HomeMy WebLinkAboutRES 1984-54 - Board r RESOLUTION N09 8454 OF THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT ADOPTING ELECTRIC RULE NOe 12 DEFINING ELECTRIC CONNECTION AND FACILITIES FEES WHEREAS, the public interest is to be served by the implementation of consistent, concise and understandable electric policies and procedures; and WHEREAS, the policy concerning connection and facilities fees is in need of updating, NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1 . Electric Rule No. 12 defining connection and facilities fees, a copy of which is attached hereto, is hereby adopted, 2. All previous policies, resolutions and ordinances concerning connection and facilities fees are hereby rescinded. 3. This resolution shall become of f ective 30 days f rom this date. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a regulrar meeting held within said District on the 4th day of September, 1984, by the following roll call vote: AYES: Cooley, Corbett, Duffy, Hamilton and Maass. NOES: None. ABSENT: None. TRUCKEE DONNER PUBLIC UTILITY DISTRICT By i s A. Maass, President ATTEST: Susan M. Craig, Deputy Dis rict Clerk ,.. .,y,:,,; ._,., _ ,..;.::: ..L::..... ✓...Y,.....-,.. ..... .. .... ..... ...r... .... .-.rv--.-.-,-....--...: .t-..r..-.......,...v,.....a.«.Q.�-xs.-po.casarTCe%hl�7rrfruwrd'rR•1!S"ef'a++r..wr..1t.!en.y:,.F.r r.a..5•...r. :--s+'+rM.r'gr:MMlrrlMrfrr..f++f+�vsfa►+... r E-12-1 POLICY ITEM: FEES AND CHARGES ELECTRIC RULE NO. 12 Date issued: 9/4/84 Reference: Resolution No. 8454 Date effective: 10/4/84 Truckee Donner Public Utility District POLICY STATEMENT All applicants for electric service (new construction/reconstruction) are subject to the following charges and fees: 12. 1 CONNECTION FEES - TEMPORARY SERVICE The Di 11trict will provide two types of temporary service; one which will be re- moved and not become permanent, and one which will become a permanent service. 1 A) Temporary _service = The actual cost of temporary service installa- tion and subsequent removal will be charged to include the labor, overhead, material, account set-up and administrative costs. The applicant will be required to pay the estimated charges plus de- posits prior to the provision of service. B) Temporary service for construction ur oses - The connection fee for temporary service is a charge determined by the District to establish service to a temporary power pole for construction pur- poses. It includes, but is not limited to, the cost of material, labor, overhead, administrative and general charges to provide the service conductor/cable and account set-up costs. 1) Tem orar service to become 2ermanent sin le 2hase - overhead The connection fee is based on labor and overhead to install the overhead service conductor from the District's overhead distri- bution system to the applicants temporary power pole (not to ex- ceed 200' in length) plus the cost of material used for the tem- porary service which cannot be made a part of the permanent ser- vice. The fee will include set-up and administrative costs, and is made a part of the permanent single phase connection fee, The cost of the meter, transformer, overhead conductor and per- manent connection transfer and included in the permanent over- head service connection fee. 2) Temporary service to become e�-manent Sin le phase _ underground _ 2 The connection fee is based upon the labor and overhead for the installation and subsequent removal of the temporary service. It includes the cost of all material used for the overhead service drop in addition to set--up and administrative costs, and is made a part of the permanent, single phase connection fee. The cost of the meter, transformer, underground cable and per- manent connection are included in the permanent underground service connection fee. 4' r E-12-2 3) Temporary_ service to become permanent three 2hase - overhead or underground - The connection fee is based upon the labor and overhead for the installation and subsequent removal of the termporary single phase service. It includes the cost of all material used for the overhead service drop in addi- tion to set-up and administrative costs. The cost of the permanent three phase service connection is charged at actual costs. 12.2 CONNECTION FEES - PERMANENT SERVICE The connection fee is a charge determined by the District to establish a new service. It includes, but is not limited to, the costs of material, Labor, overhead, general and administrative costs to provide the service conductor and cable, metering, a proportionate share of the transformer costs, and the account set-up costs. A) Single phase 1) The metering portion of the connection fee is based upon the installation of one single phase, 120/240, Class 200 self contained meter. Should the service require more complex metering, the customer shall be liable for actual costs in excess of the aforementioned single phase meter. 2) The transformer costs are based upon the service being allow- ed with one-eighth of the installed 'cost of a 50 KVA► trans- former. In the event that a customer's service requires a greater portion of the installed cost than is allowed for in the current connection fee, the connection fee may be adjust- ed to include the excess cost. Should the service require a non-standard transformer, the applicant may be required to provide same. 3) The connection fee allows for up to 100 feet of service cable for underground services. The applicant will be required to pay for the installed cost of the service cable in excess of 100 feet. 4) The customer may receive temporary service for construction purposes by paying an increased permanent connection fee. B) Three phase 1) The connection fee for three phase service will include the actual cost of material, labor, overhead, general and admin- istrative costs to provide the service conductor/cable, meter- ing, transformer and the account set--up costs. 2) The meter, transformers, conductor/cable and material will be charged at actual costs, or provided by the applicant, at the discretion of the District. s 7 .wt-,acg:<:,. A::. ,. .. .. _,. _ ,...;;-' :,.:; ..,,. :...; .�5.'-. ....,.,. ...._. 1.u. .6Gv._:.,'A+iJ:r:-u.. ..... .-.,+ ......V.. .. _. .„..... ,.. ,...•Ya...,.._ ...... ... ... ....,.....:_. .... _ _ __ __. _ . y t K E-12-3 12.3 CONNECTION FEES - PERMANENT SERVICE, MULTIPLE (SINGLE AND THREE PHASE In the event that a service requires (multiple metering, the original service will be governed by the connection fees for a permanent service. Subsequent connections made from the same service drop will be subject to the applicable metering, transformer and account set--up costs in addition to the facilities fees. 1294 FACILITIES FEES The facilities fee is a, charge determined by the District to cover the appli- cant's pro rats share of the cost of the existing supply facilities and any expansion or additions thereof which are required to serve the applicant. The cost of future facilities shall be included in the facilities fee in order to maintain an equitable distribution of benefits received between present and future service connections. 12.5 SERVICE FEES Any customer requesting work for their sole convenience will be charged the actual cost of the service performed including material, labor, equipment, overhead and any appropriate facilities fees (see Miscellaneous Electric Ser- vice Fees, Page E-25). 1296 EXPIRATION Fees paid will be of f ective f or a period of one year f rom the date of applical- t ion. Applicant may be subject to payment of increased fees if the permanent connection has not been made within the specified time period. This rule shall apply to those applicants who have previously paid connection fees but have not yet received permanent service. Such applicants may be sub- ject to payment of increased connection fees if the permanent connection has not been made within one year from the effective date of this rule. smc 7/16/84 r