HomeMy WebLinkAboutRES 1993-48 - Board RESOLUTION NO. 9348
OF THE
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
AUTHORIZING THE TRANSFER OF FUNDS FROM ELECTRIC FACILITIES
FEES TO THE ELECTRIC GENERAL FUND
WHEREAS, the State of California adopted, in 1988, AB 1600 which regulates the manner
in which this District shall administer the collection and use of facilities fees; and
WHEREAS, this District adopted Ordinance No. 8903 entitled Water and Electric Facilities
Fee Ordinance and also adopted an administrative code for implementation and collection
of facilities fees; and
WHEREAS, this District, in 1993, adopted an electric system master plan to guide its
electric system expansion as development occurred, and
WHEREAS, this District has collected facilities fees prior to and subsequent to the
effective date of AB 1600, and
WHEREAS, projects have been undertaken by this District that qualify for facilities fee
expenditure; and
WHEREAS, District staff has prepared a report entitled "Report on Facilities Fees
Reimbursement for Electric Projects;"
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner
Public Utility District as follows:
1. That it adopts the Report on Facilities Fees Reimbursement for Electric Projects
as its finding.
2. That it approve the transfer of the following electric facilities fees to the electric
general fund.
WO# DESCRIPTION AMOUNT ZONES
93-64107 Recloser& fuse 2,227.90 All zones
coordination @
TD/RW Beck
93-64001 Recloser installation 69,051.36 All zones
at TD sub
93-64013 Recloser installation 1,203.37 All zones
at Truckee Sub
93-64112 Recloser installation 8,755.88 91 & 92
at Donner State Park
93-64012 Redesign Truckee 23,274.09 All zones
substation
93-64114 Reconductoring - 55,397.99 All zones
Donner Pass
93-64115 Reconductoring - 116,217.92 All zones
Donner Pass
93-64109 Rebuild downtown 7,068.15 81
alley
93-64110 Pole replacement- TD 50,495.39 All zones
- 62
93-64118 Pole replacement- TD 5,516.77 All zones
- 61
93-64119 Pole replacement- TD 3,586.84 All zones
- 63
93-64111 Circuit 3 - Bernese 45,721.42 All zones
92-64007 U/G Feeder 3, TD - 63 138,643.14 All zones
93-64113 Three phase loop - 26,259.74 All zones
Sitzmark to P/H
92-64103 Three phase loop - 8,235.60 91
Felton Woods to
Washoe
TOTAL $561,655.56
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held
within the District on December 6, 1993 by the following roll call vote:
AYES: Aguera, Corbett, Jones, Maass and Sutton.
NOES: None.
ABSENT. None.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
J0 R. Aguera, PfOsident
ATTES