HomeMy WebLinkAboutRES 1981-21 - Board RESOLUTION NO. 8121
OF THE
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
APPROVING EMPLOYMENT CONTRACT - JAMES HANSEN AND ASSOCIATES
WHEREAS, the Truckee Donner Public Utility District desires to explore
alternative and economical sources of electrical power including hydrogenera-
tion, cogeneration, solar power and coal fired energy producing plants; and
WHEREAS, James Hansen and Associates, Incorporated, consulting engineers,
have proposed to provide engineering work, technical assistance, and consulta-
tion concerning potential power suppliers including Friant Power Authority,
surplus power suppliers in the Pacific Northwest, and power suppliers affil-
iated with the Western Area Power Administration; and
WHEREAS, said engineers have proposed to perform such work in accordance
with the letter Agreement dated February 12, 1981, a copy of which is attached
hereto as Exhibit "A" and incorporated herein by reference, which Agreement has
been read and approved by District Counsel and the Board of Directors;
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee
Donner Public Utility District as follows:
1. That the President of the Board of Directors be authorized to
sign the letter Agreement with James Hansen and Associates dated
February 12, 1981, engaging their services as outlined therein.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public
Utility District at a meeting held within said District on the 2nd day of
March, 1981, by the following roll call vote :
AYES: Kuttel, Maass and Huber.
NOES: None.
ABSENT: Duffy.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Roberta C. Huber, President
ATTEST:
oc Susan M. Craig, Deputy Distri /t Clerk
Reso. # 8121
JAMES HANSEN and ASSOCIATES
Incorporated
CONSULTING ENGINEERS
James C.Hansen Springfield,Vermont
John J.Boudreau P.O. Box 161564 Sacramento,California
Sacramento,California 95816
Local 916-786-5424
Main Office 916-366-6455
February 12, 1981
Truckee-Donner Public Utility District
P.O. Box 3o9
Truckee3 CA 95734
ATTN: Roberta Huber President
Proposal-, Engineering Services for Obtaining a Cost-
Effective Long Range Power SUP2-ly
Dear Roberta:
This proposal details the engineering work and technical assistance
related to the location and obtaining a cost-effective long range power
supply for Truckee-Donner Public Utility District,
All potential power supplies, such as hydrogeneration from Friant
Power Authority, future co-generation and solar power developments , firm
power supplies from Western Area Power Administration, and surplus power
supplies from the Pacific Northwest, and/or coal fired plants located in
Nevada or Utah will be analyzed for cost-effectiveness as long range power
supplies for Truckee-Donner PUD. In the immediate future, a proposal to
Friant Power Authority RFP will be prepared and comments on WAPA marketing
plans for the additional 102 mw will be prepared.
The proposal contained herein is contingent on the approval of the
Board of Directors for Truckee-Donner PUD. Kenneth Peters , California
0
Office Manager and Senior Engineer3 will be assigned to the project and
w ill 'be assisted as necessary by James Hansen and John Boudreau, Registered
Professional Engineers in the State of California.
_QUALIFICATION AND EXPERIENCE
For the past five years , James Hansen and Associates , as engineering
consi-iltants to the State of California, Department of Water Resources , has
been involved in the evaluation of the possibilities of anti-trust actions
against California public power companies , evaluation- of renewable energy
sources , and p reliminary feasibility studies of small scale hydro sites
located within California. The assigned engineers have extensive experience
in determining the value of power and the appropriate wheeling rates , and. in
power negotia:tions in California, Oregon and Washington. Also, the firm has
had extensive- experience in similar work in the Northeastern United States
and particularly in the states of New York and Vermont. Attached are the
0
firin's "Qualifications and Experience"&
g 101100-110
Roberta Huber 2 February 12, 1981
SCOPE OF SERVICES
James Hansen and Associates proposes to undertake the following
10
engineering services for Truckee-Donner PUD:
1) By February 18, 1981, analyze and prepare technical information
for a proposal to answer Friant Power Authority Request for
Proposal to purchase 24 mw of hydroelectric power.
2) By February 27, 1981, prepare comments to WAPA on their power
marketing plan as presented in the Public Information Forum
of January 14, 1981. Included and emphasized should be tech-
nical information and reasoning for the consideration of
Truckee-Donner PUD, a preference agency. Monitor and provide
continuous evaluation of WAPA's market plan until final alloca-
tions have been made; estimated completion is December, 1981,
3) Prepare the necessary engineering data and provide assistance
in preliminary negotiations for wheeling any future power
supplies throughout Pacific Gas and Electric) and Sierra
Pacific Power systems.,
4) Observe the development of, evaluate, prepare necessary proposals ,
and provide assistance in answering any requests to obtain pos-
sible future power supplies.
5) As requested, results of services will be reported, written or
verbally, to the Board,
6) Our continuing services will be provided on demand by the Board
of Directors or its designated representative.
ESTIMATED COST
For calendar year 1981 , we estimate the cost of providing the con-
sulting services outlined above at $5 ,000 and agree not to exceed such amount
without prior approval from the Board of Directors. Billing for consulting
services will be by monthly invoices based upon actual time and expenses in
accordance with our Standard Hourly Rates, a copy of which is attached.
ACCEPTANCE OF PROPOSAL
Acceptance of t1iis proposal by Truckee-Donner may be indicated by
returning one copy with the authorized signature of the appropriate Truckee-
Donner official in the approval block provided below.
s
Roberta Huber
3 February 12, 1981
We look forward to working with Truckee-Donner in its planning
for a long range power supply. If you have any questions , please contact
me.,
Sincerely yours ,
Kenneth B. Peters
California office Manager and
Senior Engineer
KBP/cl
Encl.
cc: James Hansen
APPROVED BY:
(Title.)
DATE: ..
.i
FAMES HANSEN atikd ASSOCIATES
Incorporated
CONSULTING ENGINEERS
James C.Hansen Springfield,Vermont
John J.Boudreau P.O. Box 161564 Sacramento,California
Sacramento,California 95816
Local 916.786-5424
Main Office 916-366-6455
STANDARD HOURLY RATES
February 3 , 1981
The Consulting Engineers ' Standard Hourly Rates allow for basic
salary and personal benefits , including liability insurance, medical
insurance, sick leave, holiday and vacation pay, Federal insurance con-
tributions , workman's compensation insurance, unemployment compensation,
retirement contributions , and similar items . The Standard Hourly Rates
are as follows :
(1) For work performed except for services as an expert
witness :
Consul tiny Engineer $/11our
Principals $50
Professional Staff $25--45
Draftsyneii/Analysts/Teclinicians $15--25
Secretary/Clerical. $10 -20
detained alists -- TI-ie acti-i-c-il hourly rzites not
* j
to exceed $50 , plus 10% to cover the Consulting Engi-
neerls overhead costs and fee.
(2) For services as an ex p ,eve rt witness , excluc *
of time
spent in preparation of testimony and standby which
would be determined pursuant to paragraph ( 1) above ,
at the hourly rates in paragraph (1) plus 25%.
(3) A discount of 1 .5% shall. apply for payment received
within 30 days of the invoice date.
(4) An interest charge of 1. 5% per month shall begin
after 60 days of the 'Invoice date.
(5) Travel time between Sacramento C-And Truckee - $50 per
round trip.
(6) Travel expenses $ .20 per mile.