HomeMy WebLinkAboutRES 1991-25 - Board RESOLUTION NO. 9125
OF THE
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
APPROVING CONTRACT DOCUMENTS, PLANS AND
SPECIFICATIONS FOR THE ARMSTRONG HIGH PRESSURE
PIPELINE PROJECT
AND ISSUING A CALL FOR BIDS
WHEREAS, it is the desire of the District to go forward with
Armstrong high pressure pipeline project; and
WHEREAS, in accordance with the California Environmental Quality
Act Guidelines, a categorical exemption was filed with the County
of Nevada;
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the
Truckee Donner Public Utility District as follows:
1. That the contract documents, plans and specifications
prepared by Sauers Engineering and on file in the
District's Engineering Department are hereby approved.
2 . That the President of the Board of Directors is hereby
directed to issue a call for proposals, and that the date
and time established for the bid opening is 10: 00 AM on
Tuesday, August 27, 199.
3 . That the bid will not be awarded until 30 days from the
filing date of the categorical exemption have expired.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner
Public Utility District at a regular meeting thereof duly called
and held in the District on the 5th day of August 1991 by the
following roll call vote:
AYES: Corbett, Maass, Sutton and Aguera.
NOES: None.
ABSENT: Curran.
TRU EE DONN R BLIC UTILITY DISTRICT
By
&qheilh R. A ra, President
ATTEST:
Su n M. Craig, Deputy Distr' t Clerk
""` smc