Loading...
HomeMy WebLinkAboutRES 2004-08 - Board ` TRUCKEE DONNER Resolution No. 2004- 08 PROVIDING FOR CONSTRUCTION OF A WATER PIPELINE EXTENSION IN HIGH STREET WHEREAS Truckee Donner Public Utility District(District)serves water in the Truckee Community for domestic and fire protection purposes; and WHEREAS to accomplish that task the District builds and maintains a water distribution system in accordance with certain engineering and construction standards; and WHEREAS District experiences significant growth in customer base resulting in an increase in demand for water for domestic and fire protection service; and WHEREAS District has a long term policy requiring that development pay its own way by paying for facilities that are required to serve the load it places on the District's system for domestic and fire flow service; and WHEREAS District policy recognizes that District has an obligation to current and future customers ...�. to have in place a water distribution system that meets certain performance standards relating to pressure, water quality and fire protection, and prepares a Water System Master Plan to guide the District in development of its water system; and WHEREAS said Master Plan calls for construction of a water pipeline extension in High Street to provide a loop for water quality for existing customers to be funded with facilities fees; and WHEREAS construction of said loop in High Street has not been scheduled for construction for several more years; and WHEREAS the Town of Truckee has announced that it intends to perform pavement restoration on High Street; and WHEREAS the Town and District attempt to coordinate construction of water pipelines such that District does not cut recently paved streets; and WHEREAS owners of certain parcels on High Street in Truckee desire to develop said parcels in the future, which by itself could require extension of the pipeline; and WHEREAS each prospective developer of vacant land on High Street proposes to develop at different times; and WHEREAS the Board of Directors finds that it is in the interest of District's current customers and future developers of vacant parcels on High Street to agree to jointlyfund construction of a pipeline - - in High Street at this time to accommodate the Town's paving program; NOW therefore be it resolved by the Board of Directors of Truckee Donner Public Utility District that: 1. District offers to enter into an agreement with the owners of five vacant parcels on High Street,further described as APN 19-081-32, 19-081-33, 19-081-34, 19-081-20 and 19-081- 09,to construct an eight-inch water pipeline on High Street from the western terminus of the existing High Street pipeline to a point of interconnection to an existing pipeline at the Roundabout on Donner Pass Road. 2. Funding for said pipeline extension shall come from contributions from the developers of the vacant parcels on High Street and from the District's previously collected facilities fees. 3. The contribution of funds from District's existing facilities fees shall be 50% of the cost to construct the pipeline extension, not to exceed $50,000. 4. The developers of the remaining five parcels shall pay the remainder of the cost to construct the pipeline extension by contributing equal shares sufficient to fund the remainder of the total cost. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the seventh day of April, 2004 by the following roll call vote: AYES: Directors Maass, Sutton and Van Gundy NOES: None RECUSED: Director Hemig ABSENT: Director Aguera TRUCKEE DONNER PUBLIC UTILITY DISTRICT J es A. Maass, President ATTEST: Peter L. olzmeister, Dis rict Clerk