Loading...
HomeMy WebLinkAboutRES 1980-19 - Board ORIGINAL RESOLUTION 8019 FINDING THAT THE WATER SYS TEM IMPROVEMENTS , WELL HAZARD ELIMINATION AND PIPE LINE REPLACEMENT PROJECT ' WILL NET HAVE A SIGNIFICANT EFFECT ON THE ENVIRONMENT - AND DIRECTING THE FILING NOTICE OF EXEMPTION WHEREAS : The staff of the Truckee Donner Public Utility District has conducted an Environmental Impact Assessment of the proposed. Project in accordance with the District Guideline i lementing the C.E.Q.Ae of 1970; and WHEREAS : The Board of Directors in open session discussed the staff assessment and invited public comment; and WH EREAS : Each Director has personal knowledge of the Truckee area that supplements the assessment and public comment. NOW THEREFORE BE IT RESOLVED that the proposed Well Hazard Elimination and Pipe Line Replacement Project, is hereby found not to create a s ignif icant env ironmental impact, specifically in the following areas: 1. The Project will not have the potential to degrade the quality of the ,env ironment or curtail the range of the env ironment; 2. The Project will not achieve short term, - to the disadvantage of long term, environmental goals; 3 . -The Project will have no impact which 'are individually limited, but cumulatively considerable; 4. The Project will not cause substantial adverse effects on human beings, either directly or indirectly. 5 . The Project is categorically exempt for C .E.Q .A. BE IT FURTHER RESOLVED THAT a Notice of Exemption be' prepared and filed with the Nevada County Clerk at the earliest opportunity. PASSED AND ADOPTED this 26th day of March 1980 by the following vote: AYES ., Huber, Maass, Kuttel NOES : None ABSENT: Hatch, Sutton TRUCILEE D4NNER PUBLIC UTILITY DIST. ATTEST: L Karl Kutte�l, President. 1 � � PJ OTi CF OF FILINGORIGINAL . CATEGOR I CAL EX E�il PT I ON - Responsible Agency: TRUCKEE DONNER Contact: Phone PUBLIC UTILITY DISTRICT A. Milton Seymour. 91.6-587-3896 Address: City: County: Zip:. P.O. Box 3o9 Truckee Nevada 95734 Project litieWe11 Hazard Elimination and Pipe -Line Area: Zoning: Rep lac ement P roj e c t N/A N/A . . . ...:. Project Location: At Va rious Locations Assessor's Parcel No.: Throughout the District � N/A Project Desciption & Benefits : The Project tiri.11 accomplish the plugging 'of the existing Donner Creek Well to eliminate the potential contamination of the ground water' source of supply. Additionally, the Project will identify, locate, quantify* . and repair maj or system losses that Will result in the saving of approximately 90.1000 KWH of energy annually and prevent the needless extraction -of 250 acre feet of ground water annually. .Findings: 1. An Environmental Assessment has been prepared by the Staff and 'P reviewed by the * Board. 2. An Environmental Impact Report has not been prepared. 3 . . The Project is categorically exempt from C .E.Q.A. per Section 3.5 Class II of the District Implementation Guidelines. ' . i D°fe: March 26., 1980 Attest: County Clerk � Filing Data Signed Karl Kutt6l 7iile President of the Board As Milton S-e-ymour 01 Clerk & Gen. Manager