Loading...
HomeMy WebLinkAboutORD 2003-05 - Board TRUCKEE DONNER !U1 PUblic Utility District Ordinance No. 2003- 05 AMENDING THE ELECTRIC RETAIL RATES AND AMENDING THE ELECTRIC CONNECTION CHARGES WHEREAS District staff has prepared a budget for District operation for 2004; and WHEREAS,on December 17,2003 a public hearing was held to receive comments from the public concerning the 2004 budget; and WHEREAS THE Board has adopted the budget for 2004; and WHEREAS the budget for 2004 recommends that electric retail rates and electric connection charges be increased to cover increases in costs of providing District services; and WHEREAS on December 17, 2003 a public hearing was held to receive public commends on proposed rate increases; NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee Donner Public Utility District as follows: Section 1. Effective 30 days from the date this ordinance is adopted the following monthly electric rates shall be effective. Domestic Electric Rates: Permanent Residents Rate P 10 Customer Charge: per month $5.00 Energy Charge per kilowatt-hour $0.114 Domestic Electric Rates: Non-Permanent Residents Rate S 10 Customer Charge: per month $5.00 Energy Charge per kilowatt-hour $0.130 Small Commercial Rates Rate 15 Customer Charge: per month $9.70 Energy Charge per kilowatt-hour $0.137 Medium Commercial Rates Rate 20 Customer Charge: per month $96.85 Energy Charge per kilowatt-hour $0.0811 Demand Charge per kilowatt of demand $11.11 1 Large Commercial Rates Rate 25 Customer Charge: per month $425.00 Energy Charge per kilowatt-hour $0.0835 Demand Charge per kilowatt of demand $10.62 Section 2. Effective 30 days from the date this ordinance is adopted the following electric connection charge schedule shall be effective. ELECTRIC CONNECTION FEES Size and Type of Service Connection Fee A. Single phase, 120/240 service Three-wire overhead 1) Temporary Actual cost 2) Permanent connection to structure $1,155 3) Temporary connection to customer-owned $1,418 power pole and subsequent transfer to stru ctu re B. Single phase, 120/240 service Three-wire underground (overhead transformer) 1) Permanent connection to structure $1,155 2) Temporary connection to customer-owned $1,418 power pole; removal of same and installation of underground permanent service to structure C. Single phase, 120/240 service Three-wire underground (padmount transformer) 1) Permanent connection to structure $1,155 2) Temporary connection to customer-owned power pole; removal of same and installation $1,418 of underground permanent service to structure 2 Section 3. If no protest is made pursuant to Public Utilities Code Section 16078, then this ordinance shall be effective thirty days after adoption by the board of directors of the District. Section 4. The Clerk of the District shall immediately cause a copy of this ordinance to be published in a newspaper of general circulation and posted in three places within the District. Section 5. The provisions of other Ordinances shall remain if effect to the extent that they do not conflict with this ordinance. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting duly called and held within the District on the seventeenth day of December 2003 by the following roll call vote: AYES: Directors Aguera, Hemig, Maass, Sutton and Van Gundy NOES:None ABSENT: None TRUCKEE DONNER PUBLIC UTILITY DISTRICT By S 5 Jame . Maass, President of the Board ATTEST: Peter L. Holzmeister, Clerk of the Board bhc 3