HomeMy WebLinkAboutRES 1994-14 - Board RESOLUTION NO. 9414 OF THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT RATIFYING AND APPROVING EMERGENCY REPAIR WORK - AIRPORT WELL WHEREAS, the District's Airport Well is the District's most productive water well, and the efficiency and reliability of the District's entire water system is dependant upon the successful operation of the Airport Well; and WHEREAS, on March 4, 1994, a District employee noticed an unusual noise coming from the well pump; and WHEREAS, through communications with the pump manufacturer, B W/I P International, it was determined that it was necessary to immediately repair the pump, and that continued operation of the pump could lead to extensive damage that would require the pump to be out of service for a considerable length of time; and WHEREAS, during the winter and spring of the year it is possible to take the Airport Well out of service for short periods of time, but it would be extremely harmful to the District's - overall water system if it were necessary to take the Airport Well out of service during the summer months; and WHEREAS, it was determined by District staff that it would not be possible to engage in competitive bidding for the work that needed to be done without significant delays which would increase the risk that the Airport Well would be significantly damaged, and increase the risk that the Airport Well would be out of service for a substantial length of time; and WHEREAS, because it is impossible to determine what repair work needs to be done until the pump is actually removed and available for inspection, it would be extremely difficult, if not impossible, to prepare plans and specifications for competitive bidding; and WHEREAS, District staff considered the situation to present an emergency, and therefor District staff immediately engaged Resource Development Company to remove the pump, and further arranged for Brown-Milbery, Inc. of Reno to inspect and repair the pump motor, and arranged to have B W/I P International disassemble, inspect and repair the pump; and WHEREAS, the total cost of the work described above was approximately $14,000; and WHEREAS, Public Contract Code Section 20201 requires that the District engage in competitive bidding on any expenditure in excess of the $10,000; and WHEREAS, Public Contract Code Section 20205.1 provides that in the case of great emergency, by consent of at least 2/3 of its members, the Board may once do or caused to be done without notice all repair or replacement work necessary to meet the emergency; and WHEREAS, the District's need to have the pump immediately repaired and returned to service created a great emergency, which pursuant to Public Contract Code Section 20205.1 would justify the District in dispensing with the competitive bidding procedures for the repair of the Airport Well; NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. The recitals set forth above are hereby adopted as findings of the Board of Directors of the Truckee Donner Public Utility District. 2. The Board of Directors hereby ratifies and approves the actions of District staff in arranging for the immediate repair of the Airport Well, and in dispensing with competitive bidding so that the work could be done on an immediate basis. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting thereof duly called and held within said District on the 18th day of April, 1994, by the following roll call: AYES: Aguera, Corbett, Jones, Maass and Sutton NOES: none ABSENT: none TRUCKEE DONNER PUBLIC UTILITY DISTRICT By: C��V%� (A 'Iry mes Maass, President ATTEST: san M. Craig, Deputy Distr' t Clerk -2-