Loading...
HomeMy WebLinkAboutRES 1993-52 - Board RESOLUTION NO. 9352 'F OF THE TRUCK EE DONNER PUBLIC UTILITY DISTRICT APPROVING PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS AND ISSUING A CALL FOR BIDS FOR GENERATOR CONNECTIONS AT VARIOUS PUMP STATIONS WHEREAS, the Board of Directors of the Truckee Donner Public Utility District has determined to proceed with generator connections at various pump stations; and WHEREAS, funds for this project are included in Proposition 55 funding; and WHEREAS, this project is categorically exempt as a Class 1 Exemption (minor alteration of existing public facilities); and WHEREAS, Consulting Engineer Keith Sauers has prepared plans, specifications and bidding documents and District Counsel John Phelps has reviewed and approved such documents; NOW, THEREFORE, BE 1T RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. That the plans, specifications and bidding documents be approved and advertised in an appropriate manner. 2. That the date and time of the bid opening be scheduled for 2:00 PM on January 18, 1994. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 20th day of December 1993 by the following roll call vote: AYES: Aguera, Corbett, Jones and Maass. NOES: None. ABSENT. Sutton. TRUCKEE DONNER PUBLIC UTILITY DISTRICT a . J es A. Maass, President A TTES T Susan M. Craig, Deputy D" rict Clerk smc