HomeMy WebLinkAboutORD 1982-03 - Board OR-DINANCE NO. 82 .Y
OF THE
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
RESCINDING RESOLUTION NO. 7709 AND
ESTABLISHING ELECTRIC CONNECTION AND FACILITIES FEES
WHEREAS, the cost of providing electric facilities has increased sharply
during the past several years;
NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee
Donner Public Utility District as follows:
1. Effective with the effective date of this Ordinance, all
prior resolutions and ordinances pertaining to Electric De-
partment connection and facilities fees are rescinded and of
no further force ai-A effect.
2. That Exhibit "All, Electric Connect ionand Facilities
Fees, a copy of which is attached hereto, is hereby adopted.
3. The effective date of the Connection and Facilities Fees
Schedule shall be /X 1 1982.
4. The Clerk of the District shall irmiediately cause a copy
of this ordinance to be published once in the local newspaper
and copies shall be posted in at least three public places
within the District
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public
Utility District at a regular meeting thereof duly called and held within said
District on the eZ- day of 1982, by the following roll call
vote:
AYES:
NOES V-
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
B ,(11�1 I (4�"
T_
J?- P s A. Maass, President
ATTEST.-
Susan M. Craig, Deputy D___'L""s' trict Clerk
smc
1/28/82
40
.low
Exhibit "A"
ELECTRIC CONNECTION AND FACILITIES FEE SCHEDULE
Availability
Service hereunder is available throughout the District's service area.
Applicabilit
The Charges hereunder are applicable to all applicants for service at locations
not previously served by the District.
Rate
The initial charge for service to applicants 'under the District's electric tariff
shall consist of a connection fee and, if applilcable, a facilities fee as follows:
Size of Service Connection Fee Facilities Fee
1 0 Residential Service
3-wire OVERHEAD $450-00 $200.00
1 0 Residential Service
3-wire UNDERGROUND $500-00 $200.00
3 0 208, 240 or 480V kw
4-wire OVERHEAD $600-00 Demand x $80
3 0 2081 240 or 480V kw
Demand x $80
4-wire UNDERGROUND $650-00
The service required in all sizes includes 200 feet (overhead}and 100 feet (under-
ground) of wire, an overhead or pad mount standard voltage transformer, and one
meter. If additional meters are required, they shall be billed a set up fee plus
the actual cost of the meters.
Any needed extensions of the service wire for more than the footage allowance
will be billed on the basis of actual cost of the wire.
SmC
2/16/82
Exhibit "A"