HomeMy WebLinkAboutRES 2005-22 - Board TRUCKEE DONNER PUblic Utility District Resolution No. 2005 - 22 FINDING AN EMERGENCY SITUATION AT TAHOE DONNER SUBSTATION AND DIRECTING THAT COMPETITIVE BIDDING BE DISPENSED WITH IN CONNECTION WITH THE DISTRICT'S REPLACEMENT OF THE FAILED 5 MVA TRANSFORMER AND THE PURCHASE OF A NEW 5 MVA TRANSFORMER UNIT WHEREAS, one of the three transformers at Tahoe Donner Substation has failed, making that unit inoperative until it is fixed; and WHEREAS, the spare transformer unit is now in service at Tahoe Donner Substation, leaving the substation without a spare unit for other contingencies; and WHEREAS, it is the District's operating practice to have a spare transformer unit at each substation; and WHEREAS, although the District can jury-rig a spare transformer together for use at Tahoe Donner Substation if another transformer failed by paralleling the outputs of existing smaller transformer units stored elsewhere, it is only temporary fix and requires the use of a crane and transport trucks at two locations; and WHEREAS, the District's temporary solution to an additional contingency at Tahoe Donner Substation significantly increases the likelihood of failures and problems due to the very fact of using old equipment connected in a temporary arrangement; and WHEREAS, this temporary solution to an additional contingency will not enable the system to handle the additional load required during the upcoming winter peak demand period; and WHEREAS, it will take approximately 14 to 16 weeks to have the failed transformer rebuilt and refurbished at a cost of$112,000; and WHEREAS, it will take approximately 13 to 15 weeks to purchase and take delivery of a new transformer at a cost of$110,798; and WHEREAS, it will take an additional 3 to 4 weeks to the times quoted above to complete the competitive bid process whether the transformer is rebuilt or replaced; and WHEREAS, the combination of the time to complete the competitive bid process and the rebuilding or replacement of this transformer puts the delivery of the unit squarely within the District's peak demand period of late December and early January; and WHEREAS, the cost to rebuild the failed unit or to purchase a brand new unit is almost equal; and WHEREAS, the lead time to purchase a new transformer is shorter than the time required for refurbishment; and Resolution 2005-22 WHEREAS, the failed transformer is 23 years old and although refurbishment will bring it to like- new condition, it will remain a 23 year old design; and WHEREAS, the purchase of a brand new transformer is therefore the better of the two options available; and WHEREAS, Public Contract Code Section 22050 provides that in the case of an emergency, a public agency, pursuant to a four-fifths vote of the governing body may repair or replace a public facility, take any directly related and immediate action required by that emergency and procure the necessary equipment, services and supplies for those purposes without giving notice for bids to let contracts; and WHEREAS, the District's need to repair or replace the transformer immediately has created a great emergency which, pursuant to Public Contract Code 22050, is justification for the District to dispense with the competitive bidding procedures; NOW THEREFORE BE IT RESOLVED that the Board of Directors of the District adopt the above recitals as its findings; and BE IT FURTHER RESOLVED by the Board of Directors that for the reasons set forth above, the District finds that the failure of the 5 MVA transformer at Tahoe Donner Substation has created an emergency and that the emergency will not permit a delay resulting from a competitive solicitation for bids and that a replacement of the failed transformer is necessary to respond to the emergency. BE IT FURTHER RESOLVED that the District shall therefore dispense with competitive bidding for the purchase of a new 5 MVA transformer for Tahoe Donner Substation from the R.E. Uptegraff Company. BE IT FURTHER RESOLVED that the Board of Directors shall review the emergency action at its next regularly scheduled meeting and at every regularly scheduled meeting thereafter until the action is terminated to determine whether there is a need to continue the action. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 2eh day of July, 2005 by the following roll call vote: AYES: Directors Aguera, Hemig, Taylor and Thomason NOES: None ABSENT: Director Sutton TRUCKEE DONN PUBLIC UT ITY DISTRICT B , y•• J. R He ig, Aresident, B and of Direc s ATTEST: a eo-- .X Peter L. Holzmeister, Cle k of the Board Resolution 2005-22 -- - ------- tILJ U U 1 RX. UPTEGRAFF MANUFACTURING COMTANY .. 120 Uptegraff Drive Phone: (724) 887-7700 P.O. Box 182 Fax: (724) 887-4748 Scottdale,PA 15683 E-mail: sales@uptegraff.com Page 1 of 4 7/26/05 Fax to: 530/587-1189 Phone: 530/582-3969 TRUCKEE DONNER PUD Attn: Mr.Joe Horvath Subject: Transformer RFQ In response to your verbal request,we are pleased to offer the following quotation: 1-5000/5600/6250/7000 WA, single phase, 60 hertz, 55/65° C temperature rise, mineral oil filled(Type ED, Class ONAN/ONAF, sealed tank construction with welded-on main cover suitable for outdoor duty at 6300 feet -ve sea level in an unclassified area;Uptegraff transformer type P. High voltage rated 60000 (350 BIL), L. apped with three 2-1/2%full capacity above and one 2-1/2% full capacity below nominal primary regulating taps; low voltage rated 7200/12470Y(110 kV BIL). Impedance to be 8.0%± IEEE tolerances. Copper windings. High voltage and low voltage terminals to be cover, exposed. Transformer to be equipped with standard ANSI/IEEE/NEMA accessories; full vacuum tank construction; standard alkyd enamel paint finish(3 ails DFT)—color to be ANSI 70; core ground disconnect terminated externally; 3-54 kV high voltage station class lightning arresters; alarm contacts provided on top liquid thermometer, winding hot spot thermometer, liquid level gauge,pressure relief device, and sudden pressure relay; alarm contact enclosure;to also include pressure vacuum gauge; pressure vacuum bleeder device; Knight-Ai& equipment(nitrogen gas control system); H1 equipped with one-100:5 multi ratio, C400 current transformer per phase;X1 equipped with one- 600:5 multi ratio, C400 current transformer per phase;unit to be duplicate to Uptegraff Spec,No. 9717, provided in 1998. Net Each Price ..................................... ............... S 110,798.00 ........................................... The price quoted is f m through promised shipment based on an order being received within 60 days maximum from the date of this quotation. Current shipping leadtime is 13 to 15 weeks(subject to factory loading at time of order entry or release for manufacture), following receipt of an order OR approval of submitted data should it be required. Drawing leadtirne is 5 to 7 weeks ARO. t. iivuacaa r 1LLru %.V LfL,f UUL TRUCTICEE DONNER PUD 7`105 Pane 2 Our terms are net 30 days following date of shipment with unit quoted FOB our plant at Scottdale,PA,with freight allowed and prepaid to first destination(Truckee, CA)----to be in accord with Uptegraff"'Perms and Conditions of Sale" dated 03-01-05. Should you require additional information,please do not hesitate to contact me. sjb Kevin Heide Sales Manager Email copy to: M-K Associates -- ---- - -- L% ,.J q-,, JL L:guar r mr%3 t,u IgJ U U 3 o3�olro� R. E. UPTEGRAFF MANUFACTURING COMPANY TERMS AND CONDITIONS OF SALE GENERAL By acceptance of this quotation.Buyer agrees to pay R.E.Uptegraff Manufacturing Company('`Seiler')the total selling price specified In the quotation and to comply with the terms and conditions of sale speellkd herein. PAYMENT TERMS Payment terms are net cash 30 days from date of shipment,unless otherwise agreed to by Buyer and Seller. If shipment is delayed at the request of the Buyer,payment is due 30 days Prom the date that the Seller would have otherwise shipped the order,as determined at the sole discretion of the Seiler. Irpayment is not received by Seiler within 39 days of the date of shipment,Buyer agrees to pay a service charge of i.S%per month or Fraction thereof on any unpaid balance. PRICE ADJUSTMENTS The total selling price is valid for 69 days 11mm the date of the quotation. If the date of shipment and Invoicing exceeds 90 days from the date of the Buyer's purchase order,material cost Inflationary adjustments may be required. In lift of material cost inflationary adjustments.progress payments locking in material costs at the time of the purchase order world be acceptable to the Seller. TAXES Quoted prices do net include any present or future federal,state or municipal sales,use,excise and similar taxes, unless otherwise shows on the proposal or acknowledgement. Buyer shall pay sold taxes union Seller Is supplied with a legal exemption certificate. SSIPPINC DATE The shipping date of the order as specified in the quotation is approximate and will be computed from date of receipt by Seller of complete and approved specifications from Buyer. •T-"&^NSPORT The Seller shall determine the shipping point,method and route of shipment All ants are quoted FOR Scottdale, PA;and all freight charges are the responsibility of the Buyer unless quoted otherwise by the Seller and accepted by the Bayer. DELAY OR DEFAULT All sale$are subject to(a)nth delay in or Failure of performances by the seller as may be due to coma which substantially isterfcwe with or restrict the supply or availability of any required rawer material or labor,(b)the Seller being able to obtain and to devote the fulfillment thereof the necessary labor,materuft and plant facilities.(c)the effect of governmental regulations and restrictions from time to time in force,(d)causes beyond the room=-hie control of the Seiler,luck as Acts of God,Acts of the Buyer,Acts of Civil or Military Authority,Priorities,Files, Strikes at any Place or Company,Floods,Epidemics,Quarantine Icstrietions.War,Riot,Delays In Transportation or Car Shortage. INSPECTION &ACCEPTANCE Buyer may inspect during manufacture and may witness performance tests. Buyer must reject test and performance data within five(5)days of submission by Seller,or Purchaser it conclusively presumed to have accepted said data. Test data shall be acceptable if it meets the values given Ice the traas&nner performance Specifications subject to the stipulated testing conditions and tolerances. PERFORMANCE TESTED ABUdTY TO WITHSTAND OVERCURRENTS,OVERVOLTAGZ%AND ANY OTHER REQUIREMENTS,SAID ABMITY HAV114G BEEN DEMONSTRATED AND ACCEPTED BY BUYER,SHALL CONSTITUTE A DEMONSTRA- TiON OF FITNESS FOR THAT PARTICULAR PURPOSE AND NO WARRANTY,EXPRESS OR 1MPLIZD. WILL APPLY TO SAID PERFORMANCE THEREAFTER. WARRANTY Seiler warrants that the pods sold hereunder or its manufacture will be of the kind and quality described In the contract and will be free of defects in design,workmanship,and material at the time of shipment. This warranty shall apply only to defects brought to the attention of Seiler within one your from shipment or one year from Installation,whichever is longer,provided that is no event shall this warranty be applicable for longer than 18 months from date of shipment Seller shall,as its sole liability hereunder for breach.cm.ect by repair or replacement,any such defect appearing under proper and normal use. Cos&toward removal of the tramfbrmer(4 from dw job site,loading on the trunk,incoming and ouVainrg tronVorM*x bwwem thr job s&e sad repair fociW unloading after recap and o nstolbstlow shall be directly borne by riot Buyer. This warranty shall not apply if the transformer is operated under conditions of improper installation and misuse,such as,belt not Bodied to,improper overvoltage protection,overcurrent protection or Improper grounding. Failure of a winding(call)Is not,in itself, evidence of a defect as to design,*orkmanslup,or materlais. Seller will not warrant transformers that are not properly Installed in accordance with but not limited to,Seiler'$installation and Maintenance Instructions. Page 1 of 2 ,n'u V A TERMS AND CONDITIONS OF SALE(contd.) 03-01-0 NO EXPRESS WARRANTY AND NO IMPLIED WARRANTY WHETHER OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR USE,OR OTHERWISE(EXCEPT AS TO TITLE),OTHER THAN THOSE EXPRESSLY SET FORTH ABOVE.WHICH ARE MADE EXPRESSLY IN LIEU OF ALL OTHER WARRANTTES,SHALL APPLY TO PRODUCTS SOLD BY US,AND NO WAIVER,ALTERATION,OR MODIFICATIONS OF THE F09EGOiN1G CONDITIONS SHALL BE VALID UNLESS MADE IN WRITINC AND SIGNED BY AN EXECUTIVE OFFICER OF SELLER'S CORPORATION. Additional warranties may be extended by Seller upon request of,and at extra cony to Buyer. SELLER DOES NOT WARRANT TIRE PERFORMANCE OF TRANSFORMERS OR COMPONENT PARTS IF BUYER SPECWMS THE MAKE,THE DESIGN OR THE CONSTRUCTION THEREOF. LINDTATION LIABILITY Seller's liability far any claim of any Idud hereunder shall not exceed the purchase price of the goods. Seiler shall not be liable in any event for special or consequential damages lnduding,but not limited to,loss of profits or revenue,loss of usc,cost of capital,cost of substitute goods,downtime costs or claims of customers of Buyer for suck damages. TERMINATION An order may be terminated by Buyer only on written notice and upon payment of reasonable cancellation charges determined by Seiler. Such charges shall include,but not be limited to,all costs Incurred up to date of receipt of notice of termination plus 15%of the net price as compensation for disruptions in scheduling and other indirect costs. PATENTS Seiler will,at its sole cost,defend all suits instituted against Buyer and pay any damages awarded thereon,Insofar as the cults Involve an infringement of any United States patents,provided that Seller receives prompt notice of the Institution of any such proceedings and Seller is permitted to defend same with its own counsel. Buyer agrees to indemnify and bold harmless Seller from all costs,expenses and liabilities resulting from claims of Infringement of any United States patent or trademark arising from Seller's using the Buyer's designs,specifications,or imtruedons In furnishing goods to the Buyer. RETURNS Sealer will accept the return of goods for credit or replacement only when return authorization has previously been obtained in writing from Seiler. CHANCES If any changes arc requested by Buyer after acceptance of the quotation by Buyer,Seller shall submit to Buyer any adjustments In price„delivery,warranty,and the like occasioned by such change: Seller shall make changes only " alter written assent by Buyer to such adjustments. G&NERAL In the event that titre are any inconsistencies among the inquiry,the quotation,the purchase order,the acknowledgment,or any other writing ackanged between Seiler and Buyer,the following order of precedence shall govern;(a)Seller's acknowledgment;(b)terns on the face of the purchase order:(c)these Standard Conditions of Sale;(d)the Seller's proposal:(a)all other docum enm U.S.EXPORT CONTROLS Buyer warrants that it is and will remain in compliance with all apart and re-export requirea nts,including,but not Waited to the Export Administration Act and regulations,the Arno Export Control Act and regulations.the Trading with the Enemy Act and regulations,and any orders and Licenses issued tlbreunder(collectively the "Export Laws"). Buyer additionally warrants that it has not been,and is not currently,debarred,suspended, prohibited or impaired from exporting„re-exporting,reeeivinfi,purchasing,procuring,or otherwise obtaining say product,commodity,or technology regulated by any agency of the govawneut of the United States. In particular, Buyer,hereby,gives assurance that unless notice is given to and prior authorization is obtained as required by the Export Laws,buyer will not knowingly re-export,directly or indirectly,the goods or technology sold,licensed or otherwise transfarred pursuant hereto or the direct product thereof to any country or reelpWat barred from receiving such goods,technology or direct product thereof pursuant to the Export Laws or otherwise. TAXES AND IMPORT DUTIES Buyer is responsible for any associated taxes,tariffs,and any other imports that may be applied to this shipment. Page 2 of 2