Loading...
HomeMy WebLinkAboutORD 1979-05 - Board ORDINANCE NO. 79 05 OF TRUCKEE-DONNER PUBLIC UTILITY DISTRICT APPROVING AN AGREEMENT WITH DART INDUSTRIES PROVIDING FOR ADDITIONAL ACTIONS TO FURTHER THE COMPLETION OF THE TAHOE DONNER WATER SYS AND AUTHORIZING THE EXECUTION THEREOF WHEREAS, the Truckee-Donner Public Utility District entered into an agreement dated March 19, 1970, with Lakeworld Development Company, wherein and whereby Lakeworld , agreed to construct a water distribution system in a subdivision developm ent at Truckee, Nevada County, California, then known as "Tahoe Northwoods!', with the cost of construction to be borne by Lakeworldo, and WHEREAS, said agreement calls for conveyance of the water distribution system to the District after completion thereof; and WHEREAS, on February 23, 1971, Dart Industries, Inc., a Delaware corporation, purchased said developm ent subject to said agreement and changed the name of the project to "Tahoe Donner"; and WHEREAS, on October 15, 1973, a supplemental agreement was entered into between the District and Dart concerning the water service to said development, which agreement supplements the March 19, 1970, agreement with the 1970 ag reement remaining in full force and effect; and WHEREAS, there remains certain issues relating, to the water supply for Tahoe Donner that are unresolved; and WHEREAS, the parties have prepared an agreement which attempts to resolve as many issues as possible relating to the water supply for Tahoe Donner. BE IT ENACTED by the Board of Directors of the Truckee-Donner Public Utility District as follows: 1* The Agreement Between Truckee-Donner Public Utility District And Dart Industries, Inc. Respecting Certain Developments Related To The Tahoe Donner Water System attached hereto and marked Exhibit "All is hereby approved. 2. The President and Clerk are hereby directed to execute said Agreement for and on behalf of the District,. o 3* The Clerk of the District shall immediately cause a copy of . this Ordinance to be published once in the local newspaper and copies posted in at least three (3) public places within the District. PASSED AND ADOPTED by the Board of Directors of the Truckee-Donner Public Utility District, at a meeting held within said District on the 6th. day of August 1979, by the following roll call vote: AYES: Huber Kuttel Maass ti N 0 ES: Sutton ABSENT: Hatch 0 TRUCKEE-DONNER PUBLIC UTILITY DISTRICT 'A By M ES A. MAASS, President ATT To 9s; A. "4- M ILTO N SEYMOU, Clerk Thereof AGREEMENT BETWEEN TRUCKEE DONNER PUBLIC UTILITY DISTRICT AND DART INDUSTRIES, INC. RESPECTING CERTAIN DEVELOPMENTS RELATED TO THE TAHOE DONNER WATER SYSTEM THIS AGREEMENT is made and entered into this day of 119791 - by and between TRUCKEE DONNER PUBLIC UTILITY DISTRICT, a local public agency of the State of California, hereinafter referred to as "TDPUD" and DART INDUSTRIES, INC. ,, a Delaware corporation authorized to do business in California, hereinafter referred to as "Dart,." W I T N E S S E T He I WHEREAS,, Dart has- purchased the Airport Well; and WHEREAS, TDPUD and Dart desire to provide water from the Airport Well to the Tahoe Donner Project to satisfy the requirements of the 1970 and 1973 Agreements; and WHEREAS, there remain certain issues relating to the water supply for Tahoe Donner that are unresolved; and WHEREAS,, the parties desire to resolve as many of these issues as possible. NOW, THEREFORE, in consideration of the mutual promises herein contained, Dart and TDPUD agree as follows: A. GENERAL 1. Except as otherwise expressly provided herein, this agreement does not inodify, alter or supercede the previous agreements made in 1970 and 1973 or at other times. 2. This agreement does not purport to be a. final and absolute conclusion of all matters between Dart and TDPUD relating to water system development for the Tahoe Donner pro j ect. It is the intent of this agreement to finally and conclu- si vely resolve those items contained herein. At the present time there are no other known unresolved items. Nothing contained herein shall affect the parties' posture in the. Richmond case* 6 3. All of Dart's oblig ations under this Agreement are subject to a condition precedent that Dart is able to complete the purchase of the Airport Well and ob-. tain a dismissal with prejudice in the'Hatch case. B. MATTERS RELATING TO THE AIRPORT WELL 1. Dart agrees to provide to TDPUD the Airport Well, necessary connecting e two pump stations, and other appurtenances to provide the balance of lines, 4,000 gal lons p er minute of water (average demand on the maximum day) to the Tahoe Donner Project. ----------- and contract documents and • 2. TDPUD agrees to review the plans, specifications • make recommendations far compliance with existing TDPUD, standards within ten (10) days after presentation to the Board of Directors. 3. When any developer directly connects to the pipeline within ten (10) years from acceptance of the pipeline, a facilities fee will be levied by TDPUD and reimbursed to Dart exclusive of TDPUDIs administrative, legal and engineering charg es. The appropriate facilities fee shall be determined by the District En- gineer and shall not be., less than the TDPUD' s then current fee schedule. 4. Dart agrees t6" include tees at appropriate intervals in the pipeline to provide for future fire hydrants. Hydrants are not to be provided by Dart. S. Dart agrees that the desig n criteria for the Airport Well with pumps and appurtenances shall be 2,500 gallons per minutes. 6. Dart also agrees to provide a 400,000 to 600,000 gallon water tank, Pump station and associated equipment necessary to pump 2,500 gallons per minute to the Northside Tank. 7. Dart agrees to provide, in the Airport Well pumphouse, piping to accomo- date additional future pumps to ultimately supply additional water from the Air- port Well to the community of Truckee. Dart agrees to supply pumps and facilities to p rovide the Truckee Tahoe Airport District with up to 2,000 gallons per minute f or f our hours of f ire f low water. 8. Dart and TDPUD agree that the present pump in the Northside Well will remain the same, but the piping will be changed by Dart to provide for an addi- tional booster station at the Northside Well. 9. Pursuant to the terms of Dart's purchase agreement for the. Airport Well, TDPUD ag rees not to impose any source and storage fees on the property presently owned by the Truckee Tahoe Airport District or any connection fees for the Truckee Tahoe Airp ort District's existing domestic uses; however, the Truckee Tahoe Air- port District will be responsible for normal, monthly ,water usage fees, now or he imposed by TDPUD for fire, standby, water and domestic consumption. 10. Dart agrees to transfer to TDPUD in as-is condition any interest Dart may acquire in the present Airport Well pump, motor and appurtenances removed from the Airport Well, if not usable elsewhere in the project. 11. Dart agrees to grant to TDPUD, and TDPUD agrees to accept, the Sanders Well along with pipeline easements between the Sanders Well and the Northside pump station. 12. Dart ag rees that the design criteria for the equipment at the new North- side Booster Pump Station shall be to pump 4,000 gallons per minute to the Donner -2- Trails Tank. 13. TDPUD aqrees that the above actions will satisfy all water volume re- quirements for the Tahoe Donner Project at full development as well as any demand by TDPUD for_ three sources of water. C. OTHER MATTERS 1.. TDPUD agrees to reimburse Dart the sum of $23.769.18 for sums advanced by Dart to up-size the'West River Street pipeline. 2. TDPUD aqret=is to record with the Nevada County Recorder the deeds receiv- ed from Dart during the month of December, 1-975. 3. TDPUD agrees to release the 828(),1000.00 performance bond originally issued try gu*arantei:% the insta-l-lation of the Donner Lake facilities unon disability of the nipeline and removal of the treatment plant. 4. TDPUD agrees to grant to the Tahoe Donner Propertv owners Association the beacon power line easement extending from the southerly boundary of Tahoe Donner Unit No. 8 to a point where the easement leaves Tahoe Donner near the northeast corner of Unit No. 8. This grant to the Property owners Association shall be effective upon completion of new power lines being constructed in Unit No. 8 by Dart. 5. TDPUD agrees to grant access easements across the front of Parcel I, Unit 8 (Sitzmark Tank) , and across Parcel A, Unit 9 (Falcon Point Tank) , to the adjacent lot owners using those access easements. 6. Dart agrees to change the obligation of the 1.6 million dollar letter of credit from Donner Creek facilities to the Airport Well and Pipeline facilities. TDPUD agrees to approve the change after completion of the Airport Well purchase by Dart. 7. Dart agrees to reimburse TDPUD Restricted Funds for Tahoe Donner Water System Improvements in the amount that was previously withheld for the Northwoods Boulevard pipeline of $56,875.00. 8. Dart agrees to contribute to TDPUD Restricted Funds for Tahoe Donner Water System Improvements the amount of $32,000.00 that was excluded by the terms of the 1970 Agreement. 9. Dart agrees to reimburse TDPUD General Fund the sum of $14,000.00 for work performed in trouble-shooting and eliminating design problems in the Tahoe Donner telemetry system. % 10. Dart agrees to reimburse the TDPUD General Fund the sum of $6,000.00 for the purchase of a data logger for the telemetry system. 11. Dart agrees to reimburse TDPUD General Fund for all costs relating to -3- the purchase and ins-.- __Llation of four altitude valves, one each at Herringbone and Roundhill, Falcon Point. and Sitzmark Tanks, provided, however, the amount of reim bursable cost of these altitude valves shall not exceed $25,000.000 12. Dart agrees to pay TDPUD General Fund the sum of $35,000.00 for cathodic protection, investigation and mitigation on the Tahoe Donner Water Distribution p System in full settlement of any claims of the TDPUD arising out of design or construction- by Dart of the Tahoe Donner Water System* 13. Dart ag rees to commission Dr. John Sharp to compile and print an update to the 1975 Truckee Groundwater Report and to provide twenty (20) copies to the TDPUD. 14. Dart ag rees to grant to TDP`UD a small parcel adjacent to the Donner Trails Tanks (Parcel #18,--681-013) . 15. Dart agrees to release Dart' s security interest on the Southside Com- plex property held as security for the under-river crossing. 16. Dart ag rees to grant TDPUD a utility easement across the westerly boundary of 1.a two and one-half acre parcel behind the Church on Highway 267 (Par- cel #19-44-27) 0 17. Dart will, within forty (40) days after execution of this agreement: a) Remove the pumps from the Donner Lake pumphouse; and b) Fill with concrete the pit that contained the pumps and fill with con- crete app roximately sixty (60) feet of the intake pipe to the existing valve near the concrete launching ramp; and c) Offer the pumphouse building to the Tahoe Donner Property. Owners Associa tion. If the offer is not accepted, Dart will remove the building. 18. Dart shall, on or before July 1, 1982, remove the treatment plant from its present parcel. IN WITNESS WHEREOF, the p arties hereto have executed this agreement on the day and year first above writtene TRUCKEE DONNER PUBLIC UTILITY DISTRICT DART INDUSTRIES, INC. By By James A. Maass, President ATTEST: ATTEST: A. Milton Seymour Clerk of the Board -4-