Loading...
HomeMy WebLinkAboutRES 1984-47 - Board s RESOLUTION NO* 8447 OF THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT APPROVING AND DIRECTING THE FILING OF THE PROJECT 83aw2 WATER SYSTEM IMPROVEMENTS NOTICE OF COMPLETION FOR THE HIGHWAY 267 LINE REPLACEMENT WHEREAS, a construction contract was entered into May 21, 1984 between a the Truckee Donner Public Utility District and Jetco Underground to complete the Project 83-2 water system improvements, namely the highway 267 line re-- placement; and WHEREAS, completed the co leted facilities will be.f ormall accepted by the F District upon expiration of a 35 day period after filing of the Notice of P Completion with the County; NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: I. The President of the Board is hereby authorized to execute the Notice of Completion attached hereto on behalf of the District. 2. The General Manager shall cause the Notice of Completion to - be recorded in the official records of"Nevada County. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Pub- lic Utility District at a meeting thereof held within the District on the bth day of August, 1984 by the following roll call vote: AYES: Cooley, Corbett, Duffy, Hamilton and Maass. NOES: None. ABSENT: None. TRUCKEE DONNER PUBLIC UTILITY DISTRICT 6 By es A. Maass, President ATTEST: f Susa.t MO Craig, Deputy Distri Clerk PROJECT 83-2 HIGHWAY 267 LINE REPLACEMENT NOTICE OF COMPLETION TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTICE IS HEREBY GIVEN by the Truckee Donner Public Utility District , by its duly authorized President of the Board of Directors, on behalf of the Truckee Donner Public Utility District, herein called District, located in the County of Nevada, State of California, as follower 1 . That the nature of the work consisted of the installation of 2,574 linear feet of 80 .Ductile Iron Pipe and Appurtenances. 2. That certain work of construction mentioned above as a whole was actually completed on or before the 16th day of July, 1984 . 3 . That said work of improvement was and is located in whole on real property wherein the Truckee Dower Public Utility District owns an interest in fee or has a maintenance easement. 4 . That said work of improvement was performed pursuant to written contr.act dated May 218 19840o entered into by and between the District and . Jetco Underground . 5. That the name of the surety for said contractor is Indemnity Company of California, Poet Office. Box 660118 , Sacramento, California, 95866* 6. That the address of the Truckee Donner Public Utility District is Post Office Box 309, Truckee, California, phone (916 ) 587-=3896. 7 . 'lnat the locations of the real property, upon which the work was performed is situated in the Truckee area; County of Nevada, State of California, and generally described as follows : Within said limits of work as shown on the plan sheet for project 83-2, Highway 267 Line Replacement, Sheet 1 of 1 . Dated : 'A RUCKEEā€¢ DONNER PUBLIC UTILITY DISTRICT ames A. Maass, President