HomeMy WebLinkAboutORD 1992-03 - Board ORDINANCC NO 9203
.� .:::
OF THE
.. ......... .......... .... L ...........................
TRUCKEEDON ......
NER PUB IC 0 TIL 1.TY DIS TRIC T
ESTABLISHING ELECTRIC CONNECTIONAND FACILIT/ES
FEE SCHEDULE
WHEREAS, are view of the electrical connection fees for both overhead and underground
single phase 1201240 service has re vealed an increase in costs over the past se veral years;
NOW, THEREFORE, BE l T ENACTED by the Board of Directors of the Truckee Donner
Public Utility District as follows:
1. Effective 30 days from the date this ordinance is adopted, the
EL EC TR/C CONNECT/ON AND FA CIL/T/ES FEES
SCHEDULE, a copy of which is attached hereto, shall go into
effect and prior electric and connection facilities fee schedules
shall be rescinded.
2. The Clerk of the Board is hereby directed to post and publish
this ordinance in accordance with state law.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility
District at a regular meeting thereof duly called and held within said District on the 6th day
of April 1992, by the following roll call vote:
A YES.- Corbett, Curran, Maass and Sutton.
NOES. None.
ABSENT.- Aguera
TRUCKEEDONNER PUBL/C UT/L/TYD/STR/CT
BY-
J0694R. Aguera, Pr " ent
A TTES
Susan M. Craig, Deputy District erk
smc
ELECTRIC CONNECTION AND FACILITIES FEES
Applicability
The charges hereunder are applicable to all applicants for service at locations not
previously served by the District or where the serving capacity of an existing service is
increased to greater than that previously served by the District. The initial charge for
service to applicants under the District's electric tariff shall consist of a connection fee and,
if applicable, a facilities fee as appears following:
ELECTRIC CONNECTION AND FACILITIES FEE SCHEDULE
SIZE AND TYPE OF SERVICE CONNECTION FEE FACILITIES FEE
A) SINGLE PHASE. 120/140 SERVICE
THREE-WIRE OVERHEAD
1) Temporary Actual cost -0-
2) Permanent connection to structure $625 Residential $200
Commercial $40/KW
3) Temporary connection to customer
owner power pole and subsequent
transfer to structure $800 Residential $200
Commercial $40/KW
B) SINGLE PHASE. 120/240 SERVICE
THREE-WIRE UNDERGROUND
1) Permanent connection to structure $850 Residential $200
Commercial $40/KW
2) Temporary connection to customer
owned power pole; removal of same
and installation of underground
permanent service to structure $1,075 Residential $200
Commercial $40/KW
C) THREE PHASE. 208. 240 OR 480
KV SERVICE
FOUR-WIRE OVERHEAD
1) Permanent connection to structure Actual cost $40/KW
2) Temporary single phase 120/240
service for construction purposes -
to become three-phase permanent $175 -0-
D) THREE PHASE, 208, 240 OR 480
KV SERVICE
FOUR WIRE UNDERGROUND
1) Permanent connection to structure Actual cost $40/KW
2) Temporary single phase 120/240
service for construction purposes -
to become three-phase permanent $175 -0-
smc 4/7/92
ORD 9203