HomeMy WebLinkAboutRES 1992-33 - Board RESOLUTION NO. 9233
OF THE
_TRUCKEE DONNER. PUBLIC UTILITY DISTRICT . ...
APPROVING PLANS, SPECIFICATIONS AND CONTRACT
DOCUMENTS AND ISSUING A CALL FOR BIDS
FOR CONSTRUCTION OF GEOLOGIC TEST HOLES
WHEREAS, District staff has recommended, and the Board of Directors of the Truckee
Donner Public Utility District has agreed, to go forward with construction of geologic test
holes; and
WHEREAS, Consulting Engineer Keith Sauers has prepared plans, specifications and
bidding documents for the project and District Counsel has reviewed and approved those
documents; and
WHEREAS, Consulting Engineer Keith Sauers has prepared and filed a categorical
exemption on the project with the County of Nevada as required by the California
Environmental Quality Act;
NOW, THEREFORE, BE 1 T RESOL VED by the Board of Directors of the Truckee Donner
Public Utility District as follows:
1. That the plans, specifications and bidding documents on file in the District's
Planning Department be approved and advertised in an appropriate manner.
2. That the date and time of the bid opening be scheduled for 10:00 A.M. on
September 2 9 ,1992.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held
within the District on the 8th of September 1992 by the following roll call vote:
AYES: Corbett, Curran, Maass, Sutton and Aguera.
NOES: None.
ABSENT. None.
TRU EE DONNER PUBLIC UTILITY DISTRICT
By
a-
Jo!epA . Aguera, Plesident
ATTE _
Susan M. Craig, Deputy Distrf& Clerk
smc