Loading...
HomeMy WebLinkAbout1975-12-31 Min Ord - Board 1975 RESOLUTIONS i 7501 AUTHORIZING THE GENERAL MANAGER OR HIS DESIGNEE TO ATTEND SMALL CLAIMS COURT 7502 ELECTRIC CONNECTION FEE AND CHARGES, AMENDING RESOLUTIONS 6930, 7202 and 7312 7503 ADDING A FUEL COST ADJUST TO BASIC ELECTRIC RATES; AMENDING OR ADDING TO RESOLUTION NO. 7302 WHICH SETS FORTH ELECTRIC RATES AND CHARGES, AND/OR MODIFYING PRIOR RESOLUTIONS 7217, 7219 and 7222 AND RATE SCHEDULES D1A, D16, GS1 . GS2 and GS3. 7504 IMPLEMENTING AND FIXING ELECTRIC AND WATER STANDBY CHARGES PURSUANT TO ORDINANCE 7501 OF THE DISTRICT, FOR FISCAL YEAR 1975-1976 7505 DECLARING CANDIDATE ELECTED 7506 REA COMPLIANCE ASSURANCE 7507 OPENING BANK ACCOUNT AT TAHOE NATIONAL BANK AND AUTHORIZING SIGNATURES 7508 ADOPTING RURALITE BASIC SAFETY RULES / 7509 ADOPTING GENERAL ORDER NO. 95, RULES FOR OVERHEAD ELECTRIC � LINE CONSTRUCTION 7510 ADOPTING GENERAL ORDER NO. 128, RULES FOR CONSTRUCTION OF UNDER- GROUND ELECTRIC SUPPLY AND COMMUNICATIONS SYSTEM 7511 FIXING AND PLACING ELECTRIC AND WATER STANDBY CHARGES ON DISTRICT TAX ROLL FOR COLLECTION BY THE COUNTY OF NEVADA 7512 FIXING AND PLACING ELECTRIC AND WATER STANDBY CHARGES ON DISTRICT TAX ROLL FOR COLLECTION BY THE COUNTY OF NEVADA 7513 APPROVING AND ACCEPTING A PORTION OF THE PRIMARY ELECTRIC DISTRIBUTION SYSTEM MORE PARTICULARLY DESCRIBED HEREIN 7514 REQUIRING REMOVAL OF TEMPORARY ELECTRIC LINES AND SERVICES TO DONNER LAKE HOMES> DONNER PINES WEST, AND/OR TO THE DEVELOPMENT COMMONLY KNOWN AS DONNER PINES, INC. , AND SETTING REQUIREMENT FOR CONNECTION OR RECONNECTION 7515 SETTING FORTH TRUCKEE-DONNER PUBLIC UTILITY DISTRICT' S INTENT TO ACQUIRE THE TRUCKEE TAHOE AIRPORT DISTRICT WELL 7516 DECLARING SURPLUS PERSONAL PROPERTY AND AUTHORIZING THE SALE THEREOF 7517 AUTHORIZING THE GRANT OF AN EASEMENT TO THE COUNTY OF NEVADA, STATE OF CALIFORNIA, FOR STORM DRAIN PURPOSES, SUBJECT TO REVERTER TO THE DISTRICT IN THE EVENT OF ABANDONMENT 7518 APPROVING THE PROJECT COMMONLY KNOWN AS "TTSA ELECTRIC DISTRIBUTION LINE" , AND FINDING THAT THE PROJECT IS A MINISTERIAL PROJECT FOR WHICH NO ENVIRONMENTAL IMPACT REPORT IS REQUIRED 7519 APPROVING CONTRACT DOCUMENTS FOR TTSA ELECTRIC DISTRIBUTION LINE DATED SEPTEMBER 1975, AND AUTHORIZING PUBLICATION Of NOTICE TO BIDDERS 7520 1975 - 1976 UNION CONTRACT 7521 APPROVING AND ACCEPTING A PORTION OF THE PRIMARY ELECTRIC DISTRI- BUTION SYSTEM OF TAHOE DONNER MORE PARTICULARLY DESCRIBED HEREIN 7522 ACCEPTING THE "SOUTHSIDE WELL" AND AUTHORIZING THE FILING OF NOTICE OF COMPLETION 7523 APPROVING AND ACCEPTING A PORTION OF THE PRIMARY ELECTRIC DISTRIBUTION SYSTEM OF TAHOE DONNER, MORE PARTICULARLY DESCRIBED HEREIN 7523 AMENDING TITLE 20 OF THE 1975 UNION CONTRACT CONTAINED IN - _ RESOLUTION NO, 75209 PERTAINING TO THE GROUP INSURANCE PROGRAM 7524 DECLARING AND REAFFIRMING THE 1975 GENERAL DISTRICT ELECTION RESULTS 7525 AUTHORIZING THE RELEASE OF THE SURETY ON THE DART INDUSTRIES, INC. FAITHFUL PERFORMANCE BOND WITH RESPECT TO ELECTRIC POWER SERVICE CONSTRUCTION AT TAHOE DONNER 7526 APPROVING AND ACCEPTING, WITH CONDITIONS AS STATED HEREIN, THE TAHOE DONNER WATER DISTRIBUTION SYSTEM ORDINANCE 7501 FIXING A CHARGE OR CHARGES FOR ELECTRIC AND WATER STANDBY OR IMMEDIATE AVAILABILITY CHARGES ON LANDS WITHIN THE DISTRICT BOUNDARIES TO WHICH ELECTRICITY OR WATER IS MADE AVAILABLE FOR ANY PURPOSE WHETHER USED OR NOT, AND PROVIDING MEANS FOR COLLECTION THEREOF