Loading...
HomeMy WebLinkAboutRES 1980-84 - Board RESOLUTION NO. 8084 OF THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT AUTHORIZING FILING OF TRUCKEE DON14ER PUBLIC UTILITY DISTRICT MARTISWOODS/SIERRA PINES ANNEXATION WITH PLACER COUNTY LAFCO WHEREAS, the Board of Directors of the Truckee Donner Public Utility District has previously authorized the investigation of the feasibility of annexation of additional lands, and WHEREAS, the area located south of the existing District boundaries and descrip tions attached hereto, marked "Exhibit A," has been found feas ible for annexation into the Truckee Donner Public Utility District; and WHEREAS, requests for annexing of the Martis Wood Subdivision and Sierra Pines Subdivision to the Truckee Donner Public Utility District were received from all owners of property within the subject area; and WHEREAS, the District Engineer has made various recommendations re- specting the conditions of annexation; NOW,r THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: That the staff of the Truckee Donner Public Utility District shall prep are all necessary documents for the proposed annexation which shall be titled Martis Woods/Sierra Pines; That conditions of the proposed annexation shall be that the develop- ers of the Martis Woods Subdivision and the Sierra Pines Subdivision ac- complish the following or provide the equivelant. 1. Refit. the Southside Booster to provide greater capacity in accordance with the full development demands of the proposed Subdivision. 2. Refit the Ponderosa Palisades Booster to provide greater capacity in accordance with the, full development demands of the proposed subdivision* 3. Provide a loop tie between Ponderosa Drive and Evergreen Circle to provide additional distribution system capacity. 4. Provide an 8" diameter loop construction between the pro- posed developments and Silvertip Drive* 5. Provide a 100,000 gallon surface mounted storage tank at an approximate elevation of 6,390 MSL with appropriate piping. 6. Provide an 8" diameter loop construction connecting with the off-site loop described in Item 4 above. 7. Provide a 6" diameter loop construction throughout* 8. Provide a duplex booster station designed to function with Item Number 5. 9. Provide a surface mounted 200,000 gallon steel storage tank on the west parts of Lots 84 and 85 of Martis Woods Subdivision. Provide 1501 x 1501 deeded parcel for the booster in 3 above and the tank. 10. Facility fees shall be charged to the developments in accordance with the schedules and analysis provided in the guidelines, rules and regulations. Page 1 of 2 11. The developers shall be required to provide the neces sar submi ssions as detailed in the guidelines and y standards prior to the issuance of a will serve letter that would be tied to the development agreement as pro- vided in the rules, regulations, standards and guide- lines. Further, that the staff shall file said application for annexation with the LAFCo of Placer Countyo Passed and adopted at a regular meeting of the Board of Directors of the Truckee Donner Public Utility District duly called and held in said District on the 1st day of December, 1980, by the following roll call vote: AYES: Duffy, Kuttell Maasso Sutton and Huber. NOES: None. ABSENT: None. TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Roberta Huber, President ATTEST: Susan M. Craig, Deputy bestrict Clerk Page 2 of 2