Loading...
HomeMy WebLinkAboutORD 1984-04 - Board ............. .. .. r� ..-.r-....r ._. -, ti.r..nw;,w :nrF.x:r .--+. _,..,.. -: _ ......;., . .,... ...._..., ,z ..era_ ►r-. .. _..-... ....._........ ......,,4. .. .. ,...:.:_. .., ..,.:,.,._. ._...,.y,,.......wu_ Ye f �. ORDINANCE NO. 84 04 ar.Y.rA OF THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT RESCINDING PF`41VIOUS RESOLUTIONS AND ORDINANCES AND ESTABLISHING ELECTRIC CONNECTION AND FACILITIES FEES WHEREAS, the cost of providing electric facilities has increased sharply during the past several years, and the District's electric connection and facilities fees schedule is in need of updating; NOTAI I THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee Donner Public Utility District as fellows 1. As of the effective date of this ordinance, all prior resolutions and ordinances pertaining to electric connection and facilities tees are rescinded and of no further force and effect,. 2. That the Electric Connection and Facilities Fees, a copy of which is attached hereto, shall become effective October 4, 1984. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Pub- lic Utility District at a. regular meeting thereof duly called and held within said District on the. 4th day of September 1984, by the fol.lowi.ng roll call vote: AYES: Corbett, Duffy, Hamilton and Maass. NOES: Cooley. ABSENT: None. TRUCKEE DONNED. PUBLIC UTILITY DISTRICT By J AA. Maass, President ATTEST Susan M. Craig, Deputy D]. trict Clerk } p,<n t^e '�.t:,.. ,'••.•••.•. . .",:"7:f::Wa'.':'At,'b� ...,.,. r,:,•; 7*ry':'_ ,..�s,�"-.QS'1 '�:ARiC�77 °1venrs'■■rraacarr�e7eac�a..ws'•�:■nraa'Rn+■.-+or+wwr n.+•w.aA*+��c+.++rrr . ..rweworrMaar�,:.. ■ N E 12--4 CONNECTION AND FACILITIES FEES A2 pplicability The charges hereunder are applicable to all applicants for service at locations not previously served by the District or where the serving capacity of an ex- isting service is increased to greater than that previously served by the Dis- trict. The initial charge for service to applicants under the District's elec- tric tariff shall consist of a connection fee and, if applicable, a facilities fee as follows: CONNECTION FEE FACILITIES FEE A) SINGLE PHASE, 120/240 SERVICE THREE-WIRE OVERHEAD 1) Temporary Actual cost -0- 2) Permanent connection to structure $ 450.00 Residential. $200.00 Commercial $ 80.00/KW 3) Temporary connection to customer Owned power pole and subsequent $ 575.00 Residential $200.00 transfer to structure Commercial $ 80.00/KW B) SINGLE PHASE, 120/240 SERVICE THREE-WIRE UNDERGROUND 1) Permanent connection to structure $ 600.00 Residential $200.00 Commercial $ 80*00/KW 2) Temporary connection to customer owned power pole; removal of same and installation of underground $ 775.00 Residential $200.00 permanent service to structure Commercial $ 80.00/KW C) THREE PHASE, 208, 240 or 480 KV SERVICE FOUR-WIRE OVERHEAD 1) Permanent connection to structure Actual cost $ 80.00/KW 2) Temporary single phase 120/240 service for construction purposes $ 175.00 -0-- to become three-phase permanent D) THREE PHASE, 208, 240 or 480 KV SERVICE FOUR WIRE UNDERGROUND 1) Permanent connection to structure Actual cost $ 80.00/KW r 2) Temporary single phase 120/240 service for construction purposes $ 175.00 -0-� to become three-phase permanent smc Adopted 10/4/84 7/1 b/8 4 Ordinance No. 8404