HomeMy WebLinkAboutRES 1994-05 - Board RESOLUTION NO. 9405
OF THE
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
APPROVING PLANS, SPECIFICATIONS AND CONTRACT
DOCUMENTS AND ISSUING A CALL FOR BIDS FOR PIPE
LINING AT THE 1-80 CROSSING
WHEREAS, District staff has recommended, and the Board of Directors of the Truckee
Donner Public Utility District has agreed, to go forward with pipe lining at the Interstate
80 crossing, and
WHEREAS, Consulting Engineer Keith Sauers has prepared plans, specifications and
bidding documents for the project and District Counsel has reviewed and approved those
documents; and
WHEREAS, Consulting Engineer Keith Sauers has prepared and filed a categorical
exemption on the project with the County of Nevada as required by the California
Environmental Quality Act;
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner
Public Utility District as follows:
1. That the plans, specifications and bidding documents on frle in the District's
Planning Department be approved and advertised in an appropriate
manner.
2. That the date and time of the bid opening be scheduled for 2:00 PM on
March 1, 1994.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held
within the District on the 7th day of February 1994 by the following roll call vote:
AYES: Aguera, Corbett, Jones, Maass and Sutton.
NOES: None.
ABSENT.• None.