Loading...
HomeMy WebLinkAboutORD 1999-02 - Board ORDINANCE NO. 9902 OF THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT AMENDING THE DISTRICT'S ELECTRIC CONNECTION AND FACILITIES FEES SCHEDULE WHEREAS the District provides electric service to residential and commercial customers within its service territory; and WHEREAS the District installs overhead or underground electric service lines to residential structures when application is made; and WHEREAS it is a long-standing policy of the District to charge a connection fee that covers the full cost of installing the service; and WHEREAS the district has adopted a policy requiring the installation of underground electric services in specific circumstances because of the economic and aesthetic benefits for the community; and WHEREAS the District wishes to price its electric connection fee to promote the installation of underground services; NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee Donner Public utility District as follows: 1. That effective with the effective date of this ordinance, all portions of prior ordinances and/or resolutions that are inconsistent with the provisions of this ordinance are hereby repealed insofar as they are inconsistent. 2. That the electric connection and facilities fees schedule be amended as set forth in the attached exhibit. 3. If no protest is made pursuant to Public Utilities Code Section 16078, then this ordinance shall be effective as of the date it was adopted by the Board of Directors and the fee adjustment shall be effective 30 days from the date of adoption. 4. That the Clerk of the District shall immediately cause a copy of this ordinance to be published in a newspaper of general circulation and posted in three places within the District PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the second day of June 1999 by the following roll call vote: AYES: Hemig, Maass, Sutton and Jones. NOES: None. ABSENT: Aguera. TRUCKEE DONNER PUBLIC UTILITY DISTRICT By 4(25� -PJZ� , - Peter L. Holzmeister, CI rk of the Board AATT4E :usan M. Craig, Deputy District 1jerk smc ELECTRIC CONNECTION AND FACILITIES FEES Applicability The charges hereunder are applicable to all applicants for service at locations not previously served by the District or where the serving capacity of an existing service is increased to greater than that previously served by the District. The initial charge for service to applicants under the District's electric tariff shall consist of a connection fee and, if applicable, a facilities fee as appears following: SIZE AND TYPE OF SERVICE CONNECTION FACILITIES FEE FEE A SINGLE PHASE,1201140 SERVICE THREE-WIRE OVERHEAD 1. Temporary* Actual cost -0- 2. Permanent**connection to structure $685 Residential$200 Commercial $40/KW 3. Temporary connection to customer $860 Residential $200 owner power pole and subsequent Commercial transfer to structure $40/KW B SINGLE PHASE,1201240 SERVICE THREE-WIRE UNDERGROUND 1. Permanent connection to structure $860 Residential $200 Commercial $40/KW 2. Temporary connection to customer $1,085 Residential $200 owned power pole; removal of same and Commercial installation of underground permanent $40/KW service to structure C THREE PHASE,2098,240 OR 480 KV SERVICE FOUR-WIRE OVERHEAD 1. Permanent connection to structure Actual cost $40/KW 2. Temporary single phase 120/240 service $175 -0- for construction purposes—to become three-phase permanent * Temporary—requires two or more trips ** Permanent—requires only one trip