HomeMy WebLinkAboutRES 2001-19 - Board Public-r `�TRUCKEE DONNER 7,
Resolution No. 2001 =19
AUTHORIZING THE ACCEPTANCE OF THE MARTIS VALLEY PIPELINE PROJECT AND DIRECTING
FILING OF THE NOTICE OF COMPLETION
WHEREAS,the Board of Directors of the Truckee Donner Public Utility District authorized the Martis
Valley Pipeline Project; and
WHEREAS, the contract was awarded to Joe Suter Construction Co., and the contractor entered
into an agreement with the District to perform the work; and
WHEREAS, the District's Water Engineer has recommended that the work be accepted by the
District;
NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows:
1. That the District hereby accepts the Martis Valley Pipeline Project as complete.
2. That the Clerk of the District be directed to file with the County of Nevada the Notice of
Completion, a copy of which is attached hereto.
3. That 35 days following the filing of the Notice of Completion, the 10% retained from the
contractor payments be released to the contractor if no claims have been made to the District by
materiel suppliers or laborers.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the
District on the 20"'day of June 2001 by the following roll call vote:
AYES: Aguera,Van Gundy, Hemig, Sutton and Maass.
NOES: None.
ABSENT: None.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
James 6. Maass, President of the Board
ATTEST:
E -
Peter L. Holzmeister, Clerk of the B and
smc
RECORDING REQUESTED BY:
Truckee Donner Public Utility District
WHEN RECORDED, RETURN TO:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Post Office Box 309
Truckee, CA 96160
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN:
1. That the name and address of the public entity for whom the improvement project was done, as
owner thereof, is the Truckee Donner Public Utility District, Post Office Box 309, Truckee, CA
96160.
2. That on June 20, 2001, the hereinafter described improvements were accepted as complete
pursuant to a resolution of the Truckee Donner Public Utility District,the awarding authority.
3. That the subject improvements of the Notice are generally described and identified as follows:Martis
Valley Pipeline Project
4. That the name of the contractor for such project was:Joe Suter Construction Co.,P.O.Box 3000,
Truckee, CA 96160.
Dated: TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Peter olzmeister, General Manager
STATE OF CALIFORNIA
COUNTY OF NEVADA
2M—tvo
�� �c�v/before me, Susan M. Craig, personally appeared PETER L. HOLZMEISTER, personally
me to be the person whose name is subscribed to the within instrument and acknowledged to me that he
executed the same in his authorized capacity,and that by his signature on the instrument the person or the entity upon
behalf of which the person acted, executed the instrument.
Witnes y hand nd offici seal.
SUSAN M. CRAIG
Cornmisdon#1147474
usan M. Craig, Notary �},1@MyCcffvn.EipI
Not ry Public-Collt xRld
Nevada County
es 19 19.2001