Loading...
HomeMy WebLinkAboutORD 1979-09 - Board ORDINANCE NO. 79 09 OF TRUCKEE DONNER PUBLIC UTILITY DISTRICT CHANGING COMMERCIAL ELECTRIC RATES WHEREAS, the District's wholesale electric supplier, Sierra Pacific Power Company, has petitioned :and received approval for a rate increase; and WHEREAS, as a result of its 'increased costs, the Board of Directors of the Truckee Donner Public Utility District has realized that it is essential to increase its electric rates. BE IT ENACTED by the Board of Directors of the Truckee Donner Public 16 Utility District as follows. 1* Effective with the effective date of this Ordinance, the rate provisions of Ordinance No. 7802, and all other portions of prior ordinances and/or resolutions which are inconsistent with the provisions of this Ordinance are hereby repealed. BE IT FURTHER ENACTED that the electric rates for small general service commercial customers shall be known as Schedule GS-1 and shall be as f ollows. Energy Charge $7.40 per hour for the first 100 kwhrs or less, and all kwhrs thereafter shall be billed at the rate of $0.049 per kwhr, Minimum Cha The minimum charge for service hereunder shall be the energy charge plus $1.7 5 per kilowatt or total connected load in excess of seven kilowatts. For the purpose hereof, a horsepower will be considered as equivalent to a kilowatt. BE IT FURTHER ENACTED that the following electric rates shall be charged to all large general service customers, being hereby established as Schedules GS-2A and GS-2B. Applicability To general service requirements within the District, including power and fighting taken at one point of delivery with more than 30 kilowatts of demand. Character of Service Sixty-hertz alternating current. The District reserves the right. to specify the voltage and phase of service supplied under this schedule. .Monthly Rate a. Connected Load, 600 kVa or less. Demand Charge: $4.40 per kW of billing demand, but not less than $13 4.0 0. Energy Charge.* $0.029 per kWh. Am b, Connected Load, greater than 600 kVa: Customer Charge: $225-00 per bill Demand Charge. $4.40 per kW of billing demand, but not less than $2,640.00. Energy Charge: $0.025 per kWh. Minimum Charge, the 'greater of. (1) the current Demand Charge; (2) 50% of the highest Demand Charge established in the -preceding eleven months. *Moo Measured Demand The maximum measured 15 minute average kilowatt load during the billing period. If, at the discretion of the District, the customer's usage is intermittent or highly fluctuating, then a shorter time 'interval may be used. .Billing Demand The greater of. i's Current per i od's measured demand; 2. 5 0% of the highest Billing Demand established during the preceding eleven months; or 3. 5 0% of the contract demand. .Primary Service Discount If, at the discretion of the District, service is supplied at the primary voltage available, the Demand and Energy charges of the applicable rate above shall be reduced by 2-1/2900 Primary M eterin Discount If, at the discretion of the District, service is metered at the primary voltage available, the Demand and Energy charges of the applicable rate above shall be reduced by 2-1/2%0 Tower Factor Adjustment The District, at its discretion, may adjust the energy and demand charges to correct for average power factors above or below 80%. Such adjustments will be made by increasing or decreasing the energy and demand charges by .15% for each 1% or major fraction thereof by which the average power factor is greater or less than 80% lagging. Fuel Clause Adjustment tment Bills computed in accordance with the foregoing rates and charges are subject to adjustment for charges in the cost of fuel pursuant to Schedule FCA. Terms of Agreement A contract will be required as a condition of service for not less than three (3) years. Terms of Service Service under this schedule is subject to the District's Rules and Regulations for electric service. BE IT FURTHER ENACTED that the fuel clause adjustment as adopted in Ordinance No. 7702 on April 5, 1977, shall hereafter be added to and included in the monthly charge on all billings and shall not be stated therein as a separate item* This Ordinance shall become effective thirty (30) days from the date of adop tion. The Clerk of the District shall immediately cause a copy of this Ordinance to be published once in the local newspaper and copies shall be posted in at least three (3) public places within the District. PASSED AND ADOPTED by the Board of Directors of the Truckee-Donner Public Utility District, at a meeting held within said District on the 19th day of November 1979, by the following roll call vote: AYES: Huber Maass Sutton Kuttel NOES: None ABSENT: Hatch TRUCKEE-DONNER PUBLIC UTILITY INSTRIC'T' By XAR rUL K PTEL, President E A TT T Af A M ILTO N SEYM VRq Clerk Thereof CERTIFICATE OF POSTING ORDINANCE NO. 7909 TRUCKEE DONNER PUBLIC UTILITY DISTRICT CHANGING COMMERCIAL ELECTRIC RATES STATE OF CALIFORNIA COUNTY OF NEVADA The undersigned, Susan M. Craig, under penalty of perjury, certifies as follows: That for and on behalf of the Clerk of the Truckee Donner Public Utility District, I caused copies of Ordinance No. 7909, an ordinance changing com- mercial electric rates, adopted by the Board of Directors of said District on November 19, 1979, to be posted within thirty (30) days following adoption in four places within said District, to wit: 1. Nevada County Government Center 2. Nevada County Library, Truckee Branch 3, United States Postal Service Office 4. Truckee Donner Public Utility District Said posting was completed on the 20th day of November, 1979 Executed on the 20th day of November, 979. usan M. Craig, Deputy Distrj Clerk