Loading...
HomeMy WebLinkAboutRES 1972-20 - Board RESOLUTION NO* 72,2 0 of R PUBLIC C UTILITY DISTRICT TRUCKEE - DONNE FEASIBILITY REPORT BY SIERRA AUTHORIZING FE OPERATION AND C POWER COMPANY ON OPER t, PACIFIC ELECTRICAL UTILITY OF M ANNGEMEN T OF THE THE DISTRICT. . es to undertake a feasibility Sierra Pacific Power Company desir a services WHEREAS, S and operation of the electrical stud as related to the management p and report and y e-Donner Public Utility District, and facilities and utility of T rucke District desires that such study WHERE AS, Truckee-Donner Public Utility and report be undertaken: _ 11 THE BOARD OF DIRECTORS OF THEREFORE, BE IT RESOLVED BY NOW TH DISTRICT as follows: TRUCKEE - DONN ER PUBLIC UTILITY • Company, at its own cost and expense, 1 That the Sierra Pacific Poweras to possible manage- . • undertake a feasibility study and report hereby authorized to un s of the Truckee - Donner i s he y o f the electrical system and work ment, operation, or control Public Utility District. f said study ud and report copy thereof shall e That u 2• pon completion o District, it being anticipated that such esented to the Board of Directors of the Dist • Ron or about. December 19th, 1972. port will b e presented s ente�3 - Pass ed and adopted by the Board of Directors of .Truckee Danner Public District on . meeting thereof duly called and held in e Utility District at a regular me g vote: y November, 1972, by the following the 7th day of AYES: Directors Roy_ tPrS ' 1VG1�V1�AT n 1 c nn S ��e NOES: Directors ' ABSENT: Directors ' TRUCKEE DON N ER PUBLIC UT ILITY DBM( By: resi ent of the boar o irectors. ATTEST: er an ex-o icio c�cretary thereof. Page 339 low .e m