Loading...
HomeMy WebLinkAboutRES 1981-56 - Board RESOLUTION NO, 8106,04- IX.Ci OF THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT COMMENDING THE WESTERN AREA POWER ADMINISTRATION PROPOSED ALLOCATION PLAN OF JULY 21 19811 AND FINDING IT TO BE EQUITABLE, FAIR AND RESPONSIVE TO THE NEEDS OF CONCERNED ENTITIES WHEREAS, the Truckee Donner Public Utility District is a preference agency established in 1927 and located in northern California; and WHEREAS the Truckee Donner Public Ut ility District has a current load of some 15,000 kilowatts serving over 5,000 customers, 4,000 of which are residential consumers- and WHEREAS, the Truckee Donner Public Utility District's present system serves an area with over 8,000 undeveloped residential building sites; and WHEREAS, the Western Area Power Administration's allocation plan of- fers the most equitable distribution of power to the most potential users, and WHEREAS, the Western Area Power Administration's plan offers coopera- tion and assistance in the transmission and distribution of power allot- ments to the various allottees; NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows'.-6 1. That the Board, on this date, has detdrmined the Power Marketing Plan prepared by the Western Area Power Ad- ministration on June 2, 1981, to be commendable. 2. That the formulation of the proposed allocation plan set forth in the June 2, 1981, Power Marketing Plan prepared by the Western Area Power Administration is the most eq- uitable, fair and responsive to the needs of all concern- ed entities presented to the District up to this time. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a regular meeting thereof duly called and held in the District on the ,r4?r,'�(,day of 1981, by the f ollowing roll call vote: AYES0- r 77, J NOES: ABSENT: -Z_ TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Roberta C. Huber, President ATTEST: 0,00 e.4 x cza Susan M. Craig, Deputy Dis i"ct Clerk