HomeMy WebLinkAboutRES 1993-46 - Board RESOLUTION NO. 9346
OF THE
TRUCKEE D ONNER PUBL IC U TIL I T Y DIS TRI C T
APPROVING PLANS, SPECIFICATIONS AND CONTRACT
DOCUMENTS AND ISSUING A CALL FOR BIDS ON PROPOSITION 55
GEOLOGIC TEST HOLES 11 AND WELL REHABILITATION PROJECT
WHEREAS, District staff has recommended, and the Board of Directors of the Truckee Donner Public Utility
District has agreed, to go forward with the Geologic Test Holes !! and Well Rehabilitation Project, a
component of the Prop 55, Safe Drinking Water Bond Law Program; and
WHEREAS, Consulting Engineer Keith Sauers has prepared plans, specifications and bidding documents
for the project and District Counsel has reviewed and approved those documents; and
WHEREAS, Consulting Engineer Keith Sauers has prepared and filed all the environmental documents on
the project as required by the California Environmental Quality Act;
NOW, THEREFORE, BE 1T RESOLVED by the Board of Directors of the Truckee Donner Public Utility
District as follows:
1. That the plans, specifications and bidding documents on file in the District's
Planning Department be approved and advertised in an appropriate manner.
2. That the date and time of the bid opening be scheduled for 2:00 PM on
Wednesday, November 24, 1993.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District
on the 1st day of November 1993 by the following roll call vote:
AYES: Jones, Maass, Sutton and Aguera.
NOES: None.
ABSENT: Corbett.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
se h R. Aguera, Presi ent
�')zv 4
ATTEST
Susan M. Craig, Deputy Districdblerk
smc