HomeMy WebLinkAboutRES 1981-75 - Board RESOLUTION NO. 81_
OF THE
TRU(.,'K1-;j'E DONNER PU13T.jl'C UTILITY DISTRICT
AUTHORIZING EXECUTION OF THE
CALIFORNIA Efj NERGY COMMISSION
ANEMOMETER LOAN AGREEM11j-NT
WHEREAS, the Board of Directors of the Truckee Donner PubZic Utility
District desires to part ic-&*
pate in the Anemometer Loan Program sponsored by
the California Energy Commission,
NOW, THb.,`RE1-#7ORE, BE IT RESOLVED by the Board o f Directors of the Truckee
Donner PuNic Utility District as foZZows:
7. The President of the Board is hereby authori2ed to execute
and submit the CaZ"&*f-ornq*la Energy Commission Anemometer Loan
Agreement, copy of which has been attached hereto and marked
Exhibit "A I%
PASSL10 AND ADOPTED by the Board of Directors o f the Tru(--.akee Donner PubZic
Utility District at a meeting thereof dWy called and held 11*n the District on
the -19th day of October, 1981J. by the followi 0
ng roZZ caZZ vote.
A Y ES
NOwl kl-3'
ABSENT:
TRUCK Ell-Pi DONNER PUBLIC UTILITY D14c,TRIC-7
By
Roberta C. Huber, President
ATTEST,
Susan M. Craig, Deputy Distrk65t-�CZerk
w
gym:_
t
ANEMOMETER LOAN AGREEMENT
i.uTE OF PROJECT LEADER D. Eugene ene Holt, Genera Z Manager
ORGANIZATION TRUCK EE DONNER PUBLIC UTILITY DISTRICT
ADDRESS P. o. Boy: 309_a .'I'.rurikee Cry l iLrmao 95734
Street city ---State Zip
PHONE 916 3 587-3896
DATE LOANED
DATE TO BE RETURNED DATE ACTUALLY RETURNED
LOCATION OF. INSTRUMENT(S) 1 .
Latitude Longitude E evation
2.
Lati tude Longi tude/El evati on
3.
Late tude Longi tud&/-El evati on
4.
Latitude Longitude E evati on
DESCRIPTION OF SITE(S)
Glacier Tank site - Parse Z 114911, Unit 3 'Tahoe Donner Subdivision
S2tf ma ak ra?j Pump Station, site Parc e 7 Unit 8 Tahoe Donner Subdivision
LOAN ITEI-IS SERIAL n
The California Energy Commission hereby provides the items listed above for your
use during the period beginning and ending
In regard to this agreement, the recipient of the loaned equipment pment shall
designate one individual as the project leader. The project proJ'
and on behalf of the recipient shall agree to: leader personnally
(1 ) Certify that the equipment is in first-class working condition,
(2? Be fully responsible for the equipment and indemnify the California
Energy Commission against any damage or loss while in control
possession of the user, and marestitution upon demand by CEC should
any damage or loss occur,
( 3) Practice due care in using said loaned equipment, for public safety,
and defend, hold harmless, protect and indemnify the California Energy
Commission as owner from and against all claims or demands for
damages, including claims for property damage, personal injury, or
death resulting from equipment transportation or use or from acts on
0
the part of the recipient or recipient' s employees while said equip-
ment is in the control or possession of recipient,
(4) Assume all responsibility for installing, reading, dismantling and
returning the loaned instruments to the California Energy Commission.
E5) Collect and record wind data on a weekly basis.
(6} Provide the California Energy Commission with the wind resource data
on a monthly basis . A minimum of three to six months of wind
measurements will be required by the California Energy Commission to
estimate the long-term resource at a given site, depending on the
region and season in which data is taken. Normal data collection will
be for a period of one year.
(7 ) Assume full responsibility for establishing a wind farm development
plan.
(8) Return all equipment to the CEC, or to a site determined by CEC and
agreeable to recipient.
The California Energy Commission shall :
{1 ) Loan the equipment to the recipient,
(2) Advise the recipient on where to install the loaned instruments.
(3) Provide technical and economic advice for the recipient' s wind farm
development plan,
(4) Calculate the seasonal and annual average windspeed and estimate the
annual energy available based on data received from the recipient,
•
I agree to the terms and conditions set forth i n this agreement,
'00000�"
Proj ect ea er Date CEC Anemometer Loan Date
D. .Eug ene [Jolt 10122181 Program,Coordinator
Genera Manager
A ��_)i /'A "A
Recipient Date CEC Bus i ne ss Services Date
PPCs Iden t 10I12181 Certification
Board of Directors
Either the Program Coordinator or the Project Leader can terminate measurements
at a given site with a 30-day written notice. I f measurements at any site show
little potential , the Cali fornia Energy Commi ssi on reserves the right to remove
the l oaned instruments. Any changes to this agreement, must be i n wri ti ng and
approved by both parties,