLinkAboutRES 1973-22 - Board (2) a
s�
RESOLUTION NO. 7222 ;
OF THE
TRUCKEE-DONNER PUBLIC
UTILITY DISTRICT
BOARD OF DIRECTORS
AMENDING RESOLUTION No., 6701
=- AND REGULATION FOR ELECTRIC SERVICE
RULES
S
y
Y THE BOARD OF DIRECTORS OF THE TRUCKEE-DONNER
BE IT RESOLVED B
PUBLIC UTILITY DISTRICT AS FOLLOWS:
is hereby amended as follows:
No. 6701 of this District
Resolution
Distribution Line Extension.
KV 25, paragraph 3 Di
Rule page amended as follows :
g
Sin le phase is hereby
t
:t
RULE XV
Extensions -- Single Phase
3, Distribution Line
end its single phase lines town
The District will extend
• on the following conditions:
applicant
a licant steals pay the
actual construction
Section (a) Thepp
cost
s of the line extension.
• required to sign a contract
• n b) The applicant will be req
Section � of distribution line is
where line extension a deposit of 60$
involved, and he shall place ,P This
'mate rep�.red by the District.
of an estimate p dited to the actual
deposit shall then be cre xtension.
cost
I O�t
at the completion of the line e
:p .
an additional customerts}
is (are) connected
Section t c} When
' line extension, the construction
to the original amount realized
will be prorated and the
chargelicant(s)effected.
will be -refunded to the a pP
. l remain in effect on a line
This condition steal . years from
n for a period of five (5) ye
extension f the line extensions
the date of completion o
x fired, anyone After this period has e e who connects p a for this
to this extension shall not have to pay
• more money can be realized by any
extension and no
existing consumers on the line extension.
4 , Distribution Line
Extensions - Three Phase
Section t
' a) Overhead Line
• re uired to pay all costs
. :: The applicant shall be q , incurred
-.Y of construction that are
at completion The applicant
three phase line extension. •
for a p •
required to place a deposit of
shall also be req % d b the District.
60% of an estimate as prepare y
The deposit will then be credited toward the
actual final cost of the extension. The District
cost
shall provide the transformers bank at no
to applicant.
page 14
l .i
RESOLUTION 722� • • • • • a • • • • • • • • • • . e • • e
, , . • .continued
Section (b)
Underground Line
l be required to pay all
The applicant steal underground
incurred for a three phase g
Costs line extension. The applicant shall provide
• with a concrete pad for the
the District all conform to the
transformer,. The pad sh
-- the District.
spec ications set forth by
P
The applicant shall also be required to
osit of 60% of the estimate as
place a dep The deposit well
prepared by the District.
al cost
P credited
then be ere toward the actual final
• nsa n. The District shall
of the line exte nsformer at no cost
provide the pad mount tra
to applicant*
al customer {s} is (are) connect-
. Section (c) when an addition Se overhead or)
ed to
the origi l three phase
the construction
line extension,
underground charge will be prorated and the amount realized
d.
will be refunded to the applicant(s) effected*
a line
dition shall remain in effect
This con ears from
extens
ion for a period of f ive (5) y
letion of the line extension
the date of comp
After this period has expired, anyone who
• all not have to pay for this
connects to this extension shall an existing
� more money can be realized by Y
extension and no
consumers on the line extension*
ssed and adopted by the Board
of Directors of the Truckee-Donner
Pa
• District this-
following . day of
Januar 1973 , by the
Public Utility
1 following roll call vote:
.F �Zov ti�Iat e_�
1 AYES :: Ilex Ajiders on N is on one
NOES :
F Henn, Loehr I:?u a n e A n ds rs on
ABSENT:T: H e
T RUC KE
E-DC�NNE�' PUBLICUTILITY DISTRICT
RO
Y ji A RS -- P RE S I DENT OF THE BOAR
ATTEST: ;r
{ A.''V
ff
J.
D E -a�r'FICIO SECRETARY
CLERK A11,41
January 2nd, 1973
Page 15