Loading...
HomeMy WebLinkAboutRES 1984-53 - Board ....t m. . :HA�4'.. w+-1.. H31 t'.lgi.I. Y•_. RESOLUTION NO, 8453 OF THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT ADOPTING ELECTRIC RULE NO. 7 - POLICY REGARDING TEMPORARY SERVICE - WHEREAS, the public interest is to be served by the implementation of consistent, concise, and understandable electric policies and procedures; and WHEREAS, the Board of Directors has determined the need to update Electric Rule No. 7 pertaining to temporary service; NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. Electric Rule No. 7 as adopted on May 21, 1984 by Resolution No. 8430 is hereby rescinded. 2. Electric Rule No. 7, a copy of which is attached hereto, is hereby adopted effective 30 days from this date, PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Pub- lic Utility District at a regular meeting held within said District on the 4 th day of September 1984, by the following roll call vote: AYES: Cooley, Corbett, Duffy, Hamilton and Maass. NOES: None. ABSENT: None. TRUCKEE DONNER PUBLIC UTILITY DISTRICT B J s A. Maass, President ATTEST: A Susan M. Craig, Deputy District Clerk t 4 E`M7-1 POLICY ITEM: TR CIRAR31 RR2111CR ELECTRIC RULE No, 7 Date issued: 9/4 Z 8 4 _ �...� Reference. Resolut i - No,,.. 84.53 .....�,. Date effective: 10/4/84 Truckee Donner Public Utility District POLICY STATEMENT 7. 1 The District will supply temporary service to customers under the follow- ing conditions: A) Where temporary service is not intended to transfer to that of a permanent status, the applicant will be required to pay to the District in advance, the estimated cost of installing and remov- ing the facilities required, as determined by the District. The applicant shall be required to place a deposit in accordance with the District's rules and regulations. B) Where temporary service is for the purpose of construction and the service will ultimately transfer to permanent single phase, the customer shall be required to pay applicable connection and facil- ities fees for permanent service. C) Where temporary service is for the purpose of construction and the service will ultimately transfer to permanent three phase, the cus- tomer shall be required to pay applicable connection and facilities fees for temporary service. In order to establish permanent service, the customer will be required to pay the actual cost for the perman- ent service connection and f aciliteis fees as established by the Dis- trict. smc 7/16/84 4