HomeMy WebLinkAboutRES 1991-26 - Board RESOLUTION NO. 9126 mom. OF THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT AUTHORIZING EMERGENCY REPAIR WORK WHEREAS, an automobile accident on July 23, 1991 on Ski Slope Drive in the Tahoe Donner Subdivision caused one of the three Tahoe Donner substation transformers to short-circuit, resulting in substantial damage to the transformer; and WHEREAS,the damaged transformer,which was manufactured by General Electric Company, was examined by a General Electric field service technician who recommended that the unit be repaired, at an approximate cost of $55,000; and WHEREAS, a spare transformer was moved to the Tahoe Donner substation to replace the damaged one, but the spare transformer is in poor condition and cannot be expected to operate indefinitely; and WHEREAS, although a new transformer can be purchased, a new transformer could not be received for approximately 12 months; and WHEREAS, General Electric Company has estimated that the damaged transformer can be repaired and returned to use within approximately 10 weeks; and WHEREAS, the District is presently operating without a spare transformer; and WHEREAS, although it might be possible for another company to repair the damaged transformer, General Electric Company can undoubtedly repair the transformer more efficiently and cost-effectively and is the logical choice to repair the transformer; and WHEREAS, Public Contract Code Section 20205.1 requires that the District engage in competitive bidding on any expenditure in excess of $10,000; and WHEREAS, Public Contract Code Section 20205.1 provides that in cases of great emergency, by consent of at least two-thirds of its members, the Board may at once do or cause to be done without notice all repair or replacement work necessary to meet the emergency; and WHEREAS, the District's lack of a spare transformer, its urgent need to have the damaged transformer repaired, and its inability to purchase a new transformer sooner than the damaged transformer can be repaired, constitutes a great emergency, which pursuant to Public Contract Code Section 20205.1, would justify the District dispensing with competitive bidding procedures for the repair of the damaged transformer; and WHEREAS, District Counsel has advised the District that it may dispense with competitive bidding in this situation, for the reasons set forth above, NOW, THEREFORE, BE IT RESOLVED by the Directors of the Truckee Donner Public Utility District as follows: 1. The recitals set forth above are hereby adopted as findings of the Board of Directors of the Truckee Donner Public Utility District. 2. The District General Manager is hereby authorized to dispense with competitive bidding for the repair of the damaged transformer, and is authorized and directed to take all steps necessary to arrange for General Electric Company to repair the damaged transformer and return it to use as soon as possible. -2- PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting thereof duly called and held within said District on the 5th day of August 1991, by the following roll call: AYES: Aguera, Corbett, Maass, Sutton NOES: None ABSENT: Richard Curran TRUCKEE DONNER PUBLIC UTILITY DISTRICT By: osEoh Aguera, sident ATTEST: Susan M. Craig, Deputy District Cler -3-