Loading...
HomeMy WebLinkAboutRES 1980-02 - Board �r RESOLUTION NO. 80 02 OF TRUCKEE DONNER PUBLIC UTILITY DISTRICT AUTHORIZATION To SIGN AND FILE .A. PETITION FOR A REVISED DOMESTIC WATER PERMIT FOR SOUTHS IDE WELL #2 WITH THE STATE DEPARTMENT OF HEALTH SERVICES BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District that pursuant and subject to all of the terms, conditions and provisions of Division 5, Part 1, Chapter 7, Sections 4 010 to 4035 of the Cal- ifornia Health and Safety Code and all amendments thereto, relating to domestic water supplies, application by this District be made to the State Department of Health, for a permit to operate a deep water well known as Southside well #2. This well will be used to supplement the water supplies within the serving area of the Truckee Donner Public Utility District. BE IT FURTHER RESOLVED that the President of the Board of Directors of the Truckee Donner Public Utility District is hereby authorized and directed to cause the necessary data to be prepared, and investigations to be made, and in the name of said District to sign and file such application with the said State Department of Health. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting held within said District on the 21st day of January 1980, by the following roll call vote.- AYES: Huber, Kutt el, Maass, Sutton, NOES: None, ABSENT: Hatch. TRUCKEE DONNER PUBLIC UTILITY DISTRICT By _J-.Of� Karl Ku el, President ATTEST A. Milton Seymbur, ,Clerk of the Board .Z" NOTICE OF FILING -'CATEGORICAL E X E N1 P_f 10�1 w .Responsible Agency: Truckee Donner Contact: Mone: Public Util ty District A. MILI-Lon Seymour 587-3896 c�t�ress: City: Count L • . County: P. P.0. Box 309 Truckee Ne' vada 95,734 Project I;tle % Water S ourc e Augmen t a t ibn & Elimii-ia- Aria: Zoning : .Lion ofw System• Losses i ProjWellect 77-1Nn...2 Recon- 4/ • _ e -de N/A N/A- t • • • r r, ProieCt 'Location; Assessors Parcel No.: S ouths ide Complex ad •ace' nt .'to State Hwy 267 19-45-41 - • Pm ect Desciption 8. E ene ifs The pro"Pect entails the removal .off• the demol-ished bu�.�.din salsa in g exis t3-,ng equi merit •and the• reconstruction• if the opump bti ding and contr• ls . Reconstruction of the urn station Vail re--establish thie existin .. p p g source o f . . supply. to. meet . existing near termpeak v7ater deinands . • Findings: .1 A .Preliminarytntiirbnmental Assessment . has been _ prepared. . 2 . The, .pro3ect is categorically exenl-)t :from C .E-. .A.-. per- Sectio*rl .. 3 .5. Class -11 'of the District Guideline's'. • Dole: ..� , t-.,� At!e.0. • County Clerk SCI 7 '' ~ c :� de•nt of the Board �� �.e s A• Milton "S nmou•r' Clerk & General Mgr,