HomeMy WebLinkAboutRES 1972-20 - Board RESOLUTION NO* 72,2 0
of
R PUBLIC C UTILITY DISTRICT
TRUCKEE - DONNE
FEASIBILITY REPORT BY SIERRA
AUTHORIZING FE OPERATION AND
C POWER COMPANY ON OPER t,
PACIFIC ELECTRICAL UTILITY OF
M
ANNGEMEN T OF THE
THE DISTRICT.
. es to undertake a feasibility
Sierra Pacific Power Company desir a services
WHEREAS, S and operation of the electrical
stud as related to the management p and
report and y e-Donner Public Utility District,
and facilities and utility of T rucke
District desires that such study
WHERE
AS, Truckee-Donner Public Utility
and report be undertaken: _
11 THE BOARD OF DIRECTORS OF
THEREFORE, BE IT RESOLVED BY
NOW TH DISTRICT as follows:
TRUCKEE - DONN ER PUBLIC UTILITY
• Company, at its own cost and expense,
1 That the Sierra Pacific Poweras to possible manage-
.
• undertake a feasibility study and report
hereby authorized to un s of the Truckee - Donner
i s he y o f the electrical system and work
ment, operation, or control
Public Utility District.
f said study ud and report copy thereof shall e
That u
2• pon completion o District, it being anticipated that such
esented to the Board of Directors of the Dist
• Ron or about. December 19th, 1972.
port will b e presented s ente�3
-
Pass
ed and adopted by the Board of Directors of .Truckee Danner Public
District on
. meeting thereof duly called and held in e
Utility District at a regular me g vote:
y November, 1972, by the following
the 7th day of
AYES: Directors Roy_ tPrS '
1VG1�V1�AT n 1 c nn S ��e
NOES: Directors '
ABSENT: Directors '
TRUCKEE
DON N ER PUBLIC UT ILITY DBM(
By:
resi ent of the boar o irectors.
ATTEST:
er an ex-o icio
c�cretary thereof.
Page 339
low
.e m