HomeMy WebLinkAboutRES 1969-14 - Board RESOLUTION NO* 6914
of the
BOARD of D IRECTORS
of the
T RUCKEE-DONNER PUBLIC UTILITY DISTRICT
WHEREAS_,_ the Truckee-Donner Public Utility District, is a part-
_
is iP ant in the Rural Electrification program prov id ing for extension
of rural electrical distribution lines, and
Whereas a revision of the Kilowatt Hour Certification required for
future power use estimates has been prepared by the Power Requirements
Branch of the Rural. Electrification Administration on July 2nd, 1969,
and
Whereas, said revised certification is a reasonable forecast of conditions
likely to prevail,
NOW THEREFORE BE IT RESOLVED that the revised Kilowatt Hour Certification
TMM dated July 2nd, 1969 is hereby approved and accepted.
Passed and adopted, by the Board of Directors of the Truckee-Donner
Public Utility District at a regular meeting duly held on the 15 th
day of July 1969 by the following roll call vote:
AYES:.- R kLaterg __ ,.,.,.,,._ Gore
Doyle F irpo
NOES: Nonce •
ABSENT: None - -- •
Paul A Doyle, President dof the Board
Clerk anC . -Officio Sec, Lary
Page 98