HomeMy WebLinkAboutRES 1980-01 - Board RESOLUTION NO. 8001
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
APPROVING THE PLANS, SPECIFICATIONS AND BIDDING
DOCUMENTS FOR THE RECONSTRUCTION OF SOUTHSIDE WELL NO. 2
BUILDING' AND CALLING FOR BIDS
WHEREAS, various improvements to the District's Southside Well No. 2
were provided by Ce W. Roen Construction Company as a part of the District's
Water Source Augmentation and Elimination of System Losses, Project 77-1; and,
WHEREAS., on or about August 30 1979, the Southside Well No 2 Pump
Building was destroyed by malicious acts of a person as yet unknown, utiliz-
ing a cat D-8 as the implement of destruction; and,
WHEREAS, the water source provided by Southside Well No. 2 is an es-
sential element in the District' s water supply capabilities and must be placed
on line at the earliest date.
NOW THEREFORE BE IT RESOLVED as follows:
1. That the plans, specifications and bidding documents are hereby
approved,
2. Bids shall be opened in the District Office at 4:00 P.M. , Feb-
ruary 29, 1980 and publicly read aloud.
3. The Manager is directed to have the advertisement for bids
published in the Sierra Sun two times prior to the bid open-
4
ing,
PASSED AND ADOPTED this 7th day of January, 1980, by the following
roll call vote:
AYES: Hatch, Huber, Maass, Sutton, Kuttel,
NOES: None.
ABSENT: None,
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
-,7
By
Karl Kuttel President
ATTEST
Milton 'Seymour, 1/6rk of the Board
Re solution #8001
ADVERTISEMENT FOR BIDS
The Truckee Donner Public Utility District, hereinafter •called the Owner invites
separate sealed proposals for performing work as detailed in the documents en-
titled "Plans, Specifications and Contract Documents., for the construction of
Water Source Augmentation and Elimination of System Losses - Project 77-1, Re-
construction of South side Well #2 Building, Truckee, Nevada County, California."
Proposals shall be delivered to the office of the:
Truckee Donner Public Utility District
Post Office Box 309 (Donner Pass Road)
Truckee, California 95734
up until the hour of 4:00 O'clock P.m*,F February 29, 1980, at which time they
will be publicly opened and read aloud.
The reconstruction project consists of removing and disposing of the demolished
Southside Well #2 and reconstructing a replacement building in accordance with
the Plans, specifications and bidding documents therefore.
Plans and Specifications and Contract Documents may be examined or obta ined
at the office of Cook Associates, Engineering Consultants, 2060 Park Avenue,
Oroville, California 95965, or at the District off ice. A copy of said docum-
ments may be obtained upon payment of $20.00 for each set. Said payment is to
be made in the form of a check made payable to Cook Associates. Any bidder, upon
returning such set in good condition within ten days after the bid opening, will
be refunded his payment. Non-bidders will not be refunded their payment.
Attention to bidders is particularly called to the requirements, as to condi-
tions of employment to be observed and minimum wage rates to be paid under the
contract.
The Owner hereby notifies all bidders that it will affirmatively insure that
in any contract entered into pursuant to this advertisement, minority business
enterprises will be afforded full opportunity to submit bids in response to
this invitation and will not be discriminated against on the grounds of race,
color, or national origin in consideration for an award.
Each bidder must deposit with his bid, security in the amount, form and subject
to the conditions provided in the Instructions to Bidders.
The Owner specifically reserves the right to waive any informalities or to
reject any or all proposals,,
No bidder may withdraw his bid within 60 days after ter the actual date of the
opening thereof
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
KARL KUTTEL
President, Board of Directors
ffff
smc 1/7/80