HomeMy WebLinkAboutORD 1979-02 - Board 31
ORDINANCE NO, 79O2
OF
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
ORDAIINING THE APPROVAL AND A CC EPTANCE OF THE TAH.OE DONNER
OFF
-SITE WATER TRANSMISSION SYSTEM, PHASE 11
A4
ir-41
•
WHEREAS , TrUckee Donner H Pub c Utility District entered into an
-ld Development Company wherein
with Lakewor
agreement dated March 19, 1970, d*i stri but ion system in a
and whereby Lake world agreed to construct a water
Subdivision delvel oplMent at Tr uckee, Nevada Co untYpt California, then known
as "Tahoe Northwoods," with the costs of construction to be borne by Lciike-
world; and
distribu-
WHEREAS, saia agreement calls for conveyance of the water-
tion system to t he. District after completion thereof; and
WHEREAS , on February 23, 1�]`1 , Dart Industries, Incet a Delaware Cor-
poration, purchased said development subject -to said agreement and Changed
.,the name of the prc.)Ject to Tahoe Donner; and
WHEREAS, on October 15, 1973, a supplemental agreement was entered
into by the DistrijCA and Dart concerning the via service to said deve-lop-
inent, which agreemE-,int. supplements the said March 19, 1970, agreement with
the 1970 agreement remaining in full force and effect; and
WHEREAS under said 1970 agreement the District was required to ap-
t 0 tself that said
prove the Plans and inspect 'the construction arid assure i
4 1
works and water d �s.tribution system was constructed in accordance w" th
the approved plans and specifications,and thereafter accept said water dist ribution sys tem and from the date I of acceptance to assume all responsi-
--espair of the system and to be
bility, for future operat ion, maintenance and i
-forever thereafter responsible therefor; and
WHEREAS , the Dis t r ict recei ved assurance from Cook Associates , Engin-
I
eer-ing Consult R3nts , the, p l ans, s p ec ificat ions and cons trUCtion documen ts
)*rectors. --
y
were appropriate arid recommended sarrie. for approval by the Board of Ll
and
WHEREAS, the Board of Directors approved the plans, specifications
and contract documents by Resolution 7835 at the reg. ularly called and con-
dUCted Board Meeting of June 21 , 1978;,,'and
WHEREAS, the Dist rict received assurance from Cook Associates, En
• -its that the 16" diameter pipeline has been installed in
gineering Consultai and that continuous inspec-
substantial compliance with the approved plans a
tion by Cook Associates staff members was accomplished, and
WHEREAS, the Notice of Completion was recorded October 26, 1978, and
the effective bonds arf.,,. Payment and Performance: Bonds Y5789-6463 issued by
Industrial Indemnity Company; and
WHEREAS , Dart has, now offered to convey said, system to the Distr;, ct
by Grant Deed; and
WHEREAS , the. District has found and determined that said water s�ls-
2
rem is in cond it i on to be accepted by the Dist r ict subject to the terms
and co nditions stated herein.
NACTED by the Board of Directors of the Truckee
NOW, THEREFOREO BE IT E
.6
Donner Public litility District as follows'
1 . The District does hereby find and declare that the Tahoe
1 System, Phase 11 , is
Donner Off-Site te:,Water Transmossion
complete.
diameter transmission main
2. The �)1400 .11neal foot OF' W
is hereby accepted in-to the Truckee
�^,rjow n a s) Fhase, 11
U t i I it District water distribution sys-
Donne r P LAA i C I
tem for operation and ma. entenance-
Passed and adopted by the Board of Directors of the Truckee Donner
Public Utility Dist,vict at a meeting thereof held within the District
t h i s 5thday of February 1979, by the -following roll call vote:
:►
�-I t.i h F�r- Kuttel Sutton 10 Maass
AYES:
NOES: N n
ABSENT. H.,a t c I
TRUCKEE DON14ER PUBLIC UTILITY DISTRICT
B
a Aes A. Maass President
,
A,rTEST:
V
1.4 M 41 11on S eyl-no LI r
'I e r k f t he D i s r i c.t.
CERTIFICAT' OF POSTING
ORDINANCE NO. 79A �
TRUCK.rE E DONNE PUBLIC UTILITY DISTRICT
ORDAINING THiE APP ROVAL AND ACUEF'TANCE OF THE 'TAHOE DONNER
-SITE WATER. TRANSMISSION SYSTEM, PHASE 11
OFF
tat. STATE OF CALIFORNIA :>
COUNTY OF NEVADA
The unders i gned Susan M. Craig, Linder penalty of perjury, certifies
il S F0 I I ovqs
retary of the Truckee Donner Pub] ic
That f c.)r and on hc-Jit,I f of the Sec.0
E_%
liti I i ty D i str,ict� ►I C-aw-, ,d copies of 0 dinance No. 790Z, an Ordinance
-)f the Tahoe Donner off-site Water
orda•ining the approval and a cceptance
Transmission System, Whase 11 , adopted by the Board of Dircsctors of said
D i iv- 1979, t,(-.) be posted within thirty (30) days
fol lowing, adaption i n four places within said District, to wit:
1 . Nevada Cciunty Governi-tient Center
Nevada County Library , Tr-Llckee Branch
3 Uniteld Srates Postal Service Office .......
.
4. Truckee Doviner Publ is lit.1 ) ity_District ......
-1979-
a S i d osting w(is cOmpleted on the day o
,) p
1979.
Executed on th(-?
00
1i�ve e cretatry
.)tjsan M. Craig, Executive