HomeMy WebLinkAboutRES 2000-01 - Board Public Utility District Resolution No. 2000=01 Setting District Policy Regarding As-built Drawings WHEREAS, the District does not,currently have any written requirements regarding the submission of as-built drawings by developers; and WHEREAS, the District wishes to ensure that as-built drawings are submitted in a format that is compatible with the District's current CAD software (AutoCad) and GIS software; and WHEREAS, the District wishes to implement a refundable project documentation fee at the time a development agreement is signed that would be used to develop as-built drawings if they are not submitted within a given period of time by the developer; NOW, THEREFORE, BE IT RESOLVED by the Board of Directors that the attached policy regarding as-built drawings be adopted and become part of the District's Codes. (See Sections5.01.027, �., 6.04.027 and 7.12.027.) PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the fifth day of January 2000 by the following roll call vote: AYES: Jones, Maass, Sutton and Hemig. NOES: None. ABSENT: Aguera TRUCKEE DONNE UBLIC UTILIT DISTRICT By J. Ron rr"ig, President, Board of Direc rs ATTEST:�& za Peter L. olzmeister, District Clerk smc .. TRUCKEE DONNER PUBLIC UTILITY DISTRICT POLICY REGARDING AS-BUILT DRAWINGS It is the policy of the Truckee Donner Public Utility District (District) to require the submittal of As-Built Drawings on all construction projects where facilities have been constructed and dedicated to the District. DEVELOPER RESPONSIBILITIES The details of the District's As-Built Drawing policy are outlined below. The policy makes numerous references to a party designated as the "Developer." The term "Developer" is intended to refer to the project developer or property owner who is responsible for the construction of the project and the required water and/or electric system improvements. The Developer may utilize other parties or designated agents such as contractors, architects or engineers to perform the duties.and responsibilities outlined in this Policy. However, the failure of a third party to comply with this policy and its obligations shall not relieve the Developer of his responsibilities and shall not imply or impose any obligations upon the District. PROJECT DOCUMENTATION DEPOSIT At the time that the Developer signs the Development Agreement, the District-shall impose a Project Documentation Deposit equal to 5 percent of the construction cost of water and/or electric facilities to serve the project. The minimum deposit shall be $500. This deposit shall be held by the District and refunded to the Developer upon successful completion of the As-Built Drawings as outlined below. The Developer shall not be due any interest on monies held by the District. AS-BUILT DRAWING PROCEDURES During the construction of the project, the Developer shall be responsible for maintaining a set of As-Built Drawings. The basis of the As-Built Drawings shall be the Construction Drawings as reviewed and approved by the District. 1) The Developer shall maintain one set of As-Built Drawings at the Project Site. On these, all project conditions, locations, configurations, and any other changes or deviations which may vary from the information represented on the original Construction Drawings shall be noted, including buried or concealed construction and utility features which are revealed during the course of construction. Special attention shall be given to recording the horizontal and vertical location of all buried utilities that differ from the locations indicated, or which were not indicated on the Construction Drawings. Drawings shall also note the location of any other buried infrastructure such as landscape irrigation, onsite drainage, lighting, hydronic heating, etc. As-Built drawings shall be supplemented by any detailed sketches as necessary or directed to fully indicate the facilities as actually constructed. As-Built Standards Page 1 TDPUD Policy Regarding As-Built Drawings 2) These master As-Built Drawings shall be maintained up-to-date during the progress of the Project. Red ink shall be used for alterations and notes. Notes shall identify relevant changes by number and date. 3) As-Built Drawings shall be accessible to District personnel at all times during the construction period. 4) The As-Built Drawings shall be submitted to the District upon completion of the project. Failure to submit complete As-Built Drawings may result in the partial or full forfeiture of the Project Documentation Deposit. A) Submitted As-Built Drawings will be reviewed by District staff for completeness, accuracy and format. If the As-Built Drawings are found to be acceptable, the Project Documentation Deposit will be refunded to the Developer. If the As-Built Drawings are considered unacceptable, they will be returned to the Developer for correction and resubmittal. B) If the corrected As-Built Drawings have not been resubmitted to the District after 60 days, the District will correct the As-Built Drawings as necessary to conform with this Policy. All costs incurred by the District to perform such work will be deducted from the Project Documentation Deposit and the remainder will be refunded to the Developer. The District may utilize either District personnel or outside contractors to complete the As-Built Drawings. The determination of which party is to perform such work shall be at the sole discretion of the District. Q In the event that the Developer fails to submit As-Built drawings within 60 days .jr of acceptance of the facilities by the District, the District will proceed with development of the As-Built Drawings. Such failure to submit As-Built Drawings shall result in the forfeiture of the entire Project Documentation Deposit, whether or not the Deposit is sufficient to complete development of the As-Built Drawings. AS-BUILT DRAWING FORMAT The Developer shall submit one hard copy of the As-Built Drawings. Drawings shall be 24" x 36" or 22"x 34" and shall be printed on bond paper. The Developer shall also submit electronic files containing the information depicted on the As-Built Drawings. In the event that the Developer does not have the capability of producing electronic drawings, the District will accept the hard copy drawings as fulfillment of the As-Built requirements. However, the cost to the District for scanning, vectorizing and manipulating drawings to develop the required electronic data will be deducted from the Project Documentation Deposit Electronic files shall conform to the following requirements: • File format shall be AutoCad Release 12-14 compatible. As-Built Standards Page 2 TDPUD Policy Regarding As-Built Drawings 0 Files shall be submitted on portable media such as 3.5-inch floppy diskette, ZIP disk or CD-ROM. The media containing the files shall become the property of the District, and will not be returned to the Developer. Files may be compressed in a format that is compatible with the WinZip decompression software. • The Developer shall submit all files used to produce the As-Built Drawings. Drawing files may utilize external references to reduce file size. However, all such reference files shall be included in the submittal. • Drawing layer structure shall be as given in Table 1. The Developer may use any combination of other layer names as desired for other elements depicted in the drawings. However, the relevant infrastructure system facilities shall appear on the designated layers. If certain facilities indicated by a given layer are not included as part of the project, the corresponding drawing layers may be purged from the drawing file. Table 1. Standard Layering Convention Layer Name Description Electric System E-NEW_PR13PH All new underground primary 3-phase circuits to be constructed as part of the project. E-EXIST_PRI3PH All existing underground primary 3-phase circuits. E-NEW_PRIIPH All new underground primary single-phase circuits to be constructed as part of the project. E-EXIST_PRIIPH All existing underground primary single-phase circuit. E-NEW_SEC All new secondary distribution to be constructed as part of the project. E-EXIST_SEC All existing secondary distribution. -- E-NEW VAULT All new vaults,boxes, manholes and other similar underground structures. E-EXIST_VAULT All existing vaults,boxes, manholes and other'simi4ar underground structures. E-NEW_SYSTEM All new transformers, switches,risers and similar structures. E-EXIST_SYSTEM All existing transformers, switches, risers and similar structures. Roadways &Traffic R-EXIST_RW All existing edge of right-of-way within the vicinity of the project under development. The edge of right-of-way for both public and private roads shall be indicated. R-NEW_RW All new edge of right-of-way to be constructed as part of the project under development. The edge of right-of-way for both public and private roads shall be indicated. R-EXIST_EOP All existing edge of pavement within the vicinity of the project under development. The edge of pavement for both public and private roads shall be indicated. R-NEW_EOP All new edge of pavement to be constructed as part of the project under development. The edge of pavement for both public and private roads shall be indicated. As-Built Standards Page 3 TDPUD Policy Regarding As-Built Drawings Layer Name Description R-EXIST_TRAFFIC All existing traffic signals, signal poles, control boxes, sensor loops and similar traffic control devices within the vicinity of the project under development. R-NEW_TRAFFIC All new traffic signals, signal poles, control boxes, sensor loops and similar traffic control devices to be constructed as part of the project under development. R-EXIST_LIGHTING All existing street lighting, light poles, circuits (both underground and overhead), control boxes and similar lighting devices within the vicinity of the project under development. R-NEW LIGHTING All new street lighting, light poles, circuits (both underground and overhead), control boxes and similar lighting to be constructed as part of the project under development. Sanitary Sewer S-NEW PIPE All new sewer mains to be constructed as part of the project under development. Manholes and other appurtenances shall be depicted on separate layers as noted below. S-EXIST PIPE All existing sewer mains within the vicinity of the project under development. Such mains may or may not be a point of connection for new piping to be constructed. S-NEW_LATERAL All new sewer laterals to be constructed as part of the project under development. The depiction of laterals may be stopped where they " enter a structure. S-EXIST_LATER.AL All existing sewer laterals within the vicinity of the project under development. - S-NEW_MH All new sewer manholes to be const wied as part of the project under development. Other new appurtenances such as tees and wyes shall also be depicted on this layer. S-EXIST_MH All existing sewer manholes and appurtenances within the vicinity of the project under development. Storm Drainage D-NEW PIPE All new storm drain piping and culverts to be constructed as part of the project under development. D-EXIST_PIPE All existing storm drain piping and culverts within the vicinity of the project under development. Such piping may or may not be a point of connection for new piping to be constructed. D-NEW APP All new storm drain drop inlets,junction boxes, manholes, headwalls and similar appurtenances to be constructed as part of the project under development. D-EXIST_APP All existing storm drain drop inlets,junction boxes, manholes, headwalls and similar appurtenances within the vicinity of the project under development. Such appurtenances may or may not be a point of connection for new facilities to be constructed. As-Built Standards Page 4 TDPUD Policy Regarding As-Built Drawings Layer Name Description Water System W-NEW PIPE All new main line water piping to be constructed as part of the project under development. Main line piping is all piping to be dedicated to the District and maintained by the District upon successful completion of testing & acceptance of the facilities by the District. Valves and fittings shall be depicted on separate layers as noted below. W-EXIST_PIPE All existing water piping within the vicinity of the project under development. Such piping may or may not be a point of connection for new piping to be constructed. W-NEW LATERAL All new water service laterals to be constructed as part of the project under development. For the purposes of As-Built Drawings only, the lateral is considered all piping from the main line pipe through the meter box to the point of termination. The depiction of laterals may be stopped where they enter a structure. W-EXIST LATERAL All existing water service laterals within the vicinity of the project under development. W-NEW BOX All new water meter boxes to be constructed as part of the project under development. W-EXIST BOX All existing water meter boxes within the vicinity of the project under development. W-NEW VALVE All new main line water valves to be constructed as part of the project under development. Valves shall also include blow-offs, air-release valves,vacuum release valves and pressure reducing valves. W-EXIST_VALVE All existing main line water valves_within the vicinity of the project under development. --' W-NEW FITTING All new main line fittings to be constructed as part of the project under development. Fittings shall include tees, elbows, crosses and hydrants. W-EXIST FITTING All existing main line fittings within the vicinity of-the project under development. W-NEW OTHER All other water system facilities not given above to be constructed as part of the project shall be located on this layer. W-EXIST_OTHER All other existing water system facilities not given above shall be located on this layer. • The size,material, lining and coating of all new water system facilities shall be noted on the plans. • The size and type of all new electric system facilities including conduit, vaults, boxes, service panels and meter panels shall be noted on the plans. • The coordinate system for all as-built drawings shall be California State Plane Coordinates, NAD 83, Zone 2 in US feet. All elevations shall be referenced to the NGVD 88 datum with elevations given in feet. As-Built Standards Page 5 TDPUD Policy Regarding As-Built Drawings • The complete coordinates (northing, easting and elevation) shall be noted for at least three points on the drawings. • In cases where plan and profile sheets cannot completely depict the facilities as constructed, the Developer shall utilize details, sections, elevations or other similar drawings to illustrate the facilities as constructed. Such drawings shall be to scale and the scale shall be clearly noted on the drawings. • All plan sheets shall be to scale and the scale shall be clearly noted on the drawings. • All plan sheets shall have an arrow indicating the direction North. END OF POLICY As-Built Standards Page 6